ALL CONTRACTORS SUBMITTING BID PROPOSALS FOR THIS PROJECT ARE REQUIRED
TO VISIT THE SITE PRIOR TO BIDDING TO VERIFY EXISTING CONDITIONS AND
FEASIBILITY OF DESIGN INTENT OF THESE CONSTRUCTION DOCUMENTS
(CONSTRUCTION DRAWINGS AND SPECIFICATIONS). ANY VARIATION IN SITE
CONDITIONS AND CONSTRUCTION DOCUMENTS SHALL BE BROUGHT TO THE
CONTRACTING OFFICER REPRESENTATIVE'S (COR) ATTENTION IN WRITING
IMMEDIATELY AND (5) BUSINESS DAYS PRIOR TO BID DATE. THE SUBMISSION OF BID
PROPOSAL'S SHALL BE CONSIDERED EVIDENCE THAT THE CONTRACTOR HAS VISITED
THE SITE, VERIFIED ITS CONDITIONS AND IS PREPARED TO PERFORM WORK AS
INTENDED IN THESE DOCUMENTS. NO EXTRA PAYMENTS SHALL BE ALLOWED DUE TO
THE CONTRACTOR'S CLAIMS FOR EXTRA WORK REQUIRED BY THEIR FAILURE TO VISIT
THE SITE. CONTRACTOR IS RESPONSIBLE TO PROVIDE THE GREATER QUALITY AND
QUANTITY WHEN DISCREPANCIES ARE DISCOVERED, UNLESS DIRECTED OTHERWISE.
CONSTRUCTION SHALL CONFORM TO ALL GOVERNING CODES.
IF EXISTING CONDITION VARIES FROM DRAWINGS, CONTRACTOR SHALL CONTACT
C.O.R. PRIOR TO CONTINUING WORK.
CONTRACTOR SHALL NOTIFY C.O.R. OF ANY DISCREPANCIES, OR ANY ADDITIONAL
INFORMATION REQUIRED DURING THE BID PERIOD (5) BUSINESS DAYS PRIOR TO
SUBMITTAL OF BID.
FIRST FLOOR FINISH FLOOR ELEVATION OF 100'-0" IS FOR REFERENCE ONLY. FINISH
FLOOR OF NEW CONSTRUCTION CORRESPONDS WITH ACTUAL EXISTING FIRST
FLOOR FINISH FLOOR ELEVATION AS SHOWN ON CIVIL SITE PLAN.
DO NOT SCALE DRAWINGS. IF DIMENSIONS ARE IN QUESTION THE CONTRACTOR
SHALL BE RESPONSIBLE FOR OBTAINING CLARIFICATION FROM THE C.O.R. BEFORE
CONTINUING WITH THE WORK.
EACH CONTRACTOR IS RESPONSIBLE FOR COORDINATING THEIR WORK WITH ALL
SURROUNDING CONSTRUCTION ELEMENTS AND TRADES AFFECTED.
EACH CONTRACTOR IS RESPONSIBLE FOR CREATING ALL OPENINGS, PENETRATIONS,
LINTELS, ETC. AS REQUIRED TO PERFORM THEIR PORTION OF WORK. AT FIRE RATED
PARTITIONS, CLOSE OPENINGS / PENETRATIONS / ETC. WITH FIRESTOPPING THAT
MATCHES OR EXCEEDS THE PARTITION RATING.
ALL ITEMS REQUIRING COLOR SELECTION SHALL BE SELECTED BY THE ARCHITECT
DURING THE SUBMITTAL REVIEW FROM MANUFACTURERS' STANDARD, OR FULL
RANGE (AS DIRECTED IN SPECIFICATION) OF COLORS.
IT IS THE CONTRACTOR'S RESPONSIBILITY FOR THE COORDINATION OF ALL
DRAWINGS AND SPECIFICATIONS AS REQUIRED TO PERFORM THE WORK AS CALLED
FOR, SHOWN AND REASONABLY IMPLIED IN THE CONTRACT DOCUMENTS.
ASBESTOS CONTAINING MATERIALS SHALL NOT BE USED ON ANY PROJECT.
FINISH AND PAINT WALLS BEFORE INSTALLING CASEWORK, EQUIPMENT, FIXTURES,
ELEC. PANELS, BOXES, SURFACE CONDUIT, ETC., IF APPLICABLE.
CONTRACTOR TO INSTALL WOOD OR METAL BLOCKING FOR ALL CASEWORK,
EQUIPMENT, HANDRAILS, BATH ACCESSORIES, FIXTURES, ETC. AS RECOMMENDED
BY MANUFACTURER, IF NOT OTHERWISE SHOWN HEREIN.
ALL WOOD BLOCKING LOCATED OUTSIDE THE BLDG. ENVELOPE, IN EXTERIOR
WALLS/ROOFS OR IN CONTACT W/ CONCRETE OR MASONRY, SHALL BE TREATED
LUMBER, AND FASTENED WITH SCREWS. ALL TREATED WOOD BLOCKING SHALL
HAVE CORROSION RESISTANT SCREWS.
