AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to:

a. Proposal due date remains unchanged at 25 August 2009 at 2:00 PM EST.

b. Add G & W Systems Laboratory (Turrets) Project Table of Contents.

c. Change the G & W Systems Tech Data (Building 3350) Project Table of Contents

d. Add G & W Systems Tech Data Facility (BLDG 3350) draw ing A-901 dated 6/30/2009

e. Add G & W Systems Laboratory (Turrets) architectural draw ings dated 7/2/2009

Continued on follow ing page

1. CONTRACT ID CODE PAGE OF PAGES

J 1 20

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Jul-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-09-R-0016

X 9B. DATED (SEE ITEM 11)

24-Jul-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Jul-2009

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-09-R-0016

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

AMENDMENT 0001

CONTINUATION PAGE:

f. Answer to Contractor Questions (Questions 1-2). Questions and Answers for Informational Purposes Only.

g. Add updated Wage Rates in Section 00800, General Decision Number: NJ080043 07/24/2009

NJ 43.

NOTE: Offeror must acknowledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the following methods: in the space provided on the SF 1442, by separate letter, or by telegram by signing block 15 below. FAILURE TO

ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT

IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION,

MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208)

AMENDMENT NO. 1 TO PLANS & SPECIFICATIONS ISSUED 24 JULY 2009 FOR

Guns & Weapons Systems Research Laboratory (Turrets) at Picatinny Arsenal, Picatinny, New Jersey

1. SPECIFICATION CHANGES:

a.) The following SPECIFICATIONS are NEW and are ISSUED with this amendment:

G&W Systems Laboratory (Turrets)

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 10 00 SF 1442 & BIDDING SCHEDULE

00 22 11 PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA AND BASIS OF

AWARD – BEST VALUE LPTA

00 31 24 ENVIRONMENTAL ASSESSMENT INFORMATION

00 31 32 GEOTECHNICAL DATA

00 60 00 REPRESENTATIONS AND CERTIFICATIONS AND OTHER STATEMENT OF BIDDERS

00 70 00 CONTRACT CLAUSES

00 80 00 SPECIAL CONTRACT REQUIRMENTS & WAGE RATE DETERMINATIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 12 00.00 18 DESIGN AND RECORD DRAWING REQUIREMENTS

01 32 01.00 18 PROJECT SCHEDULE

01 33 00.00 18 SUBMITTAL PROCEDURES

01 33 29 LEED(TM) DOCUMENTATION

01 35 28.00 18 SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 02.00 18 QUALITY CONTROL SYSTEM (QCS)

01 45 04.00 18 CONTRACTOR QUALITY CONTROL

01 45 20.00 18 TESTING FOR MECHANICAL AND ELECTRICAL SYSTEMS

01 45 30.00 18 CONTRACTOR WARRANTY MANAGEMENT

01 52 60.00 18 CONSTRUCTION INDOOR AIR QUALITY (IAQ) MANAGEMENT

01 62 35 RECYCLED / RECOVERED MATERIALS

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 23.00 18 OPERATION AND MAINTENANCE DATA

01 91 13 COMMISSIONING

DIVISION 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

03 40 00.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE

CONSTRUCTION

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL

05 50 00 METAL: MISCELLANEOUS AND FABRICATIONS

05 50 03.00 10 MACHINE WORK

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 16 00 SHEATHING

06 41 16.00 10 LAMINATE CLAD ARCHITECTURAL CASEWORK

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 17 16 BENTONITE COMPOSITE SHEET WATERPROOFING

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 21 29 SPRAYED INSULATION

07 27 00 AIR BARRIER

07 42 63 FABRICATED WALL PANEL ASSEMBLIES

07 60 00 FLASHING AND SHEET METAL

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 33 23 OVERHEAD COILING DOORS

08 62 00 TRANSLUCENT WALL PANEL SYSTEMS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 06 90 COLOR SCHEDULE

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 00 CERAMIC TILE

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 68 00 CARPET

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 14 02 INTERIOR SIGNAGE

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

DIVISION 11 - EQUIPMENT

11 13 13 LOADING DOCK BUMPERS

DIVISION 12 - FURNISHINGS

12 21 00 WINDOW BLINDS

DIVISION 13 - SPECIAL CONSTRUCTION

13 34 19 METAL BUILDING SYSTEMS

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

21 30 00 FIRE PUMPS

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 48 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND

EQUIPMENT

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS

23 09 23.13 20 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC

23 11 25 FACILITY GAS PIPING

23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM

23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS

23 37 13 DIFFUSERS, REGISTERS, AND GRILLS

23 52 00 HEATING BOILERS

23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

23 82 00.00 20 TERMINAL HEATING AND COOLING UNITS

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 35 43 400-HERTZ (HZ) SOLID STATE FREQUENCY CONVERTER

26 41 01.00 10 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 55 53.00 10 EXTERIOR LIGHTING INCLUDING SECURITY AND CCTV APPLICATIONS

DIVISION 27 - COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 05 28 PATHWAYS FOR ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 05 19 GEOTEXTILE

31 11 00 CLEARING AND GRUBBING

31 23 00.00 20 EXCAVATION AND FILL

31 31 16 SOIL TREATMENT FOR SUBTERRANEAN TERMITE CONTROL

31 32 11 SOIL SURFACE EROSION CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 16.17 COLD MILLING OF BITUMINOUS PAVEMENTS

32 11 23 AGGREGATE BASE COURSE

32 12 10 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 16 13 CONCRETE SIDEWALKS AND CURBS

32 17 23.00 20 PAVEMENT MARKINGS

32 31 13 CHAIN LINK FENCES AND GATES

32 92 19 SEEDING

DIVISION 33 - UTILITIES

33 11 00 WATER DISTRIBUTION

33 30 00 SANITARY SEWERS

33 40 01 STORM DRAINAGE

33 51 03.00 10 GAS DISTRIBUTION SYSTEM

33 71 02.00 20 UNDERGROUND ELECTRICAL DISTRIBUTION

DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT

41 22 13.19 JIB CRANES

41 22 23.26 POWERED HOISTS AND TROLLEY SYSTEM

-- End of Project Table of Contents –

b. The following specification have been REVISED and RE-ISSUED with this Amendment:

G&W Systems Tech Data (Building 3350)

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

00 10 00 SF 1442 & BIDDING SCHEDULE

00 22 11 PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA AND

BASIS OF AWARD – BEST VALUE LPTA

00 60 00 REPRESENTATIONS AND CERTIFICATIONS AND OTHER STATEMENT OF

BIDDERS

00 70 00 CONTRACT CLAUSES

00 80 00 SPECIAL CONTRACT REQUIRMENTS & WAGE RATE DETERMINATIONS

00 90 10 APPENDICES

01 12 00.00 18 DESIGN AND RECORD DRAWING REQUIREMENTS

01 32 01.00 18 PROJECT SCHEDULE

01 33 00.00 18 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 02.00 18 QUALITY CONTROL SYSTEM (QCS)

01 45 04.00 18 CONTRACTOR QUALITY CONTROL

01 45 20.00 18 TESTING FOR MECHANICAL AND ELECTRICAL SYSTEMS

01 45 30.00 18 CONTRACTOR WARRANTY MANAGEMENT

01 57 20.00 10 ENVIRONMENTAL PROTECTION

01 62 35 RECYCLED / RECOVERED MATERIALS

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 23.00 18 OPERATION AND MAINTENANCE DATA

DIVISION 03 – CONCRETE

03 11 13.00 10 STRUCTURAL CONCRETE FORMWORK

03 15 13.00 10 EXPANSION JOINTS, CONTRACTION JOINTS, AND WATERSTOPS

03 20 01.00 10 CONCRETE REINFORCEMENT

03 30 00 CAST-IN-PLACE CONCRETE

DIVISION 05 – METALS

05 12 00 STRUCTURAL STEEL

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 41 16.00 10 LAMINATE CLAD ARCHITECTURAL CASEWORK

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 11 13 BITUMINOUS DAMPPROOFING

07 60 00 FLASHING AND SHEET METAL

07 92 00 JOINT SEALANTS

DIVISION 08 – OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 33 23 OVERHEAD COILING DOORS

08 34 59 VAULT DOORS AND DAY GATES

08 45 23 TRANSLUCENT WALL PANELS

08 71 00 DOOR HARDWARE

08 91 00 METAL [WALL] [AND] [DOOR] LOUVERS

DIVISION 09 – FINISHES

09 29 00 GYPSUM BOARD

09 51 00 ACOUSTICAL CEILINGS

09 90 00 PAINTS AND COATINGS

DIVISION 10 – SPECIALTIES

10 14 01 EXTERIOR SIGNAGE

10 14 02 INTERIOR SIGNAGE

10 26 13 WALL AND CORNER GUARDS

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

DIVISION 13 - SPECIAL CONSTRUCTION

13 34 19 METAL BUILDING SYSTEMS

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 – PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

