West Point Middle School

SECTION 21 13 13.00 10

WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

05/09

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this s pecification to the extent referenced. The publications are referred t o within the text by the basic designation only.

AMERICAN SOCIETY OF SANITARY ENGINEERING (ASSE)

ASSE 1015 (2009) Performance Requirements for Double Check Backflow Prevention Assemblies and Double Check Fire Protection Backflow Prevention Assemblies - (ANSI approved 2010)

AMERICAN WATER WORKS ASSOCIATION (AWWA)

AWWA B300 (1999; R 2004) Hypochlorites

AWWA B301 (1999; R 2004) Liquid Chlorine

AWWA C104/A21.4 (2008; Errata 2010) Cement-Mortar Lining for Ductile-Iron Pipe and Fittings for Water

AWWA C110/A21.10 (2008) Ductile-Iron and Gray-Iron Fittings for Water

AWWA C111/A21.11 (2007) Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings

AWWA C151/A21.51 (2009) Ductile-Iron Pipe, Centrifugally Cast, for Water

AWWA C203 (2008) Coal-Tar Protective Coatings and Linings for Steel Water Pipelines - Enamel and Tape - Hot-Applied

AWWA C651 (2005; Errata 2005) Standard for Disinfecting Water Mains

AWWA C652 (2002) Disinfection of Water-Storage Facilities

ASME INTERNATIONAL (ASME)

ASME B16.1 (2005) Gray Iron Threaded Fittings;

Classes 25, 125 and 250

ASME B16.11 (2009) Forged Fittings, Socket-Welding and Threaded

ASME B16.21 (2005) Nonmetallic Flat Gaskets for Pipe Flanges

ASME B16.3 (2006) Malleable Iron Threaded Fittings, 100% Construction Documents SECTION 21 13 13.00 10 Page 1

Classes 150 and 300

ASME B16.4 (2006) Standard for Gray Iron Threaded Fittings; Classes 125 and 250

ASME B16.9 (2007) Standard for Factory-Made Wrought Steel Buttwelding Fittings

ASME B18.2.2 (1987; R 2005) Standard for Square and Hex Nuts

ASTM INTERNATIONAL (ASTM)

ASTM A 135/A 135M (2009) Standard Specification for Electric-Resistance-Welded Steel Pipe

ASTM A 183 (2003; R 2009) Standard Specification for Carbon Steel Track Bolts and Nuts

ASTM A 449 (2007b) Standard Specification for Hex Cap Screws, Bolts, and Studs, Steel, Heat Treated, 120/105/90 ksi Minimum Tensile Strength, General Use

ASTM A 47/A 47M (1999; R 2009) Standard Specification for Ferritic Malleable Iron Castings

ASTM A 53/A 53M (2007) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless

ASTM A 536 (1984; R 2009) Standard Specification for Ductile Iron Castings

ASTM A 795/A 795M (2008) Standard Specification for Black and Hot-Dipped Zinc-Coated (Galvanized) Welded and Seamless Steel Pipe for Fire Protection Use

ASTM F 436 (2009) Hardened Steel Washers

FM GLOBAL (FM)

FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/CC_host/pages/ public/custom/FM/login.cfm

MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS

INDUSTRY (MSS)

MSS SP-71 (2005) Gray Iron Swing Check Valves, Flanged and Threaded Ends

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 101 (2009; TIA 09-1; TIA 09-2) Life Safety Code

NFPA 13 (2010; Errata 10-1) Standard for the Installation of Sprinkler Systems

NFPA 24 (2010) Standard for the Installation of Private Fire Service Mains and Their Appurtenances

100% Construction Documents SECTION 21 13 13.00 10 Page 2

UNDERWRITERS LABORATORIES (UL)

UL Bld Mat Dir (2010) Building Materials Directory

UL Fire Prot Dir (2010) Fire Protection Equipment Directory

1.2 SYSTEM DESCRIPTION

Furnish piping offsets, fittings, and any other acc essories as required to provide a complete installation and to eliminate interference with other construction. Install sprinkler system over and under ducts, piping and platforms when such equipment can negati vely effect or disrupt the sprinkler discharge pattern and coverag e. Provide wet pipe sprinkler system in all areas of the building. Exc ept as modified herein, the system shall be designed and installed in accordance with NFPA 13 and UFC 3-600-01 . Rack sprinklers shall be in accordance with NFPA 13 .

Pipe sizes which are not indicated on drawings shal l be determined by hydraulic calculation. Design any portions of the sprinkler system that are not indicated on the drawings including locatin g sprinklers, piping and equipment, and size piping and equipment when t his information is not indicated on the drawings or is not specified h erein. The design of the sprinkler system shall be based on hydraulic ca lculations, and the other provisions specified herein.

1.2.1 Hydraulic Design

Hydraulically design the system to discharge a mini mum density of 0.10 gpm/square foot over the hydraulically most demanding 3,00 0 square feet of floor area in light hazard areas as indicated on the drawings. For ordinary hazard I areas as indicated on the drawing s, hydraulically design the system to discharge a minimum density of 0.15 gpm/square foot over the hydraulically most demanding 3,000 square feet of floor area.

For ordinary hazard II areas as indicated on the dr awings, hydraulically design the system to discharge a minimum density of 0.20 gpm/square foot over teh hydraulically most demanding 3,000 square feet of floor area.

The minimum pipe size for branch lines in gridded s ystems shall be 1-1/4 inch . Hydraulic calculations shall be in accordance wi th the Area/Density Method of NFPA 13 . Water velocity in the piping shall not exceed 20 ft/s .

1.2.1.1 Hose Demand

Add an allowance for exterior hose streams of 500 gpm to the sprinkler system demand at the fire hydrant shown on the draw ings.

1.2.1.2 Basis for Calculations

The design of the system shall be based upon a wate r supply with a static pressure of 38 psi , and a flow of 675 gpm at a residual pressure of 34 psi . Water supply shall be presumed available at the fire hydrant shown on the drawings . Hydraulic calculations shall be based upon the Hazen-Williams formula with a "C" value of 120 for black steel piping and 100 for existing underground piping. Hydraulic calculations shall be based on operation of the fire pump(s) provided in Section 21 30 00

FIRE PUMP.

