Plans_-_Amendment__7_-_4_Jun_15.pdf
PDF 1 MB Posted
- Solicitation number
- W912DS-15-B-0005
About this file
W912DS-15-B-0005 AMENDMENT 0007 PLANS
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
e3enmrt3 Typewritten Text e3enmrt3 Typewritten Text e3enmrt3 Typewritten Text e3enmrt3 Typewritten Text Revise the extent of pavement work e3enmrt3 Typewritten Text
GROUND FLOOR
0' - 0"
B.O. SOFFIT
32' - 0"
N-AN-CN-D
A-301
A-501
T.O. CAST STONE
9' - 0"
EXIST.
SUPENDED
ACOUTICAL TILE
CEILIING SYSTEM
AFFECTED BY
CONSTRUCTION
OF NEW ROOF
ABOVE TO BE
REPLACED WITH
MATCHING
CEILING KC-10 ENGINE TRAINING
TRAINING DEVICE WITH
PYLON
N-B
A-301
AL
IG
N
NEW 1 HOUR FIRE RATED SEPERATION
WALL FROM TOP OF EXIST. WALL TO
UNDERSIDE OF ROOF DECKING: 3 5/8"
METAL STUDS @ 16" O.C. WITH 5/8" THK.
TYPE 'X' GYP. BD.
GROUND FLOOR
0' - 0"
B.O. SOFFIT
32' - 0"
A-301
N-1N-2N-3
A-501
T.O. CAST STONE
9' - 0"
EXISTING ADJACENT C-17 HIGH
BAY TRAINING SPACE BEYOND
NEW ROOF PANELS &
SUBSTRATE BEYOND
INFILL PORTION OF EXIST.
CLERESTORY WITH INSULATED
METAL PANEL TO MATCH FINISH
OF EXIST. ADJACENT
INFILL PORTION OF EXIST.
CLERESTORY WITH INSULATED
METAL PANEL TO MATCH FINISH
OF EXIST. ADJACENT
N-4 N-2.5
GROUND FLOOR
0' - 0"
B.O. SOFFIT
32' - 0"
A-301
N-1N-2N-3
T.O. CAST STONE
9' - 0"
N-4
EXISTING ADJACENT C-17 HIGH
BAY TRAINING SPACE BEYOND
NEW ROOF PANELS &
SUBSTRATE BEYOND
INFILL PORTION OF EXIST.
CLERESTORY WITH INSULATED
METAL PANEL TO MATCH FINISH
OF EXIST. ADJACENT
INFILL PORTION OF EXIST.
CLERESTORY WITH INSULATED
METAL PANEL TO MATCH FINISH
OF EXIST. ADJACENT
KC-10 ENGINE TRAINING
TRAINING DEVICE WITH
PYLON
KC-10 MAIN LANDING
GEAR TRAINING
DEVICE
A-502
N-2.5
SHEET
IDENTIFICATION
1 2 3 4 5
D R
AW
N
B Y:
D
ES
I G N
B Y:
SB
M
T
BY
SI
ZE
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
U S
A R
M Y
C O
RP
S
O F
EN
G
IN
EE
R S
C
KD
B Y:
US Army Corps of Engineers ®
" x
4"
D
C
B
A
FI
LE
N U
M
BE
R
PL
O
T
SC
AL
E:
PL
O
T D
AT
E:
SHEET OF
/8
'-0
6/
/ 2
3:
: 3
PM
A D
D
IT
IO
N
T O M
A
IN
TE
N
A N
C E
TR
A
IN
IN
G
FA
C
IL
IT
Y
JU
N
E
, 2
New York District
D es ig ne r
Au th or
Ap pr ov er
A-301
N
EW
YO
R
K D
IS
TR
IC
T
C he ck er
BU
IL
D
IN
G
SE
C
TI
O N
S
JB
M cG U
IR
E
D
IX
LA
KE
H U
R
ST
A- 3 0
1-
1/8" = 1'-0"1 SECTION A
1/8" = 1'-0"3 SECTION C
1/8" = 1'-0"2 SECTION B
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
e3enmrt3 Polygonal Line e3enmrt3 Polygonal Line e3enmrt3 Polygon e3enmrt3 Polygonal Line e3enmrt3 Polygonal Line e3enmrt3 Polygon e3enmrt3 Typewritten Text Revise the overhead sectional door track profile e3enmrt3 Typewritten Text e3enmrt3 Polygonal Line e3enmrt3 Polygonal Line e3enmrt3 Polygon e3enmrt3 Polygon e3enmrt3 Typewritten Text e3enmrt3 Typewritten Text e3enmrt3 Typewritten Text e3enmrt3 Typewritten Text e3enmrt3 Typewritten Text e3enmrt3 Typewritten Text e3enmrt3 Typewritten Text e3enmrt3 Typewritten Text AT PRESENT, JMDL DOES NOT HAVE A CENTRAL BASE-WIDE UTILITY MANAGEMENT CONTROL SYSTEM (UMCS) THAT IS OPERATIONAL. THEREFORE, IT IS SUFFICIENT FOR THE CONTRACTOR TO PROVIDE A VARIABLE REFRIGERANT FLOW (VRF) SYSTEM CONTROLS PANEL TO CONTROL THE SYSTEM LOCALLY.
THE CONTROLS PANEL SHALL INCORPORATE THE FLEXIBILITY FOR FUTURE CENTRAL BASE-WIDE SYSTEM NETWORK REMOTE CONNECTION CAPABILITY FOR MONITORING AND CONTROLS; AND BE MADE READY FOR FUTURE CONNECTION TO A GENERIC BACNET CENTRAL SYSTEM. THE INPUT/OUTPUT (I/O) PARAMETERS SHALL AT A MINIMUM BE: STATUS, ALARM, ROOM SET-POINT, 365-DAY, 24-HR/DAY OPERATIONAL TIME CLOCK.
1) THE VRF CONTROL PANEL SHALL ALLOW FOR LOCAL OPERATOR CONTROLS OF ALL VRF SYSTEM PARAMETERS AND SET-POINT ADJUSTMENTS.
2) ROOM SET-POINT SHOULD BE 76 DEG F/SUMMER; 68 DEG F/WINTER HEATING BY OVERHEAD GAS FIRED INFRA-RED HEATERS.
3) VRF SYSTEM OPERATIONAL SHALL ONLY START AND STOP UPON OPERATOR MANUALLY STARTING THE SYSTEM LOCALLY; ALSO, THE VRF SYSTEM SHALL ONLY BE CAPABLE OF OPERATING WITHIN A WORKING HOUR WINDOW OF 0700 HRS TO 1700 HRS. PROVIDE 365-DAY, 24-HRS/DAY OPERATIONAL TIME CLOCK.
4) THE VRF SYSTEM "SET-BACK" CONDITION SHALL BE "OFF" FOR BOTH WINTER AND SUMMER. THE ROOM TEMPERATURE SHALL BE MAINTAINED AT 55 DEG F DURING "SET-BACK" MODE BY THE INFRA-RED HEATERS.
5) ALL SET POINTS AND ADJUSTMENTS ARE TENTATIVE AND MAY BE ADJUSTED THROUGH FIELD COORDINATION WITH THE COE FIELD CONTRACTING OFFICER REPRESENTATIVE.
6) LOCATION OF VRF CONTROLS PANEL SHALL BE COORDINATED WITH COE FIELD COR.
e3enmrt3 Typewritten Text e3enmrt3 Typewritten Text e3enmrt3 Typewritten Text e3enmrt3 Typewritten Text e3enmrt3 Polygon e3enmrt3 Typewritten Text Revised BAS Notes 2 June 2015 e3enmrt3 Typewritten Text
File details come from the government source that posted it. Updated .