Appendix_A_-_As-Builds_-_MTF.pdf

PDF 42 MB Posted

Attached to
Addition to Maintenance Training Facility, Bldg. 2324 JB McGuire-Dix-Lakehurst, NJ
Solicitation number
W912DS-15-B-0005
Issued by

About this file

W912DS-15-B-0005 AS BUILTS

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NTH

PS

CLIENT

DESIGNER

CONSULTANTS

ISSUE

REGISTRATION

PROJECT NO:

KEY PLAN

DMJMH+N, Inc. Rev. 2003-1c 2003

MARK DESCRIPTIONDATE

032151346.0000

CHECKED BY:

DRAWN BY:

SHEET TITLE

B

1 3 4 5 6

1 32 4 5 6

A

C

D

E

T: 703-807-2500 F: 703-807-2599 www.dmjm.com

1525 WILSON BLVD, SUITE 1100, ARLINGTON VIRGINIA 22209

MAINTENANCE

TRAINING FACILITY

MCGUIRE AIR FORCE BASE

NEW JERSEY

PROJECT NO. PTFL053000S

PROJECT

..\..\..\..\151103 MCGUIRE AFB\CAD\BKGND\G\USACE_LOGO.JPG

CONSULTANTS

ISSUE

REGISTRATION

PROJECT NO:

KEY PLAN

DMJMH+N, Inc. Rev. 2003-1c 2003

MARK DESCRIPTIONDATE

032151346.0000

CHECKED BY:

DRAWN BY:

SHEET TITLE

B

1 3 4 5 6

1 32 4 5 6

A

C

D

E

T: 703-807-2500 F: 703-807-2599 www.dmjm.com

1525 WILSON BLVD, SUITE 1100, ARLINGTON VIRGINIA 22209

MAINTENANCE

TRAINING FACILITY

MCGUIRE AIR FORCE BASE

NEW JERSEY

PROJECT NO. PTFL053000S

A

A A

AA

A

A

A

A

A

A

A

A

WEST ARNOLD AVE

VANDENBERG AVE

RADIN RD

Ex Ex Ex ExEx Ex Ex ExEx Ex Ex Ex Ex Ex Ex

Ex ExEx Ex Ex ExEx Ex Ex Ex

E x

E x

Ex Ex Ex Ex

BUILDING 2215

BUILDING 2216BUILDING 2217

BUILDING 2306

BUILDING

BUILDING 2251NEW HANGAR (BLDG 2250)

BUILDING

W H

IT

E S T

GRISSOM RD

VA

N

DEN

B U

RG A

VE

WEST ARNOLD AVE

CHAFFEE AVE

C-17 CONSOLIDATED FLIGHTLINE OPERATIONS FACILITY

AIR FREIGHT TERMINAL SITE

116.54

116.53

116.44

116.29

116.27

15"

RC

P

18" RCP

116.64

116.35

116.24

116.58

117.00

115.64 11

116.32

114.77

115.70

116.30

116.46

" R

C P

117.61

(2

HVAC

115.59

115.58

WV

WV 11

15" R C P

117.64

(1)

116.10

CO

CO

M

E

EBA

116.91

116.56

117.01

117.65

BUILDING 2306

116.73

HVAC

118.11

EBA

CO

116.45

116.12

116.21

(2)(1)

115.46

S

HVAC

6" RCP

116.84

(2

(1)

116.61

116.91

116.65

R C P

15"

RC

P

116.39

DC

116.30

(3

(1)

(2)

" R

C P

116.19

(3

(2)

114.93

114.15

113.95

114.52

114.86

114.76

U U

DC

114.65

114.59

113.84

113.83

(1)

113.62

113.41

12"

(1)

8"

(2)

(3) S

113.45

# WV

VG

114.28

114.14

114.08

113.33

114.42

U

113.74

U

113.78

30" RCP

112.77

113.70

U

113.47

30" RCP

113.23

(1)

112.40 (2)(1) (2)

113.01

113.09

(1)

114.28

DC

FIBER OPTIC

WV

114 # 113.79

113.95

(1

DC

114.41

C M P

113.88

12"

113.71113.69

113.85

113.95

S(2)

(3

(2)

(1)

WV114

36" RC

P

12"

FIBER OPTIC

(2)

112.78

(1)

36" RCP

114.10

114112.83

114.73

113.99

114.34

114.49

114.76

113.64

113.42

BUILDING 2319

115.52

114.56

HVAC

DC

" R

CP

CO

24" RCP

(1

113.95

114.65

115.17

114.83

115.92

115.33

115.90

116.09 116.11

115.52

115.84 115.69

115.38 115.03

115.61

(1

115.43 115.42

U

U

114.61 114.67

115.64

114.90 114.94

WV WV

115.79

115.98

115.92

116.63

115.89

116.09

INV=112.65

115.99

115.8518 " R

C P

116.10

INV=113.80

116.61

115.90

INV=113.91

117.33

115.69

117.14

HVAC

115.89

117 114.95

5 11

119.40

115.22

BUILDING

CO

115.87 119.48

119.99

119.92

115.97

WV

MC

STEAM

116 118

119.90

119.89

(1)

115.07

115.68115.91

115.96

115.43

WV

114.67

114.93

115115

115.33

115.16

114.54

113.95(2 ) 114.04

113.83

114.58 114.71

114.77

30" RCP

114.25

114.99

114.51

(1)

114.91115

115.55

115.20

115.62

115.97

114.31

(2)(2) 113.44

(1) (1)

30" RCP

114.72

115.61

114 113.80

30" RCP

112.83 112.97

115.26

114.77

EBA

HVAC

HVAC

115.73

ECO 116

115.52

115.20

116.53

115.60

115.78

115.82

115.67

116.43

116.64

114.67

" P

V C

(1)

115.12

S

U

115 115

115.78

115.57 HVAC

E

12" C

MP

115.77

114.56

15" HDPE

114.14

12" H

DP

E

(3)

(1)

114.15

(2)

114.41

" P

V C

(2

(1)

S

117.3811

114.07

(1)11 4 11

8" DIP

115.51

114.88

115.94 11

116.23

116.84

116.76

115.09

115.17

114.21

(1)

(2)S

116.97

8" PVC

(1)

" P

V C

8" P

VC

CO

116.55

WV

114.45

118.43

CO

118.27

114.73

114.64

S

INV=114.77

116.07

INV=114.63

116.15

INV=113.83

116.23

116.26

116.24

HVAC-EBA

E

HVAC

116.25

BUILDING 2315

E

6 11

U

EBA

HVAC

116.28

115.97

BUILDING

EXISTING

115.93

116.18

116.31

116.07

115.92

(1)115.98

12" H

DP

E

(3)(1)

(2

(2

(1)

BUILDING

116.05

116.04

116.04 115.35

" H

D P E

(1)

(2)

WV

WV

117.25

DC

116.36

BUILDING 2320

118.55

117.41

S

114.53

114.68 DC

" H

DP

E

HVAC

(2

(1)

114.32

WV

H D P E

(1

H D P E

(2

5 11

EBA

(1)

117.01

CO

(2

(1)

S

116.61

4"

CO

E

CO

117 HVAC

CO

117.49

HD

PE

(3

(2

CO

HVAC

HVAC

E

(2)

E

6"

(3)

(1)

116.94

BUILDING

CO

CO

DC

(3

HD

PE

12" H

DPE

(2)(1)

EBA

H D P E

(1)

118.63

118.36

114.55

114.14

HVAC

113.32

P V C

114.73

114.50

EBA

EM

113.97

114.22

HVAC

114.68

113.98

WV

114.47

113.78

12"

113.47

112.97

114.99

DC

115.20

114.79

114.95

115.18

115.27

115.43

8" PVC

DC

113.72

(2)

(3)

(1)

S

114.79

115.14

113.64

CO

114.70

CO

113.51

113.26

WV

113.98

113.33

118.37

WV

118.35

119 11

113.06

114.42

115.02

FIBER OPTIC

113.21

12"

115.36

115.31

(2)

(3)

(1)

(4)

S

115.16

DC

#6" V

CP

WV

MARKER

PETROLEUM PIPELINE

114.80

12"

114.96

114.59

(2)

DC

U

113.35

S

12"

(4

CO

117.55

CO

HVAC

CO

CO

CO117.51

117.56

U

18" C

MP

116.67

12" R C P

114.13

114.43

116.81

115.60

115.34

116 116

VG

W

VG

VG

115.54

E

RC

P (2 )(3)

(1)

S

8"

(2)

113.90

113.85

114.33

114.17

DC

(2) (1)

18" CMP

VG

114.11

113.63

113.37

DC

113.49

(1)

12"

113.37

113.46

FLIGHT SIMULATOR

BUILDING

(UNDER CONSTRUCTION)

SUMP=106.41

INV(2)=106.41

INV(1)=106.40

INV=109.60

INV(2)=113.52

INV(1)=113.70

RIM=114.58

INV=113.25

INV=112.85

CB-60

INV=114.10

INV(2)=113.31

INV(1)=113.56

RIM=116.49

MH-D57

INV(2)=112.60

INV(1)=112.50

RIM=116.64

MH-D58

INV(3)=112.61

INV=113.18

INV=112.03

INV(2)=108.72

INV(1)=108.80

RIM=115.14

MH-S49

INV(1)=109.69

RIM=114.53

MH-S53

INV(2)=109.67

NO ACCESS

RIM=114.59

SUMP=106.35

INV(2)=106.55

INV(1)=106.53

GR=114.27

CB-64

MH-S65

CB-16

INV(2)=107.78

INV(1)=107.76

GR=112.13

INV=110.20

INV(2)=107.77

INV(1)=107.75

GR=112.14

CB-39

CB-38

GR=113.45

CB-21

INV(1)=109.46

RIM=111.96

MH-D40

INV(3)=100.34

INV(2)=100.29

INV(1)=103.99

RIM=113.40

MH-S41

INV=110.19

INV(2)=100.76

INV(1)=101.82

RIM=113.77

INV(3)=106.64

INV(2)=106.04

INV(1)=105.94

RIM=113.74

MH-D31

MH-S36

INV(2)=107.24

INV(1)=107.54

RIM=111.22

MH-D29

GR=113.53

CB-33

GR=114.32

CB-32

MH-S35

INV(3)=105.65

INV(2)=101.87

INV(1)=101.86

RIM=114.95

GR=114.35

GR=114.50

CB-15

EL=115.32

E=2021123.313 N=436108.461

X CUT-4

INV=112.73

INV(4)=102.09

INV(3)=108.37

INV(2)=102.11

INV(1)=106.10

RIM=114.77

INV(2)=114.65

INV(1)=114.35

RIM=117.45

MH-S69

GR=114.04

CB-25

GR=114.11

CB-26

INV(2)=105.83

INV(1)=106.03

RIM=116.18

MH-S22

GR=113.68

CB-19

INV(3)=112.41

INV(2)=112.07

INV(1)=111.32

RIM=117.46

MH-D11

CB-10

INV(3)=110.16

INV(2)=110.26

INV(1)=110.51

RIM=116.66

CB-67

INV(2)=106.32

INV(1)=106.34

GR=114.17

GR=114.05

CB-66

SUMP=106.29

SUMP=112.35

INV(3)=112.57

INV(2)=112.85

INV(1)=113.00

RIM=116.75

NO PIPES VISIBLE

SUMP=109.88

RIM=115.68

MH-D1

CB-2

INV=112.54

INV(2)=103.01

INV(1)=103.11

RIM=113.41

MH-S8

MH-S9

GR=113.84

CB-34

CB-17

GR=114.80

INV(2)=106.30

INV(1)=106.23

RIM=113.93

MH-D7

INV(2)=102.45

INV(1)=102.52

RIM=114.27

MH-S6

INV(3)=102.71

INV(2)=103.29

INV(1)=102.85

RIM=113.52

MH-S5

INV(4)=102.76

CHILLER

KVA

300 KVA

750 KVA

T T T T T T T

T

S

U

W

S

S

T

WV

(2

8" P

VC

8" P

VC

18" R C P

S

B.R.P.

(4)

T

S

W

W

UNKNOWN MH

(A.M.O.G.)

