AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Amend the bid schedule.

2. Provide answ ers to questions from interested vendors, for informational purposes only.

3. Incorporate revised w age determination

The bid opening date remains unchanged at 22 September 2016 at 2:00PM EST.

NOTE: Bidders must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by one of the follow ing Methods: In the space provided on the SF1442, by separate letter, or by signing the block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE

MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 28

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Sep-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-16-B-0018

X 9B. DATED (SEE ITEM 11)

23-Aug-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Sep-2016

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-16-B-0018

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0002

Section 00 10 00 - SOLICITATION/CONTRACT FORM

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Base Bid Item - Renovate Bldg 484

FFP

Provide all labor, equipment, appliances, and materials, and furnish and perform all work in strict accordance with the specifications, schedules, and drawings forming parts thereof, subject to the terms and conditions of the contract to construct RENOVATIONS TO BUILDING #484. The work includes, but is not specifically limited to site work, all building trades, structural, MPE/FP and communication systems, except for items below.

FOB: Destination

NET AMT

0002 1 Job Base Bid Item - Final Record Drawing

FFP

All work for the Final Record Drawing Submission (See paragraph 10, of Section

00 73 00). [THIS CLIN IS A PRE-PRICED FIXED AMOUNT OF $50,000]

0003 1 Job OPTION Optional Bid Item No. 1

FFP

Deduct labor and materials for all work associated with removal of raised platform in Training Room #127 in its entirety. Lower doors #28 & #29 to floor level.

Drawing A-109

0004 1 Job OPTION Optional Bid Item No. 2

FFP

Deduct labor and materials for all work associated with removal of window type “F” (at two locations) and type “G” (at two locations). Delete steel lintels. Infill opening with brick veneer. Infill metal stud, insulation, gypsum board at interior side at Type “F”.

0005 1 Job OPTION Optional Bid Item No. 3

FFP

Deduct labor and materials for all work associated with removal of fixed seating in Training Room #127.

0006 1 Job OPTION Optional Bid Item No. 4

FFP

Deduct labor and materials for all work associated with cabinetwork and plumbing in spaces #133, #136 and #137. Please refer to Note #5 below for details.

0007 1 Job OPTION Optional Bid Item No. 5

FFP

Deduct labor and materials for all work associated with cast stone and soldier brick course bands in lieu of EIFS. Please refer to Note #4 below for details.

0008 100 Square

Foot

OPTION Optional Bid Item No. 6

FFP

Replacement materials for all work associated with providing alternate light fixtures A, A1, B, B1, C, C, E, E1, F, K, P, & P1, please refer to Note #3 and #8 below for details. [ESTIMATED QUANTITY]

0009 100 Square

OPTION Optional Bid Item No. 7

Labor and materials for Removal and disposal of concrete, including excavation and backfill, if encountered. [ESTIMATED QUANTITY]

0010 100 Linear

OPTION Optional Bid Item No. 8

Labor and materials for Hand digging around unmarked utilities, if encountered.

[ESTIMATED QUANTITY]

0011 100 Linear

OPTION Optional Bid Item No. 9

Labor and materials for Fixing broken 4" to 6" diameter unmarked utility line, if encountered. [ESTIMATED QUANTITY]

0012 100 Cubic

Yard

OPTION Optional Bid Item No. 10

Labor and materials for Excavation, additional CMU foundation wall extension and backfill for deeper than indicated footings. [ESTIMATED QUANTITY]

0013 500 Square

OPTION Optional Bid Item No. 11

Labor and materials for Removal and replacement of concrete sidewalk.

[ESTIMATED QUANTITY]

0014 1 Job OPTION Optional Bid Item No. 12

FFP

Deduct all labor, materials and equipment for all work associated with demolition and replacement of new roof as shown on the drawings.

0015 1 Job OPTION Optional Bid Item No. 13

FFP

Deduct all labor, materials and equipment for all work associated with repairs of exterior façade, (wall/brick, cast Stone) except at infill locations as shown on the plans.

0016 1 Job OPTION Optional Bid Item No. 14

FFP

Deduct all labor, materials and equipment for all work associated with site work (including drainage, exterior sign…) and landscaping (excluding utility connections and mechanical yard).

0017 1 Job OPTION Optional Bid Item No. 15

FFP

Deduct all labor, materials and equipment for all work associated with construction of new canopies, complete, i.e. Exterior patio, exterior dinner/event patio and both covered entrances as shown on the drawings.