IF DISCREPANCIES BETWEEN PLANS OR SPECIFICATIONS OCCUR THE CONTRACTOR
SHALL NOTIFY THE C.O.R. THE MOST RESTRICTIVE, HIGHER QUALITY OR GREATER
VALUE WILL APPLY. FOR BIDDING, CONTRACTOR SHALL USE THE MOST RESTRICTIVE,
HIGHER QUALITY OR GREATER VALUE BUT FINAL DETERMINATION WILL BE
DETERMINED BY THE C.O.R. DURING SUBMITTAL REVIEW OR BY REPLYING TO RFI.
FOR INSTALLATION OF ALL WORK WHICH IS DEPENDENT ON CONDITION OF
SUBSTRATE, CAREFULLY INSPECT AND VERIFY SUITABILITY OF SUBSTRATE FOR
INSTALLATION OF WORK. DO NOT INSTALL WORK OVER UNSUITABLE OR
UNACCEPTABLE SUBSTRATES. CORRECT UNACCEPTABLE SUBSTRATES BEFORE
INSTALLING WORK. CONTRACTOR IS RESPONSIBLE FOR ALL GRINDING, LEVELING,
SANDING, PATCHING, ETC. TO CORRECT ALL EXISTING SURFACES TO PREPARE
FOR NEW FINISHES.
MOUNTING HEIGHTS OF ELECTRICAL, PLUMBING, MECHANICAL, AND OTHER DEVICES
SHALL COMPLY WITH HEIGHTS INDICATED ON DRAWINGS. NOTIFY C.O.R. IF
CONFLICTS ARE ENCOUNTERED.
ALL EXPOSED METAL, METAL DECK, STRUCTURAL, BAR JOISTS, CONDUITS, PIPES,
ANGLES, BRACKETS, DUCT, ETC. SHALL NOT BE PAINTED UNLESS NOTED OTHERWISE.
ALL PARTITIONS EXTEND TO BOTTOM OF ROOF DECK UNLESS OTHERWISE NOTED.
CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING ANY EXISTING ANCHORS,
BRACKETS, ETC. AND PATCH LIKE NEW BEFORE INSTALLING NEW FINISHES.
ALL EXPOSED CONCRETE FLOORS SHALL BE CLEANED AT THE END OF PROJECT AND
HAVE A 2ND COAT OF SEALER APPLIED.
FOR APPLICABLE CODES LISTING & BUILDING CODE REVIEW, REFER TO LIFE SAFETY
PLANS.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
SHEET
REFERENCE
NUMBER
SHEET
A N S I D
W -0 -D -0
U S A R M Y E N G
IN
E E R D
IS
T R
IC
T
N E W Y O R K h tt p /w w w .n a n .u s a c e .a rm y .m il
S O L
IC
IT
A T
IO
N N O
F
IL
E N A M E
D W N B Y
C K D B Y
D E S
IG
N E D B Y
D A T E
S
IZ
E
S U B M
IT
T E D B Y
P L O T T E D B Y
P L O T D A T E
D E S C R
IP
T
IO
N
D A T E
C O N T R A C T N O
M A R K
A P P R
US Army Corps of Engineers
New York District
VICINITY MAP
NOT TO SCALE
PROJECT NUMBER: AM 2455205
D
2 3
C
A
B
D E S C R
IP
T
IO
N
D A T E
M A R K
A P P R
S U B M
IT
T E D B Y
P L O T D A T E
M A Y N Y D A /E C O V E R
OF
LOCATION PLAN
NOT TO SCALE
W O O L P E R T
F o u n ta in s P a rk w a y
S u it e
F a ir v ie w H e ig h ts
IL
-2
T e l:
-7
F a x (6 -0 w w w .w o o lp e rt .c o m
/1 /2 :4 :5 A M
/1 /2 :4 :5 A M
C R e v it L o c a l F ile s \W P M S \2 R e v it W P M S F ile s \W e s t P o in t M S c s a m p le .r v t
C O
V E
R S
H E
E T
C A S G R C C E D
C A S
W R T
G -0 .d w g
J U L Y
G-001
M J L
M J L
100% CONSTRUCTION
DOCUMENTS
100% CONSTRUCTION
DOCUMENTS
W E
S T
P O
IN
T
M
ID
D L
E S
C H
O O
L
A D
D
IT
IO
N
A N
D R
E N
O V
A T
IO
N
W E
S T
P O
IN
T
N
E W
Y O
R K
WEST POINT MIDDLE SCHOOL
ADDITION AND RENOVATION
WEST POINT, NEW YORK
SOUTHWEST VIEW
PROJECT GENERAL NOTES:PROJECT TEAM:
PROJECT STAMP AND SIGNATURES:
ARCHITECTURE, LANDSCAPE ARCHITECTURE, STRUCTURAL
CIVIL, PLUMBING, MECHANICAL, AND ELECTRICAL ENGINEERING
FIRE PROTECTION AND LIFE SAFETY:
INTERIOR DESIGN:
FOOD SERVICE:
WOOLPERT
343 FOUNTIANS PARKWAY
SUITE 100
FAIRVIEW HEIGHTS, IL
62208-2044
TEL: (618) 632-7004
FAX: (618) 632-0100
www.woolpert.com
ROLF JENSEN & ASSOCIATES, INC.
360 WEST 31st STREET
SUITE 900
NEW YORK, NY 10001
TEL: (212) 695-6670
FAX: (212) 695-6671
www.rjainc.com
OCULUS INC.