22 07 19 PLUMBING PIPING INSULATION

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS

23 09 23.13 20 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC

23 31 13 METAL DUCTS

23 36 00 AIR TERMINAL UNITS

23 37 13 DIFFUSERS, REGISTERS, AND GRILLS

23 72 00.00 10 ENERGY RECOVERY SYSTEMS

23 73 13 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITS

DIVISION 26 – ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 27 26.00 40 WIRING DEVICES

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 32 13.00 20 SINGLE OPERATION GENERATOR SETS

26 36 23.00 20 AUTOMATIC TRANSFER SWITCHES

26 41 00.00 20 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 52 00.00 40 EMERGENCY LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 27 – COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 – EARTHWORK

31 00 00 EARTHWORK

31 23 00.00 20 EXCAVATION AND FILL

31 32 11 SOIL SURFACE EROSION CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

32 92 19 SEEDING

DIVISION 33 – UTILITIES

33 11 00 WATER DISTRIBUTION

33 30 00 SANITARY SEWERS

33 40 00 STORM DRAINAGE UTILITIES

33 70 02.00 10 ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

-- End of Project Table of Contents --

2. The following Drawings are NEW and ISSUED with this Amendment:

Project Name Drawing Date Comment G&W Systems Tech Data Facility A-901 6-30-09 New Sheet

G&W Systems Laboratory (Turrets) 1A-102 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 1A-111 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 1A-112 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 1A-121 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 1A-122 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 1A-130 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 1A-131 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 1A-132 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 1A-151 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 1A-201 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 1A-202 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 1A-203 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 1A-301 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 1A-401 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 1A-402 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 1A-403 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 1A-404 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 1A-405 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 1A-511 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 1A-512 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 1A-551 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 1A-571 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 1A-581 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 2A-101 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 2A-102 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 2A-122 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 2A-131 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 2A-132 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 2A-151 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 2A-152 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 2A-201 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 2A-202 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 2A-301 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 2A-551 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 2A-571 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 3A-601 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 3A-602 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 3A-603 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 3A-611 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 3A-620 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 3A-801 7-2-09 New Sheet

G&W Systems Laboratory (Turrets) 3A-802 7-2-09 New Sheet

ANSWER TO CONTRACTORS QUESTIONS (Questions 1 -2)

The following questions and answers are provided for information only. Nothing contained in the questions and answers amends or revises any provisions of the solicitation.

Questions and Answers

FOR INFORMATION PURPOSES ONLY

1. Question: Drawing S-401 in the G&W Systems Tech Data (Building 3350) is shown in the Project Index on sheet G-001 but it is not included in the drawing set.

Answer: Drawing S-401 was omitted from the project and is to be removed from the Project index.

2. Question: Drawing A-901 in the G&W Systems Tech Data (Building 3350) is shown in the Project Index on sheet G-001 but it is not included in the drawing set.

Answer: Drawing A-901 will be included in this amendment.

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

WAGE DETERMINATION 0001

General Decision Number: NJ080043 07/24/2009 NJ43

State: New Jersey JR 27 July 2009

Construction Type: Building

County: Morris County in New Jersey.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Modification Number Publication Date

0 04/24/2009 1 05/01/2009 2 06/05/2009 3 06/26/2009 4 07/03/2009 5 07/17/2009 6 07/24/2009

ASBE0032-008 09/19/2008

Rates Fringes

ASBESTOS WORKER/HEAT & FROST INSULATOR

(includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems;

also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement)....................... $ 41.99 26.84

BRNJ0002-014 11/01/2008

Rates Fringes BRICKLAYER (Including Caulking, Cleaning and Pointing)........................ $ 36.70 20.97

Work on high stacks: 22% per hour additional.

BRNJ0002-016 11/01/2008

Rates Fringes

MASON - STONE.................... $ 36.70 20.97

Work on high stacks: 22% per hour additional.

BRNJ0007-022 06/01/2009

Rates Fringes Tile finisher.................. $ 38.43 20.90 Tile setter.................... $ 46.83 24.15

Tile finisher: Work grouting all epoxy: $10.00 additional per day.