1.2.1.3 Hydraulic Calculations

Prepare hydraulic calculations as outlined in NFPA 13 , except that calculations shall be performed by computer using s oftware intended specifically for fire protection system design usin g the design data

100% Construction Documents SECTION 21 13 13.00 10 Page 3 shown on the drawings. Software that uses k-factor s for typical branch lines is not acceptable. Calculations shall be bas ed on the water supply data shown on the drawings to substantiate t hat the design area used in the calculations is the most demanding hydr aulically. Water supply curves and system requirements shall be plot ted on semi-logarithmic graph paper so as to present a sum mary of the complete hydraulic calculation. Provide a summary sheet lis ting sprinklers in the design area and their respective hydraulic refe rence points, elevations, actual discharge pressures and actual f lows. Elevations of hydraulic reference points (nodes) shall be indicat ed. Documentation shall identify each pipe individually and the nodes connected thereto.

Indicate the diameter, length, flow, velocity, fric tion loss, number and type fittings, total friction loss in the pipe, equ ivalent pipe length and Hazen-Williams coefficient for each pipe. For gridded systems, calculations shall show peaking of demand area fric tion loss to verify that the hydraulically most demanding area is being used. Also for gridded systems, a flow diagram indicating the quan tity and direction of flows shall be included. A drawing showing hydraul ic reference points (nodes) and pipe designations used in the calculati ons shall be included and shall be independent of shop drawings.

1.2.2 Sprinkler Coverage

Sprinklers shall be uniformly spaced on branch line s. In buildings protected by automatic sprinklers, sprinklers shall provide coverage throughout 100 percent of the building. This inclu des, but is not limited to, telephone rooms, electrical equipment r ooms, boiler rooms, switchgear rooms, transformer rooms, and other elec trical and mechanical spaces. Coverage per sprinkler shall be in accorda nce with NFPA 13 , but shall not exceed 100 square feet for extra hazard occupancies, 130 square feet for ordinary hazard occupancies, and 225 square feet for light hazard occupancies. Exceptions are as follow s:

a. Sprinklers may be omitted from small rooms which are exempted for specific occupancies in accordance with NFPA 101 .

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for inf ormation only. When used, a designation following the "G" designation i dentifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Shop Drawings ; G, AE

Three copies of the Sprinkler System Shop Drawing s, no later than 21 days prior to the start of sprinkler system installation.

As-Built Drawings

As-built shop drawings, at least 14 days after co mpletion of the Final Tests, updated to reflect as-built condit ions after all related work is completed. Drawings shall be o n reproducible full-size mylar film.

SD-03 Product Data

Fire Protection Related Submittals

A list of the Fire Protection Related Submittals submitted in concurrence with the shop drawings .

100% Construction Documents SECTION 21 13 13.00 10 Page 4

Materials and Equipment

Manufacturer's catalog data included with the Spr inkler System Drawings for all items specified herein. The data shall be highlighted to show model, size, options, etc., tha t are intended for consideration. Data shall be adequate to demonstrate compliance with all contract requiremen ts. In addition, provide a complete equipment list that in cludes equipment description, model number and quantity.

Spare Parts

Spare parts data for each different item of mater ial and equipment specified.

Preliminary Tests

Proposed procedures for Preliminary Tests, no lat er than 14 days prior to the proposed start of the tests. Pro posed date and time to begin the preliminary tests.

Final Acceptance Test

Proposed procedures for Final Acceptance Test, no later than 14 days prior to the proposed start of the tests. Pr oposed date and time to begin Final Acceptance Test, submitted with the Final Acceptance Test Procedures. Notification sha ll be provided at least 14 days prior to the proposed sta rt of the test. Notification shall include a copy of the Con tractor's Material & Test Certificates.

Onsite Training

Proposed Onsite Training schedule, at least 14 da ys prior to the start of related training.

Fire Protection Specialist

The name and documentation of certification of th e proposed Fire Protection Specialists, no later than 14 days after the Notice to Proceed and prior to the submittal of the sprinkler system drawings and hydraulic calculations.

Sprinkler System Installer

The name and documentation of certification of th e proposed Sprinkler System Installer, concurrent with submitt al of the Fire Protection Specialist Qualifications.

SD-05 Design Data

Sway Bracing

Load calculations for sizing of sway bracing, for systems that are required to be protected against damage from ea rthquakes.

Hydraulic Calculations

Hydraulic calculations, including a drawing showi ng hydraulic reference points and pipe segments.

SD-06 Test Reports

100% Construction Documents SECTION 21 13 13.00 10 Page 5

Preliminary Test Report

Three copies of the completed Preliminary Test Re port, no later than 7 days after the completion of the Preli minary Tests. The Preliminary Tests Report shall include both the Contractor's Material and Test Certificate for Unde rground Piping and the Contractor's Material and Test Certi ficate for Aboveground Piping. All items in the Preliminary T ests Report shall be signed by the Fire Protection Specialist.

Final Acceptance Test Report

Three copies of the completed Final Acceptance Te sts Reports, no later than 7 days after the completion of the Fi nal Acceptance Tests. All items in the Final Acceptanc e Report shall be signed by the Fire Protection Specialist.

SD-07 Certificates

Inspection by Fire Protection Specialist

SD-10 Operation and Maintenance Data

Operating and Maintenance Instructions

Six manuals listing step-by-step procedures requi red for system startup, operation, shutdown, and routine ma intenance, at least 14 days prior to field training. The manual s shall include the manufacturer's name, model number, part s list, list of parts and tools that should be kept in stock by the owner for routine maintenance including the name of a local s upplier, simplified wiring and controls diagrams, troublesho oting guide, and recommended service organization (including add ress and telephone number) for each item of equipment. Each service organization submitted shall be capable of providin g 4 hour on-site response to a service call on an emergency basis.

1.4 QUALITY ASSURANCE

Compliance with referenced NFPA standards is mandat ory. This includes advisory provisions listed in the appendices of suc h standards, as though the word "shall" had been substituted for th e word "should" wherever it appears. In the event of a conflict be tween specific provisions of this specification and applicable NFP A standards, this specification shall govern. Reference to "authorit y having jurisdiction" shall be interpreted to mean the Cont racting Officer.