E

E

E

E

E

E

E

E

Ex Ex Ex

E x

E x

E x

E x

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

Ex Ex Ex

E E

E E

E E

E E

Ex

Ex

Ex

E x

E x

E x

E x

Ex Ex

D

D

D

D D

D

D

D

D

D D

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

DD D D D

D

D

D

S

S

S

S

S

S

S

S

D

D

D

D

D

D

D D

D

S

S

S

S

S

S

S

S

S

D

S

S

D

S

S

S S

D

D

D

D

D

D

D

D

D

D

D

D

D

S

S

S

S

S

S

S

S

S

S

D

D

D

D

D

D

D

S

S

S

S

S

D

W

W

D

D

S

S

S

S

S

S

S

S

G

S

S

S

S

S

S

S

S

D

S

S

S

S

S

S

S

T T

T T

T

T T

T T

T

T

T T T T T T T T T TT T T T T T TT T T T T T T T

T

T T T T T T T T

T T T T

T

T

T

T

W

W

D D D

E E E

E

E E E

S S

S S

D

D

D

D

D

D

D

S

S

S

S

S

S

S

S

S

S

S

T

T

T

T

T

T

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W W

W W

W W

D

D

E

E

E

E

E

E

E

E

E

E

E

E

E

W

W

W

W

W

W

W

W

W

W

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

W W W W

W

W

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T T

T

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

T

T

T

T

T T

T

T

T

T

T

T

T

T

T

T

T

T T

T

T

T

T

T

T

T

T

T

T

T

T

T T

T T

T

T T T T T T T T T T T T T T T T T T T T T T

T T

T T

T T

T T T

T

B .R .P

12" B.R.P.12" B.R.P.

W

W

W

W

W

W

W

W

W

W

W

W

W

W

B .R .P

TO

C

FO

F

EX. HANDHOLE #4

ABOVE

GROUND

HTHW

U.G. HTHW FOR

FLIGHT SIM BLDG

BUILDING

BUILDING

EX. P

A R K

IN

G

EX. P

A R K

IN

G

EX. P

A R K

IN

G

W W

W W

W

W W W

A P P R O X

ABAN.

MH-D47

RIM=112.02

INV(1)=110.52

MH-D48

RIM=113.21

INV(1)=110.52

INV(2)=110.58

MH-D61

RIM=115.88

SUMP=114.63

CB-50

RIM=113.26

INV(1)=111.01

SUMP=110.88

CB-52

RIM=114.01

INV(1)=110.13

INV(2)=108.37

INV(3)=108.60

SUMP=108.15

CB-51

RIM=113.88

INV(1)=109.57

INV(2)=109.39

CB-55

GR=114.35

INV(1)=107.23

INV(2)=107.03

INV(3)=107.01

SUMP=106.86

CB-54

GR=114.05

INV(1)=109.02

SUMP=108.91

CB-56

GR=114.47

INV(1)=106.82

INV(2)=106.83

SUMP=106.68

CB-46

RIM=112.54

INV(1)=108.88

INV(2)=108.81

MH-D44

RIM=113.80

INV(1)=108.18

INV(2)=108.19

CB45

RIM=111.75

SUMP=108.35

MH-D43

RIM=113.80

INV(1)=108.10

INV(2)=108.15

CB-42

GR=112.64

INV(1)=107.99

INV(2)=108.09

INV(3)=110.07

INV(4)=108.24

MH-S63

RIM=116.00

INV(1)=113.54

INV(2)=113.26

MH-S27

RIM=116.10

INV(1)=110.53

INV(2)=110.42

MH-S24

RIM=114.78

INV=107.42

MH-S29

RIM=115.64

INV(1)=107.64

INV(2)=107.66

INV(3)= 108.24

(2

(1

PK-8

N=436358.271 E=2019875.755

EL.=116.41

PK-6

N=435933.283 E=2020726.901

EL.=114.38

(1) (2) D D D

S

S

S

S

S

S

S

S

S

S

S

(3)

S

S

MH-S23

RIM=114.92

INV(1)=106.43

INV(2)=107.28

(2

T

P3 P7

B3 B7

B7 B4 B9

B10

B2

B1

P8

B5

P9

P10

B6

P2

P1

P4

P5

P6

BUILDING

W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W12" B.R.P. 12" B.R.P.12" B.R.P.

U.G. HTHW FOR

FLIGHT SIM BLDG

ABOVE

GROUND

HTHW

UNDERGROUND

HTHW

T T T T T T T

T

T

T

T

T

T

T

T

T T T T T T T

T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T

T

T

T

T

A

A

A A

AA

A

A

A

A

A

A

A

A

WEST ARNOLD AVE

VANDENBERG AVE

RADIN RD

Ex Ex Ex ExEx Ex Ex ExEx Ex Ex Ex Ex Ex Ex

Ex ExEx Ex Ex ExEx Ex Ex Ex

E x

E x

Ex Ex Ex Ex

BUILDING 2215

BUILDING 2216BUILDING 2217

BUILDING 2306

BUILDING

BUILDING 2251NEW HANGAR (BLDG 2250)

BUILDING

W H

IT

E S T

GRISSOM RD

VA

N

DEN

B U

RG A

VE

WEST ARNOLD AVE

CHAFFEE AVE

C-17 CONSOLIDATED FLIGHTLINE OPERATIONS FACILITY

AIR FREIGHT TERMINAL SITE

116.54

116.53

116.44

116.29

116.27

15"

RC

P

18" RCP

116.64

116.35

116.24

116.58

117.00

115.64 11

116.32

114.77

115.70

116.30

116.46

" R

C P

117.61

(2

HVAC

115.59

115.58

WV

WV 11

15" R C P

117.64

(1)

116.10

CO

CO

M

E

EBA

116.91

116.56

117.01

117.65

BUILDING 2306

116.73

HVAC

118.11

EBA

CO

116.45

116.12

116.21

(2)(1)

115.46

S

HVAC

6" RCP

116.84

(2

(1)

116.61

116.91

116.65

R C P

15"

RC

P

116.39

DC

116.30

(3

(1)

(2)

" R

C P

116.19

(3

(2)

114.93

114.15

113.95

114.52

114.86

114.76

U U

DC

114.65

114.59

113.84

113.83

(1)

113.62

113.41

12"

(1)

8"

(2)

(3) S

113.45

# WV

VG

114.28

114.14

114.08

113.33

114.42

U

113.74

U

113.78

30" RCP

112.77

113.70

U

113.47

30" RCP

113.23

(1)

112.40 (2)(1) (2)

113.01

113.09

(1)

114.28

DC

FIBER OPTIC

WV

114 # 113.79

113.95

(1

DC

114.41

C M P

113.88

12"

113.71113.69

113.85

113.95

S(2)

(3

(2)

(1)

WV114

36" RC

P

12"

FIBER OPTIC

(2)

112.78

(1)

36" RCP

114.10

114112.83

114.73

113.99

114.34

114.49

114.76

113.64

113.42

BUILDING 2319

115.52

114.56

HVAC

DC

" R

CP

CO

24" RCP

(1

113.95

114.65

115.17

114.83

115.92

115.33

115.90

116.09 116.11

115.52

115.84 115.69

115.38 115.03

115.61

(1

115.43 115.42

U

U

114.61 114.67

115.64

114.90 114.94

WV WV

115.79

115.98

115.92

116.63

115.89

116.09

INV=112.65

115.99

115.8518 " R

C P

116.10

INV=113.80

116.61

115.90

INV=113.91

117.33

115.69

117.14

HVAC

115.89

117 114.95

5 11

119.40

115.22

BUILDING

CO

115.87 119.48

119.99

119.92

115.97

WV

MC

STEAM

116 118

119.90

119.89

(1)

115.07

115.68115.91

115.96

115.43

WV

114.67

114.93

115115

115.33

115.16

114.54

113.95(2 ) 114.04

113.83

114.58 114.71

114.77

30" RCP

114.25

114.99

114.51

(1)

114.91115

115.55

115.20

115.62

115.97

114.31

(2)(2) 113.44

(1) (1)

30" RCP

114.72

115.61

114 113.80

30" RCP

112.83 112.97

115.26

114.77

EBA

HVAC

HVAC

115.73

ECO 116

115.52

115.20

116.53

115.60

115.78

115.82

115.67

116.43

116.64

114.67

" P

V C

(1)

115.12

S

U

115 115

115.78

115.57 HVAC

E

12" C

MP

115.77

114.56

15" HDPE

114.14

12" H

DP

E

(3)

(1)

114.15

(2)

114.41

" P

V C

(2

(1)

S

117.3811

114.07

(1)11 4 11

8" DIP

115.51

114.88

115.94 11

116.23

116.84

116.76

115.09

115.17

114.21

(1)

(2)S

116.97

8" PVC

(1)

" P

V C

8" P

VC

CO

116.55

WV

114.45

118.43

CO

118.27

114.73

114.64

S

INV=114.77

116.07

INV=114.63

116.15

INV=113.83

116.23

116.26

116.24

HVAC-EBA

E

HVAC

116.25

BUILDING 2315

E

6 11

U

EBA

HVAC

116.28

115.97

BUILDING

EXISTING

115.93

116.18

116.31

116.07

115.92

(1)115.98

12" H

DP

E

(3)(1)

(2

(2

(1)

BUILDING

116.05

116.04

116.04 115.35

" H

D P E

(1)

(2)

WV

WV

117.25

DC

116.36

BUILDING 2320

118.55

117.41

S

114.53

114.68 DC

" H

DP

E

HVAC

(2

(1)

114.32

WV

H D P E

(1

H D P E

(2

5 11

EBA

(1)

117.01

CO

(2

(1)

S

116.61

4"

CO

E

CO

117 HVAC

CO

117.49

HD

PE

(3

(2

CO

HVAC

HVAC

E

(2)

E

6"

(3)

(1)

116.94

BUILDING

CO

CO

DC

(3

HD

PE

12" H

DPE

(2)(1)

EBA

H D P E

(1)

118.63

118.36

114.55

114.14

HVAC

113.32

P V C

114.73

114.50

EBA

EM

113.97

114.22

HVAC

114.68

113.98

WV

114.47

113.78

12"

113.47

112.97

114.99

DC

115.20

114.79

114.95

115.18

115.27

115.43

8" PVC

DC

113.72

(2)

(3)

(1)

S

114.79

115.14

113.64

CO

114.70

CO

113.51

113.26

WV

113.98

113.33

118.37

WV

118.35

119 11

113.06

114.42

115.02

FIBER OPTIC

113.21

12"

115.36

115.31

(2)

(3)

(1)

(4)

S

115.16

DC

#6" V

CP

WV

MARKER

PETROLEUM PIPELINE

114.80

12"

114.96

114.59

(2)

DC

U

113.35

S

12"

(4

CO

117.55

CO

HVAC

CO

CO

CO117.51

117.56

U

18" C

MP

116.67

12" R C P

114.13

114.43

116.81

115.60

115.34

116 116

VG

W

VG

VG

115.54

E

RC

P (2 )(3)

(1)

S

8"

(2)

113.90

113.85

114.33

114.17

DC

(2) (1)

18" CMP

VG

114.11

113.63

113.37

DC

113.49

(1)

12"

113.37

113.46

FLIGHT SIMULATOR

BUILDING

(UNDER CONSTRUCTION)

SUMP=106.41

INV(2)=106.41

INV(1)=106.40

INV=109.60

INV(2)=113.52

INV(1)=113.70

RIM=114.58

INV=113.25

INV=112.85

CB-60

INV=114.10

INV(2)=113.31

INV(1)=113.56

RIM=116.49

MH-D57

INV(2)=112.60

INV(1)=112.50

RIM=116.64

MH-D58

INV(3)=112.61

INV=113.18

INV=112.03

INV(2)=108.72

INV(1)=108.80

RIM=115.14

MH-S49

INV(1)=109.69

RIM=114.53

MH-S53

INV(2)=109.67

NO ACCESS

RIM=114.59

SUMP=106.35

INV(2)=106.55

INV(1)=106.53

GR=114.27

CB-64

MH-S65

CB-16

INV(2)=107.78

INV(1)=107.76

GR=112.13

INV=110.20

INV(2)=107.77

INV(1)=107.75

GR=112.14

CB-39

CB-38

GR=113.45

CB-21

INV(1)=109.46

RIM=111.96

MH-D40

INV(3)=100.34

INV(2)=100.29

INV(1)=103.99

RIM=113.40

MH-S41

INV=110.19

INV(2)=100.76

INV(1)=101.82

RIM=113.77

INV(3)=106.64

INV(2)=106.04

INV(1)=105.94

RIM=113.74

MH-D31

MH-S36

INV(2)=107.24

INV(1)=107.54

RIM=111.22

MH-D29

GR=113.53

CB-33

GR=114.32

CB-32

MH-S35

INV(3)=105.65

INV(2)=101.87

INV(1)=101.86

RIM=114.95

GR=114.35

GR=114.50

CB-15

EL=115.32

E=2021123.313 N=436108.461

X CUT-4

INV=112.73

INV(4)=102.09

INV(3)=108.37

INV(2)=102.11

INV(1)=106.10

RIM=114.77

INV(2)=114.65

INV(1)=114.35

RIM=117.45

MH-S69

GR=114.04

CB-25

GR=114.11

CB-26

INV(2)=105.83

INV(1)=106.03

RIM=116.18

MH-S22

GR=113.68

CB-19

INV(3)=112.41

INV(2)=112.07

INV(1)=111.32

RIM=117.46

MH-D11

CB-10

INV(3)=110.16

INV(2)=110.26

INV(1)=110.51

RIM=116.66

CB-67

INV(2)=106.32

INV(1)=106.34

GR=114.17

GR=114.05

CB-66

SUMP=106.29

SUMP=112.35

INV(3)=112.57

INV(2)=112.85

INV(1)=113.00

RIM=116.75

NO PIPES VISIBLE

SUMP=109.88

RIM=115.68

MH-D1

CB-2

INV=112.54

INV(2)=103.01

INV(1)=103.11

RIM=113.41

MH-S8

MH-S9

GR=113.84

CB-34

CB-17

GR=114.80

INV(2)=106.30

INV(1)=106.23

RIM=113.93

MH-D7

INV(2)=102.45

INV(1)=102.52

RIM=114.27

MH-S6

INV(3)=102.71

INV(2)=103.29

INV(1)=102.85

RIM=113.52

MH-S5

INV(4)=102.76

CHILLER

KVA

300 KVA

750 KVA

T T T T T T T

T

S

U

W

S

S

T

WV

(2

8" P

VC

8" P

VC

18" R C P

S

B.R.P.