1 SOUTH MEMORIAL DRIVE
SUITE 1500
ST. LOUIS, M0 63102
TEL: (314) 367-6100
FAX: (314) 367-1489
www.oculusinc.com
CAMACHO USA
6735 PEACHTREE INDUSTRIAL BLVD
SUITE 120
ATLANTA, GA 30360
TEL: (770) 582-1144
FAX: (770) 582-1009
www.camachoUSA.com
ARCHITECT
STRUCTURAL
ENGINEER
MECHANICAL
ENGINEER
PLUMBING
ENGINEER
ELECTRICAL
ENGINEER
FIRE PROTECTION
ENGINEER
ENVIRONMENTAL
ENGINEER
CIVIL ENGINEER
ENVIRONMENTAL ENGINEER:
EA ENGINEERING, SCIENCE, &
TECHNOLOGY, INC.
15 LOVETON CIRCLE
SPARKS, MD 21152
TEL: (410) 329-5158
FAX: (410) 771-4204
www.eaest.com
D
2 3
C
A
B
SHEET
A N S I D
U S A R M Y E N G
IN
E E R D
IS
T R
IC
T
N E W Y O R K h tt p /w w w .n a n .u s a c e .a rm y .m il
S O L
IC
IT
A T
IO
N N O
F
IL
E N A M E
D W N B Y
C K D B Y
D E S
IG
N E D B Y
D A T E
S
IZ
E
S U B M
IT
T E D B Y
P L O T T E D B Y
P L O T D A T E
D E S C R
IP
T
IO
N
D A T E
C O N T R A C T N O
M A R K
A P P R
US Army Corps of Engineers
New York District
D E S C R
IP
T
IO
N
D A T E
M A R K
A P P R
SHEET
REFERENCE
NUMBER
OF
M A Y N Y D A /E C O V E R
S U B M
IT
T E D B Y
P L O T D A T E
W -0 -D -0
THIS BAR IS ONE INCH ON
ORIGINAL DRAWING
IF NOT ONE INCH ON THIS
SHEET, ADJUST SCALES
ACCORDINGLY
0 1"
W O O
LP
ER
T
Fo un ta in s P ar kw ay S ui te
Fa irv ie w H ei gh ts , I L
8-
Te l:
(6 ) 6 -7
Fa x:
(6
) 6
-0 w w w .w oo lp er t.c om
/1 /2 :2 :2 A M
/1 /2 :2 :2 A M
C R e v it L o c a l F ile s \W
P M S \2 R e v it W
P M S F ile s \W e s t P o in t M S c s a m p le .r v t
IN
D
E X
O F
D R
A W
IN
G
S
G-002
C A S G R C C E D
C A S
W R T
G -0 .d w g
J U L Y
M J L
M J L
100% CONSTRUCTION
DOCUMENTS
W E
S T
P O
IN
T
M
ID
D L
E S
C H
O O
L
A D
D
IT
IO
N
A N
D R
E N
O V
A T
IO
N
W E
S T
P O
IN
T
N
E W
Y O
R K
INDEX OF DRAWINGS
TITLEDGN FILESHT NO. PLATE NO. SHT NO. DGN FILE TITLEPLATE NO.
M-615 33 M-615 HOT WATER SYSTEM PIPING DIAGRAMS
M-701 34 M-701 HVAC SEQUENCE OF OPERATION
M-702 35 M-702 HVAC SEQUENCE OF OPERATION
11 - Electrical
E-001 1 E-001 GENERAL NOTES AND LEGEND
ES101 2 ES101 PARTIAL ELECTRICAL SITE BUILDING PLAN
ES102 3 ES102 PARTIAL ELECTRICAL SITE ROADWAY PLAN
ED101 4 ED101 DEMOLITION BASEMENT LIGHTING AND SYSTEMS PLAN
ED102 5 ED102 DEMOLITION FIRST FLOOR LIGHTING AND SYSTEMS PLAN
ED103 6 ED103 DEMOLITION SECOND FLOOR LIGHTING AND SYSTEMS PLAN
ED111 7 ED111 DEMOLITION BASEMENT POWER PLAN
ED112 8 ED112 DEMOLITION FIRST FLOOR POWER PLAN
ED113 9 ED113 DEMOLITION SECOND FLOOR POWER PLAN
ED114 10 ED114 DEMOLITION ROOF POWER PLAN
EL101A 12 EL101A BASEMENT LIGHTING PLAN – AREA A
EL101B 13 EL101B BASEMENT LIGHTING PLAN – AREA B
EL102A 14 EL102A FIRST FLOOR LIGHTING PLAN – AREA A
EL102B 15 EL102B FIRST FLOOR LIGHTING PLAN – AREA B
EL102C 16 EL102C FIRST FLOOR LIGHTING PLAN – AREA C
EL103 17 EL103 SECOND FLOOR LIGHTING PLAN - AREA A
EP101A 18 EP101A BASEMENT POWER PLAN – AREA A
EP101B 19 EP101B BASEMENT POWER PLAN – AREA B
EP102A 20 EP102A FIRST FLOOR POWER PLAN – AREA A
EP102B 21 EP102B FIRST FLOOR POWER PLAN – AREA B
EP102C 22 EP102C FIRST FLOOR POWER PLAN – AREA C
EP103 23 EP103 SECOND FLOOR POWER PLAN – AREA A