1.4.1 Fire Protection Specialist

Perform work specified in this section under the su pervision of and certified by the Fire Protection Specialist who is an individual registered professional engineer who has passed the fire protection engineering written examination administered by the National Council of Examiners for Engineering and Surveys (NCEES) or a registered professional engineer in a related engineering discipline with a minimum of 5 years experience, dedicated to fire protection engineering that can be verified with documentation. The Fire Protectio n Specialist shall prepare a list of the fire protection related submittals from the Contract Submittal Register that relate to the succ essful installation of the sprinkler systems(s). The submittals identi fied on this list shall be accompanied by a letter of approval signed and dated by the Fire Protection Specialist . The Fire Protection Specialist shall be regularly engaged in the design and installation of the type and complexity of system specified in the contract docu ments, and shall have

100% Construction Documents SECTION 21 13 13.00 10 Page 6 served in a similar capacity for at least three sys tems that have performed in the manner intended for a period of no t less than 6 months.

1.4.2 Sprinkler System Installer

Work specified in this section shall be performed b y the Sprinkler System Installer who is regularly engaged in the in stallation of the type and complexity of system specified in the cont ract documents, and shall have served in a similar capacity for at leas t three systems that have performed in the manner intended for a period of not less than 6 months.

1.4.3 Shop Drawings

Shop Drawings shall conform to the requirements est ablished for working plans as prescribed in NFPA 13 . Drawings shall include plan and elevation views demonstrating that the equipment wi ll fit the allotted spaces with clearance for installation and maintena nce. Each set of drawings shall include the following:

a. Descriptive index of drawings in the submittal with drawings listed in sequence by drawing number. A legend identifyin g device symbols, nomenclature, and conventions used.

b. Floor plans drawn to a scale not less than 1/8" = 1'-0" which clearly show locations of sprinklers, risers, pipe hangers, seismic separation assemblies, sway bracing, inspector's te st connections, drains, and other applicable details necessary to c learly describe the proposed arrangement. Each type of fitting use d and the locations of bushings, reducing couplings, and weld ed joints shall be indicated.

c. Actual center-to-center dimensions between spri nklers on branch lines and between branch lines; from end sprinklers to adjacent walls; from walls to branch lines; from sprinkler f eed mains, cross-mains and branch lines to finished floor and roof or ceiling.

A detail shall show the dimension from the sprinkle r and sprinkler deflector to the ceiling in finished areas.

d. Longitudinal and transverse building sections s howing typical branch line and cross-main pipe routing as well as elevati on of each typical sprinkler above finished floor.

e. Details of each type of riser assembly; pipe ha nger; sway bracing for earthquake protection, and restraint of undergr ound water main at point-of-entry into the building, and electrical devices and interconnecting wiring.

1.5 DELIVERY, STORAGE, AND HANDLING

All equipment delivered and placed in storage shall be housed in a manner to preclude any damage from the weather, hum idity and temperature variations, dirt and dust, or other contaminants. Additionally, all pipes shall either be capped or plugged until insta lled.

1.6 EXTRA MATERIALS

Submit spare parts data for each different item of material and equipment specified. The data shall include a comp lete list of parts and supplies, with current unit prices and source o f supply, and a list of parts recommended by the manufacturer to be repl aced after 1 year and 3 years of service. A list of special tools and te st equipment required for maintenance and testing of the products supplie d by the Contractor shall be included.

100% Construction Documents SECTION 21 13 13.00 10 Page 7

PART 2 PRODUCTS

2.1 STANDARD PRODUCTS

Provide materials and equipment which are standard products of a manufacturer regularly engaged in the manufacture o f such products and that essentially duplicate items that have been in satisfactory use for at least 2 years prior to bid opening.

2.2 NAMEPLATES

All equipment shall have a nameplate that identifie s the manufacturer's name, address, type or style, model or serial numbe r, and catalog number.

2.3 REQUIREMENTS FOR FIRE PROTECTION SERVICE

Provide Materials and Equipment that have been tested by Underwriters Laboratories, Inc. and are listed in UL Fire Prot Dir or approved by Factory Mutual and listed in FM APP GUIDE. Where the terms "listed" or "approved" appear in this specification, such shall mean listed in UL Fire Prot Dir or FM APP GUIDE.

2.4 UNDERGROUND PIPING COMPONENTS

2.4.1 Pipe

Piping from a point 6 inches above the floor to a point 5 feet outside the building wall shall be ductile iron with a rate d working pressure of 175 psi conforming to AWWA C151/A21.51 , with cement mortar lining conforming to AWWA C104/A21.4 . Piping more than 5 feet outside the building walls shall comply with Section 33 11 00 WATER DISTRIBUTION for details regarding connection to the existing water mains.

2.4.2 Fittings and Gaskets

Fittings shall be ductile iron conforming to AWWA C110/A21.10 . Gaskets shall be suitable in design and size for the pipe w ith which such gaskets are to be used. Gaskets for ductile iron p ipe joints shall conform to AWWA C111/A21.11 .

2.4.3 Gate Valve and Indicator Posts

Gate valves for underground installation shall be o f the inside screw type with counter-clockwise rotation to open. Wher e indicating type valves are shown or required, indicating valves sha ll be gate valves with an approved indicator post of a length to perm it the top of the post to be located 3 feet above finished grade. Gate valves and indicator posts shall be listed in UL Fire Prot Dir or FM APP GUIDE.

2.5 ABOVEGROUND PIPING COMPONENTS

Aboveground piping shall be steel .

2.5.1 Steel Piping Components

2.5.1.1 Steel Pipe

Except as modified herein, steel pipe shall be blac k as permitted by NFPA 13 and shall conform to applicable provisions of ASTM A 795/A 795M , ASTM A 53/A 53M , or ASTM A 135/A 135M . Pipe in which threads or grooves are cut or rolled formed shall be Schedule 40 or sh all be listed by Underwriters' Laboratories to have a corrosion resi stance ratio (CRR) of

1.0 or greater after threads or grooves are cut or rolled formed. Pipe

100% Construction Documents SECTION 21 13 13.00 10 Page 8 shall be marked with the name of the manufacturer, kind of pipe, and ASTM designation.

