4221 Forbes Blvd., Suite 250 Lanham, MD 20706

301.794.8797 | 301.794.4454 Fax | www.GSipt.net

New York District

G&W Systems Tech Data Facility

FY09 BCA PN-65527

Picatinny Arsenal, New Jersey

JUNE 30, 2009

VOLUME 1 OF 2 | BUILDING 3350

90 PERCENT DESIGN SUBMITTAL

4221 Forbes Blvd., Suite 250 Lanham, MD 20706

301.794.8797 | 301.794.4454 Fax | www.GSipt.net

New York District

G&W Systems Tech Data Facility

FY09 BCA PN-65527

Picatinny Arsenal, New Jersey

JUNE 30, 2009

VOLUME 2 OF 2 | BUILDING 3350

90 PERCENT DESIGN SUBMITTAL

G & W Systems Tech Data Facility BLDG3350

PICATINNY ARSENAL, NJ

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 12 00.00 18 DESIGN AND RECORD DRAWING REQUIREMENTS

01 32 01.00 18 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 00.00 13 SOURCES FOR REFERENCE PUBLICATIONS

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 02.00 18 QUALITY CONTROL SYSTEM (QCS)

01 45 04.00 18 CONTRACTOR QUALITY CONTROL

01 45 20.00 18 TESTING FOR MECHANICAL AND ELECTRICAL SYSTEMS

01 45 30.00 18 CONTRACTOR WARRANTY MANAGEMENT

01 57 20.00 10 ENVIRONMENTAL PROTECTION

01 62 35 RECYCLED / RECOVERED MATERIALS

01 74 16 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 23.00 18 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION AND DECONSTRUCTION

DIVISION 03 - CONCRETE

03 11 14.00 10 FORMWORK FOR CONCRETE

03 15 13.00 10 EXPANSION JOINTS, CONTRACTION JOINTS, AND WATERSTOPS

03 30 00 CAST-IN-PLACE CONCRETE

DIVISION 04 - MASONRY

04 20 00 MASONRY

DIVISION 05 - METALS

05 05 23 WELDING, STRUCTURAL

05 12 00 STRUCTURAL STEEL

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 00 METAL STAIRS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 41 16.00 10 LAMINATE CLAD ARCHITECTURAL CASEWORK

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 11 13 BITUMINOUS DAMPPROOFING

07 60 00 FLASHING AND SHEET METAL

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 33 23 OVERHEAD COILING DOORS

08 34 59 VAULT DOORS

PROJECT TABLE OF CONTENTS Page 1

08 45 23 TRANSLUCENT WALL PANELS

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 29 00 GYPSUM BOARD

09 51 00 ACOUSTICAL CEILINGS

09 83 13 ACOUSTICAL WALL TREATMENT

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 14 01 EXTERIOR SIGNAGE

10 14 02 INTERIOR SIGNAGE

10 26 13 WALL AND CORNER GUARDS

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

DIVISION 13 - SPECIAL CONSTRUCTION

13 27 54.00 10 ELECTROMAGNETIC (EM) SHIELDING

13 34 19 METAL BUILDING SYSTEMS

13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT

13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

22 07 19 PLUMBING PIPING INSULATION

22 11 23.00 10 SUBMERSIBLE PUMP, AXIAL-FLOW AND MIXED-FLOW TYPE

22 13 36 PNEUMATIC SEWAGE EJECTORS

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS

23 09 13.34 CONTROL VALVES, SELF-CONTAINED

23 09 23 DIRECT DIGITAL CONTROL FOR HVAC AND OTHER LOCAL BUILDING

SYSTEMS

23 09 23.13 20 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC

23 23 00 REFRIGERANT PIPING

23 31 11.11 40 DUCTS, LOW PRESSURE

23 31 13 METAL DUCTS

23 36 00 AIR TERMINAL UNITS

23 37 13 DIFFUSERS, REGISTERS, AND GRILLS

23 52 43.00 20 LOW PRESSURE WATER HEATING BOILERS (UNDER 800,000 BTU/HR

OUTPUT)

23 54 16.00 10 HEATING SYSTEM; GAS-FIRED HEATERS

23 64 00 PACKAGED WATER CHILLERS, ABSORPTION TYPE

23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

23 72 00.00 10 ENERGY RECOVERY SYSTEMS

23 73 13 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITS

PROJECT TABLE OF CONTENTS Page 2

23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 20 00 INTERIOR DISTRIBUTION SYSTEM

DIVISION 27 - COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 23 00.00 20 EXCAVATION AND FILL

31 32 11 SOIL SURFACE EROSION CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 16 13 CONCRETE SIDEWALKS

32 92 19 SEEDING

DIVISION 33 - UTILITIES

33 11 00 WATER DISTRIBUTION

33 30 00 SANITARY SEWERS

33 40 00 STORM DRAINAGE UTILITIES

33 70 02.00 10 ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 3

G&W SYSTEM TECH DATA FACILITY PICATINNY ARSENAL, NJ

DIVISION 00 TABLE OF CONTENTS

00700 CONTRACT CLAUSES – NYD Version

Assembled by the NY District Contracting Division.

00 80 00.00 18 SPECIAL CONTRACT REQUIREMENTS – NYD

Version Rev. 10/08

Attachment: Project and Safety Signs

Section 00700 - 1

SECTION 00700

CONTRACT CLAUSES

1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

full text of a clause may be accessed electronically at these addresses:

2 52.3-4001 INFORMATION REGARDING BID, PERFORMANCE, AND PAYMENT BONDS

(a) Bid Bonds: (Applicable only if bid is $25,000 or greater.) Each bidder shall submit with its bid a Bid Bond (Standard Form 24) with good and sufficient surety or sureties acceptable to the Government, or other security as provided in Section I - "BID BOND", in the form of twenty percent (20%) of the bid price or $3,000,000, whichever is less.

The Bid Bond penalty may be expressed in terms of a percentage of the bid price or may expressed in dollars and cents.

(b) Performance and Payment Bonds: (Applicable only if the contract is $25,000 or greater.) Within 10 calendar days after award, a Performance Bond (Standard Form 25) and a Payment Bond (Standard Form 25A), each with good and sufficient surety or sureties acceptable to the Government, shall be furnished. The penal sums of such bonds will be as follows:

(1) Performance Bond: The penal sum of the performance bond shall equal one hundred percent (100%) of the contract price. The performance bond shall specifically provide coverage for taxes imposed by the United States which are collected, deducted, or withheld from wages paid by the Contractor in carrying out the contract with respect to which such bond is furnished.