CARP0006-009 05/01/2009

Rates Fringes CARPENTER (Scaffold Builder).....$ 39.45 49.75%

The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.

CARP0006-010 05/01/2009

Rates Fringes

CARPENTER

Including Acoustical Ceiling Installation, Drywall Hanging, Formwork, Batt and Blown Insulation... $ 39.45 49.75%

CARP0029-008 05/01/2009

Rates Fringes Soft floor layer............... $ 39.45 49.75%

CARP0715-007 05/01/2009

Rates Fringes Millwright.................... .$ 40.27 49.75%

Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or outside of buildings: the first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.

ELEC0102-023 06/02/2008

Rates Fringes

ELECTRICIAN (Including Low Voltage Wiring) Cable splicer...............$ 50.07 51% Electrician.................$ 45.52 51%

Work forty ft. or more above the ground or protective rigging (does not apply to pole work, or to use of a manlift or high reach-type lift): 10% per hour additional.

Work with, or the removal of, asbestos materials: 114% times the journeyman rate.

ELEV0001-003 03/17/2008

Rates Fringes

Elevator mechanic Work on the addition, replacement, refurbishing or relocation of control, drive, generating equipment, hoistway or pit equipment, including work involving a structural rise in the elevator shafts in an existing building and other elevator work in the machine room, hoistway or pit; Also, changes in design and appearance of basic escalator equipment...$ 38.46 21.565 All other work..............$ 48.19 21.715

PAID HOLIDAYS: New Year's Day, President's Day, Good Friday, Memorial Day, Fourth of July, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving Day, and Christmas Day.

PAID VACATION:

A worker who has worked less than 5 years: 4% of his or her hourly rate for all hours worked.

A worker who has worked 5 to 10 years: 6% of his or her hourly rate for all hours worked.

A worker who has worked 15 or more years: 8% of his or her hourly rate for all hours worked.

ENGI0825-020 07/01/2009

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 42.02 22.50

GROUP 2.....................$ 40.43 22.50

GROUP 3.....................$ 38.52 22.50

GROUP 4.....................$ 36.89 22.50

GROUP 5.....................$ 35.18 22.50

Hazardous waste removal work: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: 20% per hour additional.

PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided 1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday.

DEFINITION OF GROUPS:

GROUP 1: Backhoe, Including Backhoe Track; Boom; Concrete Paving Machine; Crane (all types, including overhead and straddle traveling type); Drill (down-the-hole drill, rotary drill, self-propelled hydraulic drill, self-powered drill); Elevating Grader; Excavator; Front End Loader (5 cu. yd. and over); Piledriver (length of boom, including length of leads, shall determine premium rate applicable); Trencher

GROUP 2: Backhoe Loader Combo; Concrete Pumper; Grader/Blade (Finish); Hoist; Hydraulic Crane, 10 Tons and under; Front End Loader (2 cu. yd. but less than 5 cu. yd.); Scraper; Side Boom

GROUP 3: Asphalt Spreader; Bulldozer;Compressor(2 or 3) (in Battery) (within 100 ft.); Forklift; Front End Loader (1 cu. yd. and over but less than 2 cu. yd.); Lull; Mechanic; Paver, Asphalt; Roller, Blacktop; Tractor;

GROUP 4: Bobcat/Skid Loader; Compressor (Single); Farm Tractor; Front End Loader (under 1 cu. yd.);

Hydroseeder; Roller, Grade; Pump, Hydraulic

GROUP 5: Oiler

* IRON0011-012 07/01/2009

Rates Fringes

Ironworkers:

Reinforcing................. $ 34.34 35.60 Structural, Ornamental...... $ 37.14 35.60

LABO0222-006 05/01/2009

Rates Fringes

LABORER MASON TENDER:

Brick/Cement/Concrete....... $ 28.55 19.42

LABO0222-011 05/01/2009

Rates Fringes

Laborers: Asphalt Shoveler, Asphalt Spreader, Pipelayer, Power Tool Operator And Screedman................... $ 28.05 19.42

LABO1030-002 05/01/2009

Rates Fringes

Asbestos Removal Laborer......... $ 28.05 16.22

The removal, abatement, enclosure and decontamination of personal protective equipment, chemical protective clothing and machinery relating to asbestos and/or toxic and hazardous waste or materials which shall include but not necessarily be limited to: the erection, moving, servicing and dismantling of all enclosures, scaffolding and barricades; the operation of all tools and equipment normally used in the removal or abatement of asbestos and toxic or hazardous waste or materials; the labeling, bagging, cartoning, crating, or other packaging of materials for disposal; the clean-up of the worksite; and all other work incidental to the removal, abatement, encapsulation, enclosure, and decontamination of asbestos and toxic or hazardous waste or materials; and, in addition, all work tasks involved in the maintenance and operation of energy resource recovery plants (co-generation plants)

PAIN0711-018 05/01/2009

Rates Fringes

DRYWALL FINISHER/TAPER........... $ 35.58 17.67

* PAIN0711-021 05/01/2009

Glazier........................ $ 37.53 17.85

Work welding or using a cutting torch: $1.00 per hour additional.

Work on a swing stage scaffold; on a pipe scaffold providing the working height of the platform is 30 ft. or above;

and on motorized lifts provided that the height of the lift platform is above the second floor or above thirty feet:

$1.00 per hour additional.

* PAIN0711-022 05/01/2009

Rates Fringes

PAINTER (Spray).................. $ 30.50 14.28

PLAS0029-002 05/01/2008

Rates Fringes

CEMENT MASON/CONCRETE FINISHER... $ 38.00 19.55

PLAS0029-003 05/01/2008

Rates Fringes

PLASTERER........................ $ 38.00 19.55

PLUM0014-007 05/01/2009

MORRIS COUNTY (does not include the Borough of Chatham; Township of Chatham; Borough of Chester;

Townships of Chester, Harding and Long Hill; Borough of Mendham; Townships of Mendham and Mount Olive;

Township of Washington (Town of Long Valley only))

PLUMBER (Excluding HVAC Pipe Installation)....................$ 46.71 24.59

PLUM0024-013 11/01/2008

MORRIS COUNTY (Borough of Chatham; Township of Chatham; Borough of Chester; Townships of Chester, Harding and Long Hill; Borough of Mendham; Townships of Mendham and Mount Olive; Township of Washington (Town of Long Valley only)

PLUMBER (Excluding HVAC Pipe Installation)....................$ 43.00 23.70

PLUM0274-007 05/01/2009

MORRIS COUNTY (does not include the Borough of Chatham; Township of Chatham; Borough of Chester;

Townships of Chester, Harding and Long Hill; Borough of Mendham; Townships of Mendham and Mount Olive;

Township of Washington (Town of Long Valley only))

PIPEFITTER (Including HVAC Pipe Installation)............... $ 45.96 24.34

PLUM0475-013 05/01/2009

MORRIS COUNTY (Borough of Chatham; Township of Chatham; Borough of Chester; Townships of Chester, Harding and Long Hill; Borough of Mendham; Townships of Mendham and Mount Olive; Township of Washington (Town of Long Valley only)

PIPEFITTER (Including HVAC Pipe Installation)............... $ 48.65 22.55

ROOF0004-007 06/01/2006

Rates Fringes ROOFER (Includes All Types of Roofs)........................... $ 31.57 16.50

SFNJ0696-006 07/01/2009

Rates Fringes SPRINKLER FITTER (Fire Sprinklers)...................... $ 51.60 20.01

SHEE0025-005 06/01/2008

Rates Fringes SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 41.69 29.13

SUNJ2004-014 01/02/2009

Rates Fringes

LABORER: Common or General...... $ 27.60 9.87 LABORER: Landscape.............. $ 24.70 0.00 PAINTER: Brush & Roller......... $ 32.91 5.77

TEAM0408-002 05/01/2008

Rates Fringes

TRUCK DRIVER

Dump Truck.................. $ 33.00 12.16+a Off the Road Truck.......... $ 32.85 12.16+a

a. Employer contributes $1304.35 per month per worker for health and welfare.

Hazardous waste removal work, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional.

Hazardous waste removal work, where the worker is working in a hazardous waste site, in a zone requiring Level A personal protection for any of the workers: $3.00 per hour additional.

Hazardous waste removal work, where the worker is not working in a zone requiring Level A, B or C personal protection: $1.00 per hour additional.

PAID HOLIDAYS: New Year's Day, President's Day, Decoration Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided that the worker has been assigned to work, or, "shapes", one day of the calendar week during which the holiday occurs.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

(End of Summary of Changes)