(4)

T

S

W

W

UNKNOWN MH

(A.M.O.G.)

E

E

E

E

E

E

E

E

Ex Ex Ex

E x

E x

E x

E x

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

Ex Ex Ex

E E

E E

E E

E E

Ex

Ex

Ex

E x

E x

E x

E x

Ex Ex

D

D

D

D D

D

D

D

D

D D

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

DD D D D

D

D

D

S

S

S

S

S

S

S

S

D

D

D

D

D

D

D D

D

S

S

S

S

S

S

S

S

S

D

S

S

D

S

S

S S

D

D

D

D

D

D

D

D

D

D

D

D

D

S

S

S

S

S

S

S

S

S

S

D

D

D

D

D

D

D

S

S

S

S

S

D

W

W

D

D

S

S

S

S

S

S

S

S

G

S

S

S

S

S

S

S

S

D

S

S

S

S

S

S

S

T T

T T

T

T T

T T

T

T

T T T T T T T T T TT T T T T T TT T T T T T T T

T

T T T T T T T T

T T T T

T

T

T

T

W

W

D D D

E E E

E

E E E

S S

S S

D

D

D

D

D

D

D

S

S

S

S

S

S

S

S

S

S

S

T

T

T

T

T

T

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W W

W W

W W

D

D

E

E

E

E

E

E

E

E

E

E

E

E

E

W

W

W

W

W

W

W

W

W

W

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

W W W W

W

W

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T T

T

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

T

T

T

T

T T

T

T

T

T

T

T

T

T

T

T

T

T T

T

T

T

T

T

T

T

T

T

T

T

T

T T

T T

T

T T T T T T T T T T T T T T T T T T T T T T

T T

T T

T T

T T T

T

B .R .P

12" B.R.P.12" B.R.P.

W

W

W

W

W

W

W

W

W

W

W

W

W

W

B .R .P

TO

C

FO

F

EX. HANDHOLE #4

ABOVE

GROUND

HTHW

U.G. HTHW FOR

FLIGHT SIM BLDG

BUILDING

BUILDING

EX. P

A R K

IN

G

EX. P

A R K

IN

G

EX. P

A R K

IN

G

W W

W W

W

W W W

A P P R O X

ABAN.

MH-D47

RIM=112.02

INV(1)=110.52

MH-D48

RIM=113.21

INV(1)=110.52

INV(2)=110.58

MH-D61

RIM=115.88

SUMP=114.63

CB-50

RIM=113.26

INV(1)=111.01

SUMP=110.88

CB-52

RIM=114.01

INV(1)=110.13

INV(2)=108.37

INV(3)=108.60

SUMP=108.15

CB-51

RIM=113.88

INV(1)=109.57

INV(2)=109.39

CB-55

GR=114.35

INV(1)=107.23

INV(2)=107.03

INV(3)=107.01

SUMP=106.86

CB-54

GR=114.05

INV(1)=109.02

SUMP=108.91

CB-56

GR=114.47

INV(1)=106.82

INV(2)=106.83

SUMP=106.68

CB-46

RIM=112.54

INV(1)=108.88

INV(2)=108.81

MH-D44

RIM=113.80

INV(1)=108.18

INV(2)=108.19

CB45

RIM=111.75

SUMP=108.35

MH-D43

RIM=113.80

INV(1)=108.10

INV(2)=108.15

CB-42

GR=112.64

INV(1)=107.99

INV(2)=108.09

INV(3)=110.07

INV(4)=108.24

MH-S63

RIM=116.00

INV(1)=113.54

INV(2)=113.26

MH-S27

RIM=116.10

INV(1)=110.53

INV(2)=110.42

MH-S24

RIM=114.78

INV=107.42

MH-S29

RIM=115.64

INV(1)=107.64

INV(2)=107.66

INV(3)= 108.24

(2

(1

PK-8

N=436358.271 E=2019875.755

EL.=116.41

PK-6

N=435933.283 E=2020726.901

EL.=114.38

(1) (2) D D D

S

S

S

S

S

S

S

S

S

S

S

(3)

S

S

MH-S23

RIM=114.92

INV(1)=106.43

INV(2)=107.28

(2

T

P3 P7

B3 B7

B7 B4 B9

B10

B2

B1

P8

B5

P9

P10

B6

P2

P1

P4

P5

P6

BUILDING

W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W12" B.R.P. 12" B.R.P.12" B.R.P.

U.G. HTHW FOR

FLIGHT SIM BLDG

ABOVE

GROUND

HTHW

UNDERGROUND

HTHW

T T T T T T T

T

T

T

T

T

T

T

T

T T T T T T T

T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T

T

T

T

T

SCALE IN FEET

30 30

EXISTING CONDITION NOTES:

1. THIS PLAN IS COMPILED FROM VARIOUS SOURCE DATA INCLUDING:

* FIELD TOPOGRAPHIC AND UTILITY SURVEY (8/03)

LANGAN ENGINEERING & ENVIRONMENTAL SERVICES, P.C.

MR. JOSEPH E. ROMANO, P.L.S.

NJ LICENSE 36273

201.794.6900

* UTILITY DESIGN DRAWINGS FOR THE NEW FLIGHT SIMULATOR

BUILDING (BY FRANKFURT, SHORT, BRUZA, INC. (8/02)

* FIELD SURVEY BY MICHAEL BAKER JR. (10/02)

* AS-BUILT INFORMATION PROVIDED BY MCGUIRE AFB CIVIL

ENGINEERING OFFICE

2. EXISTING UTILITES ARE SHOWN FROM SOURCES LISTED ABOVE AND

HORIZONTAL AND VERTICAL LOCATIONS SHALL BE CONSIDERED

APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY EXISTING UTILITIES

PRIOR TO ALL EXCAVATIONS. CONTRACTOR TO IMMEDIATELY NOTIFY

CONTRACTING OFFICER OF ANY DISCREPANCIES.

3. B.R.P. = BY RECORD PLAN

4. BORING LOCATIONS ARE APPROXIMATE AND WERE PROVIDED BY

THE GEOTECHNICAL ENGINEER.

CLIENT

DESIGNER

CONSULTANTS

ISSUE

REGISTRATION

PROJECT NO:

KEY PLAN

DMJMH+N, Inc. Rev. 2003-1c 2003

BID SET

MARK DESCRIPTIONDATE

CHECKED BY:

DRAWN BY:

SHEET TITLE

B

1 3 4 5 6

1 32 4 5 6

A

C

D

E

T: 703-807-2500 F: 703-807-2599 www.dmjm.com

1525 WILSON BLVD, SUITE 1100, ARLINGTON VIRGINIA 22209

MAINTENANCE

TRAINING FACILITY

MCGUIRE AIR FORCE BASE

NEW JERSEY

PROJECT NO. PTFL053000S

PROJECT

USACE_LOGO.JPG

NJ Certificate of Authorization No: 24GA27996400

Environmental Services Engineering and

New York, NY 10001-2727 360 West 31st St, Suite 900

Phone: (212) 479-5400 Miami, FL Doylestown, PA Elmwood Park, NJ

New Haven, CT Fax: (212) 479-5444 Philadelphia, PA

21 Penn Plaza djh ctv

032151346.0000

04/08/04- BID SET

LEGEND:

ψ

VG

G

WV

V

CO

ϖ ξ

PK-1

HYDRANT

MANHOLE

AREA LIGHT

GAS VALVE

CATCH BASIN

WATER VALVE

SIGNAL POLE

STREET LIGHT

BENCH MARK

CLEAN OUT

TREE

POLE

SIGN

SANITARY

BOLLARD

ELECTRIC

WATER

GAS

MONITORING WELL

STORM DRAIN

SPOT ELEVATIONx322.35

TELEPHONE

TREE LINE

GUARD RAIL (TYPE AS NOTED)

OVERHEAD WIRE

FENCE (TYPE AS NOTED)

DC DEPRESSED CURB

SOUTHEASTERN

EXTENSION

1"= 30'

GUYWIREξA EXISTING CONTOUR

P2

BORING LOCATION (PER

GEOTECHNICAL REPORT)

BUILDING ENTRANCE

VEGETATION

05/06/04 REVISION NO. 11

1 1

BASE BID

OPTION 2 (NIC)

OPTION 2 (NIC)

OPTION 1 (NIC)

OPTION 1 (NIC)

OPTION 3

OPTION 4

OPTION 1 (NIC)

OPTION 1 (NIC)

A

A

A A

AA

A

A

A

A

A

A

A

A

WEST ARNOLD AVE

VANDENBERG AVE

RADIN RD

Ex Ex ExEx Ex ExEx Ex Ex Ex Ex ExEx Ex ExEx Ex Ex

E x

E x

Ex Ex Ex

BUILDING 2215

BUILDING 2216BUILDING 2217

BUILDING 2306

BUILDING

BUILDING 2251NEW HANGAR (BLDG 2250)

BUILDING

W H

IT

E S T

GRISSOM RD

VA

N

DEN

B U

RG A

VE

WEST ARNOLD AVE

CHAFFEE AVE

C-17 CONSOLIDATED FLIGHTLINE OPERATIONS FACILITY

AIR FREIGHT TERMINAL SITE

116.54

116.53

116.44

116.29

116.27

15"

RC

P

18" RCP

116.64

116.35

116.24

116.58

117.00

115.64 11

116.32

114.77

115.70

116.30

116.46

" R

C P

117.61

(2

HVAC

115.59

115.58

WV

WV 11

15" R C P

117.64

(1)

116.10

CO

CO

M

E

EBA

116.91

116.56

117.01

117.65

BUILDING 2306

116.73

HVAC

118.11

EBA

CO

116.45

116.12

116.21

(2)(1)

115.46

S

HVAC

6" RCP

116.84

(2

(1)

116.61

116.91

116.65

R C P

15"

RC

P

116.39

DC

116.30

(3

(1)

(2)

" R

C P

116.19

(3

(2)

114.93

114.15

113.95

114.52

114.86

114.76

U U

DC

114.65

114.59

113.84

113.83

(1)

113.62

113.41

12"

(1)

8"

(2)

(3) S

113.45

# WV

VG

114.28

114.14

114.08

113.33

114.42

U

113.74

U

113.78

30" RCP

112.77

113.70

U

113.47

30" RCP

113.23

(1)

112.40 (2)(1) (2)

113.01

113.09

(1)

114.28

DC

FIBER OPTIC

WV

114 # 113.79

113.95

(1

DC

114.41

C M P

113.88

12"

113.71113.69

113.85

113.95

S(2)

(3

(2)

(1)

WV114

36" RC

P

12"

FIBER OPTIC

(2)

112.78

(1)

36" RCP

114.10

114112.83

114.73

113.99

114.34

114.49

114.76

113.64

113.42

BUILDING 2319

115.52

114.56

HVAC

DC

" R

CP

CO

24" RCP

(1

113.95

114.65

115.17

114.83

115.92

115.33

115.90

116.09 116.11

115.52

115.84 115.69

115.38 115.03

115.61

(1

115.43 115.42

U

U

114.61 114.67

115.64

114.90 114.94

WV WV

115.79

115.98

115.92

116.63

115.89

116.09

INV=112.65

115.99

115.8518 " R

C P

116.10

INV=113.80

116.61

115.90

INV=113.91

117.33

115.69

117.14

HVAC

115.89

117 114.95

5 11

119.40

115.22

BUILDING

CO

115.87 119.48

119.99

119.92

115.97

WV

MC

STEAM

116 118

119.90

119.89

(1)