(2) Payment Bond:

(i) When the contract price is 1,000,000 or less, the penal sum will be fifty (50%) of the contract price.

(ii) When the contract price is in excess of $1,000.000 but more than $5,000,000 , the penal sum shall be forty percent (40%) of the contract price.

(iii) When the contract price is more than $5,000,000, the penal sum shall be $2,500,000/

3 52.201-7000

CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)

(Reference 01.602-70)

4 52.202-1 IDEFINITIONS (OCT 1995)--ALTERNATE I (APR 1984)

(Reference 2.201)

5 52.203-3 GRATUITIES (APR 1984)

Section 00700 - 2

(Reference 3.202)

6 52.203-5 COVENANT AGAINST CONTINGENT FEES (APR 1984)

(Reference 3.404)

7 52.203-7 ANTI-KICKBACK PROCEDURES (JUL 1995)

(Reference 3.502-3)

8 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (JAN

1997) (Reference 3.104-9(b))

9 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL

TRANSACTIONS (JUN

1997) (Reference 3.808(b))

10 52.204-1 APPROVAL OF CONTRACT (DEC 1989)

This contract is subject to the written approval of Contracting Officer and shall not be binding until so approved.

(End of clause)

11 52.203-7001

SPECIAL PROHIBITION ON EMPLOYMENT (JUN 1997)

(Reference 03.570-5) 12 52.203-7002

DISPLAY OF DOD HOTLINE POSTER (DEC 1991)

(Reference 03.7002)

13 52.204-2 SECURITY REQUIREMENTS (AUG 1996)

(Reference 4.404(a))

14 52.204-4 PRINTING/COPYING DOUBLE-SIDED ON RECYCLED PAPER (JUN 1996)

(Reference 4.304)

15 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS

DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (JUL 1995)

(Reference 9.409(b))

16 52.211-1 AVAILABILITY OF SPECIFICATIONS LISTED IN THE GSA INDEX OF

FEDERAL

SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS (JUN

1997) (Reference 11.204(a))

17 52.211-2 AVAILABILITY OF SPECIFICATIONS LISTED IN THE DOD INDEX OF

SPECIFICATIONS

AND STANDARDS (DODISS) (JUN 1997)

(Reference 11.204(b))

18 52.211-16 VARIATION IN QUANTITY (APR 1984)

(Reference 11.703(a))

19 52.214-26 AUDIT AND RECORDS--SEALED BIDDING (OCT 1997)

(Reference 14.201-7(a)) 20 52.228-7004

BONDS OR OTHER SECURITY (DEC 1991)

(Reference 28.170)

21 52.214-27 PRICE REDUCTION FOR DEFECTIVE COST OR PRICING DATA--

MODIFICATIONS--

SEALED BIDDING (OCT 1997)

(Reference 14.201-7(b))

22 52.214-28 SUBCONTRACTOR COST OR PRICING DATA--MODIFICATIONS--SEALED

BIDDING

(OCT 1997)

(Reference 14.201-7(c))

Section 00700 - 3

23 52.214-29 ORDER OF PRECEDENCE--SEALED BIDDING (JAN 1986)

(Reference 14.201-7(d))

24 52.219-8 UTILIZATION OF SMALL, SMALL DISADVANTAGED AND WOMEN-OWNED SMALL

BUSINESS CONCERNS (JUN 1997)

(Reference 19.708(a))

25 52.219-9 SMALL, SMALL DISADVANTAGED AND WOMEN-OWNED SMALL BUSINESS

SUBCONTRACTING

PLAN (AUG 1996)

(Reference 19.708(b)(1)

26 52.219-14 LIMITATIONS ON SUBCONTRACTING (DEC 1996)

(Reference 19.508(e))

27 52.219-16 LIQUIDATED DAMAGES--SUBCONTRACTING PLAN (OCT 1995)

(Reference 19.708(b)(2)

28 52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)

(Reference 22.103-5(a))

29 52.222-3 CONVICT LABOR (AUG 1996)

(Reference 22.202)

30 52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS ACT--OVERTIME

COMPENSATION

(JUL 1995)

(Reference 22.305)

31 52.222-6 DAVIS-BACON ACT (FEB 1995)

(Reference 22.407(a)(1)

32 52.222-7 WITHHOLDING OF FUNDS (FEB 1988)

(Reference 22.407(a)(2)

33 52.222-8 PAYROLLS AND BASIC RECORDS (FEB 1988)

(Reference 22.407(a)(3)

34 52.222-9 APPRENTICES AND TRAINEES (FEB 1988)

(Reference 22.407(a)(4)

35 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)

(Reference 22.407(a)(5)

36 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (FEB 1988)

(Reference 22.407(a)(6)

37 52.222-12 CONTRACT TERMINATION--DEBARMENT (FEB 1988)

(Reference 22.407(a)(7)

38 52.222-13 COMPLIANCE WITH DAVIS-BACON AND RELATED ACT REGULATIONS (FEB

1988) (Reference 22.407(a)(8)

39 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)

(Reference 22.407(a)(9)

40 52.222-15 CERTIFICATION OF ELIGIBILITY (FEB 1988)

(Reference 22.407(a)(1)

41 52.222-26 EQUAL OPPORTUNITY (APR 1984)

(Reference 22.810(e))

42 52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION

(APR 1984)

(Reference 22.810(f))

43 52.222-35 AFFIRMATIVE ACTION FOR DISABLED VETERANS AND VETERANS OF THE

VIETNAM

ERA (APR 1998)

(Reference 22.1308)

44 52.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES (JUN 1998)

(Reference 22.1408(a))

45 52.222-37 EMPLOYMENT REPORTS ON DISABLED VETERANS AND VETERANS OF THE

VIETNAM ERA (APR 1998)

(Reference 22.1308(b))

46 52.223-2 CLEAN AIR AND WATER (APR 1984)

Section 00700 - 4

(Reference 23.105(b))

47 52.223-6 DRUG-FREE WORKPLACE (JAN 1997)

(Reference 23.505(b)) 48 52.223-7004

DRUG-FREE WORK FORCE (SEP 1988)

(Reference 23.570-4)

49 52.225-5 BUY AMERICAN ACT--CONSTRUCTION MATERIALS (JUN 1997)

(Reference 25.207(a))

50 52.225-15 BUY AMERICAN ACT--CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS

ACT AND

NORTH AMERICAN FREE TRADE AGREEMENT (JUN 1997)

(Reference 25.207(d))

51 52.225-11 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (OCT 1996)

(Reference 25.702) 52 52.225-7002

QUALIFYING COUNTRY SOURCES AS SUBCONTRACTORS (DEC 1991)

(Reference 25.109-70(a) 53 52.225-7003

INFORMATION FOR DUTY-FREE ENTRY EVALUATION (MAR 1998)

(Reference 25.605-70(d) 54 52.225-7031

SECONDARY ARAB BOYCOTT OF ISRAEL (JUN 1992)

(Reference 25.770-5)

55 52.227-1 AUTHORIZATION AND CONSENT (JUL 1995)

(Reference 27.201-2(a))

56 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT

INFRINGEMENT

(AUG 1996)

(Reference 27.202-2)

57 52.227-4 PATENT INDEMNITY--CONSTRUCTION CONTRACTS (APR 1984)

(Reference 27.203-5) 58 52.227-7003

TERMINATION (AUG 1984)

(Reference 27.7009-2(c) 59 52.227-7018

RIGHTS IN NONCOMMERCIAL TECHNICAL DATA AND COMPUTER SOFTWARE--

SMALL

BUSINESS INNOVATION RESEARCH (SBIR) PROGRAM (JUN 1995)

(Reference 27.7104(a))

60 52.228-1 BID GUARANTEE (SEP 1996)

(Reference 28.101-2)

61 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997)

(Reference 28.106-4(a))

62 52.228-5 INSURANCE--WORK ON A GOVERNMENT INSTALLATION (JAN 1997)

(Reference 28.310)

63 52.228-11 PLEDGES OF ASSETS (FEB 1992)

(Reference 28.203-6)

64 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (JAN 1991)

(Reference 29.401-3) 65 52.231-7000

SUPPLEMENTAL COST PRINCIPLES (DEC 1991)

(Reference 31.100-70)

66 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (MAY 1997)

(Reference 32.111(a)(5)

67 52.232-17 INTEREST (JUN 1996)

(Reference 32.617(a)&()

68 52.232-23 ASSIGNMENT OF CLAIMS (JAN 1986)

Section 00700 - 5

(Reference 32.806(a)(1)

69 52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (MAR 1994)

Notwithstanding any other payment terms in this contract, the Government will make invoice payments and contract financing payments under the terms and conditions specified in this clause. Payment shall be considered as being made on the day a check is dated or an electronic funds transfer is is made. Definitions of pertinent terms are set forth in 32.902. All days referred to in this clause are calendar days, unless otherwise specified.

(a) Invoice Payments.

(1) For purposes of this clause, there are several types of invoice payments which may occur under this contract, as follows:

(i) Progress payments, if provided for elsewhere in this contract, based on Contracting Officer approval of the estimated amount and value of work or services performed, including payments for reaching milestones in any project:

(A) The due date for making such payments shall be 14 days after receipt of the payment request by the designated billing office.

However, if the designated billing office fails to annotate the payment request with the actual date of receipt, the payment due date shall be deemed to be the 14th day after the date the Contractor's payment request is dated, provided a proper payment request is received and there is no disagreement over quantity, quality, or Contractor compliance with contract requirements.

(B) The due date for payment of any amounts retained by the Contracting Officer in accordance with the clause at 52.232-5, Payments Under Fixed-Price Construction Contracts, shall be as specified in the contract or, if not specified, 30 days after approval for release to the Contractor by the Contracting Officer.

(ii) Final payments based on completion and acceptance of all work and presentation of release of all claims against the Government arising by virtue of the contract, and payments for partial deliveries that have been accepted by the Government (e.g., each separate building, public work, or other division of the contract for which the price is stated seperately in the contract):

(A) The due date for making such payments shall be either the 30th day after receipt by the designated billing office of a proper invoice from the Contractor, or the 30th day after Government acceptance of the work or services completed by the Contractor, whichever is later. However, if the designated billing office fails to annotate the invoice with the date of actual receipt, the invoice payment due date shall be deemed to be the 30th day after the date the Contractor's invoice is dated, provided a proper invoice is received and there is no disagreement over quantity, quality, or Contractor compliance with contract requirements.

(B) On a final invoice where the payment amount is subject to contract settlement actions (e.g., release of claims), acceptance shall be deemed to have occurred on the effective date of the contract settlement.

(2) An invoice is the Contractor's bill or written request for payment under the contract for work or services performed under the contract. An invoice shall be prepared and submitted to the designated billing office.

A proper invoice must include the items listed in subdivisions (a)(2)(i) through (a)(2)(ix) of this clause. If the invoice does not comply with these requirements, the Contractor will be notified of the defect within 7 days after receipt of the invoice at the designated billing office.

Untimely notification will be taken into account in the computation of

Section 00700 - 6 any interest penalty owed the Contractor in the manner described in subparagraph (a)(4) of this clause:

(i) Name and address of the Contractor.

(ii) Invoice date.

(iii) Contract number or other authorization for work or services performed (including order number and contract line item number).

(iv) Description of work or services performed.

(v) Delivery and payment terms (e.g., prompt payment discount terms).

(vi) Name and address of Contractor official to whom payment is to be sent (must be the same as that in the contract or in a proper notice of assignment).

(vii) Name (where practicable), title, phone number, and mailing address of person to be notified in event of a defective invoice.

(viii) For payments described in subdivision (a)(1)(i) of this clause, substantiation of the amounts requested and certification in accordance with the requirements of the clause at 52.232-5, Payments Under Fixed-Price Construction Contracts.

(ix) Any other information or documentation required by the contract.

(3) An interest penalty shall be paid automatically by the designated payment office, without request from the Contractor, if payment is not made by the due date and the conditions listed in subdivisions (a)(3)(i) through (a)(3)(iii) of this clause are met, if applicable.

(i) A proper invoice was received by the designated billing office.

(ii) A receiving report or other Government documentation authorizing payment was processed and there was no disagreement over quantity, quality, Contractor compliance with any contract term or condition, or requested progress payment amount.

(iii) In the case of a final invoice for any balance of funds due the Contractor for work or services performed, the amount was not subject to further contract settlement actions between the Government and the Contractor.

(4) The interest penalty shall be at the rate established by the Secretary of the Treasury under section 12 of the Contract Disputes Act of 1978 (41 U.S.C. 611) that is in effect on the day after the due date, except where the interest penalty is prescribed by other governmental authority. This rate is referred to as the "Renegotiation Board Interest Rate," and it is published in the Federal Register semiannually on or about January 1 and July 1. The interest penalty shall accrue daily on the invoice payment amount approved by the Government and be compounded in 30-day increments inclusive from the first day after the due date through the payment date. That is, interest accrued at the end of any 30-day period will be added to the approved invoice payment amount and be subject to interest penalties if not paid in the succeeding 30-day period. If the designated billing office failed to notify the Contractor of a defective invoice within the periods prescribed in subparagraph (a)(2) of this clause, then the due date on the corrected invoice will be adjusted by subtracting the number of days taken beyond the prescribed notification of defects period. Any interest penalty owed the Contractor will be based on this adjusted due date. Adjustments will be made by the designated payment office for errors in calculating interest penalties, if requested by the Contractor.

(i) For the sole purpose of computing an interest penalty that might be due the Contractor for payments described in subdivision (a)(1)(ii) of this clause, Government acceptance or approval shall be deemed to have occurred constructively on the 7th day after the Contractor has completed the work or services in accordance with the terms and conditions of the contract. In the event that actual acceptance or

Section 00700 - 7 approval occurs within the constructive acceptance or approval period, the determination of an interest penalty shall be based on the actual date of acceptance or approval. Constructive acceptance or constructive approval requirements do not apply if there is a disagreement over quantity, quality, or Contractor compliance with a contract provision. These requirements also do not compel Government officials to accept work or services, approve Contractor estimates, perform contract administration functions, or make payment prior to fulfilling their responsibilities.

(ii) The following periods of time will not be included in the determination of an interest penalty:

(A) The period taken to notify the Contractor of defects in invoices submitted to the Government, but this may not exceed 7 days.

(B) The period between the defects notice and resubmission of the corrected invoice by the Contractor.

(iii) Interest penalties will not continue to accrue after the filing of a claim for such penalties under the clause at 52.233-1, Disputes, or for more than 1 year. Interest penalties of less than $1.00 need not be paid.

(iv) Interest penalties are not required on payment delays due to disagreement between the Government and Contractor over the payment amount or other issues involving contract compliance, or on amounts temporarily withheld or retained in accordance with the terms of the contract. Claims involving disputes, and any interest that may be payable, will be resolved in accordance with the clause at 52.233-1, Disputes.

(5) An interest penalty shall also be paid automatically by the designated payment office, without request from the Contractor, if a discount for prompt payment is taken improperly. The interest penalty will be calculated on the amount of discount taken for the period beginning with the first day after the end of the discount period through the date when the Contractor is paid.

(6) If this contract was awarded on or after October 1, 1989, a penalty amount, calculated in accordance with regulations issued by the Office of Management and Budget, shall be paid in addition to the interest penalty amount if the Contractor--

(i) Is owed an interest penalty;

(ii) Is not paid the interest penalty within 10 days after the date the invoice amount is paid; and

(iii) Makes a written demand, not later than 40 days after the date the invoice amount is paid, that the agency pay such a penalty.

(b) Contract Financing Payments.

(1) For purposes of this clause, if applicable, "contract financing payment" means a Government disbursement of monies to a Contractor under a contract clause or other authorization prior to acceptance of supplies or services by the Government, other than progress payments based on estimates of amount and value of work performed. Contract financing payments include advance payments and interim payments under cost-type contracts.

(2) If this contract provides for contract financing, requests for payment shall be submitted to the designated billing office as specified in this contract or as directed by the Contracting Officer. Contract financing payments shall be made on the 30th day after receipt of a proper contract financing request by the designated billing office. In the event that an audit or other review of a specific financing request is required to ensure compliance with the terms and conditions of the

Section 00700 - 8 contract, the designated payment office is not compelled to make payment by the due date specified. For advance payments, loans, or other arrangements that do not involve recurrent submissions of contract financing requests, payment shall be made in accordance with the corresponding contract terms or as directed by the Contracting Officer.

Contract financing payments shall not be assessed an interest penalty for payment delays.

(c) The Contractor shall include in each subcontract for property or services (including a material supplier) for the purpose of performing this contract the following:

(1) A payment clause which obligates the Contractor to pay the subcontractor for satisfactory performance under its subcontract not later than 7 days from receipt of payment out of such amounts as are paid to the Contractor under this contract.

(2) An interest penalty clause which obligates the Contractor to pay to the subcontractor an interest penalty for each payment not made in accordance with the payment clause--

(i) For the period beginning on the day after the required payment date and ending on the date on which payment of the amount due is made;

and

(ii) Computed at the rate of interest established by the Secretary of the Treasury, and published in the Federal Register, for interest payments under section 12 of the Contract Disputes Act of 1978 (41 U.S.C. 611) in effect at the time the Contractor accrues the obligation to pay an interest penalty.

(3) A clause requiring each subcontractor to include a payment clause and an interest penalty clause conforming to the standards set forth in subparagraphs (c)(1) and (c)(2) of this clause in each of its subcontracts, and to require each of its subcontractors to include such clauses in their subcontracts with each lower-tier subcontractor or supplier.

(d) The clauses required by paragraph (c) of this clause shall not be construed to impair the right of Contractor or a subcontractor at any tier to negotiate, and to include in their subcontract, provisions which--

(1) Permit the Contractor or a subcontractor to retain (without cause) a specified percentage of each progress payment otherwise due to a subcontractor for satisfactory performance under the subcontract without incurring any obligation to pay a late payment interest penalty, in accordance with terms and conditions agreed to by the parties to the subcontract, giving such recognition as the parties deem appropriate to the ability of a subcontractor to furnish a performance bond and a payment bond;

(2) Permit the Contractor or subcontractor to make a determination that part or all of the subcontractor's request for payment may be withheld in accordance with the subcontract agreement; and

(3) Permit such withholding without incurring any obligation to pay a late payment penalty if--

(i) A notice conforming to the standards of paragraph (g) of this clause has been previously furnished to the subcontractor; and

(ii) A copy of any notice issued by a Contractor pursuant to subdivision (d)(3)(i) of this clause has been furnished to the Contracting Officer.

(e) If a Contractor, after making a request for payment to the Government but before making a payment to a subcontractor for the subcontractor's performance covered by the payment request, discovers that all or a portion of the payment otherwise due such subcontractor is subject to withholding from the subcontractor in accordance with the

Section 00700 - 9 subcontract agreement, then the Contractor shall--

(1) Furnish to the subcontractor a notice conforming to the standards of paragraph (g) of this clause as soon as practicable upon ascertaining the cause giving rise to a withholding, but prior to the due date for subcontractor payment;

(2) Furnish to the Contracting Officer, as soon as practicable, a copy of the notice furnished to the subcontractor pursuant to subparagraph (e)(1) of this clause;

(3) Reduce the subcontractor's progress payment by an amount not to exceed the amount specified in the notice of withholding furnished under subparagraph (e)(1) of this clause;

(4) Pay the subcontractor as soon as practicable after the correction of the identified subcontract performance deficiency, and--

(i) Make such payment within--

(A) Seven days after correction of the identified subcontract performance deficiency (unless the funds therefor must be recovered from the Government because of a reduction under subdivision (e)(5)(i)) of this clause; or

(B) Seven days after the Contractor recovers such funds from the Government; or

(ii) Incur an obligation to pay a late payment interest penalty computed at the rate of interest established by the Secretary of the Treasury, and published in the Federal Register, for interest payments under section 12 of the Contracts Disputes Act of 1978 (41 U.S.C. 611) in effect at the time the Contractor accrues the obligation to pay an interest penalty;

(5) Notify the Contracting Officer upon--

(i) Reduction of the amount of any subsequent certified application for payment; or

(ii) Payment to the subcontractor of any withheld amounts of a progress payment, specifying--

(A) The amounts withheld under subparagraph (e)(1) of this clause;

and

(B) The dates that such withholding began and ended; and

(6) Be obligated to pay to the Government an amount equal to interest on the withheld payments (computed in the manner provided in 31 U.S.C.

3903(c)(1)), from the 8th day after receipt of the withheld amounts from the Government until--

(i) The day the identified subcontractor performance deficiency is corrected; or

(ii) The date that any subsequent payment is reduced under subdivision (e)(5)(i) of this clause.

(f)(1) If a Contractor, after making payment to a first-tier subcontractor, receives from a supplier or subcontractor of the first-tier subcontractor (hereafter referred to as a "second-tier subcontractor") a written notice in accordance with section 2 of the Act of August 24, 1935 (40 U.S.C. 270b, Miller Act), asserting a deficiency in such first-tier subcontractor's performance under the contract for which the Contractor may be ultimately liable, and the Contractor determines that all or a portion of future payments otherwise due such first-tier subcontractor is subject to withholding in accordance with the subcontract agreement, then the Contractor may, without incurring an obligation to pay an interest penalty under subparagraph (e)(6) of this clause--

(i) Furnish to the first-tier subcontractor a notice conforming to the standards of paragraph (g) of this clause as soon as practicable upon making such determination; and

(ii) Withhold from the first-tier subcontractor's next available

Section 00700 - 10 progress payment or payments an amount not to exceed the amount specified in the notice of withholding furnished under subdivision (f)(1)(i) of this clause.

(2) As soon as practicable, but not later than 7 days after receipt of satisfactory written notification that the identified subcontract performance deficiency has been corrected, the Contractor shall pay the amount withheld under subdivision (f)(1)(ii) of this clause to such first-tier subcontractor, or shall incur an obligation to pay a late payment interest penalty to such first-tier subcontractor computed at the rate of interest established by the Secretary of the Treasury, and published in the Federal Register, for interest payments under section 12 of the Contracts Disputes Act of 1978 (41 U.S.C. 611) in effect at the time the Contractor accrues the obligation to pay an interest penalty.

(g) A written notice of any withholding shall be issued to a subcontractor (with a copy to the Contracting Officer of any such notice issued by the Contractor), specifying--

(1) The amount to be withheld;

(2) The specific causes for the withholding under the terms of the subcontract; and

(3) The remedial actions to be taken by the subcontractor in order to receive payment of the amounts withheld.

(h) The Contractor may not request payment from the Government of any amount withheld or retained in accordance with paragraph (d) of this clause until such time as the Contractor has determined and certified to the Contracting Officer that the subcontractor is entitled to the payment of such amount.

(i) A dispute between the Contractor and subcontractor relating to the amount or entitlement of a subcontractor to a payment or a late payment interest penalty under a clause included in the subcontract pursuant to paragraph (c) of this clause does not constitute a dispute to which the United States is a party. The United States may not be interpleaded in any judicial or administrative proceeding involving such a dispute.

(j) Except as provided in paragraph (i) of this clause, this clause shall not limit or impair any contractual, administrative, or judicial remedies otherwise available to the Contractor or a subcontractor in the event of a dispute involving late payment or nonpayment by the Contractor or deficient subcontract performance or nonperformance by a subcontractor.

(k) The Contractor's obligation to pay an interest penalty to a subcontractor pursuant to the clauses included in a subcontract under paragraph (c) of this clause shall not be construed to be an obligation of the United States for such interest penalty. A cost reimbursement claim may not include any amount for reimbursement of such interest penalty.

70 52.233-1 DISPUTES (OCT 1995)

(Reference 33.215)

71 52.233-3 PROTEST AFTER AWARD (AUG 1996)

(Reference 33.106(b))

72 52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)

(Reference 36.501(b))

73 52.236-2 DIFFERING SITE CONDITIONS (APR 1984)

(Reference 36.502)

74 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 1984)

(Reference 36.503)

75 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984)

(Reference 36.505)

Section 00700 - 11

76 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)

(Reference 36.506)

77 52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)

(Reference 36.507)

78 52.236-8 OTHER CONTRACTS (APR 1984)

(Reference 36.508)

79 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,

UTILITIES, AND

IMPROVEMENTS (APR 1984)

(Reference 36.509)

80 52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984)

(Reference 36.510)

81 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)

(Reference 36.511)

82 52.236-12 CLEANING UP (APR 1984)

(Reference 36.512)

83 52.236-13 ACCIDENT PREVENTION (NOV 1991)

(Reference 36.513(a))

84 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)

(Reference 36.515)

85 52.236-17 LAYOUT OF WORK (APR 1984)

(Reference 36.517)

86 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997)

(Reference 36.521) 87 52.236-7000

MODIFICATION PROPOSALS--PRICE BREAKDOWN (DEC 1991)

(Reference 36.570(a))

88 52.236-7004 PAYMENT FOR MOBILIZATION AND DEMOBILIZATION (DEC 1991)

(a) The Government will pay all costs for the mobilization and demobilization of all of the Contractor's plant and equipment at the contract lump sum price for this item.

(1) 60 percent of the lump sum price upon completion of the Contractor's mobilization at the work site.

(2) The remaining 40 percent upon completion of demobilization.

(b) The Contracting Officer may require the Contractor to furnish cost data to justify this portion of the bid if the Contracting Officer believes that the percentages in paragraphs (a)(1) and (2) of this clause do not bear a reasonable relation to the cost of the work in this contract.

(1) Failure to justify such price to the satisfaction of the Contracting Officer will result in payment, as determined by the Contracting Officer, of--

(i) Actual mobilization costs at completion of mobilization;

(ii) Actual demobilization costs at completion of demobilization; and

(iii) The remainder of this item in the final payment under this contract.

(2) The Contracting Officer's determination of the actual costs in paragraph (b)(1)of this clause is not subject to appeal.

89 52.236-7001 CONTRACT DRAWINGS, MAPS, AND SPECIFICATIONS (DEC 1991)

(a) The Government--

(1) Will provide the Contractor, without charge, five sets (five unless otherwise specified) of large-scale contract drawings and specifications except publications incorporated into the technical

Section 00700 - 12 provisions by reference;

(2) Will furnish additional sets on request, for the cost of reproduction; and

(3) May, at its option, furnish the Contractor one set of reproducibles, or half-size drawings, in lieu of the drawings in paragraph (a)(1) of this clause.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies; and

(4) Be responsible for any errors which might have been avoided by complying with this paragraph (b).

(c) Large scale drawings shall, in general, govern small scale drawings.

Figures marked on drawings shall, in general, be followed in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work which are manifestly necessary to carry out the intent of the drawings and specifications, or which are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work, but shall be performed as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Title File and Drawing No.

See 0800-6 page 0800-3.

90 52.236-7005

AIRFIELD SAFETY PRECAUTIONS (DEC 1991)

(Reference 36.570(b)(3)

91 52.242-13 BANKRUPTCY (JUL 1995)

(Reference 42.903)

92 52.243-4 CHANGES (AUG 1987)

(Reference 43.205(d)) 93 52.243-7001

PRICING OF CONTRACT MODIFICATIONS (DEC 1991)

(Reference 43.205-71)

94 52.244-1 SUBCONTRACTS (FIXED-PRICE CONTRACTS) (OCT 1997)

(Reference 44.204)

95 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS AND COMMERCIAL COMPONENTS

(APR 1998)

(Reference 44.403)

96 52.245-2 GOVERNMENT PROPERTY (FIXED-PRICE CONTRACTS) (DEC 1989)

(Reference 45.106(b)(1)

97 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)

(Reference 46.312) 98 52.246-21 I

WARRANTY OF CONSTRUCTION (MAR 1994)--ALTERNATE I (APR 1984)

(Reference 46.710(e)(2) 99 52.247-7023

TRANSPORTATION OF SUPPLIES BY SEA (NOV 1995)

(Reference 47.573(b)) 100 52.247-7024

NOTIFICATION OF TRANSPORTATION OF SUPPLIES BY SEA (NOV 1995)

(Reference 47.573(c))

Section 00700 - 13

101 52.248-3 VALUE ENGINEERING--CONSTRUCTION (MAR 1989)

(Reference 48.202)

102 52.249-2 ITERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE)

(SEP 1996)--

ALTERNATE I (SEP 1996)

(Reference 49.502(b)(1)

103 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)

(Reference 49.504(c)(1)

104 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.

(b) The use in this solicitation or contract of any N/A (48 CFR N/A ) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

(NM)

105 52.253-1 COMPUTER GENERATED FORMS (JAN 1991)

(Reference 53.111)

106 52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991)

(Reference 14.201-6y &)

107 52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991)

(Reference 14.201-6x &)

108 52.3-4002 APPLICABILITY OF COMPLETE WAGE RATE DECISION

Read the following in conjunction with the Wage Rates:

In addition to the wages rates in this solicitation, the complete decision of the Secretary of Labor contains wage rates for other classes of laborers and mechanics. Because it does not appear that the work called for by this solicitation will require the use of such other classes, the wage rates applicable to them have not been reprinted herein. However, if any such classes of laborers or mechanics actually are employed to perform work under the contract resulting from this solicitation, payment will be required as specified in the clauses entitled "Davis-Bacon Act" at Wage rates contained in the completed decision of the Secretary of Labor. Offerors desiring the complete decision may request it from the Contracting Officer.

109 52.0-4000 EFARS 52.202-10001 DEFINITIONS.

(a) The term "head of the agency" or "Secretary" as used herein means the Secretary of the Army; and the term "his duly authorized representative" means the Chief of Engineers, Department of the Army, or an individual or board designated by him.

(b) The agency board of contract appeals having jurisdiction over all appeals from final decisions of the Contracting Officer under the Contract Disputes Act of 1978 is the Corps of Engineers Board of Contract Appeals, Office of the Chief of Engineers, Pulaski Building, 20 Massachusetts Avenue, N.W., Washington, D.C. 20314-1000.

Section 00700 - 14

110 52.242-7000

POSTAWARD CONFERENCE (DEC 1991)

(Reference 42.570)

END OF SECTION 00700

TABLE OF CONTENTS

SECTION 00700

CONTRACT CLAUSES

1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

2 52.3-4001 INFORMATION REGARDING BID, PERFORMANCE, AND PAYMENT

BONDS

3 52.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)

4 52.202-1 I DEFINITIONS (OCT 1995)--ALTERNATE I (APR 1984)

5 52.203-3 GRATUITIES (APR 1984)

6 52.203-5 COVENANT AGAINST CONTINGENT FEES (APR 1984)

7 52.203-7 ANTI-KICKBACK PROCEDURES (JUL 1995)

8 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER

ACTIVITY (JAN 1997)

9 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL

TRANSACTIONS (JUN

1997)

10 52.204-1 APPROVAL OF CONTRACT (DEC 1989)

11 52.203-7001 SPECIAL PROHIBITION ON EMPLOYMENT (JUN 1997)

12 52.203-7002 DISPLAY OF DOD HOTLINE POSTER (DEC 1991)

13 52.204-2 SECURITY REQUIREMENTS (AUG 1996)

14 52.204-4 PRINTING/COPYING DOUBLE-SIDED ON RECYCLED PAPER

(JUN 1996)

15 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN

SUBCONTRACTING WITH CONTRACTOR

DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (JUL

1995)

16 52.211-1 AVAILABILITY OF SPECIFICATIONS LISTED IN THE GSA

INDEX OF FEDERAL

SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM

DESCRIPTIONS (JUN 1997)

17 52.211-2 AVAILABILITY OF SPECIFICATIONS LISTED IN THE DOD

INDEX OF SPECIFICATIONS

AND STANDARDS (DODISS) (JUN 1997)

18 52.211-16 VARIATION IN QUANTITY (APR 1984)

19 52.214-26 AUDIT AND RECORDS--SEALED BIDDING (OCT 1997)

20 52.228-7004 BONDS OR OTHER SECURITY (DEC 1991)

21 52.214-27 PRICE REDUCTION FOR DEFECTIVE COST OR PRICING DATA-

-MODIFICATIONS--

SEALED BIDDING (OCT 1997)

22 52.214-28 SUBCONTRACTOR COST OR PRICING DATA--MODIFICATIONS--

SEALED BIDDING

(OCT 1997)

23 52.214-29 ORDER OF PRECEDENCE--SEALED BIDDING (JAN 1986)

24 52.219-8 UTILIZATION OF SMALL, SMALL DISADVANTAGED AND

WOMEN-OWNED SMALL

BUSINESS CONCERNS (JUN 1997)

25 52.219-9 SMALL, SMALL DISADVANTAGED AND WOMEN-OWNED SMALL

BUSINESS SUBCONTRACTING

PLAN (AUG 1996)

26 52.219-14 LIMITATIONS ON SUBCONTRACTING (DEC 1996)

27 52.219-16 LIQUIDATED DAMAGES--SUBCONTRACTING PLAN (OCT 1995)

Section 00700 - 15

28 52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB

1997)

29 52.222-3 CONVICT LABOR (AUG 1996)

30 52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS ACT--

OVERTIME COMPENSATION

(JUL 1995)

31 52.222-6 DAVIS-BACON ACT (FEB 1995)

32 52.222-7 WITHHOLDING OF FUNDS (FEB 1988)

33 52.222-8 PAYROLLS AND BASIC RECORDS (FEB 1988)

34 52.222-9 APPRENTICES AND TRAINEES (FEB 1988)

35 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB

1988)

36 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (FEB 1988)

37 52.222-12 CONTRACT TERMINATION--DEBARMENT (FEB 1988)

38 52.222-13 COMPLIANCE WITH DAVIS-BACON AND RELATED ACT

REGULATIONS (FEB 1988)

39 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)

40 52.222-15 CERTIFICATION OF ELIGIBILITY (FEB 1988)

41 52.222-26 EQUAL OPPORTUNITY (APR 1984)

42 52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR

CONSTRUCTION (APR 1984)

43 52.222-35 AFFIRMATIVE ACTION FOR DISABLED VETERANS AND

VETERANS OF THE VIETNAM

ERA (APR 1998)

44 52.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES

(JUN 1998)

45 52.222-37 EMPLOYMENT REPORTS ON DISABLED VETERANS AND

VETERANS OF THE

VIETNAM ERA (APR 1998)

46 52.223-2 CLEAN AIR AND WATER (APR 1984)

47 52.223-6 DRUG-FREE WORKPLACE (JAN 1997)

48 52.223-7004 DRUG-FREE WORK FORCE (SEP 1988)

49 52.225-5 BUY AMERICAN ACT--CONSTRUCTION MATERIALS (JUN 1997)

50 52.225-15 BUY AMERICAN ACT--CONSTRUCTION MATERIALS UNDER

TRADE AGREEMENTS ACT AND

NORTH AMERICAN FREE TRADE AGREEMENT (JUN 1997)

51 52.225-11 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (OCT

1996)

52 52.225-7002 QUALIFYING COUNTRY SOURCES AS SUBCONTRACTORS (DEC

1991)

53 52.225-7003 INFORMATION FOR DUTY-FREE ENTRY EVALUATION (MAR

1998)

54 52.225-7031 SECONDARY ARAB BOYCOTT OF ISRAEL (JUN 1992)

55 52.227-1 AUTHORIZATION AND CONSENT (JUL 1995)

56 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND

COPYRIGHT INFRINGEMENT

(AUG 1996)

57 52.227-4 PATENT INDEMNITY--CONSTRUCTION CONTRACTS (APR 1984)

58 52.227-7003 TERMINATION (AUG 1984)

59 52.227-7018 RIGHTS IN NONCOMMERCIAL TECHNICAL DATA AND COMPUTER

SOFTWARE--SMALL

BUSINESS INNOVATION RESEARCH (SBIR) PROGRAM (JUN

1995)

60 52.228-1 BID GUARANTEE (SEP 1996)

61 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997)

62 52.228-5 INSURANCE--WORK ON A GOVERNMENT INSTALLATION (JAN

1997)

Section 00700 - 16

63 52.228-11 PLEDGES OF ASSETS (FEB 1992)

64 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (JAN 1991)

65 52.231-7000 SUPPLEMENTAL COST PRINCIPLES (DEC 1991)

66 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS

(MAY 1997)

67 52.232-17 INTEREST (JUN 1996)

68 52.232-23 ASSIGNMENT OF CLAIMS (JAN 1986)

69 52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (MAR

1994)

70 52.233-1 DISPUTES (OCT 1995)

71 52.233-3 PROTEST AFTER AWARD (AUG 1996)

72 52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)

73 52.236-2 DIFFERING SITE CONDITIONS (APR 1984)

74 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE

WORK (APR 1984)

75 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984)

76 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)

77 52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)

78 52.236-8 OTHER CONTRACTS (APR 1984)

79 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES,

EQUIPMENT, UTILITIES, AND

IMPROVEMENTS (APR 1984)

80 52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984)

81 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)

82 52.236-12 CLEANING UP (APR 1984)

83 52.236-13 ACCIDENT PREVENTION (NOV 1991)

84 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)

85 52.236-17 LAYOUT OF WORK (APR 1984)

86 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB

1997)

87 52.236-7000 MODIFICATION PROPOSALS--PRICE BREAKDOWN (DEC 1991)

88 52.236-7004 PAYMENT FOR MOBILIZATION AND DEMOBILIZATION (DEC

1991)

89 52.236-7001 CONTRACT DRAWINGS, MAPS, AND SPECIFICATIONS (DEC

1991)

90 52.236-7005 AIRFIELD SAFETY PRECAUTIONS (DEC 1991)

91 52.242-13 BANKRUPTCY (JUL 1995)

92 52.243-4 CHANGES (AUG 1987)

93 52.243-7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991)

94 52.244-1 SUBCONTRACTS (FIXED-PRICE CONTRACTS) (OCT 1997)

95 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS AND COMMERCIAL

COMPONENTS (APR 1998)

96 52.245-2 GOVERNMENT PROPERTY (FIXED-PRICE CONTRACTS) (DEC

1989)

97 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)

98 52.246-21 I WARRANTY OF CONSTRUCTION (MAR 1994)--ALTERNATE I

(APR 1984)

99 52.247-7023 TRANSPORTATION OF SUPPLIES BY SEA (NOV 1995)

100 52.247-7024 NOTIFICATION OF TRANSPORTATION OF SUPPLIES BY SEA

(NOV 1995)

101 52.248-3 VALUE ENGINEERING--CONSTRUCTION (MAR 1989)

102 52.249-2 I TERMINATION FOR CONVENIENCE OF THE GOVERNMENT

(FIXED-PRICE) (SEP 1996)--

ALTERNATE I (SEP 1996)

103 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)

104 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)

105 52.253-1 COMPUTER GENERATED FORMS (JAN 1991)

Section 00700 - 17

106 52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991)

107 52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR

1991)

108 52.3-4002 APPLICABILITY OF COMPLETE WAGE RATE DECISION

109 52.0-4000 EFARS 52.202-10001 DEFINITIONS.

110 52.242-7000 POSTAWARD CONFERENCE (DEC 1991)

G&W SYSTEM TECH DATA FACILITY BUILDING 3350

00 80 00.00 18 - 1

SECTION 00 80 00.00 18

SPECIAL CONTRACT REQUIREMENTS

(NYD rev 10/08)

INDEX OF PARAGRAPHS

1. COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK

2. LIQUIDATED DAMAGES – CONSTRUCTION

3. EQUAL OPPORTUNITY PRE-AWARD CLEARANCE OF SUBCONTRACTORS

4. INSURANCE – WORK ON A GOVERNMENT INSTALLATION

5. PERFORMANCE OF WORK BY THE CONTRACTOR

6. CERTIFICATES OF COMPLIANCE

7. IMPLEMENTING GUARANTEES

8. BID GUARANTEE

9. CONTRACT DRAWINGS, MAPS AND SPECIFICATIONS

10. RECORD DRAWINGS

11. DESIGNATION OF PROPERTY ADMINISTRATOR

12. PHYSICAL DATA

13. PRICING OF ADJUSTMENTS

14. PAYMENT FOR MATERIALS DELIVERED OFF-SITE

15. EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE

16. ALTERATIONS IN CONTRACT

17. AVAILABILITY AND USE OF UTILITY SERVICES AND PERMITS

18. SALVAGE MATERIALS AND EQUIPMENT

19. IDENTIFICATION OF GOVERNMENT-FURNISHED PROPERTY

20. CONSTRUCTION PROJECT SIGNS

21. LABOR SURPLUS AREA EXPENDITURE REQUIREMENTS

22. TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER

23. SCHEDULING AND DETERMINATION OF PROGRESS

24. IDENTIFICATION OF EMPLOYEES

25. FIELD OFFICE

26. EXCLUSION OF PERIODS IN COMPUTING COMPLETION SCHEDULES

27. QUANTITY SURVEYS

00 80 00.00 18 - 2

28. TIME EXTENSIONS

29. MISPLACED MATERIAL

30. SUPERINTENDENCE OF SUBCONTRACTORS

31. PROCEDURES FOR SUBMISSION AND PAYMENT OF ALL

CONTRACTPAYMENTS

32. VERIFICATION OF SMALL BUSINESS UTILIZATION

33. HAZARDOUS MATERIAL IDENTIFICATION & MATERIAL SAFETY DATA

34. SAFETY AND HEALTH REQUIREMENTS MANUAL

35. SPECIAL SCHEDULING REQUIREMENTS FOR MECHANICAL AND

ELECTRICAL SYSTEMS

36. SUBMISSION OF CLAIMS

37. PARTNERSHIP IMPLEMENTATION PLAN

38. PRECONSTRUCTION CONFERENCE

39. GOVERNMENT RESIDENT MANAGEMENT SYSTEM AND CONTRACTOR

QUALITY CONTROL SYSTEM (QCS) MODULE

40. CONSTRUCTION COLOR/FINISH SELECTION PACKAGE SUBMITTAL

41. PRICING of CONTRACTOR-FURNISHSED AND INSTALLED PROPERTY

AND GOVERNMENT-FURNISHED CONTRACTOR-INSTALLED PROPERTY

42. ENVIRONMENTAL RESPONSIBILITY

43. QUALIFICATIONS FOR PERFORMANCE OF ELECTRICAL WORK

44. Not Used

45. Not Used

46. UTILITY SERVICE INTERRUPTIONS (USI) AND SHUTDOWNS

47. NOTIFICATION AND PERMIT REQUEST REQUIREMENTS FOR VARIOUS

ACTIVITIES

48. NOTIFICATION AND/OR REQUEST REQUIREMENTS

49. THE CONSTRUCTION LIMITS AND CONSTRUCTION ACCESS ROUTE

50. MATERIAL DELIVERIES

51. PROTECTION OF GOVERNMENT PROPERTY

52. HOUSEKEEPING

53. STORAGE OF CONSTRUCTION EQUIPMENT

54. PARKING

55. PICATINNY REQUIREMENTS

56. ELECTRONIC DOCUMENTS AND COMMUNICATION

00 80 00.00 18 - 3

57. SALVAGEABLE AND UNSALVAGEABLE MATERIALS

58. MATERIALS

59. SUBMISSIONS

60. MEETINGS

61. CONTRACTOR COORDINATION AND VERIFICATION OF DETAILS AND

DIMENSIONS:

62.