EP104A 24 EP104A ELECTRICAL ROOF PLAN - AREA A
EP104B 25 EP104B ELECTRICAL ROOF PLAN - AREA B
EP104C 26 EP104C ELECTRICAL ROOF PLAN - AREA C
EY101A 27 EY101A BASEMENT SYSTEMS PLAN – AREA A
EY101B 28 EY101B BASEMENT SYSTEMS PLAN – AREA B
EY102A 29 EY102A FIRST FLOOR SYSTEMS PLAN – AREA A
EY102B 30 EY102B FIRST FLOOR SYSTEMS PLAN – AREA B
EY102C 31 EY102C FIRST FLOOR SYSTEMS PLAN – AREA C
EY103 32 EY103 SECOND FLOOR SYSTEMS PLAN – AREA A
E-401 33 E-401 ENLARGED KITCHEN POWER PLAN
E-402 34 E-402 SUB-BASEMENT PARTIAL PLANS FOR LIGHTING, POWER, AND SYSTEMS
E-403 35 E-403 ENLARGED SERVER ROOM "B2" DEMOLITION, POWER, AND SYSTEMS
PLANS
E-404 36 E-404 EXISTING GYM BUILDING 705C 1ST FLOOR POWER AND SYSTEMS PLAN
E-405 37 E-405 EXISTING GYM BUILDING 705C 2ND FLOOR POWER AND SYSTEMS PLAN
E-406 38 E-406 PARTIAL EXISTING BUILDING 705 POWER AND SYSTEMS PLAN
E-501 39 E-501 DETAIL SHEET
E-502 40 E-502 DETAIL SHEET
E-601 41 E-601 EXISTING AND NEW ELECTRICAL ONE-LINE DIAGRAMS
E-602 42 E-602 ELECTRICAL EQUIPMENT SCHEDULE
E-603 43 E-603 ELECTRICAL EQUIPMENT SCHEDULE
E-604 44 E-604 PANELBOARD SCHEDULES
E-605 45 E-605 PANELBOARD SCHEDULES
E-606 46 E-606 PANELBOARD SCHEUDLES
E-607 47 E-607 PANELBOARD SCHEDULES
E-608 48 E-608 PANELBOARD SCHEDULES
E-609 49 E-609 FIRE ALARM RISER DIAGRAMS
E-610 50 E-610 TELEVISION & CLOCK RISER DIAGRAMS
E-611 51 E-611 P/A RISER DIAGRAMS
E-612 52 E-612 SECURITY RISER DIAGRAMS
E-613 53 E-613 EXISTING BUILDING TELEPHONE / DATA RISER DIAGRAM
E-614 54 E-614 NEW BUILDING TELEPHONE / DATA RISER DIAGRAM
E-615 55 E-615 LIGHT FIXTURE SCHEDULE
R-001 56 R-001 REFERENCE SHEET
R-002 57 R-002 REFERENCE SHEET
12 - Hazardous Materials
HA101 1 HA101 BASEMENT ABATEMENT PLAN
HA102 2 HA102 FIRST FLOOR ABATEMENT PLAN
HA103 3 HA103 SECOND FLOOR ABATEMENT PLAN
HA104 4 HA104 ROOF ABATEMENT PLAN
SF-102C1 14 SF-102C1 FIRST FLOOR FRAMING PLAN WITH WALLS BELOW - AREA C1
SF-102C2 15 SF-102C2 FIRST FLOOR FRAMING PLAN WITH WALLS ABOVE - AREA C2
SF-103A 16 SF-103A EXIST- SECOND FLOOR - AREA A
SF-103A-01 17 SF-103A-01 PROGRESSIVE COLLAPSE - SECOND FLOOR WITH WALLS & CABLE BELOW
- AREA A
SF-103B 18 SF-103B ROOF FRAMING PLAN WITH WALLS BELOW - AREA B
SF-103C 19 SF-103C ROOF FRAMING PLAN WITH WALLS BELOW - AREA C
SF-104A 20 SF-104A EXIST. AUDITORIUM AND ELEVATOR ROOF FRAMING PLAN - AREA A
SF-104A-01 21 SF-104A-01 PROGRESSIVE COLLAPSE - UPPER ROOF WITH WALLS & CABLE BELOW -
AREA A
SF-104B 22 SF-104B HIGH ROOF FRAMING PLAN - AREA B
SF-105A 23 SF-105A EXIST. PARAPET - AREA A
S-201 24 S-201 FOUNDATION ELEVATIONS
S-202 25 S-202 FOUNDATION ELEVATIONS
S-203 26 S-203 FOUNDATION ELEVATIONS
S-301 27 S-301 BUILDING SECTIONS
S-302 28 S-302 BUILDING SECTIONS
S-303 29 S-303 PROGRESSIVE COLLAPSE SECTIONS
S-304 30 S-304 BUILDING SECTION - GYM
S-501 31 S-501 DETAILS
S-502 32 S-502 DETAILS
S-503 33 S-503 DETAILS
S-504 34 S-504 DETAILS
S-505 35 S-505 DETAILS
S-506 36 S-506 DETAILS
S-507 37 S-507 PROGRESSIVE COLLAPSE DETAILS
S-508 38 S-508 DETAILS
S-509 39 S-509 DETAILS
S-510 40 S-510 DETAILS
S-511 41 S-511 DETAILS
S-512 42 S-512 DETAILS
S-513 43 S-513 DETAILS