115.07

115.68115.91

115.96

115.43

WV

114.67

114.93

115115

115.33

115.16

114.54

113.95(2 ) 114.04

113.83

114.58 114.71

114.77

30" RCP

114.25

114.99

114.51

(1)

114.91115

115.55

115.20

115.62

115.97

114.31

(2)(2) 113.44

(1) (1)

30" RCP

114.72

115.61

114 113.80

30" RCP

112.83 112.97

115.26

114.77

EBA

HVAC

HVAC

115.73

ECO 116

115.52

115.20

116.53

115.60

115.78

115.82

115.67

116.43

116.64

114.67

" P

V C

(1)

115.12

S

U

115 115

115.78

115.57 HVAC

E

12" C

MP

115.77

114.56

15" HDPE

114.14

12" H

DP

E

(3)

(1)

114.15

(2)

114.41

" P

V C

(2

(1)

S

117.3811

114.07

(1)11 4 11

8" DIP

115.51

114.88

115.94 11

116.23

116.84

116.76

115.09

115.17

114.21

(1)

(2)S

116.97

8" PVC

(1)

" P

V C

8" P

VC

CO

116.55

WV

114.45

118.43

CO

118.27

114.73

114.64

S

INV=114.77

116.07

INV=114.63

116.15

INV=113.83

116.23

116.26

116.24

HVAC-EBA

E

HVAC

116.25

BUILDING 2315

E

6 11

U

EBA

HVAC

116.28

115.97

BUILDING

EXISTING

115.93

116.18

116.31

116.07

115.92

(1)115.98

12" H

DP

E

(3)(1)

(2

(2

(1)

BUILDING

116.05

116.04

116.04 115.35

" H

D P E

(1)

(2)

WV

WV

117.25

DC

116.36

BUILDING 2320

118.55

117.41

S

114.53

114.68 DC

" H

DP

E

HVAC

(2

(1)

114.32

WV

H D P E

(1

H D P E

(2

5 11

EBA

(1)

117.01

CO

(2

(1)

S

116.61

4"

CO

E

CO

117 HVAC

CO

117.49

HD

PE

(3

(2

CO

HVAC

HVAC

E

(2)

E

6"

(3)

(1)

116.94

BUILDING

CO

CO

DC

(3

HD

PE

12" H

DPE

(2)(1)

EBA

H D P E

(1)

118.63

118.36

114.55

114.14

HVAC

113.32

P V C

114.73

114.50

EBA

EM

113.97

114.22

HVAC

114.68

113.98

WV

114.47

113.78

12"

113.47

112.97

114.99

DC

115.20

114.79

114.95

115.18

115.27

115.43

8" PVC

DC

113.72

(2)

(3)

(1)

S

114.79

115.14

113.64

CO

114.70

CO

113.51

113.26

WV

113.98

113.33

118.37

WV

118.35

119 11

113.06

114.42

115.02

FIBER OPTIC

113.21

12"

115.36

115.31

(2)

(3)

(1)

(4)

S

115.16

DC

#6" V

CP

WV

MARKER

PETROLEUM PIPELINE

114.80

12"

114.96

114.59

(2)

DC

U

113.35

S

12"

(4

CO

117.55

CO

HVAC

CO

CO

CO117.51

117.56

U

18" C

MP

116.67

12" R C P

114.13

114.43

116.81

115.60

115.34

116 116

VG

W

VG

VG

115.54

E

RC

P (2 )(3)

(1)

S

8"

(2)

113.90

113.85

114.33

114.17

DC

(2) (1)

18" CMP

VG

114.11

113.63

113.37

DC

113.49

(1)

12"

113.37

113.46

FLIGHT SIMULATOR

BUILDING

(UNDER CONSTRUCTION)

SUMP=106.41

INV(2)=106.41

INV(1)=106.40

INV=109.60

INV(2)=113.52

INV(1)=113.70

RIM=114.58

INV=113.25

INV=112.85

CB-60

INV=114.10

INV(2)=113.31

INV(1)=113.56

RIM=116.49

MH-D57

INV(2)=112.60

INV(1)=112.50

RIM=116.64

MH-D58

INV(3)=112.61

INV=113.18

INV=112.03

INV(2)=108.72

INV(1)=108.80

RIM=115.14

MH-S49

INV(1)=109.69

RIM=114.53

MH-S53

INV(2)=109.67

NO ACCESS

RIM=114.59

SUMP=106.35

INV(2)=106.55

INV(1)=106.53

GR=114.27

CB-64

MH-S65

CB-16

INV(2)=107.78

INV(1)=107.76

GR=112.13

INV=110.20

INV(2)=107.77

INV(1)=107.75

GR=112.14

CB-39

CB-38

GR=113.45

CB-21

INV(1)=109.46

RIM=111.96

MH-D40

INV(3)=100.34

INV(2)=100.29

INV(1)=103.99

RIM=113.40

MH-S41

INV=110.19

INV(2)=100.76

INV(1)=101.82

RIM=113.77

INV(3)=106.64

INV(2)=106.04

INV(1)=105.94

RIM=113.74

MH-D31

MH-S36

INV(2)=107.24

INV(1)=107.54

RIM=111.22

MH-D29

GR=113.53

CB-33

GR=114.32

CB-32

MH-S35

INV(3)=105.65

INV(2)=101.87

INV(1)=101.86

RIM=114.95

GR=114.35

GR=114.50

CB-15

EL=115.32

E=2021123.313 N=436108.461

X CUT-4

INV=112.73

INV(4)=102.09

INV(3)=108.37

INV(2)=102.11

INV(1)=106.10

RIM=114.77

INV(2)=114.65

INV(1)=114.35

RIM=117.45

MH-S69

GR=114.04

CB-25

GR=114.11

CB-26

INV(2)=105.83

INV(1)=106.03

RIM=116.18

MH-S22

GR=113.68

CB-19

INV(3)=112.41

INV(2)=112.07

INV(1)=111.32

RIM=117.46

MH-D11

CB-10

INV(3)=110.16

INV(2)=110.26

INV(1)=110.51

RIM=116.66

CB-67

INV(2)=106.32

INV(1)=106.34

GR=114.17

GR=114.05

CB-66

SUMP=106.29

SUMP=112.35

INV(3)=112.57

INV(2)=112.85

INV(1)=113.00

RIM=116.75

NO PIPES VISIBLE

SUMP=109.88

RIM=115.68

MH-D1

CB-2

INV=112.54

INV(2)=103.01

INV(1)=103.11

RIM=113.41

MH-S8

MH-S9

GR=113.84

CB-34

CB-17

GR=114.80

INV(2)=106.30

INV(1)=106.23

RIM=113.93

MH-D7

INV(2)=102.45

INV(1)=102.52

RIM=114.27

MH-S6

INV(3)=102.71

INV(2)=103.29

INV(1)=102.85

RIM=113.52

MH-S5

INV(4)=102.76

CHILLER

KVA

300 KVA

750 KVA

T T T T T

S

U

W

S

S

T

WV

(2

8" P

VC

8" P

VC

18" R C P

S

B.R.P.

(4)

T

S

W

UNKNOWN MH

(A.M.O.G.)

E

E

E

E

E

E

Ex Ex

E x

E x

E x

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

Ex Ex

E E

E E

E E

Ex

Ex

E x

E x

E x

Ex Ex

D

D

D

D

D

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S S

S

DD D

D

D

S

S

S

S

S

S

D

D

D

D

D

S

S

S

S

S

S

S

D

S

S

D

S

S

D

D

D

D

D

D

D

D

D

S

S

S

S

S

S

S

D

D

D

D

D

S

S

S

S

D

W

W

D

D

S

S

S

S

S

S

G

S

S

S

S

S

S

D

S

S

S

S

T T

T T

T T

T

T

T T T T T T TT T T T TT T T T T T

T

T T T T T T

T T T

T

T

W

D D

E E

E

E E

S S

S

D

D

D

D

D

D

S

S

S

S

S

S

S

S

T

T

T

T

W

W

W

W

W

W

W

W

W

W

W

W

W W

W W

W W

D

E

E

E

E

E

E

E

E

W

W

W

W

W

W

W

W

T

T

T

T

T

T

T

T

T

T

W W W

W

W

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

S

S

S

S

S

S

S

S

S

S

S

S

T

T

T

T

T

T

T

T

T

T

T T

T T

T

T

T

T

T

T

T

TT

T

T

T T T T T T T T T T T T T T T T

T T

T T

T

T T

T

B .R .P

12" B.R.P.12" B.R.P.

W

W

W

W

W

W

W

W

W

W

B .R .P

TO

C

FO

F

EX. HANDHOLE #4

ABOVE

GROUND

HTHW

U.G. HTHW FOR

FLIGHT SIM BLDG

BUILDING

BUILDING

EX. P

A R K

IN

G

EX. P

A R K

IN

G

EX. P

A R K

IN

G

W W

W W W W

A P P R O X

ABAN.

MH-D47

RIM=112.02

INV(1)=110.52

MH-D48

RIM=113.21

INV(1)=110.52

INV(2)=110.58

MH-D61

RIM=115.88

SUMP=114.63

CB-50

RIM=113.26

INV(1)=111.01

SUMP=110.88

CB-52

RIM=114.01

INV(1)=110.13

INV(2)=108.37

INV(3)=108.60

SUMP=108.15

CB-51

RIM=113.88

INV(1)=109.57

INV(2)=109.39

CB-55

GR=114.35

INV(1)=107.23

INV(2)=107.03

INV(3)=107.01

SUMP=106.86

CB-54

GR=114.05

INV(1)=109.02

SUMP=108.91

CB-56

GR=114.47

INV(1)=106.82

INV(2)=106.83

SUMP=106.68

CB-46

RIM=112.54

INV(1)=108.88

INV(2)=108.81

MH-D44

RIM=113.80

INV(1)=108.18

INV(2)=108.19

CB45

RIM=111.75

SUMP=108.35

MH-D43

RIM=113.80

INV(1)=108.10

INV(2)=108.15

CB-42

GR=112.64

INV(1)=107.99

INV(2)=108.09

INV(3)=110.07

INV(4)=108.24

MH-S63

RIM=116.00

INV(1)=113.54

INV(2)=113.26

MH-S27

RIM=116.10

INV(1)=110.53

INV(2)=110.42

MH-S24

RIM=114.78

INV=107.42

MH-S29

RIM=115.64

INV(1)=107.64

INV(2)=107.66

INV(3)= 108.24

(2

(1

PK-8

N=436358.271 E=2019875.755

EL.=116.41

PK-6

N=435933.283 E=2020726.901

EL.=114.38

(1) (2) D D

S

S

S

S

S

S

S

S

(3)

S

MH-S23

RIM=114.92

INV(1)=106.43

INV(2)=107.28

(2

T

BUILDING

W W W W W W W W W W W W W W W W W W W W W W W12" B.R.P. 12" B.R.P.12" B.R.P.

U.G. HTHW FOR

FLIGHT SIM BLDG

ABOVE

GROUND

HTHW

UNDERGROUND

HTHW

T T T T T T

T

T

T

T

T

T T T T T

T T T T T T T T T T TT T T T T T T T T T T

T

T

T

4 5

6A

66A

6A

1A7A

7A 7A

(CU

RB

ONL

Y)

(CU

RB

ONL

Y)

6A

NOTE:

EXISTING FIRE

HYDRANT TO

REMAIN

NOTE:

EXISTING FIRE

HYDRANT TO REMAIN

NOTE:

EXISTING TREE

TO REMAIN

NOTE:

PROTECT EXISTING TREE

(SEE DETAIL C-403)

6A (SEE

NOTE 3)

CLIENT

DESIGNER

CONSULTANTS

ISSUE

REGISTRATION

PROJECT NO:

KEY PLAN

DMJMH+N, Inc. Rev. 2003-1c 2003

BID SET

MARK DESCRIPTIONDATE

CHECKED BY:

DRAWN BY:

SHEET TITLE

B

1 3 4 5 6

1 32 4 5 6

A

C

D

E

T: 703-807-2500 F: 703-807-2599 www.dmjm.com

1525 WILSON BLVD, SUITE 1100, ARLINGTON VIRGINIA 22209

MAINTENANCE

TRAINING FACILITY

MCGUIRE AIR FORCE BASE

NEW JERSEY

PROJECT NO. PTFL053000S

PROJECT

USACE_LOGO.JPG

NJ Certificate of Authorization No: 24GA27996400

Environmental Services Engineering and

New York, NY 10001-2727 360 West 31st St, Suite 900

Phone: (212) 479-5400 Miami, FL Doylestown, PA Elmwood Park, NJ

New Haven, CT

032151346.0000

04/08/04- BID SET

DEMOLITION PLAN NOTES:

1. TREES, BUSHES, LANDSCAPING, AND OTHER FEATURES WITHIN THE

WORK AREA NOT SPECIFICALLY IDENTIFIED SHALL BE INCIDENTALLY

DEMOLISHED AND REMOVED UNLESS NOTED OTHERWISE.