2.5.1.2 Fittings for Non-Grooved Steel Pipe

Fittings shall be cast iron conforming to ASME B16.4 , steel conforming to ASME B16.9 or ASME B16.11 , or malleable iron conforming to ASME B16.3 .

Galvanized fittings shall be used for piping syst ems or portions of piping systems utilizing galvanized piping. Fittin gs into which sprinklers, drop nipples or riser nipples (sprigs) are screwed shall be threaded type. Plain-end fittings with mechanical couplings, fittings that use steel gripping devices to bite into the pi pe and segmented welded fittings shall not be used.

2.5.1.3 Grooved Mechanical Joints and Fittings

Joints and fittings shall be designed for not less than 175 psi service and shall be the product of the same manufacturer;s egmented welded fittings shall not be used. Fitting and coupling h ouses shall be malleable iron conforming to ASTM A 47/A 47M , Grade 32510; ductile iron conforming to ASTM A 536 , Grade 65-45-12. Gasket shall be the flush type that fills the entire cavity between the fitti ng and the pipe.

Nuts and bolts shall be heat-treated steel conformi ng to ASTM A 183 and shall be cadmium plated or zinc electroplated.

2.5.1.4 Flanges

Flanges shall conform to NFPA 13 and ASME B16.1 . Gaskets shall be non-asbestos compressed material in accordance with ASME B16.21 , 1/16 inch thick, and full face or self-centering flat ring t ype.

2.5.1.5 Bolts, Nut, and Washers

Bolts shall be conform to ASTM A 449 , Type 1 and shall extend no less than three full threads beyond the nut with bolts t ightened to the required torque. Nuts shall be hexagon type confor ming to ASME B18.2.2 .

Washers shall meet the requirements of ASTM F 436 . Flat circular washers shall be provided under all bolt heads and nuts.

2.5.2 Pipe Hangers

Hangers shall be listed in UL Fire Prot Dir or FM APP GUIDE and of the type suitable for the application, construction, an d pipe type and sized to be supported.

2.5.3 Valves

2.5.3.1 Control Valve and Gate Valve

Manually operated sprinkler control valve and gate valve shall be outside stem and yoke (OS&Y) type and shall be list ed in UL Bld Mat Dir or FM APP GUIDE.

2.5.3.2 Check Valve

Check valve 2 inches and larger shall be listed in UL Bld Mat Dir or FM APP GUIDE. Check valves 4 inches and larger shall be of the swing type with flanged cast iron body and flanged inspec tion plate, shall have a clear waterway and shall meet the requiremen ts of MSS SP-71 , for Type 3 or 4.

2.6 ALARM CHECK VALVE ASSEMBLY

Assembly shall include an alarm check valve, standa rd trim piping, 100% Construction Documents SECTION 21 13 13.00 10 Page 9 pressure gauges, bypass, retarding chamber, testing valves, main drain, and other components as required for a fully operat ional system.

2.7 WATERFLOW ALARM

Mechanically operated, exterior-mounted, water moto r alarm assembly shall be provided and installed in accordance with NFPA 13 . Water motor alarm assembly shall include a body housing, impell er or pelton wheel, drive shaft, striker assembly, gong, wall plate and related components necessary for complete operation. Minimum 3/4 inch galvanized piping shall be provided between the housing and the alarm check valve. Drain piping from the body housing shall be minimum 1 inch galvanized and shall be arranged to drain to the outside of the bu ilding. Piping shall be galvanized both on the inside and outside surfac es.

2.8 ALARM INITIATING AND SUPERVISORY DEVICES

2.8.1 Sprinkler Waterflow Indicator Switch, Vane Type

Switch shall be vane type with a pipe saddle and ca st aluminum housing.

The electro-mechanical device shall include a flexi ble, low-density polyethylene paddle conforming to the inside diamet er of the fire protection pipe. The device shall sense water move ments and be capable of detecting a sustained flow of one sprinkler or greater. The device shall contain a retard device adjustable from 0 to 90 seconds to reduce the possibility of false alarms caused by transient flow surges. The switch shall be tamper resistant and contain two SP DT (Form C) contacts arranged to transfer upon removal of the housing co ver, and shall be equipped with a silicone rubber gasket to assure po sitive water seal and a dustproof cover and gasket to seal the mechanism from dirt and moisture.

2.8.2 Valve Supervisory (Tamper) Switch

Switch shall be suitable for mounting to the type o f control valve to be supervised open. The switch shall be tamper resist ant and contain one set of SPDT (Form C) contacts arranged to transfer upon removal of the housing cover or closure of the valve of more than two rotations of the valve stem.

2.9 FIRE DEPARTMENT CONNECTION

Fire department connection shall be projecting type with cast brass body, matching wall escutcheon lettered "Auto Spkr" with a chromium plated finish. The connection shall have a 4" Storz fitting with a 32 degree elbow, caps with drip drains and chains.

2.10 SPRINKLERS

Sprinklers with internal O-rings shall not be used. Sprinklers shall be used in accordance with their listed coverage limit ations. Temperature classification shall be ordinary. Sprinklers in hi gh heat areas including attic spaces or in close proximity to uni t heaters shall have temperature classification in accordance with NFPA 13 . Extended coverage sprinklers shall not be used.

2.10.1 Concealed Sprinkler

Concealed sprinkler shall be chrome-plated and shal l have a nominal 1/2 inch orifice.

2.10.2 Recessed Sprinkler

Recessed sprinkler shall be chrome-plated and shall have a nominal 1/2

100% Construction Documents SECTION 21 13 13.00 10 Page 10 inch orifice.

2.10.3 Flush Sprinkler

Flush sprinkler shall be chrome-plated and shall ha ve a nominal 1/2 inch inch orifice.

2.10.4 Pendent Sprinkler

Pendent sprinkler shall be of the fusible strut or glass bulb type, quick-response type with nominal 1/2 inch orifice. Pendent sprinklers shall have a polished chrome finish.