S-514 44 S-514 DETAILS
S-515 45 S-515 DETAILS
09 - Plumbing
P-001 1 P-001 GENERAL PLUMBING NOTES AND LEGENDS
PD101 2 PD101 BASEMENT UNDERGROUND PLUMBING DEMOLITION DMV PLAN - AREA A
PD102 3 PD102 BASEMENT FLOOR PLUMBING DEMOLITION, SUPPLY PLAN - AREA A
PD103 4 PD103 FIRST FLOOR PLUMBING DEMOLITION, SUPPLY & DWV PLAN - AREA A
PD104 5 PD104 SECOND FLOOR PLUMBING DEMOLITION, SUPPLY & DWV PLAN - AREA A
P-101A 6 P-101A BASEMENT UNDERGROUND PLUMBING DWV PLAN - AREA A
P-101B 7 P-101B BASEMENT UNDERGROUND PLUMBING DWV PLAN - AREA B
P-102A 8 P-102A BASEMENT FLOOR PLUMBING SUPPLY PLAN - AREA A
P-102B 9 P-102B BASEMENT FLOOR PLUMBING SUPPLY PLAN - AREA B
P-103A 10 P-103A FIRST FLOOR PLUMBING DWV PLAN - AREA A
P-103B 11 P-103B FIRST FLOOR PLUMBING DWV PLAN - AREA B
P-103C 12 P-103C FIRST FLOOR PLUMBING DWV PLAN - AREA C
P-104A 13 P-104A FIRST FLOOR PLUMBING SUPPLY PLAN - AREA A
P-104B 14 P-104B FIRST FLOOR PLUMBING SUPPLY PLAN - AREA B
P-104C 15 P-104C FIRST FLOOR PLUMBING SUPPLY PLAN - AREA C
P-105A 16 P-105A SECOND FLOOR PLUMBING DWV PLAN - AREA A
P-106A 17 P-106A SECOND FLOOR PLUMBING SUPPLY PLAN - AREA A
P-107A 18 P-107A ROOF AREA PLUMBING PLAN - AREA A
P-107B 19 P-107B ROOF AREA PLUMBING PLAN - AREA B
P-107C 20 P-107C ROOF AREA PLUMBING PLAN - AREA C
P-108 21 P-108 UNDERGROUND RADON PIPING PLAN - AREAS B & C
P-401 22 P-401 ENLARGED BASEMENT UNDERGROUND PLUMBING, DMV PLANS - AREA A
P-402 23 P-402 ENLARGED BASEMENT FLOOR PLUMBING SUPPLY PLANS - AREA A
P-403 24 P-403 ENLARGED KITCHEN / MECH. ROOM PLUMBING SUPPLY PLAN - AREA B
P-404 25 P-404 ENLARGED FIRST FLOOR AREA PLUMBING DMV PLANS - AREA A
P-405 26 P-405 ENLARGED FIRST FLOOR AREA PLUMBING DMV PLANS - AREA B
P-406 27 P-406 ENLARGED SCIENCE ROOM AREA PLUMBING DMV PLAN - AREA C
P-501 28 P-501 PLUMBING DETAILS
P-502 29 P-502 PLUMBING DETAILS
P-503 30 P-503 PLUMBING DETAILS
P-504 31 P-504 PLUMBING DETAILS
P-505 32 P-505 PLUMBING DETAILS
P-601 33 P-601 PLUMBING SCHEDULES
P-602 34 P-602 PLUMBING SCHEDULES
P-701 35 P-701 PLUMBING DWV SCHEMATICS
P-702 36 P-702 PLUMBING DWV SCHEMATICS
P-703 37 P-703 PLUMBING SUPPLY SCHEMATICS
P-704 38 P-704 PLUMBING SUPPLY SCHEMATICS
10 - Mechanical
M-001 1 M-001 MECHANICAL LEGEND AND DESIGN CRITERIA
M-002 2 M-002 MECHANICAL PROJECT NOTES
MD101 3 MD101 MECHANICAL BASEMENT DEMOLITION PLAN - AREA A
MD102 4 MD102 MECHANICAL FIRST FLOOR DEMOLITION PLAN - AREA A
MD103 5 MD103 MECHANICAL SECOND FLOOR DEMOLITION PLAN - AREA A
MD104 6 MD104 MECHANICAL ROOF DEMOLITION PLAN - AREA A
M-101A 7 M-101A MECHANICAL BASEMENT PLAN - AREA A
M-101B 8 M-101B MECHANICAL BASEMENT PLAN - AREA B
M-102A 9 M-102A MECHANICAL FIRST FLOOR PLAN - AREA A
M-102B 10 M-102B MECHANICAL FIRST FLOOR PLAN - AREA B
M-102C 11 M-102C MECHANICAL FIRST FLOOR PLAN - AREA C
M-103 12 M-103 MECHANICAL SECOND FLOOR PLAN - AREA A
M-104A 13 M-104A MECHANICAL ROOF PLAN - AREA A
M-104B 14 M-104B MECHANICAL ROOF PLAN - AREA B
M-104C 15 M-104C MECHANICAL ROOF PLAN - AREA C
M-401 16 M-401 MECHANICAL SUB-BASEMENT PLANS -AREA A
M-402 17 M-402 ENLARGED MECHANICAL PLANS - M105 & M101 MECHANICAL ROOM
M-501 18 M-501 MECHANICAL DETAILS
M-502 19 M-502 MECHANICAL DETAILS
M-503 20 M-503 MECHANICAL DETAILS
M-504 21 M-504 MECHANICAL DETAILS
M-505 22 M-505 MECHANICAL DETAILS
M-601 23 M-601 MECHANICAL SCHEDULES
M-602 24 M-602 MECHANICAL SCHEDULES
M-603 25 M-603 MECHANICAL SCHEDULES
M-604 26 M-604 MECHANICAL SCHEDULES
M-605 27 M-605 MECHANICAL SCHEDULES
M-610 28 M-610 CHILLED WATER PLANT PIPING DIAGRAM
M-611 29 M-611 HOT WATER PLANT PIPING DIAGRAM
M-612 30 M-612 CHILLED WATER SYSTEM PIPING DIAGRAMS
M-613 31 M-613 CHILLED WATER SYSTEM PIPING DIAGRAMS
M-614 32 M-614 HOT WATER SYSTEM PIPING DIAGRAMS
A-420 60 A-420 CASEWORK PLANS
A-421 61 A-421 INTERIOR ELEVATIONS
A-422 62 A-422 INTERIOR ELEVATIONS
A-423 63 A-423 INTERIOR ELEVATIONS
A-424 64 A-424 INTERIOR ELEVATIONS
A-425 65 A-425 INTERIOR ELEVATIONS
A-426 66 A-426 INTERIOR ELEVATIONS
A-430 67 A-430 CASEWORK DETAILS
A-431 68 A-431 CASEWORK DETAILS
A-432 69 A-432 INTERIOR DETAILS
A-501 70 A-501 PLAN DETAILS
A-502 71 A-502 PLAN DETAILS
A-503 72 A-503 PLAN DETAILS
A-504 73 A-504 PLAN DETAILS
A-510 74 A-510 CEILING DETAILS
A-511 75 A-511 CEILING DETAILS
A-520 76 A-520 ROOF DETAILS
A-521 77 A-521 ROOF DETAILS
A-522 78 A-522 ROOF DETAILS
A-523 79 A-523 ROOF DETAILS
A-530 80 A-530 SECTION DETAILS
A-531 81 A-531 SECTION DETAILS
A-532 82 A-532 SECTION DETAILS
A-533 83 A-533 SECTION DETAILS
A-534 84 A-534 SECTION DETAILS
A-535 85 A-535 SECTION DETAILS
A-536 86 A-536 SEISMIC JOINT DETAILS
A-537 87 A-537 EIFS DETAILS
A-601 88 A-601 DOOR SCHEDULES
A-602 89 A-602 DOOR DETAILS
A-603 90 A-603 DOOR DETAILS
A-610 91 A-610 WINDOW / LOUVER TYPES
A-611 92 A-611 WINDOW TYPES
A-612 93 A-612 WINDOW TYPES
A-613 94 A-613 WINDOW TYPES
A-614 97 A-614 WINDOW TYPES
A-620 95 A-620 WINDOW DETAILS
A-621 96 A-621 WINDOW / LOUVER DETAILS
05 - FF&E
IN101 1 IN101 OVERALL BASEMENT FINISH PLAN
IN101A 2 IN101A BASEMENT FINISH FLOOR PLAN - AREA A
IN101B 3 IN101B BASEMENT FINISH PLAN - AREA B
IN102 4 IN102 OVERALL FIRST FLOOR FINISH PLAN
IN102A 5 IN102A FIRST FLOOR FINISH PLAN - AREA A
IN102B 6 IN102B FIRST FLOOR FINISH PLAN - AREA B
IN102C 7 IN102C FIRST FLOOR FINISH PLAN - AREA C
IN103 8 IN103 SECOND FLOOR FINISH PLAN - AREA A
IN401 9 IN401 ENLARGED FINISH PLANS
IN402 10 IN402 ENLARGED FINISH PLANS
IN403 11 IN403 ENLARGED FINISH PLANS
IN404 12 IN404 INTERIOR FINISH ELEVATIONS
IF101 13 IF101 OVERALL BASEMENT FURNITURE PLAN
IF101A 14 IF101A BASEMENT FURNITURE PLAN - AREA A
IF101B 15 IF101B BASEMENT FURNITURE PLAN - AREA B
IF102 16 IF102 OVERALL FIRST FLOOR FURNITURE PLAN
IF102A 17 IF102A FIRST FLOOR FURNITURE PLAN - AREA A
IF102B 18 IF102B FIRST FLOOR FURNITURE PLAN - AREA B
IF102C 19 IF102C FIRST FLOOR FURNITURE PLAN - AREA C
IF103 20 IF103 SECOND FLOOR FURNITURE PLAN - AREA A
IF601 21 IF601 ROOM FINISH SCHEDULE
IF602 22 IF602 ROOM FINISH LEGEND
IF603 23 IF603 ROOM FINISH LEGEND
IG101 24 IG101 OVERALL BASEMENT SIGNAGE PLAN
IG101A 25 IG101A BASEMENT SIGNAGE PLAN - AREA A
IG101B 26 IG101B BASEMENT SIGNAGE PLAN - AREA B
IG102 27 IG102 OVERALL FIRST FLOOR SIGNAGE PLAN
IG102A 28 IG102A FIRST FLOOR SIGNAGE PLAN - AREA A