0018 1 Job OPTION Optional Bid Item No. 16

FFP

Deduct all labor, materials and equipment for all work associated with demolition of loading dock, and canopies over entrances.

TOTAL BID

TOTAL BASE BID PRICE FOR LINE ITEMS 0001- 0002 ______________________

TOTAL OPTIONAL BID PRICE FOR CLINs 0003- 0018 ______________________

TOTAL BASE BID & OPTIONAL BID LINE ITEMS 0001– 0018 ______________________

NOTES:

1. Bidders are required to bid on the Base Bid and all Optional Bid Items or their bids will be rejected.

2. Bidders are reminded that they must bid on the issued plans and specifications as amended. Any deviations, conditions or attachments made by the bidder himself thereto may render the bid non-responsive and be cause for its rejection.

3. Option #6: Provide following alternate light fixtures as follows, or equal:

Manufacturer Model #

a. Type “A” Daybrite #2STG217DUNV1/2-EB

b. Type “A1” Daybrite #2STG217DUNV1/2-EBEM

c. Type “B” Ledalite #9505T02LN1XEW

d. Type “B1” Ledalite #9505T02LN1XEWEM

e. Type “C” Focal Point #FW3NS1T81CXXXERCWH

f. Type “D” Capri #CFR6V32U-SH16P

g. Type “E” Chloride #SLNURW

h. Type “E1” Chloride #SLNURW

i. Type “F” Prisma #077498

j. Type “K” Mercury #M88213PL12ASW

k. Type “P” Daybrite #2STG2CF40DUNV1/2-EB

l. Type “P1” Daybrite #2STG2CF40DUNV1/2-EBEM

4. Option #5: Delete the cast stone band on the entire perimeter of the building including gable ends and fascia beams at the covered patios. Delete the cast stone on covered entrances located above elevation 115’-4” including all surfaces and copings. Provide EIFS horizontal band, the profile is to match the former cast stone, on the entire perimeter of the building. The color of the EIFS band is to match the remaining cast stone work. Score the EIFS horizontal band to simulate former soldier course band. The color of the simulated soldier course band is to match the building brick. Provide load bearing 3-5/8” metal studs (14 gage galvanized minimum) at 16 inches on center anchored to masonry substrate and to structural steel members, 5/8” DensGlass exterior sheathing (or approved equal). Provide sealant and backer rod at all joints. Provide complete EIFS system as manufactured by Sto Corporation, Sto-Therm Essence Next or approved equal. Provide manufacturer’s fluid applied air/moisture barrier for the exterior wall sheathing. Provide shop drawings, fabrication drawings, and erection drawings, including structural design of all components, anchors, clips, etc. signed and sealed by a New Jersey professional structural engineer.

5. Option #4: Delete cabinetwork and plumbing in spaces #133, #136, & #137 including cabinets, counters, back and side splashes, type 5 counter sinks, faucets, VTR’s, and all piping back to nearest shut-off valve. Provide paint finish at former cabinetwork.

6. Bid Acceptance Period: Bidders Bids are to be valid for 120 calendar days for bid acceptance from the submission.

7. Line Item Number 0002 is pre-priced at $50,000.00, it’s a firm fixed line item, and the price shown may not be changed. See paragraph 10 of Section 00 73 00

8. Options #1 thru #6: if the cost represents savings it shall be clearly noted in parenthesis, i.e. (##,###.##)

9. Option #1 thru #6: At any time prior to 90 calendar days after Notice to Proceed of the contract, the Government at its option, may execute these Options. Execution of these options will not alter the project completion date of the contract.

10. Options #7 thru #11: At any time prior to 210 calendar days after the Notice to Proceed of the contract, the Government at its option, may execute these Options. Execution of these options will not alter the project completion date of the contract.

11. The Basis of evaluation will be the lowest responsive/responsible bidder calculated based on values of each CLIN: Base Bid (sum of CLIN 0001 thru 0002) minus sum of Options No 1 thru 5 (CLIN 0003, thru, 0007), Option No 6 (CLIN 0008) will be added/subtracted following notation in note 8 above, plus sum of Options No 7 thru 11 (CLIN 0009 thru 0013) minus Options No 12 thru 16 (CLIN 0014 thru 0018)

12. Options 12 thru 16: the government will determine the execution of these options at the time of award.

FY16 Renovate Community/Conference Center, JB-MDL (Lakehurst), N.J.

Amendment #0002

AMENDMENT 0002 to DRAWINGS and SPECIFICATIONS for FY16 Renovation of Community/Conference Center at JB- MDL, Lakehurst, N.J.

TO OFFORERS

The following changes shall be made to the drawings and specifications.

DRAWINGS

1. The following DRAWINGS have been REVISED but NOT REISSUED:

None

2. The following DRAWINGS have been REVISED and REISSUED:

None

3. The following DRAWINGS have been ADDED:

SPECIFICATIONS

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

None

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

None

3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:

Bid Schedule – is here by reissued in its entirety.

4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:

BIDDER’S QUESTIONS AND GOVERNMENT REPLY

(Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors “for information only ”and do not revise the solicitation, plans or specifications.)

1) QUESTION: There is no drawing/roof plan that shows what the structure and roof is supposed to look like without the canopies. Is there one available that can be uploaded, as we won't be able to figure the correct framing or roofing without this?

RESPONSE: No there is no drawing without the canopies. On drawing S-102 delete the structural framing and continue the roof lines at eaves as the main roof.

2) QUESTION: Missing Specs Section - 01 23 00 Bid Deduct Items (Alternates) are mentioned in the Table of Contents, but we cannot find in your bid documents.

RESPONSE: Delete the reference to “Section 01 23 00 Bid Deduction Items (Alternate) “without substitution. The solicitation document itself covers the deduct items as well as the Bid Schedule CLINS.

3) QUESTION: Repair of Exterior Façade - Does all the work on Drawing S-400 and S-401 reference to the exterior façade on bid item #12? Please clarify.

RESPONSE: Yes it does.

4) QUESTION: The drawing shows 600 LF cracks in Existing Masonry in the East, West and North Elevation. We need to know if the total quantity is 600 LF or 1800 LF.

RESPONSE: 600 LF

5) QUESTION: Optional Bid Item - Spec # 01 00 0000 Paragraph 1.4 A calls for option #6 for light fixtures, whereas the Bid Schedule states option #5. Please Clarify.

RESPONSE: A Revised Bid Schedule accompanies this amendment.

6) QUESTION: Spec # 01 00 00 Paragraph 1.4 B calls for option #5 but the bid schedule does not show that item. Please Clarify.

RESPONSE: A Revised Bid Schedule accompanies this amendment.

7) QUESTION: Do you want us to tear-off or demo any of the existing roof? If we're removing the old roof, can we do it all at once? We need to know exactly what materials are under the existing EPDM in order to properly quote the removal if we are to do the removal (ISO, light weight concrete etc.). Do we need to install a temporary roof?

RESPONSE: See drawing D-100, sheet 12 of 116, in the notes, Note 9. Remove EPDM Roof System down to metal deck including membrane, insulation, light weight concrete, etc”. If CLIN 0014, Optional Item 0012, is awarded and once the site is turned over to the contractor, the contractor is responsible for all protective measures which would include temporary protection against the weather. The Government will not direct how the Contractor performs the removal and replace of this Line Item, if awarded.

8) QUESTION: Operable Panel Partitions - For Specification Section 10651 Operable Panel Partitions Panel width of six (6) inches (per paragraph 2.2/D) is not available in an alternate system from a manufacturer on the list of acceptable suppliers.

For the (2) partitions located in Assembly Hall 132, can the panel storage closets/pockets be increased in width to accommodate other systems? Please clarify.

RESPONSE: From the sample list of manufacturers listed in the above paragraph of the question, the operable panel partition specified is available. The Sonicwall/66 may have been used for the basis of design, however, any approved equal, meeting the STC and the NRC values specified, can be submitted for consideration. The sizes of the panels and the storage /closet spaces, as shown on drawing A-10, shall remain as designed.

9) QUESTION: On Sheet A-001, note 135 states the pipe railing to be 1-1/2" OD, but does not state the material to be used for the pipe railings. What material should we assume for the required pipe railings?

RESPONSE: Section 05521, Pipe and Tube Railings, See paragraph 2.3.B for Pipe. Also, pipe railings are shown to be installed in the Mech/Elec Room 141. See Sheets A-100 and A-509.

Since these railings are to be installed in a potentially high-moisture area, these railings are to be of galvanized steel construction.

Wage Determination:

General Decision Number: NJ160039 09/09/2016 NJ39

Superseded General Decision Number: NJ20150039

State: New Jersey

Construction Type: Building

County: Ocean County in New Jersey.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/08/2016 1 01/15/2016 2 02/19/2016 3 02/26/2016 4 03/04/2016 5 04/01/2016 6 05/06/2016 7 05/13/2016 8 06/03/2016 9 07/01/2016 10 07/29/2016 11 08/05/2016 12 08/19/2016 13 09/09/2016

ASBE0089-004 07/01/2015

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR ((includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement))......................$ 40.92 31.83

PAID HOLIDAYS:

The last day prior to the Christmas and New Year's Day observed holiday: 4 hrs. pay.

BRNJ0002-013 05/01/2014

Rates Fringes

Bricklayer.....................$ 38.25 28.26

Work on high stacks: 22% per hour additional.

BRNJ0007-017 06/01/2013

Rates Fringes

Tile finisher..................$ 39.56 22.60 Tile setter....................$ 45.16 27.20

Tile finisher:

Work grouting all epoxy: $10.00 additional per day.

CARP0006-011 05/01/2016

Rates Fringes

CARPENTER

Including Acoustical Ceiling Installation, Drywall Hanging and Formwork....................$ 45.94 57%

ELEC0400-005 05/30/2016

Rates Fringes

Electrician & Cable Splicer (Including Low Voltage Wiring)...$ 46.68 33.50

ELEV0005-004 01/01/2016

Rates Fringes

Elevator mechanic..............$ 52.79 29.985

PAID HOLIDAYS:

New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving Day, and Christmas Day.

PAID VACATION:

Employer contributes 2% of basic hourly rate as vacation pay credit for 6 months to 5 years of service, and 4% for 5 years or more of service.

ENGI0825-020 01/01/2016

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 47.70 29.80

GROUP 2.....................$ 46.05 29.80

GROUP 3.....................$ 43.91 29.80

GROUP 4.....................$ 42.41 29.80

GROUP 5.....................$ 40.69 29.80

Hazardous waste removal work:

Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: 20% per hour additional.

New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided

1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday.

DEFINITION OF GROUPS:

GROUP 1:

Backhoe, Including Backhoe Track; Boom; Concrete Paving Machine; Crane (all types, including overhead and straddle traveling type); Drill (down-the-hole drill, rotary drill, self-propelled hydraulic drill, self-powered drill);

Elevating Grader; Excavator; Front End Loader (5 cu. yd.

and over); Piledriver (length of boom, including length of leads, shall determine premium rate applicable); Trencher

GROUP 2:

Backhoe Loader Combo; Concrete Pumper; Grader/Blade (Finish);

Hoist; Hydraulic Crane, 10 Tons and under; Front End

Loader (2 cu. yd. but less than 5 cu. yd.); Scraper; Side Boom

GROUP 3:

Asphalt Spreader; Bulldozer;Compressor(2 or 3) (in Battery) (within 100 ft.); Forklift; Front End Loader (1 cu. yd.

and over but less than 2 cu. yd.); Lull; Mechanic; Paver, Asphalt; Roller, Blacktop; Tractor;

GROUP 4:

Bobcat/Skid Loader; Compressor (Single); Farm Tractor; Front End Loader (under 1 cu. yd.); Hydroseeder; Roller, Grade;

Pump, Hydraulic

GROUP 5:

Oiler

IRON0011-008 07/01/2016

Northern Third of County

Rates Fringes

IRONWORKER

Reinforcing.................$ 39.24 42.92 Structural and Ornamental...$ 41.54 42.92

IRON0068-012 07/01/2015

Middle Third of County

Rates Fringes

IRONWORKER

Reinforcing.................$ 43.90 20.78 Structural and Ornamental...$ 45.89 20.78

IRON0350-007 07/01/2015

Southern Third of County

Rates Fringes

Ironworkers:

Reinforcing.................$ 45.77 28.75 Structural and Ornamental...$ 46.77 28.75

LABO0008-001 05/01/2011

Rates Fringes

Asbestos Removal Laborer.........$ 28.37 21.62

The removal, abatement, enclosure and decontamination of personal protective equipment, chemical protective clothing and machinery relating to asbestos and/or toxic and hazardous waste or materials which shall include but not necessarily be limited to: the erection, moving, servicing and dismantling of all enclosures, scaffolding and barricades; the operation of all tools and equipment normally used in the removal or abatement of asbestos and toxic or hazardous waste or materials; the labeling, bagging, cartoning, crating, or other packaging of materials for disposal; the clean-up of the worksite; and all other work incidental to the removal, abatement, encapsulation, enclosure, and decontamination of asbestos and toxic or hazardous waste or materials; and, in addition, all work tasks involved in the maintenance and operation of energy resource recovery plants (co-generation plants)

LABO0222-006 07/01/2012

Rates Fringes

LABORER

MASON TENDER:

Brick/Cement/Concrete.......$ 29.85 23.07

LABO0222-009 07/01/2012

Rates Fringes

Laborers:

Asphalt Shoveler, Asphalt Spreader, Common or General Laborer, Landscape Laborer, Pipelayer, Power Tool Operator and Screedman...................$ 29.35 23.07

PAIN0021-034 05/01/2016

OCEAN COUNTY (south of a line drawn between these cities:

Florence to Bustleton to Columbus to Jobstown to Pemberton to Ongs Hat to Chatsworth to Whiting to Pinewald to Ocean Gate to Seaside Heights)

Glazier........................$ 41.28 29.27

Work at 30 ft. above the working surface, or on a swing stage: $1.00 per hour additional.

* PAIN0711-016 05/01/2016

OCEAN COUNTY (north of a line drawn between these cities:

Florence to Bustleton to Columbus to Jobstown to Pemberton to Ongs Hat to Chatsworth to Whiting to Pinewald to Ocean Gate to Seaside Heights):

Glazier........................$ 43.39 22.43

Work welding or using a cutting torch: $1.00 per hour additional.

Work on a swing stage scaffold; on a pipe scaffold providing the working height of the platform is 30 ft. or above; and on motorized lifts provided that the height of the lift platform is above the second floor or above thirty feet:

$1.00 per hour additional.

PAIN0711-018 05/01/2016

Rates Fringes

DRYWALL FINISHER/TAPER...........$ 38.75 22.55

PAIN0711-019 05/01/2015

Rates Fringes

PAINTER (Brush & Roller).........$ 37.76 21.50 PAINTER (Spray)..................$ 40.28 19.98

PLAS0008-007 05/01/2015

Rates Fringes

Plasterer......................$ 36.87 26.33

PLAS0592-036 05/01/2016

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 40.02 31.77

PLUM0009-018 07/01/2016

OCEAN COUNTY (north of a line drawn from the Atlantic Ocean following a line westerly through the middle of the Barnegat Inlet, continuing west through Barnegat Bay into the town of Waretown; then, continuing along County Road Route 532 until County Road Route 532 becomes State Highway Route 72; then, continuing along State Highway Route 72 until it reaches the Burlington County line):

PIPEFITTER (Including HVAC Pipe Installation)...............$ 47.47 35.51 Service and Repair..........$ 37.18 19.88 PLUMBER (Excluding HVAC Pipe Installation)....................$ 47.47 35.51 Service and Repair..........$ 37.18 19.88

PLUM0322-007 05/01/2016

OCEAN COUNTY (south of a line drawn from the Atlantic Ocean following a line westerly through the middle of the Barnegat Inlet, continuing west through Barnegat Bay into the town of Waretown; then, continuing along County Road Route 532 until County Road Route 532 becomes State Highway Route 72; then, continuing along State Highway Route 72 until it reaches the Burlington County line)

PIPEFITTER (Including HVAC Pipe Installation)...............$ 44.42 36.34 PLUMBER (Excluding HVAC Pipe Installation)....................$ 44.42 36.34

ROOF0030-027 05/01/2015

Rates Fringes

Roofer

SHINGLES....................$ 25.00 18.02

SLATE AND TILE..............$ 28.00 18.02

ALL OTHER WORK..............$ 33.65 28.15

Mopper, and operator of felt-laying machine: $.50 per hour additional.

Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensing machine is used: $.50 per hour additional.

PAID HOLIDAY:

The last working day before Christmas, to be paid at the rate of four hours pay.

SFNJ0669-006 04/01/2016

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 48.15 22.36

SHEE0027-009 06/01/2012

SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 43.08 32.52

TEAM0469-004 05/01/2015

Rates Fringes

Truck drivers:

Dump Truck..................$ 37.60 29.085 Off the Road Truck..........$ 37.75 29.085

Hazardous waste removal work:

Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional.

Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional.

Work on a state or federally designated hazardous waste site where the worker is not working in a zone requiring Level A, B or C personal protection: $1.00 per hour additional.

New Year's Day, President's Day, Decoration Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day.