2.10.5 Upright Sprinkler

Upright sprinkler shall be chrome-platedquick-respo nse type and shall have a nominal 1/2 inch orifice.

2.10.6 Sidewall Sprinkler

Sidewall sprinkler shall have a nominal 1/2 inch orifice. Sidewall sprinkler shall have a polished chrome finish. Sid ewall sprinkler shall be the quick-response type.

2.10.7 Dry Sprinkler Assembly

Dry sprinkler assembly shall be of the pendent type as indicated.

Assembly shall include an integral escutcheon. Max imum length shall not exceed maximum indicated in UL Fire Prot Dir . Sprinklers shall have a polished chrome finish.

2.11 DISINFECTING MATERIALS

2.11.1 Liquid Chlorine

Liquid chlorine shall conform to AWWA B301.

2.11.2 Hypochlorites

Calcium hypochlorite and sodium hypochlorite shall conform to AWWA B300.

2.12 ACCESSORIES

2.12.1 Sprinkler Cabinet

Spare sprinklers shall be provided in accordance wi th NFPA 13 and shall be packed in a suitable metal or plastic cabinet. Spare sprinklers shall be representative of, and in proportion to, t he number of each type and temperature rating of the sprinklers insta lled. At least one wrench of each type required shall be provided.

2.12.2 Pendent Sprinkler Escutcheon

Escutcheon shall be one-piece metallic type with a depth of less than 3/4 inch and suitable for installation on pendent sprinkler s. The escutcheon shall have a factory finish that matches the pendent sprinkler heads.

2.12.3 Pipe Escutcheon

Escutcheon shall be polished chromium-plated zinc a lloy, or polished chromium-plated copper alloy. Escutcheons shall be either one-piece or split-pattern, held in place by internal spring ten sion or set screw.

100% Construction Documents SECTION 21 13 13.00 10 Page 11

2.12.4 Sprinkler Guard

Guard shall be a steel wire cage designed to encase the sprinkler and protect it from mechanical damage. Guards shall be provided on sprinklers located where subject to mechanical injury .

2.12.5 Identification Sign

Valve identification sign shall be minimum 6 inches wide by 2 inches high with enamel baked finish on minimum 18 gauge steel or 0.024 inch aluminum with red letters on a white background or white letters on red background. Wording of sign shall include, but not be limited to "main drain," "auxiliary drain," "inspector's test," "ala rm test," "alarm line," and similar wording as required to identify operational components.

2.13 DOUBLE-CHECK VALVE BACKFLOW PREVENTION ASSEMBLY

Double-check backflow prevention assembly shall com ply with ASSE 1015 .

The assembly shall have a bronze, cast-iron or stai nless steel body with flanged ends. The assembly shall include pressure gauge test ports and OS&Y shutoff valves on the inlet and outlet, 2-posi tive-seating check valve for continuous pressure application, and four test cocks.

Assemblies shall be rated for working pressure of 175 psi. The maximum pressure loss shall be 6 psi at a flow rate equal to the sprinkler water demand, at the location of the assembly. A test po rt for a pressure gauge shall be provided both upstream and downstrea m of the double check backflow prevention assembly valves. Where a backflow preventer is required for a fire pump installation, it should be located on the discharge side of the pump. The location of the ba ckflow preventer needs to be coordinated with local environmental re quirements.

PART 3 EXECUTION

3.1 FIELD MEASUREMENTS

After becoming familiar with all details of the wor k, verify all dimensions in the field, and advise the Contracting Officer of any discrepancy before performing the work.

3.2 INSTALLATION REQUIREMENTS

The installation shall be in accordance with the ap plicable provisions of NFPA 13 , NFPA 20 , NFPA 24 and publications referenced therein.

3.3 INSPECTION BY FIRE PROTECTION SPECIALIST

Prior to ceiling installation and concurrent with t he Final Acceptance Test Report, certification by the Fire Protection S pecialist that the sprinkler system is installed in accordance with th e contract requirements, including signed approval of the Prel iminary and Final Acceptance Test Reports. The Fire Protection Speci alist shall: 1) inspect the sprinkler system periodically during th e installation to assure that the sprinkler system is being provided and installed in accordance with the contract requirements, 2) witne ss the preliminary and final tests, and sign the test results, 3) afte r completion of the system inspections and a successful final test, cer tify in writing that the system has been installed in accordance with th e contract requirements. Any discrepancy shall be brought to the attention of the Contracting Officer in writing, no later than three working days after the discrepancy is discovered.

100% Construction Documents SECTION 21 13 13.00 10 Page 12

3.4 ABOVEGROUND PIPING INSTALLATION

3.4.1 Protection of Piping Against Earthquake Dam age

Seismically protect the system piping against damag e from earthquakes.

This requirement is not subject to determination un der NFPA 13 . Install the seismic protection of the system piping in acco rdance with UFC 3-310-04, NFPA 13 and Annex A. Include the required features identi fied therein that are applicable to the specific piping system.

3.4.2 Piping in Exposed Areas

Install exposed piping without diminishing exit acc ess widths, corridors or equipment access. Exposed horizontal piping, in cluding drain piping, shall be installed to provide maximum headroom.

3.4.3 Piping in Finished Areas

In areas with suspended or dropped ceilings and in areas with concealed spaces above the ceiling, piping shall be concealed above ceilings.

Piping shall be inspected, tested and approved befo re being concealed.

Risers and similar vertical runs of piping in finis hed areas shall be concealed.

3.4.4 Pendent Sprinklers

Drop nipples to pendent sprinklers shall consist of minimum 1 inch pipe with a reducing coupling into which the sprinkler s hall be threaded.