IG102B 29 IG102B FIRST FLOOR SIGNAGE PLAN - AREA B
IG102C 30 IG102C FIRST FLOOR SIGNAGE PLAN - AREA C
IG103 31 IG103 SECOND FLOOR SIGNAGE PLAN - AREA A
IG501 32 IG501 SIGNAGE DETAILS
06 - Kitchen Equipment
QF101 1 QF101 KITCHEN EQUIPMENT LAYOUT
QF201 2 QF201 KITCHEN EQUIPMENT SCHEDULE
QF202 3 QF202 KITCHEN EQUIPMENT SCHEDULE
QF301 4 QF301 KITCHEN PLUMBING CONNECTION PLAN
QF302 5 QF302 KITCHEN FLOOR DRAIN PLAN
QF401 6 QF401 KITCHEN ELECTRICAL CONNECTION PLAN
QF501 7 QF501 KITCHEN EQUIPMENT ELEVATIONS
QF502 8 QF502 KITCHEN EQUIPMENT ELEVATIONS
QF503 9 QF503 KITCHEN EQUIPMENT ELEVATIONS
QF504 10 QF504 KITCHEN EQUIPMENT DETAILS
QF601 11 QF601 KITCHEN VENTILATION DETAILS
07 - Fire & Life Safety
F-001 1 F-001 SPRINKLER DESIGN REQUIREMENTS DETAILS
F-101 2 F-101 SPRINKLER DESIGN REQUIREMENTS - SUB BASEMENT LEVEL
F-102 3 F-102 SPRINKLER DESIGN REQUIREMENTS - BASEMENT FLOOR
F-103 4 F-103 SPRINKLER DESIGN REQUIREMENTS - FIRST FLOOR
F-104 5 F-104 SPRINKLER DESIGN REQUIRMENTS - SECOND FLOOR
08 - STRUCTURAL
S-001 1 S-001 STRUCTURAL DESIGN NOTES
S-002 2 S-002 STRUCTURAL DESIGN NOTES
S-003 3 S-003 STRUCTURAL DESIGN NOTES
SD-101 4 SD-101 BUILDING DEMOLITION PLAN
SD-102 5 SD-102 RAMP-AREA A-DEMOLITION PLAN
SB-101A 6 SB-101A BASEMENT PLAN - AREA A - EXIST. GYM FLOOR
SB-101B 7 SB-101B BASEMENT PLAN - AREA B
SB-101C 8 SB-101C BASEMENT PLAN - AREA C
SF-102A 9 SF-102A EXIST. FIRST FLOOR AND NEW ELEVATOR LOBBY ROOF FRAMING- AREA A
SF-102A-01 10 SF-102A-01 PROGRESSIVE COLLAPSE - FIRST FLOOR WITH WALLS & CABLES BELOW -
AREA A
SF-102A-02 11 SF-102A-02 EXIST. BASEMENT AND ELEVATOR FLOOR - AREA A
SF-102B1 12 SF-102B1 FIRST FLOOR FRAMING PLAN WITH WALLS BELOW - AREA B
SF-102B2 13 SF-102B2 FIRST FLOOR FRAMING PLAN WITH WALLS ABOVE - AREA B2
01 - General
G-001 1 G-001 COVER SHEET
G-002 2 G-002 INDEX OF DRAWINGS
G-101 3 G-101 SUB-BASEMENT LIFE SAFETY PLAN
G-102 4 G-102 BASEMENT FLOOR LIFE SAFETY PLAN
G-103 5 G-103 FIRST FLOOR LIFE SAFETY PLAN
G-104 6 G-104 SECOND FLOOR LIFE SAFETY PLAN
02 - Civil
C-001 1 C-001 LEGEND
VF100 2 VF100 GENERAL EXISTING SITE TOPOGRAPHICAL SURVEY AND UTILITIES PLAN
(OVERALL)
VF101 3 VF101 GENERAL EXISTING SITE TOPOGRAPHICAL SURVEY AND UTILITIES PLAN
VF102 4 VF102 GENERAL EXISTING SITE TOPOGRAPHICAL SURVEY AND UTILITIES PLAN
VF103 5 VF103 GENERAL EXISTING SITE TOPOGRAPHICAL SURVEY AND UTILITIES PLAN
CD101 6 CD101 DEMOLITION AND REMOVAL PLAN
CD102 7 CD102 DEMOLITION AND REMOVAL PLAN
CD103 8 CD103 DEMOLITION AND REMOVAL PLAN
CS100 9 CS100 GEOMETRIC LAYOUT PLAN (OVERALL)
CS101 10 CS101 GEOMETRIC LAYOUT PLAN
CS102 11 CS102 GEOMETRIC LAYOUT PLAN
CS103 12 CS103 GEOMETRIC LAYOUT PLAN
CS104 13 CS104 SITE PLAN DETAILS
CS105 14 CS105 SITE PLAN DETAILS
CS106 15 CS106 SITE PLAN DETAILS
CS107 16 CS107 SITE PLAN DETAILS
CS108 17 CS108 SITE PLAN DETAILS
CS109 18 CS109 BORING LOGS
CS110 19 CS110 BORING LOGS
CG100 20 CG100 GENERAL GRADING OVERVIEW PLAN
CG101 21 CG101 GRADING AND DRAINAGE PLAN
CG102 22 CG102 GRADING AND DRAINAGE PLAN
CG103 23 CG103 GRADING AND DRAINAGE PLAN
CG104 24 CG104 GRADING DETAILS