2. ANY UTILITIES AND APPURTANENCES WITHIN THE FOOTPRINT OF THE

PROPOSED BUILDING SHALL BE COMPLETELY REMOVED AND CAPPED

OFF NO LESS THAN 5' OFF THE FOOTPRINT UNLESS NOTED OTHERWISE.

3. COORDINATE WITH CONTRACTING OFFICER FOR EXACT LOCATION OF

UTILITIES FORMERLY SERVING BUILDING 2307 THAT HAVE BEEN CUT,

CAPPED, AND ABANDONED BY OTHERS.

4. SCOPE OF THIS PLAN DOES NOT INCLUDE DEMOLITION OF EXISTING

BUILDING 2302, A SEPARATE CONTRACT BY OTHERS.

5. DEMOLITION FOR BID OPTIONS 1 AND 2 ARE NOT IN CONTRACT.

ALSO REFER TO SHEET G-002 FOR BID OPTIONS BOUNDARIES AND

INFORMATION.

SCALE IN FEET

30 30

DEMOLITION WORK ITEMS:

REMOVE O/H WIRE AND/OR UTILITY POLE3

4 REMOVE SANITARY SEWER AND MANHOLE

REMOVE ASPHALT ROADWAY

AND CONCRETE CURB

UNLESS NOTED OTHERWISE

(ITEM 7A NIC)

NOT IN CONTRACT:

REMOVE 300KVA TRANSFORMER, HVAC PAD

AND STRUCTURES FOR EX. BUILDING 2307.

TRANSFORMER TO BE SALVAGED AND

RETURNED TO CONTRACTING OFFICER.

REMOVE TREE/SHRUB

CONTRACTOR SHALL PRESERVE AS MUCH PLANTING VEGETATION AS

POSSIBLE. UTILITY INSTALLATION WILL REQUIRE REMOVAL OF SOME

VEGETATION. CONTRACTOR SHALL TAG PROPOSED VEGETATION FOR GOV'T

REVIEW AND APPROVAL PRIOR TO REMOVAL

10 REMOVE STORM DRAIN/HEADWALL

1A

NOT IN CONTRACT:

BUILDING 2302 DEMOLITION INCLUDING ALL

ABOVEGROUND FACILITIES.

REMOVE CONCRETE PADS,

APRONS, OR SIDEWALKS

(ITEM 6A NIC)

BUILDING 2307 DEMOLITION INCLUDES

SLAB-ON-GRADE AND FOUNDATION FOOTINGS

ONLY. SUPERSTRUCTURE, INTERNAL AND

EXTERNAL EQUIPMENT, FURNISHINGS, AND

APPURTENENCES BY OTHERS

NOT IN CONTRACT:

BID OPTION 2 REMOVAL OF ABOVEGROUND

HTHW LINES, CONCRETE SUPPORTS,

BOLLARDS, AND ALL SYSTEM COMPONENTS.

NOT IN CONTRACT:

REMOVE ABOVEGROUND HTHW LINES,

CONCRETE SUPPORTS, AND ALL SYSTEM

COMPONENTS

EXISTING WATER SERVICE CUT/CAPPED AT MAIN

AND ABANDONED; REMOVE AS ENCOUNTERED.

EXISTING COMMUNICATION SERVICE

CUT/CAPPED AT MAIN AND ABANDONED BY

OTHERS; REMOVE AS ENCOUNTERED.

13 REMOVE BOLLARDS, CONCRETE PADS

AND MISCELLANEOUS SURFACE

FEATURES AS DIRECTED

05/06/041 REVISION NO. 1

2 05/25/04 REVISION NO. 2

6A

7A

BID OPTION REDUCTIONS08/16/043

REMOVE TREE (NIC)

REVISION NO. 408/25/044

(BUBBLES ADDED)

A A

AA

A

A

A

A

A

A

A

A

WEST ARNOLD AVE

VANDENBERG AVE

RADIN RD

Ex Ex Ex ExEx Ex Ex ExEx Ex Ex Ex Ex Ex Ex

Ex ExEx Ex Ex ExEx Ex Ex Ex

E x

E x

Ex Ex Ex Ex

BUILDING 2215

BUILDING 2216BUILDING 2217

BUILDING 2306

BUILDING

BUILDING 2251NEW HANGAR (BLDG 2250)

BUILDING

W H

IT

E S T

GRISSOM RD

VA

N

DEN

B U

RG A

VE

WEST ARNOLD AVE

CHAFFEE AVE

C-17 CONSOLIDATED FLIGHTLINE OPERATIONS FACILITY

AIR FREIGHT TERMINAL SITE

116.54

116.53

116.44

116.29

116.27

15"

RC

P

18" RCP

116.64

116.35

116.24

116.58

117.00

115.64 11

116.32

114.77

115.70

116.30

116.46

" R

C P

117.61

(2

HVAC

115.59

115.58

WV

WV 11

15" R C P

117.64

(1)

116.10

CO

CO

M

E

EBA

116.91

116.56

117.01

117.65

BUILDING 2306

116.73

HVAC

118.11

EBA

CO

116.45

116.12

116.21

(2)(1)

115.46

S

HVAC

6" RCP

116.84

(2

(1)

116.61

116.91

116.65

R C P

15"

RC

P

116.39

DC

116.30

(3

(1)

(2)

" R

C P

116.19

(3

(2)

114.93

114.15

113.95

114.52

114.86

114.76

U U

DC

114.65

114.59

113.84

113.83

(1)

113.62

113.41

12"

(1)

8"

(2)

(3) S

113.45

# WV

VG

114.28

114.14

114.08

113.33

114.42

U

113.74

U

113.78

30" RCP

112.77

113.70

U

113.47

30" RCP

113.23

(1)

112.40 (2)(1) (2)

113.01

113.09

(1)

114.28

DC

FIBER OPTIC

WV

114 # 113.79

113.95

(1

DC

114.41

C M P

113.88

12"

113.71113.69

113.85

113.95

S(2)

(3

(2)

(1)

WV114

36" RC

P

12"

FIBER OPTIC

(2)

112.78

(1)

36" RCP

114.10

114112.83

114.73

113.99

114.34

114.49

114.76

113.64

113.42

BUILDING 2319

115.52

114.56

HVAC

DC

" R

CP

CO

24" RCP

(1

113.95

114.65

115.17

114.83

115.92

115.33

115.90

116.09 116.11

115.52

115.84 115.69

115.38 115.03

115.61

(1

115.43 115.42

U

U

114.61 114.67

115.64

114.90 114.94

WV WV

115.79

115.98

115.92

116.63

115.89

116.09

INV=112.65

115.99

115.8518 " R

C P

116.10

INV=113.80

116.61

115.90

INV=113.91

117.33

115.69

117.14

HVAC

115.89

117 114.95

5 11

119.40

115.22

BUILDING

CO

115.87 119.48

119.99

119.92

115.97

WV

MC

STEAM

116 118

119.90

119.89

(1)

115.07

115.68115.91

115.96

115.43

WV

114.67

114.93

115115

115.33

115.16

114.54

113.95(2 ) 114.04

113.83

114.58 114.71

114.77

30" RCP

114.25

114.99

114.51

(1)

114.91115

115.55

115.20

115.62

115.97

114.31

(2)(2) 113.44

(1) (1)

30" RCP

114.72

115.61

114 113.80

30" RCP

112.83 112.97

115.26

114.77

EBA

HVAC

HVAC

115.73

ECO 116

115.52

115.20

116.53

115.60

115.78

115.82

115.67

116.43

116.64

114.67

" P

V C

(1)

115.12

S

U

115 115

115.78

115.57 HVAC

E

12" C

MP

115.77

114.56

15" HDPE

114.14

12" H

DP

E

(3)

(1)

114.15

(2)

114.41

" P

V C

(2

(1)

S

117.3811

114.07

(1)11 4 11

8" DIP

115.51

114.88

115.94 11

116.23

116.84

116.76

115.09

115.17

114.21

(1)

(2)S

116.97

8" PVC

(1)

" P

V C

8" P

VC

CO

116.55

WV

114.45

118.43

CO

118.27

114.73

114.64

S

INV=114.77

116.07

INV=114.63

116.15

INV=113.83

116.23

116.26

116.24

HVAC-EBA

E

HVAC

116.25

BUILDING 2315

E

6 11

U

EBA

HVAC

116.28

115.97

BUILDING

EXISTING

115.93

116.18

116.31

116.07

115.92

(1)115.98

12" H

DP

E

(3)(1)

(2

(2

(1)

BUILDING

116.05

116.04

116.04 115.35

" H

D P E

(1)

(2)

WV

WV

117.25

DC

116.36

BUILDING 2320

118.55

117.41

S

114.53

114.68 DC

" H

DP

E

HVAC

(2

(1)

114.32

WV

H D P E

(1

H D P E

(2

5 11

EBA

(1)

117.01

CO

(2

(1)

S

116.61

4"

CO

E

CO

117 HVAC

CO

117.49

HD

PE

(3

(2

CO

HVAC

HVAC

E

(2)

E

6"

(3)

(1)

116.94

BUILDING

CO

CO

DC

(3

HD

PE

12" H

DPE

(2)(1)

EBA

H D P E

(1)

118.63

118.36

114.55

114.14

HVAC

113.32

P V C

114.73

114.50

EBA

EM

113.97

114.22

HVAC

114.68

113.98

WV

114.47

113.78

12"

113.47

112.97

114.99

DC

115.20

114.79

114.95

115.18

115.27

115.43

8" PVC

DC

113.72

(2)

(3)

(1)

S

114.79

115.14

113.64

CO

114.70

CO

113.51

113.26

WV

113.98

113.33

118.37

WV

118.35

119 11

113.06

114.42

115.02

FIBER OPTIC

113.21

12"

115.36

115.31

(2)

(3)

(1)

(4)

S

115.16

DC

#6" V

CP

WV

MARKER

PETROLEUM PIPELINE

114.80

12"

114.96

114.59

(2)

DC

U

113.35

S

12"

(4

CO

117.55

CO

HVAC

CO

CO

CO117.51

117.56

U

18" C

MP

116.67

12" R C P

114.13

114.43

116.81

115.60

115.34

116 116

VG

W

VG

VG

115.54

E

RC

P (2 )(3)

(1)

S

8"

(2)

113.90

113.85

114.33

114.17

DC

(2) (1)

18" CMP

VG

114.11

113.63

113.37

DC

113.49

(1)

12"

113.37

113.46

FLIGHT SIMULATOR

BUILDING

(UNDER CONSTRUCTION)

SUMP=106.41

INV(2)=106.41

INV(1)=106.40

INV=109.60

INV(2)=113.52

INV(1)=113.70

RIM=114.58

INV=113.25

INV=112.85

CB-60

INV=114.10

INV(2)=113.31

INV(1)=113.56

RIM=116.49

MH-D57

INV(2)=112.60

INV(1)=112.50

RIM=116.64

MH-D58

INV(3)=112.61

INV=113.18

INV=112.03

INV(2)=108.72

INV(1)=108.80

RIM=115.14

MH-S49

INV(1)=109.69

RIM=114.53

MH-S53

INV(2)=109.67

NO ACCESS

RIM=114.59

SUMP=106.35

INV(2)=106.55

INV(1)=106.53

GR=114.27

CB-64

MH-S65

CB-16

INV(2)=107.78

INV(1)=107.76

GR=112.13

INV=110.20

INV(2)=107.77

INV(1)=107.75

GR=112.14

CB-39

CB-38

GR=113.45

CB-21

INV(1)=109.46

RIM=111.96

MH-D40

INV(3)=100.34

INV(2)=100.29

INV(1)=103.99

RIM=113.40

MH-S41

INV=110.19

INV(2)=100.76

INV(1)=101.82

RIM=113.77

INV(3)=106.64

INV(2)=106.04

INV(1)=105.94

RIM=113.74

MH-D31

MH-S36

INV(2)=107.24

INV(1)=107.54

RIM=111.22

MH-D29

GR=113.53

CB-33

GR=114.32

CB-32

MH-S35

INV(3)=105.65

INV(2)=101.87

INV(1)=101.86

RIM=114.95

GR=114.35

GR=114.50

CB-15

EL=115.32

E=2021123.313 N=436108.461

X CUT-4

INV=112.73

INV(4)=102.09

INV(3)=108.37

INV(2)=102.11

INV(1)=106.10

RIM=114.77

INV(2)=114.65

INV(1)=114.35

RIM=117.45

MH-S69

GR=114.04

CB-25

GR=114.11

CB-26

INV(2)=105.83

INV(1)=106.03

RIM=116.18

MH-S22

GR=113.68

CB-19

INV(3)=112.41

INV(2)=112.07

INV(1)=111.32

RIM=117.46

MH-D11

CB-10

INV(3)=110.16

INV(2)=110.26

INV(1)=110.51

RIM=116.66

CB-67

INV(2)=106.32

INV(1)=106.34

GR=114.17

GR=114.05

CB-66

SUMP=106.29

SUMP=112.35

INV(3)=112.57

INV(2)=112.85

INV(1)=113.00

RIM=116.75

NO PIPES VISIBLE

SUMP=109.88

RIM=115.68

MH-D1

CB-2

INV=112.54

INV(2)=103.01

INV(1)=103.11

RIM=113.41

MH-S8

MH-S9

GR=113.84

CB-34

CB-17

GR=114.80

INV(2)=106.30

INV(1)=106.23

RIM=113.93

MH-D7

INV(2)=102.45

INV(1)=102.52

RIM=114.27

MH-S6

INV(3)=102.71

INV(2)=103.29

INV(1)=102.85

RIM=113.52

MH-S5

INV(4)=102.76

CHILLER

KVA

300 KVA

750 KVA

T T T T T T T

T

S

U

W

S

S

T

WV

(2

8" P

VC

8" P

VC

18" R C P

S

B.R.P.

(4)

T

S

W

W

UNKNOWN MH

(A.M.O.G.)

E

E

E

E

E

E

E

E

Ex Ex Ex

E x

E x

E x

E x

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

Ex Ex Ex

E E

E E

E E

E E

Ex

Ex

Ex

E x

E x

E x

E x

Ex Ex

D

D

D

D D

D

D

D

D

D D

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

DD D D D

D

D

D

S

S

S

S

S

S

S

S

D

D

D

D

D

D

D D

D

S

S

S

S

S

S

S

S

S

D

S

S

D

S

S

S S

D

D

D

D

D

D

D

D

D

D

D

D

D

S

S

S

S

S

S

S

S

S

S

D

D

D

D

D

D

D

S

S

S

S

S

D

W

W

D

D

S

S

S

S

S

S

S

S

G

S

S

S

S

S

S

S

S

D

S

S

S

S

S

S

S

T T

T T

T

T T

T T

T

T

T T T T T T T T T TT T T T T T TT T T T T T T T

T

T T T T T T T T

T T T T

T

T

T

T

W

W

D D D

E E E

E

E E E

S S

S S

D

D

D

D

D

D

D

S

S

S

S

S

S

S

S

S

S

S

T

T

T

T

T

T

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W W

W W

W W

D

D

E

E

E

E

E

E

E

E

E

E

E

E

E

W

W

W

W

W

W

W

W

W

W

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

W W W W

W

W

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T T

T

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

T

T

T

T

T T

T

T

T

T

T

T

T

T

T

T

T

T T

T

T

T

T

T

T

T

T

T

T

T

T

T T

T T

T

T T T T T T T T T T T T T T T T T T T T T T

T T

T T

T T

T T T

T

B .R .P

12" B.R.P.12" B.R.P.

W

W

W

W

W

W

W

W

W

W

W

W

W

W

B .R .P

TO

C

FO

F

EX. HANDHOLE #4

ABOVE

GROUND

HTHW

U.G. HTHW FOR

FLIGHT SIM BLDG

BUILDING

BUILDING

EX. P

A R K

IN

G

EX. P

A R K

IN

G

EX. P

A R K

IN

G

W W

W W

W

W W W

A P P R O X

ABAN.

MH-D47

RIM=112.02

INV(1)=110.52

MH-D48

RIM=113.21

INV(1)=110.52

INV(2)=110.58

MH-D61

RIM=115.88

SUMP=114.63

CB-50

RIM=113.26

INV(1)=111.01

SUMP=110.88

CB-52

RIM=114.01

INV(1)=110.13

INV(2)=108.37

INV(3)=108.60

SUMP=108.15

CB-51

RIM=113.88

INV(1)=109.57

INV(2)=109.39

CB-55

GR=114.35

INV(1)=107.23

INV(2)=107.03

INV(3)=107.01

SUMP=106.86

CB-54

GR=114.05

INV(1)=109.02

SUMP=108.91

CB-56

GR=114.47

INV(1)=106.82

INV(2)=106.83

SUMP=106.68

CB-46

RIM=112.54

INV(1)=108.88

INV(2)=108.81

MH-D44

RIM=113.80

INV(1)=108.18

INV(2)=108.19

CB45

RIM=111.75

SUMP=108.35

MH-D43

RIM=113.80

INV(1)=108.10

INV(2)=108.15

CB-42

GR=112.64

INV(1)=107.99

INV(2)=108.09

INV(3)=110.07

INV(4)=108.24

MH-S63

RIM=116.00

INV(1)=113.54

INV(2)=113.26

MH-S27

RIM=116.10

INV(1)=110.53

INV(2)=110.42

MH-S24

RIM=114.78

INV=107.42

MH-S29

RIM=115.64

INV(1)=107.64

INV(2)=107.66

INV(3)= 108.24

(2

(1

PK-8

N=436358.271 E=2019875.755

EL.=116.41

PK-6

N=435933.283 E=2020726.901

EL.=114.38

(1) (2) D D D

S

S

S

S

S

S

S

S

S

S

S

(3)

S

S

MH-S23

RIM=114.92

INV(1)=106.43

INV(2)=107.28

(2

T

BUILDING

W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W12" B.R.P. 12" B.R.P.12" B.R.P.

U.G. HTHW FOR

FLIGHT SIM BLDG

ABOVE

GROUND

HTHW

UNDERGROUND

HTHW

T T T T T T T

T

T

T

T

T

T

T

T

T T T T T T T

T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T

T

T

T

T

PROPOSED MAINTENANCE

TRAINING FACILITY (MTF)

6' SIDEWALK (TYP)

HVAC

6' SIDEWALK (TYP)

ASPHALT PAVEMENT (TYP.)

(2)- 7' SCORED CONCRETE

SIDEWALK (TYP.)

LANDSCAPING

LANDSCAPING

ISLAND

S/W RAMP

S/W RAMP

S/W RAMP

6' SIDEWALK

4.67' WIDE PLANTING BED

R13.5'

4' SIDEWALK

6' SIDEWALK

4' PERIMETER SIDEWALK

6' S/W

SCORED CONCRETE

ACCESS PATH

36'22'

CONCRETE CURB AND GUTTER (TYP.)

LARGE TREE

TO REMAIN

LIMIT OF ASPHALT

PAVEMENT

S/W RAMP

E

AGE

OUTDOOR

STORAGE

9'x18' PARKING SPACES (TYP.)

TYP. PLANTER

(SEE L-SERIES DWGS)

6' SIDEWALK (TYP)

ASPHALT PAVEMENT (TYP.)

LANDSCAPING

LIMIT OF NEW

ASPHALT PAVEMENT

ASPHALT PAVEMENT (TYP.)

9'x18' PARKING SPACES (TYP.)

6' SIDEWALK (TYP)

S/W RAMP

LIMIT OF ASPHALT

PAVEMENT

4' SIDEWALK

PLAIN CONCRETE

CURB

PLAIN CONCRETE

CURB

PLAIN

CONCRETE

CURB

CONCRETE

CURB AND

GUTTER

(TYP.)

S/W

RAMP

PLAIN CONCRETE

CURB (TYP.)

PLAIN

CONCRETE

CURB (TYP.)

TYP. STRIPING

(SEE SHEET C-402)

PLAIN

CONCRETE

CURB

ASPHALT

PAVEMENT

ASPHALT PAVEMENT (TYP)

EX. ASPHALT

TO REMAIN

EX. ASPHALT

TO REMAIN

CONCRETE

PAVEMENT

BELOW

CC

CC

±1.5 SY "SCRATCH"

ASPHALT MATERIAL

AS REQUIRED

LANDSCAPING

E.J. AT

CONNECTION

S/W

RAMP

(TYP.)

EXPANSION JOINTS AT

CONNECTION TO EXISTING

SIDEWALK (TYP.)

R10

R10

STOP BAR

R3'

R3'

R2'

R3'

R3'

R10 'R10

' R10

R20

R10

R8'

NOTE:

CURB RADII ARE 5' UNLESS NOTED.

NOTE:

CURB RADII ARE 5' UNLESS NOTED.

8' TRANSITION FROM

0" TO 6" CURB

24'

24' (T

YP)

33' (T

YP)

24'

33'

36.

75'

89'

9'

4' S/W

28'

66'

88'

15' 29'

11'

12'

11' 10' 6'

6' 13'

70' 70'

MAFB BASE STANDARD

CROSSWALK (TYP)

S/W RAMP

REMOVABLE BOLLARDS, TYP.

MAFB BASE STANDARD

CROSSWALK (TYP)

CONCRETE PAVERS

STOP SIGN

PERMANENT

BOLLARDS, TYP.

SLOPE GRASS AREA (OF

FORMER DRIVEWAY) TO

MEET EX. ROAD EDGE

AND CREATE SHOULDER.

IDENTICAL TO ADJACENT

LOCATION AT RIGHT

38.

9'

22.

6'

ALIGNMENT CONTROL POINT

(CENTER OF EX. TREE)

REMOVABLE

BOLLARDS,

TYP.

R10

NOTE:

CONTRACTOR

SHALL NOT

BLOCK ACCESS

TO RAMPS

BASE BID

MAFB BASE STANDARD

CROSSWALK (TYP)

S/W RAMP

OPTION 2 (NIC)

OPTION 2 (NIC)

OPTION 1 (NIC)

OPTION 1 (NIC)

OPTION 3

OPTION 4

OPTION 1 (NIC)

OPTION 1 (NIC)

PERMANENT

BOLLARDS, TYP.

PLAIN

CONCRETE

CURB (TYP.)

38.7'

FUTURE PAD FOR

TRASH RECEPTACLE

(N.I.C.)

R15'

R7.7'

REMAINDER NIC REMAINDER NIC

R

EM

A

IN

D

ER

N

IC

REMAINDER NIC

A

A

A A

AA

A

A

A

A

A

A

A

A

WEST ARNOLD AVE

VANDENBERG AVE

RADIN RD

Ex Ex Ex ExEx Ex Ex ExEx Ex Ex Ex Ex Ex Ex

Ex ExEx Ex Ex ExEx Ex Ex Ex

E x

E x

Ex Ex Ex Ex

BUILDING 2215

BUILDING 2216BUILDING 2217

BUILDING 2306

BUILDING

BUILDING 2251NEW HANGAR (BLDG 2250)

BUILDING

W H

IT

E S T

GRISSOM RD

VA

N

DEN

B U

RG A

VE

WEST ARNOLD AVE

CHAFFEE AVE

C-17 CONSOLIDATED FLIGHTLINE OPERATIONS FACILITY

AIR FREIGHT TERMINAL SITE

116.54

116.53

116.44

116.29

116.27

15"

RC

P

18" RCP

116.64

116.35

116.24

116.58

117.00

115.64 11

116.32

114.77

115.70

116.30

116.46

" R

C P

117.61

(2

HVAC

115.59

115.58

WV

WV 11

15" R C P

117.64

(1)

116.10

CO

CO

M

E

EBA

116.91

116.56

117.01

117.65

BUILDING 2306

116.73

HVAC

118.11

EBA

CO

116.45

116.12

116.21

(2)(1)

115.46

S

HVAC

6" RCP

116.84

(2

(1)

116.61

116.91

116.65

R C P

15"

RC

P

116.39

DC

116.30

(3

(1)

(2)

" R

C P

116.19

(3

(2)

114.93

114.15

113.95

114.52

114.86

114.76

U U

DC

114.65

114.59

113.84

113.83

(1)

113.62

113.41

12"

(1)

8"

(2)

(3) S

113.45

# WV

VG

114.28

114.14

114.08

113.33

114.42

U

113.74

U

113.78

30" RCP

112.77

113.70

U

113.47

30" RCP

113.23

(1)

112.40 (2)(1) (2)

113.01

113.09

(1)

114.28

DC

FIBER OPTIC

WV

114 # 113.79

113.95

(1

DC

114.41

C M P

113.88

12"

113.71113.69

113.85

113.95

S(2)

(3

(2)

(1)

WV114

36" RC

P

12"

FIBER OPTIC

(2)

112.78

(1)

36" RCP

114.10

114112.83

114.73

113.99

114.34

114.49

114.76

113.64

113.42

BUILDING 2319

115.52

114.56

HVAC

DC

" R

CP

CO

24" RCP

(1

113.95

114.65

115.17

114.83

115.92

115.33

115.90

116.09 116.11

115.52

115.84 115.69

115.38 115.03

115.61

(1

115.43 115.42

U

U

114.61 114.67

115.64

114.90 114.94

WV WV

115.79

115.98

115.92

116.63

115.89

116.09

INV=112.65

115.99

115.8518 " R

C P

116.10

INV=113.80

116.61

115.90

INV=113.91

117.33

115.69

117.14

HVAC

115.89

117 114.95

5 11

119.40

115.22

BUILDING

CO

115.87 119.48

119.99

119.92

115.97

WV

MC

STEAM

116 118

119.90

119.89

(1)