VACATION PAY CREDIT:

Workers working or receiving pay for 80 days within a year receive one week paid vacation (48 hours); 125 days receive two weeks paid vacation (96 hours); 145 days receive 15 days paid vacation (120 hours); 15 years seniority and 145 days receive 4 weeks paid vacation (160 hours).

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION/CONTRACT FORM

CLIN 0007

The CLIN extended description has changed from Replacement materials for all work associated with providing alternate light fixtures A, A1, B, B1, C, C, E, E1, F, K, P, & P1, please refer to Note #3 and #6 below for details. to Deduct labor and materials for all work associated with cast stone and soldier brick course bands in lieu of EIFS. Please refer to Note #4 below for details..

CLIN 0008

The CLIN extended description has changed from Labor and materials for Removal and disposal of concrete, including excavation and backfill, if encountered. to Replacement materials for all work associated with providing alternate light fixtures A, A1, B, B1, C, C, E, E1, F, K, P, & P1, please refer to Note #3 and #8 below for details. [ESTIMATED QUANTITY].

The cost constraint EST has been added.

CLIN 0009

The CLIN extended description has changed from Labor and materials for Hand digging around unmarked utilities, if encountered. to Labor and materials for Removal and disposal of concrete, including excavation and backfill, if encountered. [ESTIMATED QUANTITY].

The unit of issue has changed from Linear Foot to Square Foot.

CLIN 0010

The CLIN extended description has changed from Labor and materials for Fixing broken 4" to 6" diameter unmarked utility line, if encountered. to Labor and materials for Hand digging around unmarked utilities, if encountered. [ESTIMATED QUANTITY].

CLIN 0011

The CLIN extended description has changed from Labor and materials for Excavation, additional CMU foundation wall extension and backfill for deeper than indicated footings. to Labor and materials for Fixing broken 4" to 6" diameter unmarked utility line, if encountered. [ESTIMATED QUANTITY].

The unit of issue has changed from Cubic Yard to Linear Foot.

CLIN 0012

The CLIN extended description has changed from Labor and materials for Removal and replacement of concrete sidewalk. to Labor and materials for Excavation, additional CMU foundation wall extension and backfill for deeper than indicated footings. [ESTIMATED QUANTITY].

The pricing detail quantity has decreased by 400.00 from 500.00 to 100.00.

The unit of issue has changed from Square Foot to Cubic Yard.

CLIN 0013

The CLIN extended description has changed from Deduct all labor, materials and equipment for all work associated with demolition and replacement of new roof as shown on the drawings. to Labor and materials for Removal and replacement of concrete sidewalk. [ESTIMATED QUANTITY].

The pricing detail quantity has increased by 499.00 from 1.00 to 500.00.

The unit of issue has changed from Job to Square Foot.

CLIN 0014

The CLIN extended description has changed from Deduct all labor, materials and equipment for all work associated with repairs of exterior façade, except at infill locations as shown on the plans. to Deduct all labor, materials and equipment for all work associated with demolition and replacement of new roof as shown on the drawings..

CLIN 0015

The CLIN extended description has changed from Deduct all labor, materials and equipment for all work associated with site work (including drainage, exterior sign, grading, seeding, sidewalks, clearing & grubbing …) excluding utility connections and mechanical yard. to Deduct all labor, materials and equipment for all work associated with repairs of exterior façade, (wall/brick, cast Stone) except at infill locations as shown on the plans.

CLIN 0016

The CLIN extended description has changed from Deduct all labor, materials and equipment for all work associated with construction of new canopies, complete, i.e. Exterior patio, exterior dinner/event patio and both covered entrances as shown on the drawings. to Deduct all labor, materials and equipment for all work associated with site work (including drainage, exterior sign…) and landscaping (excluding utility connections and mechanical yard)..

CLIN 0017

The CLIN extended description has changed from Deduct all labor, materials and equipment for all work associated with demolition of loading dock, and canopies over entrances. to Deduct all labor, materials and equipment for all work associated with construction of new canopies, complete, i.e. Exterior patio, exterior dinner/event patio and both covered entrances as shown on the drawings..

CLIN 0018 is added as follows:

0018 1 Job OPTION Optional Bid Item No. 16

FFP

Deduct all labor, materials and equipment for all work associated with demolition of loading dock, and canopies over entrances.

SECTION 00 73 00 - SPECIAL CONTRACT REQUIREMENTS

The following Acceptance/Inspection Schedule was added for CLIN 0018:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A Government

(End of Summary of Changes)