CG105 25 CG105 GRADING DETAILS
CG106 26 CG106 EROSION AND SEDIMENTATION CONTROL PLAN
CG107 27 CG107 EROSION AND SEDIMENTATION NOTES AND DETAILS
CU101 28 CU101 COMPOSITE UTILITY PLAN
CU102 29 CU102 COMPOSITE UTILITY PLAN
CU103 30 CU103 COMPOSITE UTILITY PLAN
CU104 31 CU104 STORM DRAIN PROFILES
CU105 32 CU105 STORM DRAIN PROFILES
CU106 33 CU106 SANITARY PROFILES
CU107 34 CU107 UTILITY DETAILS
CU108 35 CU108 UTILITY DETAILS
CL102 36 CL102 LANDSCAPE PLAN
CL103 37 CL103 LANDSCAPE PLAN
04 - Architectural
A-001 1 A-001 GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
A-002 2 A-002 PARTITION TYPES
A-003 3 A-003 TYP. PARTITION DETAILS
A-004 4 A-004 TYP. PARTITION DETAILS
AD101 5 AD101 BASEMENT DEMOLITION PLAN
AD102 6 AD102 FIRST FLOOR DEMOLITION PLAN
AD103 7 AD103 SECOND FLOOR DEMOLITION PLAN
AD104 8 AD104 ROOF DEMOLITION PLAN
A-101 9 A-101 OVERALL BASEMENT FLOOR PLAN
A-101A 10 A-101A BASEMENT FLOOR PLAN - AREA A
A-101B 11 A-101B BASEMENT FLOOR PLAN - AREA B
A-102 12 A-102 OVERALL FIRST FLOOR PLAN
A-102A 13 A-102A FIRST FLOOR PLAN - AREA A
A-102B 14 A-102B FIRST FLOOR PLAN - AREA B
A-102C 15 A-102C FIRST FLOOR PLAN - AREA C
A-103 16 A-103 SECOND FLOOR PLAN - AREA A
A-104 17 A-104 CLERESTORY PLANS
A-110 18 A-110 OVERALL BASEMENT REFLECTED CEILING PLAN
A-110A 19 A-110A BASEMENT REFLECTED CEILING PLAN - AREA A
A-110B 20 A-110B BASEMENT REFLECTED CEILING PLAN - AREA B
A-111 21 A-111 OVERALL FIRST FLOOR REFLECTED CEILING PLAN
A-111A 22 A-111A FIRST FLOOR REFLECTED CEILING PLAN - AREA A
A-111B 23 A-111B FIRST FLOOR REFLECTED CEILING PLAN - AREA B
A-111C 24 A-111C FIRST FLOOR REFLECTED CEILING PLAN - AREA C
A-112 25 A-112 SECOND FLOOR REFLECTED CEILING PLAN
A-120 26 A-120 ROOF PLAN
A-120A 27 A-120A ENLARGED ROOF PLANS
A-201 28 A-201 EXTERIOR BUILDING ELEVATIONS
A-202 29 A-202 EXTERIOR BUILDING ELEVATIONS
A-203 30 A-203 EXTERIOR BUILDING ELEVATIONS
A-204 31 A-204 EXTERIOR BUILDING ELEVATIONS
A-205 32 A-205 EXTERIOR BUILDING ELEVATIONS
A-301 33 A-301 BUILDING SECTIONS
A-302 34 A-302 BUILDING SECTIONS
A-310 35 A-310 WALL SECTIONS
A-311 36 A-311 WALL SECTIONS
A-312 37 A-312 WALL SECTIONS
A-313 38 A-313 WALL SECTIONS
A-314 39 A-314 WALL SECTIONS
A-315 40 A-315 WALL SECTIONS
A-316 41 A-316 WALL SECTIONS
A-317 42 A-317 WALL SECTIONS
A-318 43 A-318 WALL SECTIONS
A-319 44 A-319 WALL SECTIONS
A-320 45 A-320 WALL SECTIONS
A-321 46 A-321 WALL SECTIONS
A-322 47 A-322 WALL SECTIONS
A-401 48 A-401 ENLARGED ELEVATOR PLANS
A-402 49 A-402 ELEVATOR SECTIONS & DETAILS
A-403 50 A-403 ENLARGED STAIR & RAMP PLANS
A-404 51 A-404 STAIR SECTIONS & DETAILS
A-405 52 A-405 INTERIOR RAMP ENLARGED PLAN & SECTIONS
A-406 53 A-406 EXTERIOR RAMP & STAIR SECTIONS
A-407 54 A-407 RAILING DETAILS
A-408 55 A-408 RAILING DETAILS
A-409 56 A-409 EXTERIOR GUARDRAIL DETAILS
A-410 57 A-410 ENLARGED TOILET ROOM PLANS & DETAILS
A-411 58 A-411 ENLARGED TOILET ROOM PLANS
A-412 59 A-412 ENLARGED PLANS
PLATE NO. SHT NO. DGN FILE TITLE PLATE NO. SHT NO. DGN FILE TITLE
3 6
4 6
5 6
6 6
File details come from the government source that posted it. Updated .