EP-602_-_PANEL_SCHEDULES.PDF
PDF 139 KB Posted
- Attached to
- General Purpose Storage Building, Watervliet, NY Federal contract opportunity
- Solicitation number
- W912DS-18-B-0014
About this file
Corrected EP-602
View the file
Other files for this federal contract opportunity
Show all 50
General Purpose Storage Building, Watervliet, NY has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PANEL NAME SECTION 1 OF 1 VOLTAGE PHASE WIRE NEUTRAL SIZE DESCRIPTION/LOCATION
LP‐1 208/120 3 4 100% ELEC Room
MAIN SIZE MAIN TYPE MOUNTING AIC RATING
100A MCB SURFACE 22KAIC
LOAD VA AMP CKT NO A B C CKT NO AMP VA LOAD
Recp Office 540 20 1 840 2 20 300 CF‐1, CF‐2 Recp Office 540 20 3 840 4 20 300 CF‐3, CF‐4 Recp Restrooms 540 20 5 840 6 20 300 CF‐5, CF‐6 Recp Elect, Fire Pump 720 20 7 1,680 8 20 960 EWC Recp Telecomm Cabinet 700 20 9 1,500 10 20‐2P 800 PTAC‐1 OFFICE
FATX (SEE NOTE 2) 250 20 11 1,050 800
FACP (SEE NOTE 2) 250 20 13 970 12 20 720 Recp Warehouse Recp (Mech Mezz) 720 20 15 1,440 14 20 720 Recp Warehouse Recp Exterior 720 20 17 1,440 16 20 720 Recp Warehouse HEAT TRACE CONTROLLERS 300 20 19 1,020 18 20 720 Recp Warehouse
SPARE 20 21 2,500 20 20‐2P 2,500 IST‐WH
SPARE 20 23 2,500 2,500
SPARE 20 25 1,164 22 20‐2P 1,164 VERU‐1
SPARE 20 27 1,164 1,164
SPACE 20 29 1,750 24 20‐2P 1,750 HEAT TRACE CIRCUIT
SPACE 20 31 1,750 1,750
SPACE 20 33 1,750 26 20‐2P 1,750 HEAT TRACE CIRCUIT
SPACE 20 35 1,750 1,750
SPACE 20 37 1,100 28 20 1100 EF‐4
SPACE 20 39 1,100 30 20 1100 EF‐5
SPACE 20 41 300 32 20 300 E‐TRAP PRIMER
SUMMARY CONN KVA 8,524 10,294 9,630 20
DEM KVA 8,524 10,294 9,630
LOAD SUMMARY VA AMP(A) % DESCRIPTION
TOTAL CONN LOAD 28,448
DEMAND LOAD 22,758
SPARE (CKT BRK) 0
CONN LOAD 28,448
CONN AMP 80
DEMAND AMP 64
DEMAND FACTOR (%) 80.0%
PANEL NAME SECTION 1 OF 1 VOLTAGE PHASE WIRE NEUTRAL SIZE DESCRIPTION/LOCATION
HLP‐1 480/277 3 4 100% ELEC Room
MAIN SIZE MAIN TYPE MOUNTING AIC RATING
100A MCB SURFACE 25KAIC
LOAD VA AMP CKT NO A B C CKT NO AMP VA LOAD
Lighting Warehouse 1250 20 1 2,150 900 Lighting Warehouse 1425 20 3 2,325 2 20‐3P 900 EF‐1, EF‐2, EF‐3 Lighting Warehouse 1070 20 5 1,970 900 Lighting Elec,Mech, Off,Rests 600 7 1,500 900 Exterior Floodlights 810 20 9 1,710 4 20‐3P 900 UH‐1, UH‐2, UH‐3
1000 1,900 900 Dock Leveler 1000 20‐3P 11 2,200 1200
1000 2,200 6 20‐3P 1200 UH‐4, UH‐5, UH‐6, UH‐7
SPARE 20 13 1,200 1200
SPARE 20 15 900 900
SPARE 20 17 900 8 20‐3P 900 Overhead Doors
SPARE 20 19 900 900
SPARE 20 21 940 940
SPARE 20 23 940 10 20‐2P 940 Lift Station (LFS)
SPARE 20 25 0 20 940 SPACE
SPARE 20 27 450 450
SPARE 20 29 450 12 20‐3P 450 Overhead Door
SPARE 20 31 450 450
SPACE 20 33 700 700
SPACE 20 35 700 14 20‐3P 700 EUH‐5
SPACE 20 37 700 700
SUMMARY CONN KVA 8,840 9,225 7,120
DEM KVA 8,840 9,225 7,120
LOAD SUMMARY VA AMP(A) % DESCRIPTION
TOTAL CONN LOAD 25,185
DEMAND LOAD 20,148
SPARE (CKT BRK) 0
CONN LOAD 25,185
CONN AMP 31
DEMAND AMP 24.8
DEMAND FACTOR (%) 80%
File details come from the government source that posted it.