9- W912DS-09-R-00111- FUZE CIVIL - MAG 1215-1216 - full size.pdf

PDF 2 MB Posted

Attached to
Construction of a Fuze Engineering Complex at Picatinny Arsenal, New Jersey.
Solicitation number
W912DS-09-R-0011
Issued by

About this file

Plans 9

View the file

Other files

File Type Posted
Amendment 8.pdf PDF
Amendment 7 Attach 7 Resp to Quest 69 70.pdf PDF
Amendment 7 Attach 3 Resp to Quest 59 .pdf PDF
Amendment 7 Attach 2 Resp to Quest 55 .pdf PDF
Amendment 7.pdf PDF
Amendment 7 Attach 5 Resp to Quest 61.pdf PDF
Amendment 7 Attach 1 Resp to Quest 54 .pdf PDF
Amendment 7 Attach 6 Resp to Quest 62.pdf PDF
Amendment 7 Attach 4 Resp to Quest 60.pdf PDF
Amendment 6 Attac 3 Resp to Quest 50.pdf PDF
Amendment 6 Attac2 Resp to Quest 50.pdf PDF
Amendment 6.pdf PDF
Amendment 6 Add Lighting Fixture to drawing 1E.doc DOC document
Amendment 6 Attac 1 Resp to Quest 37 Part A.pdf PDF
FUZE AMENDMENT 0005.pdf PDF
Amendment 4.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
How to download zip from fbo.gov.doc DOC document
12- W912DS-09-R-00111- FUZE Structural 100 Full.pdf PDF
AMENDMENT 0001.pdf PDF
16- W912DS-09-R-00111- FUZE_Electrical_100 _full_pdf.pdf PDF
12- W912DS-09-R-00111- FUZE Structural 100 Full.pdf PDF
13- MW912DS-09-R-00111- FUZE echanical_100 _Full_Size.pdf PDF
14-W912DS-09-R-00111- FUZE Plumbing_100 _Full_Size.pdf PDF
15- W912DS-09-R-00111- FUZE Fire Protection - Fullsize —
12- W912DS-09-R-00111- FUZE Structural 100 Full.pdf PDF
14-W912DS-09-R-00111- FUZE Plumbing_100 _Full_Size.pdf PDF
15- W912DS-09-R-00111- FUZE Fire Protection - Fullsize —
11- W912DS-09-R-00111- FUZE_100 Submittal_INTR_FULLSIZE.pdf PDF
16- W912DS-09-R-00111- FUZE_Electrical_100 _full_pdf.pdf PDF
13- MW912DS-09-R-00111- FUZE echanical_100 _Full_Size.pdf PDF
8- W912DS-09-R-00111- FUZE CIVIL - BLDG 3215 - full size.pdf PDF
7-W912DS-09-R-00111- FUZE CIVIL - BLDG 1516 - full size.pdf PDF
10-W912DS-09-R-00111- FUZE_100 Submittal_ARCH_FULLSIZE.pdf PDF
6- W912DS-09-R-00111- FUZE CIVIL - BLDG 6 - full size.pdf PDF
4- W912DS-09-R-00111- FUZE CIVIL - NOTES - full size.pdf PDF
5-W912DS-09-R-00111- FUZE CIVIL - DETAILS - full size.pdf PDF
1-W912DS-09-R-00111- FUZE_100 Submittal_GENRL_FULLSIZE.pdf PDF
2-W912DS-09-R-00111- FUZE-G-003-3-16-09.pdf PDF
3-W912DS-09-R-00111- FUZE G-004-3-16-09.pdf PDF
Solicitation W912DS-09-R-0011.pdf PDF
W912DS-09-R-0011 Sp ec's.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTE: REFER TO WETLANDS DELINEATION PLAN

4C-006 FOR WETLANDS AND BUFFER INFORMATION.

Sequence of Construction:

1. Install perimeter silt fencing 2 days

2. Remove any remaining pavements from site 1 day

3. Clear vegetation, strip topsoil, stockpile, temporarily stabilize and encompass with silt fence 4 days

4. Begin Building construction -

5. Extend utilities to building 2 days

6. Install pavement base courses 3 days

7. Permanently stabilize disturbed areas where possible, temporarily stabilize all other disturbed areas 5 days

8. Complete building construction 180 days

9. Complete fill operations over building 15 days

10. Permanently stabilize all disturbed areas 30 days

11. Complete paving operations 1 day

12. Remove all temporary stabilization methods once all areas are permanently stabilized. 1 day

NOTES:

1. WETLANDS / STATE OPEN WATERS LINES PER "US ARMY

TACOM-ARDEC (PICATINNY ARSENAL) BRAC WETLAND

DELINEATIONS FOR SIX (6) SITES" AS PREPARED BY THE RBA

GROUP, OCTOBER 2008.

2. PORTIONS OF DEVELOPMENT SITE FALL WITHIN 150' EXCEPTIONAL

RESOURCE VALUE WETLANDS BUFFER, AS WELL AS 300' STATE

OPEN WATERS RIPARIAN BUFFER.

3. AREAS OF DISTURBANCE WITHIN RIPARIAN ZONE:

EXISTING:

IMPERVIOUS 4,289 SF

PERVIOUS (DISTURBED, WOODED) 7,215 SF

TOTAL AREA 11,504 SF

PROPOSED:

IMPERVIOUS 3,173 SF

PERVIOUS (RESTORED) 8,331 SF

TOTAL AREA 11,504 SF

4. REFER TO DEVELOPMENT PLANS 4C-001, 4C-002, AND 4C-005 FOR

ENLARGEMENT OF DEVELOPMENT AREA.

5. RESTORATION / COMPENSATION CALCULATIONS:

REQUIRED:

EXISTING AREA REQUIRED

SURFACE RESTORATION

IMPERVIOUS 4,289 SF 0

PERVIOUS

(DISTURBED WOODED) 7,215 SF 2:1 = 14,430 SF

TOTAL 11,504 SF

PROPOSED:

SURFACE AREA CREDIT

IMPERVIOUS 3,173 SF 0

RESTORED AREA 8,331 SF 1:1 = 8,331 SF

TOTAL 11,504 SF

AREA RESTORED W/

NATIVE SHRUB &

WILDFLOWERS 6,331 SF 1:1 = 6,331 SF

TOTAL CREDIT 14,662 SF

EXISTING IMPERVIOUS AREA

PROPOSED IMPERVIOUS AREA

MAG 1215-1216 - 03-SITE PLAN
001-1215-SURVEY & DEMO
002-1215-SITE UTILITY GRADING
003-1216-SURVEY & DEMO
004-1216-SITE UTILITY GRADING
005-1215-1216-SOIL EROSION
006-1215-WETLANDS

File details come from the government source that posted it. Updated .