Hangers shall be provided on arm-overs to drop nipp les supplying pendent sprinklers when the arm-over exceeds 12 inches for steel pipe. Where sprinklers are installed below suspended or dropped ceilings, drop nipples shall be cut such that sprinkler ceiling pl ates or escutcheons are of a uniform depth throughout the finished spac e. The outlet of the reducing coupling shall not extend more than 1 inch below the underside of the ceiling. On pendent sprinklers installed be low suspended or dropped ceilings, the distance from the sprinkler d eflector to the underside of the ceiling shall not exceed 4 inches . Recessed pendent sprinklers shall be installed such that the distanc e from the sprinkler deflector to the underside of the ceiling shall not exceed the manufacturer's listed range and shall be of uniform depth throughout the finished area. Pendent sprinklers in suspended cei lings shall be center of tile .

3.4.5 Upright Sprinklers

Riser nipples or "sprigs" to upright sprinklers sha ll contain no fittings between the branch line tee and the reduci ng coupling at the sprinkler. Riser nipples exceeding 30 inches in length shall be individually supported.

3.4.6 Pipe Joints

Pipe joints shall conform to NFPA 13 , except as modified herein. Not more than four threads shall show after joint is ma de up. Welded joints will be permitted, only if welding operations are p erformed as required by NFPA 13 at the Contractor's fabrication shop, not at the p roject construction site. Flanged joints shall be provide d where indicated or required by NFPA 13 . Grooved pipe and fittings shall be prepared in accordance with the manufacturer's latest published specification according to pipe material, wall thickness and size . Grooved couplings, fittings and grooving tools shall be products of th e same manufacturer.

For copper tubing, pipe and groove dimensions shall comply with the tolerances specified by the coupling manufacturer. The diameter of grooves made in the field shall be measured using a "go/no-go" gauge, 100% Construction Documents SECTION 21 13 13.00 10 Page 13 vernier or dial caliper, narrow-land micrometer, or other method specifically approved by the coupling manufacturer for the intended application. Groove width and dimension of groove from end of pipe shall be measured and recorded for each change in g rooving tool setup to verify compliance with coupling manufacturer's tole rances. Grooved joints shall not be used in concealed locations, su ch as behind solid walls or ceilings, unless an access panel is shown on the drawings for servicing or adjusting the joint.

3.4.7 Reducers

Reductions in pipe sizes shall be made with one-pie ce tapered reducing fittings. The use of grooved-end or rubber-gaskete d reducing couplings will not be permitted. When standard fittings of t he required size are not manufactured, single bushings of the face type will be permitted.

Where used, face bushings shall be installed with t he outer face flush with the face of the fitting opening being reduced. Bushings shall not be used in elbow fittings, in more than one outlet of a tee, in more than two outlets of a cross, or where the reduction in size is less than 1/2 inch .

3.4.8 Pipe Penetrations

Cutting structural members for passage of pipes or for pipe-hanger fastenings will not be permitted. Pipes that must penetrate concrete or masonry walls or concrete floors shall be core-dril led and provided with pipe sleeves. Each sleeve shall be Schedule 40 gal vanized steel, ductile iron or cast iron pipe and shall extend thr ough its respective wall or floor and be cut flush with each wall surfa ce. Sleeves shall provide required clearance between the pipe and the sleeve per NFPA 13 .

The space between the sleeve and the pipe shall be firmly packed with mineral wool insulation. Where pipes penetrate fir e walls, fire partitions, or floors, pipes shall be fire stopped in accordance with Section 07 84 00 FIRESTOPPING. In penetrations that are not fire-r ated or not a floor penetration, the space between the s leeve and the pipe shall be sealed at both ends with plastic waterproo f cement that will dry to a firm but pliable mass or with a mechanical ly adjustable segmented elastomer seal.

3.4.9 Escutcheons

Escutcheons shall be provided for pipe penetration of ceilings and walls. Escutcheons shall be securely fastened to t he pipe at surfaces through which piping passes.

3.4.10 Inspector's Test Connection

Unless otherwise indicated, test connection shall c onsist of 1 inch pipe connected at the riser as a combination test and dr ain valve; a test valve located approximately 7 feet above the floor; a smooth bore brass outlet equivalent to the smallest orifice sprinkler used in the system;

and a painted metal identification sign affixed to the valve with the words "Inspector's Test." The discharge orifice sh all be located outside the building wall directed so as not to cau se damage to adjacent construction or landscaping during full flow discha rge.

3.4.11 Drains

Main drain piping shall be provided to discharge at a safe point outside the building approved by the COR . Auxiliary drains shall be provided as required by NFPA 13 .

100% Construction Documents SECTION 21 13 13.00 10 Page 14

3.4.12 Installation of Fire Department Connection

Connection shall be mounted on the exterior wall ap proximately 3 feet above finished grade. The piping between the conne ction and the check valve shall be provided with an automatic drip in a ccordance with NFPA 13 and arranged to drain to the outside.

3.4.13 Identification Signs

Signs shall be affixed to each control valve, inspe ctor test valve, main drain, auxiliary drain, test valve, and similar val ves as appropriate or as required by NFPA 13 . Hydraulic design data nameplates shall be permanently affixed to each sprinkler riser as spec ified in NFPA 13 .

3.5 UNDERGROUND PIPING INSTALLATION

The fire protection water main shall be laid, and j oints anchored, in accordance with NFPA 24 . Minimum depth of cover shall be 1 foot below the frost line for the locality . The supply line shall terminate inside the building with a flanged piece, the bottom of wh ich shall be set not less than 6 inches above the finished floor. A blind flange shall be installed temporarily on top of the flanged piece t o prevent the entrance of foreign matter into the supply line. A concrete thrust block shall be provided at the elbow where the pipe turns up toward the floor. In addition, joints shall be anchored in ac cordance with NFPA 24 using pipe clamps and steel rods from the elbow to the flange above the floor and from the elbow to a pipe clamp in the hor izontal run of pipe.

Buried steel components shall be provided with a co rrosion protective coating in accordance with AWWA C203. Piping more than 5 feet outside the building walls shall meet the requirements of S ection 33 11 00 WATER

DISTRIBUTION.

3.6 EARTHWORK

Earthwork shall be performed in accordance with app licable provisions of Section 31 00 00 EARTHWORK.

3.7 ELECTRICAL WORK

Except as modified herein, electric equipment and w iring shall be in accordance with Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM. Alarm signal wiring connected to the building fire alarm control system shall be in accordance with Section 28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM. All wiring for supervisory and alarm circuits sha ll be #14 AWG solid copper installed in metallic tubin g or conduit. Wiring color code shall remain uniform throughout the syst em.