115.07

115.68115.91

115.96

115.43

WV

114.67

114.93

115115

115.33

115.16

114.54

113.95(2 ) 114.04

113.83

114.58 114.71

114.77

30" RCP

114.25

114.99

114.51

(1)

114.91115

115.55

115.20

115.62

115.97

114.31

(2)(2) 113.44

(1) (1)

30" RCP

114.72

115.61

114 113.80

30" RCP

112.83 112.97

115.26

114.77

EBA

HVAC

HVAC

115.73

ECO 116

115.52

115.20

116.53

115.60

115.78

115.82

115.67

116.43

116.64

114.67

" P

V C

(1)

115.12

S

U

115 115

115.78

115.57 HVAC

E

12" C

MP

115.77

114.56

15" HDPE

114.14

12" H

DP

E

(3)

(1)

114.15

(2)

114.41

" P

V C

(2

(1)

S

117.3811

114.07

(1)11 4 11

8" DIP

115.51

114.88

115.94 11

116.23

116.84

116.76

115.09

115.17

114.21

(1)

(2)S

116.97

8" PVC

(1)

" P

V C

8" P

VC

CO

116.55

WV

114.45

118.43

CO

118.27

114.73

114.64

S

INV=114.77

116.07

INV=114.63

116.15

INV=113.83

116.23

116.26

116.24

HVAC-EBA

E

HVAC

116.25

BUILDING 2315

E

6 11

U

EBA

HVAC

116.28

115.97

BUILDING

EXISTING

115.93

116.18

116.31

116.07

115.92

(1)115.98

12" H

DP

E

(3)(1)

(2

(2

(1)

BUILDING

116.05

116.04

116.04 115.35

" H

D P E

(1)

(2)

WV

WV

117.25

DC

116.36

BUILDING 2320

118.55

117.41

S

114.53

114.68 DC

" H

DP

E

HVAC

(2

(1)

114.32

WV

H D P E

(1

H D P E

(2

5 11

EBA

(1)

117.01

CO

(2

(1)

S

116.61

4"

CO

E

CO

117 HVAC

CO

117.49

HD

PE

(3

(2

CO

HVAC

HVAC

E

(2)

E

6"

(3)

(1)

116.94

BUILDING

CO

CO

DC

(3

HD

PE

12" H

DPE

(2)(1)

EBA

H D P E

(1)

118.63

118.36

114.55

114.14

HVAC

113.32

P V C

114.73

114.50

EBA

EM

113.97

114.22

HVAC

114.68

113.98

WV

114.47

113.78

12"

113.47

112.97

114.99

DC

115.20

114.79

114.95

115.18

115.27

115.43

8" PVC

DC

113.72

(2)

(3)

(1)

S

114.79

115.14

113.64

CO

114.70

CO

113.51

113.26

WV

113.98

113.33

118.37

WV

118.35

119 11

113.06

114.42

115.02

FIBER OPTIC

113.21

12"

115.36

115.31

(2)

(3)

(1)

(4)

S

115.16

DC

#6" V

CP

WV

MARKER

PETROLEUM PIPELINE

114.80

12"

114.96

114.59

(2)

DC

U

113.35

S

12"

(4

CO

117.55

CO

HVAC

CO

CO

CO117.51

117.56

U

18" C

MP

116.67

12" R C P

114.13

114.43

116.81

115.60

115.34

116 116

VG

W

VG

VG

115.54

E

RC

P (2 )(3)

(1)

S

8"

(2)

113.90

113.85

114.33

114.17

DC

(2) (1)

18" CMP

VG

114.11

113.63

113.37

DC

113.49

(1)

12"

113.37

113.46

FLIGHT SIMULATOR

BUILDING

(UNDER CONSTRUCTION)

SUMP=106.41

INV(2)=106.41

INV(1)=106.40

INV=109.60

INV(2)=113.52

INV(1)=113.70

RIM=114.58

INV=113.25

INV=112.85

CB-60

INV=114.10

INV(2)=113.31

INV(1)=113.56

RIM=116.49

MH-D57

INV(2)=112.60

INV(1)=112.50

RIM=116.64

MH-D58

INV(3)=112.61

INV=113.18

INV=112.03

INV(2)=108.72

INV(1)=108.80

RIM=115.14

MH-S49

INV(1)=109.69

RIM=114.53

MH-S53

INV(2)=109.67

NO ACCESS

RIM=114.59

SUMP=106.35

INV(2)=106.55

INV(1)=106.53

GR=114.27

CB-64

MH-S65

CB-16

INV(2)=107.78

INV(1)=107.76

GR=112.13

INV=110.20

INV(2)=107.77

INV(1)=107.75

GR=112.14

CB-39

CB-38

GR=113.45

CB-21

INV(1)=109.46

RIM=111.96

MH-D40

INV(3)=100.34

INV(2)=100.29

INV(1)=103.99

RIM=113.40

MH-S41

INV=110.19

INV(2)=100.76

INV(1)=101.82

RIM=113.77

INV(3)=106.64

INV(2)=106.04

INV(1)=105.94

RIM=113.74

MH-D31

MH-S36

INV(2)=107.24

INV(1)=107.54

RIM=111.22

MH-D29

GR=113.53

CB-33

GR=114.32

CB-32

MH-S35

INV(3)=105.65

INV(2)=101.87

INV(1)=101.86

RIM=114.95

GR=114.35

GR=114.50

CB-15

EL=115.32

E=2021123.313 N=436108.461

X CUT-4

INV=112.73

INV(4)=102.09

INV(3)=108.37

INV(2)=102.11

INV(1)=106.10

RIM=114.77

INV(2)=114.65

INV(1)=114.35

RIM=117.45

MH-S69

GR=114.04

CB-25

GR=114.11

CB-26

INV(2)=105.83

INV(1)=106.03

RIM=116.18

MH-S22

GR=113.68

CB-19

INV(3)=112.41

INV(2)=112.07

INV(1)=111.32

RIM=117.46

MH-D11

CB-10

INV(3)=110.16

INV(2)=110.26

INV(1)=110.51

RIM=116.66

CB-67

INV(2)=106.32

INV(1)=106.34

GR=114.17

GR=114.05

CB-66

SUMP=106.29

SUMP=112.35

INV(3)=112.57

INV(2)=112.85

INV(1)=113.00

RIM=116.75

NO PIPES VISIBLE

SUMP=109.88

RIM=115.68

MH-D1

CB-2

INV=112.54

INV(2)=103.01

INV(1)=103.11

RIM=113.41

MH-S8

MH-S9

GR=113.84

CB-34

CB-17

GR=114.80

INV(2)=106.30

INV(1)=106.23

RIM=113.93

MH-D7

INV(2)=102.45

INV(1)=102.52

RIM=114.27

MH-S6

INV(3)=102.71

INV(2)=103.29

INV(1)=102.85

RIM=113.52

MH-S5

INV(4)=102.76

CHILLER

KVA

300 KVA

750 KVA

T T T T T T T

T

S

U

W

S

S

T

WV

(2

8" P

VC

8" P

VC

18" R C P

S

B.R.P.

(4)

T

S

W

W

UNKNOWN MH

(A.M.O.G.)

E

E

E

E

E

E

E

E

Ex Ex Ex

E x

E x

E x

E x

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

Ex Ex Ex

E E

E E

E E

E E

Ex

Ex

Ex

E x

E x

E x

E x

Ex Ex

D

D

D

D D

D

D

D

D

D D

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

DD D D D

D

D

D

S

S

S

S

S

S

S

S

D

D

D

D

D

D

D D

D

S

S

S

S

S

S

S

S

S

D

S

S

D

S

S

S S

D

D

D

D

D

D

D

D

D

D

D

D

D

S

S

S

S

S

S

S

S

S

S

D

D

D

D

D

D

D

S

S

S

S

S

D

W

W

D

D

S

S

S

S

S

S

S

S

G

S

S

S

S

S

S

S

S

D

S

S

S

S

S

S

S

T T

T T

T

T T

T T

T

T

T T T T T T T T T TT T T T T T TT T T T T T T T

T

T T T T T T T T

T T T T

T

T

T

T

W

W

D D D

E E E

E E E E

S S

S S

D

D

D

D

D

D

D

S

S

S

S

S

S

S

S

S

S

S

T

T

T

T

T

T

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W W

W W

W W

D

D

E

E

E

E

E

E

E

E

E

E

E

E

E

W

W

W

W

W

W

W

W

W

W T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

W W W W

W

W

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T T

T

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

T

T

T

T

T T

T

T

T

T

T

T

T

T

T

T

T

T T

T

T

T

T

T

T

T

T

T

T

T

T

T T

T T

T

T T T T T T T T T T T T T T T T T T T T T T

T T

T T

T T

T T T

T

B .R .P

12" B.R.P.12" B.R.P.

W

W

W

W

W

W

W

W

W

W

W

W

W

W

B .R .P

TO

C

FO

F

EX. HANDHOLE #4

ABOVE

GROUND

HTHW

U.G. HTHW FOR

FLIGHT SIM BLDG

BUILDING

BUILDING

EX. P

A R K

IN

G

EX. P

A R K

IN

G

EX. P

A R K

IN

G

W W

W W

W

W W W

A P P R O X

ABAN.

MH-D47

RIM=112.02

INV(1)=110.52

MH-D48

RIM=113.21

INV(1)=110.52

INV(2)=110.58

MH-D61

RIM=115.88

SUMP=114.63

CB-50

RIM=113.26

INV(1)=111.01

SUMP=110.88

CB-52

RIM=114.01

INV(1)=110.13

INV(2)=108.37

INV(3)=108.60

SUMP=108.15

CB-51

RIM=113.88

INV(1)=109.57

INV(2)=109.39

CB-55

GR=114.35

INV(1)=107.23

INV(2)=107.03

INV(3)=107.01

SUMP=106.86

CB-54

GR=114.05

INV(1)=109.02

SUMP=108.91

CB-56

GR=114.47

INV(1)=106.82

INV(2)=106.83

SUMP=106.68

CB-46

RIM=112.54

INV(1)=108.88

INV(2)=108.81

MH-D44

RIM=113.80

INV(1)=108.18

INV(2)=108.19

CB45

RIM=111.75

SUMP=108.35

MH-D43

RIM=113.80

INV(1)=108.10

INV(2)=108.15

CB-42

GR=112.64

INV(1)=107.99

INV(2)=108.09

INV(3)=110.07

INV(4)=108.24

MH-S63

RIM=116.00

INV(1)=113.54

INV(2)=113.26

MH-S27

RIM=116.10

INV(1)=110.53

INV(2)=110.42

MH-S24

RIM=114.78

INV=107.42

MH-S29

RIM=115.64

INV(1)=107.64

INV(2)=107.66

INV(3)= 108.24

(2

(1

PK-8

N=436358.271 E=2019875.755

EL.=116.41

PK-6

N=435933.283 E=2020726.901

EL.=114.38

(1) (2) D D D

S

S

S

S

S

S

S

S

S

S

S

(3)

S

S

MH-S23

RIM=114.92

INV(1)=106.43

INV(2)=107.28

(2

T

BUILDING

W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W12" B.R.P. 12" B.R.P.12" B.R.P.

U.G. HTHW FOR

FLIGHT SIM BLDG

ABOVE

GROUND

HTHW

UNDERGROUND

HTHW

T T T T T T T

T

T

T

T

T

T

T

T

T T T T T T T

T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T

T

T

T

T

S/W RAMP

6' SIDEWALK

EXPANSION JOINTS AT

CONNECTION TO EXISTING

SIDEWALK (TYP.)

9' (

TYP

OPTION 2 (NIC)

CLIENT

DESIGNER

CONSULTANTS

ISSUE

REGISTRATION

PROJECT NO:

KEY PLAN

DMJMH+N, Inc. Rev. 2003-1c 2003

BID SET

MARK DESCRIPTIONDATE

CHECKED BY:

DRAWN BY:

SHEET TITLE

B

1 3 4 5 6

1 32 4 5 6

A

C

D

E

T: 703-807-2500 F: 703-807-2599 www.dmjm.com

1525 WILSON BLVD, SUITE 1100, ARLINGTON VIRGINIA 22209

MAINTENANCE

TRAINING FACILITY

MCGUIRE AIR FORCE BASE

NEW JERSEY

PROJECT NO. PTFL053000S

PROJECT

USACE_LOGO.JPG

NJ Certificate of Authorization No: 24GA27996400

Environmental Services Engineering and

New York, NY 10001-2727 360 West 31st St, Suite 900

Phone: (212) 479-5400 Miami, FL Doylestown, PA Elmwood Park, NJ

New Haven, CT

032151346.0000

04/08/04- BID SET

SITE PLAN NOTES:

1. EXISTING SITE FEATURES FOR THE CFOF BUILDING (ACROSS

ARNOLD AVE) AND THE ADJACENT FLIGHT SIMULATOR BUILDING SHALL

BE VERIFIED IN FIELD AS CONSTRUCTION OF THESE PROJECTS IS

UNDERWAY.

2. SEE A-SERIES DRAWINGS FOR DETAIL OF AREAS ADJACENT TO THE

PROPOSED BUILDING (PATIOS, FURNISHINGS, PLANTERS, ETC.)

3. ABBREVIATIONS:

S/W = SIDEWALK

E.J. = EXPANSION JOINTS

AGE (STORAGE AREA) = AIRCRAFT GENERATION EQUIPMENT

SCALE IN FEET

30 30

SOUTHEASTERN

EXTENSION

BID OPTION NOTES:

OPTION 1 IS NOT IN CONTRACT (NIC).

OPTION 2 IS NOT IN CONTRACT (NIC).

PORTIONS OF BASE BID SIDEWALK GREYTONED OR LABELED ARE NOT

IN CONTRACT (NIC).

IF OPTION 3 AND/OR 4 IS NOT EXERCISED, EXTEND SIDE ENTRANCE

SIDEWALK AS NECESSARY AND MAINTAIN POSITIVE DRAINAGE AWAY

FROM PROPOSED BUILDING.

PRIOR TO CONSTRUCTION, COORDINATE WITH OWNER FOR ADDITIONAL

BID OPTION INFORMATION AS REQUIRED.

ALSO REFER TO SHEET G-002 FOR BID OPTION BOUNDARIES &

INFORMATION.

1"= 30'

LEGEND:

= DOOR ENTRANCE

= PARKING SPACE COUNT

= BOLLARDS

(SEE A-SERIES DWGS FOR DETAILS)

SEE INSET BELOW FOR

CONTINUED SIDEWALK

(NOT IN CONTRACT)

S/W = SIDEWALK

CC = CURB CUT

MAFB = MCGUIRE AIR FORCE BASE

= COORDINATE LOCATION POINT

SEE SHEET C-101 FOR EXISTING FEATURES LEGEND

COORDINATE POINTS:

ID NORTHING EASTING

1. 436206.6399 2020433.6353

2. 436362.7165 2020505.9133

3. 436346.0518 2020634.1122

4. 436156.6184 2020735.2002

5. 436087.0494 2020702.9832

6. 436353.4711 2020325.3391

1 05/06/04 REVISION NO. 1

2 05/25/04 REVISION NO. 2

08/16/043 BID OPTION REDUCTIONS

ENCLOSURE DELETED.

AS-BUILT CONDITIONS2/20/064

A A

AA

A

A

A

A

A

A

A

A

WEST ARNOLD AVE

VANDENBERG AVE

RADIN RD

Ex Ex Ex ExEx Ex Ex ExEx Ex Ex Ex Ex Ex Ex

Ex ExEx Ex Ex ExEx Ex Ex Ex

E x

E x

Ex Ex Ex Ex

BUILDING 2215

BUILDING 2216BUILDING 2217

BUILDING 2306

BUILDING

BUILDING 2251NEW HANGAR (BLDG 2250)

BUILDING

W H

IT

E S T

GRISSOM RD

VA

N

DEN

B U

RG A

VE

WEST ARNOLD AVE

CHAFFEE AVE

C-17 CONSOLIDATED FLIGHTLINE OPERATIONS FACILITY

AIR FREIGHT TERMINAL SITE

116.54

116.53

116.44

116.29

116.27

15"

RC

P

18" RCP

116.64

116.35

116.24

116.58

117.00

115.64 11

116.32

114.77

115.70

116.30

116.46

" R

C P

117.61

(2

HVAC

115.59

115.58

WV

WV 11

15" R C P

117.64

(1)

116.10

CO

CO

M

E

EBA

116.91

116.56

117.01

117.65

BUILDING 2306

116.73

HVAC

118.11

EBA

CO

116.45

116.12

116.21

(2)(1)

115.46

S

HVAC

6" RCP

116.84

(2

(1)

116.61

116.91

116.65

R C P

15"

RC

P

116.39

DC

116.30

(3

(1)

(2)

" R

C P

116.19

(3

(2)

114.93

114.15

113.95

114.52

114.86

114.76

U U

DC

114.65

114.59

113.84

113.83

(1)

113.62

113.41

12"

(1)

8"

(2)

(3) S

113.45

# WV

VG

114.28

114.14

114.08

113.33

114.42

U

113.74

U

113.78

30" RCP

112.77

113.70

U

113.47

30" RCP

113.23

(1)

112.40 (2)(1) (2)

113.01

113.09

(1)

114.28

DC

FIBER OPTIC

WV

114 # 113.79

113.95

(1

DC

114.41

C M P

113.88

12"

113.71113.69

113.85

113.95

S(2)

(3

(2)

(1)

WV114

36" RC

P

12"

FIBER OPTIC

(2)

112.78

(1)

36" RCP

114.10

114112.83

114.73

113.99

114.34

114.49

114.76

113.64

113.42

BUILDING 2319

115.52

114.56

HVAC

DC

" R

CP

CO

24" RCP

(1

113.95

114.65

115.17

114.83

115.92

115.33

115.90

116.09 116.11

115.52

115.84 115.69

115.38 115.03

115.61

(1

115.43 115.42

U

U

114.61 114.67

115.64

114.90 114.94

WV WV

115.79

115.98

115.92

116.63

115.89

116.09

INV=112.65

115.99

115.8518 " R

C P

116.10

INV=113.80

116.61

115.90

INV=113.91

117.33

115.69

117.14

HVAC

115.89

117 114.95

5 11

119.40

115.22

BUILDING

CO

115.87 119.48

119.99

119.92

115.97

WV

MC

STEAM

116 118

119.90

119.89

(1)

115.07

115.68115.91

115.96

115.43

WV

114.67

114.93

115115

115.33

115.16

114.54

113.95(2 ) 114.04

113.83

114.58 114.71

114.77

30" RCP

114.25

114.99

114.51

(1)

114.91115

115.55

115.20

115.62

115.97

114.31

(2)(2) 113.44

(1) (1)

30" RCP

114.72

115.61

114 113.80

30" RCP

112.83 112.97

115.26

114.77

EBA

HVAC

HVAC

115.73

ECO 116

115.52

115.20

116.53

115.60

115.78

115.82

115.67

116.43

116.64

114.67

" P

V C

(1)

115.12

S

U

115 115

115.78

115.57 HVAC

E

12" C

MP

115.77

114.56

15" HDPE

114.14

12" H

DP

E

(3)

(1)

114.15

(2)

114.41

" P

V C

(2

(1)

S

117.3811

114.07

(1)11 4 11

8" DIP

115.51

114.88

115.94 11

116.23

116.84

116.76

115.09

115.17

114.21

(1)

(2)S

116.97

8" PVC

(1)

" P

V C

8" P

VC

CO

116.55

WV

114.45

118.43

CO

118.27

114.73

114.64

S

INV=114.77

116.07

INV=114.63

116.15

INV=113.83

116.23

116.26

116.24

HVAC-EBA

E

HVAC

116.25

BUILDING 2315

E

6 11

U

EBA

HVAC

116.28

115.97

BUILDING

EXISTING

115.93

116.18

116.31

116.07

115.92

(1)115.98

12" H

DP

E

(3)(1)

(2

(2

(1)

BUILDING

116.05

116.04

116.04 115.35

" H

D P E

(1)

(2)

WV

WV

117.25

DC

116.36

BUILDING 2320

118.55

117.41

S

114.53

114.68 DC

" H

DP

E

HVAC

(2

(1)

114.32

WV

H D P E

(1

H D P E

(2

5 11

EBA

(1)

117.01

CO

(2

(1)

S

116.61

4"

CO

E

CO

117 HVAC

CO

117.49

HD

PE

(3

(2

CO

HVAC

HVAC

E

(2)

E

6"

(3)

(1)

116.94

BUILDING

CO

CO

DC

(3

HD

PE

12" H

DPE

(2)(1)

EBA

H D P E

(1)

118.63

118.36

114.55

114.14

HVAC

113.32

P V C

114.73

114.50

EBA

EM

113.97

114.22

HVAC

114.68

113.98

WV

114.47

113.78

12"

113.47

112.97

114.99

DC

115.20

114.79

114.95

115.18

115.27

115.43

8" PVC

DC

113.72

(2)

(3)

(1)

S

114.79

115.14

113.64

CO

114.70

CO

113.51

113.26

WV

113.98

113.33

118.37

WV

118.35

119 11

113.06

114.42

115.02

FIBER OPTIC

113.21

12"

115.36

115.31

(2)

(3)

(1)

(4)

S

115.16

DC

#6" V

CP

WV

MARKER

PETROLEUM PIPELINE

114.80

12"

114.96

114.59

(2)

DC

U

113.35

S

12"

(4

CO

117.55

CO

HVAC

CO

CO

CO117.51

117.56

U

18" C

MP

116.67

12" R C P

114.13

114.43

116.81

115.60

115.34

116 116

VG

W

VG

VG

115.54

E

RC

P (2 )(3)

(1)

S

8"

(2)

113.90

113.85

114.33

114.17

DC

(2) (1)

18" CMP

VG

114.11

113.63

113.37

DC

113.49

(1)

12"

113.37

113.46

FLIGHT SIMULATOR

BUILDING

(UNDER CONSTRUCTION)

SUMP=106.41

INV(2)=106.41

INV(1)=106.40

INV=109.60

INV(2)=113.52

INV(1)=113.70

RIM=114.58

INV=113.25

INV=112.85

CB-60

INV=114.10

INV(2)=113.31

INV(1)=113.56

RIM=116.49

MH-D57

INV(2)=112.60

INV(1)=112.50

RIM=116.64

MH-D58

INV(3)=112.61

INV=113.18

INV=112.03

INV(2)=108.72

INV(1)=108.80

RIM=115.14

MH-S49

INV(1)=109.69

RIM=114.53

MH-S53

INV(2)=109.67

NO ACCESS

RIM=114.59

SUMP=106.35

INV(2)=106.55

INV(1)=106.53

GR=114.27

CB-64

MH-S65

CB-16

INV(2)=107.78

INV(1)=107.76

GR=112.13

INV=110.20

INV(2)=107.77

INV(1)=107.75

GR=112.14

CB-39

CB-38

GR=113.45

CB-21

INV(1)=109.46

RIM=111.96

MH-D40

INV(3)=100.34

INV(2)=100.29

INV(1)=103.99

RIM=113.40

MH-S41

INV=110.19

INV(2)=100.76

INV(1)=101.82

RIM=113.77

INV(3)=106.64

INV(2)=106.04

INV(1)=105.94

RIM=113.74

MH-D31

MH-S36

INV(2)=107.24

INV(1)=107.54

RIM=111.22

MH-D29

GR=113.53

CB-33

GR=114.32

CB-32

MH-S35

INV(3)=105.65

INV(2)=101.87

INV(1)=101.86

RIM=114.95

GR=114.35

GR=114.50

CB-15

EL=115.32

E=2021123.313 N=436108.461

X CUT-4

INV=112.73

INV(4)=102.09

INV(3)=108.37

INV(2)=102.11

INV(1)=106.10

RIM=114.77

INV(2)=114.65

INV(1)=114.35

RIM=117.45

MH-S69

GR=114.04

CB-25

GR=114.11

CB-26

INV(2)=105.83

INV(1)=106.03

RIM=116.18

MH-S22

GR=113.68

CB-19

INV(3)=112.41

INV(2)=112.07

INV(1)=111.32

RIM=117.46

MH-D11

CB-10

INV(3)=110.16

INV(2)=110.26

INV(1)=110.51

RIM=116.66

CB-67

INV(2)=106.32

INV(1)=106.34

GR=114.17

GR=114.05

CB-66

SUMP=106.29

SUMP=112.35

INV(3)=112.57

INV(2)=112.85

INV(1)=113.00

RIM=116.75

NO PIPES VISIBLE

SUMP=109.88

RIM=115.68

MH-D1

CB-2

INV=112.54

INV(2)=103.01

INV(1)=103.11

RIM=113.41

MH-S8

MH-S9

GR=113.84

CB-34

CB-17

GR=114.80

INV(2)=106.30

INV(1)=106.23

RIM=113.93

MH-D7

INV(2)=102.45

INV(1)=102.52

RIM=114.27

MH-S6

INV(3)=102.71

INV(2)=103.29

INV(…