3.8 DISINFECTION

After all system components are installed and hydro static test(s) are completed, the entire sprinkler system shall be dis infected. Flush all sprinkler system piping with potable water until an y entrained dirt and other foreign materials have been removed before in troducing chlorinating material. Remove the flushing fitting of each cross main and of each grid branch line and then back-flush th rough the sprinkler main drain.

a. The water chlorination procedure shall be in ac cordance with AWWA C651 and AWWA C652. Feed either a hypochlorite solution (using a hypochlorinator) or liquid chlorine (using a solu tion-fed chlorinator and booster pump) into the system at a constant rate of 50 parts per million (ppm) until the entire system is filled.

b. Monitor the chlorine residual level in the wate r at six hour

100% Construction Documents SECTION 21 13 13.00 10 Page 15 intervals for a period of 24 hours. If the residua l chlorine is below 25 ppm in any interval sampled, flush all pip ing and repeat the chlorination procedure. Open and close each va lve in the system several times during this 24 hour period to ensure its proper disinfection. Following the 24-hour period, verify that no less than 25 ppm chlorine residual remains in the system . After the chlorine residual level is successfully maintained at or above 25 ppm for a 24 hour period, flush the system with wat er from the distribution system until the residual chlorine is reduced to less than one ppm.

c. Take additional samples of water at locations s pecified by the Contracting Officer in disinfected containers for b acterial examination. Test these samples in an approved lab oratory for total coliform organisms (coliform bacteria, fecal colifo rm, streptococcal, and other bacteria) in accordance wi th EPA Standard Method SM9223, Total Coliforms-PA Test.

d. Disinfection shall be repeated until tests indi cate the absence of coliform organisms (zero mean coliform density per 100 milliliters) in two separate test samples taken 24 hours apart. The system will not be accepted until satisfactory bacteriological results have been obtained.

3.9 PIPE COLOR CODE MARKING

Color code marking of piping shall be as specified in Section 09 90 00

PAINTS AND COATINGS.

3.10 PRELIMINARY TESTS

The system, including the underground water mains, and the aboveground piping and system components, shall be tested to as sure that equipment and components function as intended. The undergrou nd and aboveground interior piping systems and attached appurtenances subjected to system working pressure shall be tested in accordance with NFPA 13 and NFPA 24 .

Upon completion of specified tests, complete certif icates as specified in paragraph SUBMITTALS.

3.10.1 Underground Piping

3.10.1.1 Flushing

Underground piping shall be flushed in accordance w ith NFPA 24 . This includes the requirement to flush the lead-in conne ction to the fire protection system at a flow rate not less that the calculated maximum water demand rate of the system.

3.10.1.2 Hydrostatic Testing

New underground piping shall be hydrostatically tes ted in accordance with NFPA 24 . The allowable leakage shall be measured at the s pecified test pressure by pumping from a calibrated containe r. The amount of leakage at the joints shall not exceed 2 quarts per hour per 100 gaskets or joints, regardless of pipe diameter.

3.10.2 Aboveground Piping

3.10.2.1 Hydrostatic Testing

Aboveground piping shall be hydrostatically tested in accordance with NFPA 13 at not less than 200 psi or 50 psi in excess of maximum system operating pressure and shall maintain that pressure without loss for 2 hours. There shall be no drop in gauge pressure or visible leakage when

100% Construction Documents SECTION 21 13 13.00 10 Page 16 the system is subjected to the hydrostatic test. T he test pressure shall be read from a gauge located at the low eleva tion point of the system or portion being tested.

3.10.2.2 Backflow Prevention Assembly Forward Flo w Test

Each backflow prevention assembly shall be tested a t system flow demand, including all applicable hose streams, as specified in NFPA 13 . Provide all equipment and instruments necessary to conduct a complete forward flow test, including 2.5 inch diameter hoses, playpipe nozzles, calibrated pressure gauges, pitot tube gauge, plus all necessary supports to safely secure hoses and nozzles during the test. At the system demand flow, the pressure readings and press ure drop (friction) across the assembly shall be recorded. Provide a m etal placard on the backflow prevention assembly that lists the pressur e readings both upstream and downstream of the assembly, total pres sure drop, and the system test flow rate. The pressure drop shall be compared to the manufacturer's data.

3.10.3 Testing of Alarm Devices

Each alarm switch shall be tested by flowing water through the inspector's test connection. Each water-operated a larm devices shall be tested to verify proper operation.

3.10.4 Main Drain Flow Test

Following flushing of the underground piping, a mai n drain test shall be made to verify the adequacy of the water supply. S tatic and residual pressures shall be recorded on the certificate spec ified in paragraph SUBMITTALS. In addition, a main drain test shall b e conducted each time after a main control valve is shut and opened.

3.11 FINAL ACCEPTANCE TEST

Begin the Final Acceptance Test only when the Preliminary Test Report has been approved. The Fire Protection Specialist shall conduct the Final Acceptance Test and shall provide a complete demonstration of the operation of the system. This shall include operat ion of control valves and flowing of inspector's test connections to veri fy operation of associated waterflow alarm switches. After operati on of control valves has been completed, the main drain test shall be re peated to assure that control valves are in the open position. In additi on, the representative shall have available copies of as-built drawings and certificates of tests previously conducted. The in stallation shall not be considered accepted until identified discrepanci es have been corrected and test documentation is properly comple ted and received.

Submit the Final Acceptance Test Report as specified in the Submittals paragraph.

3.12 ONSITE TRAINING

The Fire Protection Specialist shall conduct a trai ning course for operating and maintenance personnel as designated b y the Contracting Officer. Training shall be provided for a period o f 8 hours of normal working time and shall start after the system is fu nctionally complete and after the Final Acceptance Test. The Onsite Tr aining shall cover all of the items contained in the approved Operating and Maintenance Instructions .

-- End of Section --

100% Construction Documents SECTION 21 13 13.00 10 Page 17

SECTION 21 30 00

FIRE PUMPS

04/08

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this s pecification to the extent referenced. The publications are referred t o within the text by the basic designation only.

AMERICAN WATER WORKS ASSOCIATION (AWWA)

AWWA 10084 (2005) Standard Methods for the Examination of Water and Wastewater

AWWA B300 (1999; R 2004) Hypochlorites

AWWA B301 (1999; R 2004) Liquid Chlorine

AWWA C104/A21.4 (2008; Errata 2010) Cement-Mortar Lining for Ductile-Iron Pipe and Fittings for Water

AWWA C110/A21.10 (2008) Ductile-Iron and Gray-Iron Fittings for Water

AWWA C111/A21.11 (2007) Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings

AWWA C151/A21.51 (2009) Ductile-Iron Pipe, Centrifugally Cast, for Water

AWWA C500 (2009) Metal-Seated Gate Valves for Water Supply Service

AWWA C606 (2006) Grooved and Shouldered Joints

ASME INTERNATIONAL (ASME)

ASME B16.18 (2001; R 2005) Cast Copper Alloy Solder Joint Pressure Fittings

ASME B16.22 (2001; R 2005) Standard for Wrought Copper and Copper Alloy Solder Joint Pressure Fittings

ASME B16.26 (2006) Standard for Cast Copper Alloy Fittings for Flared Copper Tubes

ASME B16.39 (2009) Standard for Malleable Iron Threaded Pipe Unions; Classes 150, 250, and 300

ASME B16.5 (2009) Pipe Flanges and Flanged Fittings: NPS 1/2 Through NPS 24 Metric/Inch Standard

ASME B31.1 (2007; Addenda a 2008; Addenda b 2009) Power Piping

100% Construction Documents SECTION 21 30 00 Page 1

ASTM INTERNATIONAL (ASTM)

ASTM A 183 (2003; R 2009) Standard Specification for Carbon Steel Track Bolts and Nuts

ASTM A 193/A 193M (2009) Standard Specification for Alloy-Steel and Stainless Steel Bolting Materials for High-Temperature Service and Other Special Purpose Applications

ASTM A 47/A 47M (1999; R 2009) Standard Specification for Ferritic Malleable Iron Castings

ASTM A 536 (1984; R 2009) Standard Specification for Ductile Iron Castings

ASTM A 795/A 795M (2008) Standard Specification for Black and Hot-Dipped Zinc-Coated (Galvanized) Welded and Seamless Steel Pipe for Fire Protection Use

ASTM B 135 (2008a) Standard Specification for Seamless Brass Tube

ASTM B 42 (2002e1) Standard Specification for Seamless Copper Pipe, Standard Sizes

ASTM B 62 (2009) Standard Specification for Composition Bronze or Ounce Metal Castings

ASTM B 75 (2002) Standard Specification for Seamless Copper Tube

ASTM B 88 (2009) Standard Specification for Seamless Copper Water Tube

ASTM D 3308 (2006) PTFE Resin Skived Tape

ASTM F 436 (2009) Hardened Steel Washers

FM GLOBAL (FM)

FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/CC_host/pages/ public/custom/FM/login.cfm

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)

NEMA MG 1 (2009) Motors and Generators

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 1963 (2009; Errata 09-1) Standard for Fire Hose Connections

NFPA 20 (2010; TIA 10-1) Standard for the Installation of Stationary Pumps for Fire Protection

NFPA 24 (2010) Standard for the Installation of Private Fire Service Mains and Their Appurtenances

100% Construction Documents SECTION 21 30 00 Page 2

NFPA 70 (2008; TIA 08-1) National Electrical Code

NFPA 72 (2010; TIA 10-1; TIA 10-2; TIA 10-3; TIA

10-4) National Fire Alarm and Signaling Code

UNDERWRITERS LABORATORIES (UL)

UL 262 (2004; R 2008) Gate Valves for Fire-Protection Service

UL 448 (2007; R 2008) Centrifugal Stationary Pumps for Fire-Protection Service

UL Fire Prot Dir (2010) Fire Protection Equipment Directory

1.2 SYSTEM DESCRIPTION

a. Except as modified in this Section or on the dr awings, install fire pumps in conformance with NFPA 20 , NFPA 70 , NFPA 72 , and UFC 3-600-01, including all recommendations and advisor y portions, which shall be considered mandatory; this includes adviso ry provisions listed in the appendices of such standards, as thou gh the word "shall" had been substituted for the word…

This is the start of the file's text. The full file is on GovTribe.

Other files for this federal contract opportunity

Other files attached to Middle School Additional Renovation, USMA, West Point, N. Y., newest first.
File Type Posted
W912DS-12-C-0001 WPMS.pdf PDF
Middle School Drawings Amendment 0006.pdf PDF
Middle School Specifications Amendment 0006.pdf PDF
W912DS-11-R-0012-0007.pdf PDF
W912DS-11-R-0012-0006.pdf PDF
Amendment 0005.pdf PDF
W912DS-11-R-0012 Amendment 0004.pdf PDF
Plans_WPMS Complete Set_Amendment_08102011.pdf PDF
W912DS-11-R-0012 Amendment 0003.pdf PDF
WPMS Amend 0003 Drawings_Complete Set_080211 1 .pdf PDF
W912DS-11-R-0012 Amendment 0003_Specs.pdf PDF
WPMS_06 Kitchen.pdf PDF
W912DS-11-R-0012 Amend. 0002.pdf PDF
Middle School Amendment 0001.pdf PDF
Middle School Front end.pdf PDF
WPMS_10 Mechanical.pdf PDF
WPMS_01 General.pdf PDF
Specifications W912DS-11-R-0012.pdf PDF
WPMS_09 Plumbing.pdf PDF
WPMS_08 Structural.pdf PDF
WPMS_07_Sprinkler.pdf PDF
Middle School.pdf PDF
WPMS_12 Hazmat.pdf PDF
WPMS_11 Electrical.pdf PDF
USMA Form 13-16 Personnel Background Check.pdf PDF
WPMS_04_Arch.pdf PDF
WPMS_05_FFE.pdf PDF
WPMS_02_Civil.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .