REFER TO WETLANDS DELINEATION PLAN 1C-013
FOR WETLANDS AND BUFFER INFORMATION.
PRELIMINARY PENDING
FLOOD PLAIN DELINEATION
T C
H
L I N
E
S
E
T
REFER TO WETLANDS DELINEATION PLAN 1C-014
FOR WETLANDS AND BUFFER INFORMATION.
T C H
L I N E S H
E E T 1 C
- 0 0 4
NOTE:
EXISTING IMPROVEMENTS TO BE REMOVED (TBR) ARE SHOWN
AS DARK LINESTYLES. EXISTING IMPROVEMENTS TO REMAIN
ARE SHOWN SCREENED.
T
E
NOTE:
EXISTING IMPROVEMENTS TO BE REMOVED (TBR) ARE SHOWN
AS DARK LINESTYLES. EXISTING IMPROVEMENTS TO REMAIN
ARE SHOWN SCREENED.
T C H
L I N E S H
E E T 1 C
- 0 0 6
T
E
T C H
L I N E S H
E E T 1 C
- 0 0 8
T
E
T C H
L I N E S H
E E T 1 C
- 0 1 0
T
E
T C H
L I N E S H
E E T 1 C
- 0 1 2
T
E
PRELIMINARY PENDING
FLOOD PLAIN DELINEATION
Sequence of Construction:
1. Install perimeter silt fencing and inlet protection for building addition. 5 days
2. Disconnect all utilities to Buildings 4, 5, and 6. Demolish Buildings 4 and 5. 45 days
3. Relocate fiber optic primary service, provide temporary service to Building 12. 20 days
4. Install storm water management basin 15 days
5. Clear vegetation, strip topsoil, stockpile, temporarily stabilize and encompass with silt fence. 5 days
6. Remove existing pavements and install stabilized construction entrances. 15 days
7. Relocate water lines 20 days
8. Rough grade site including adjacent small parking area, provide permanent and temporary stabilization where possible 10 days
9. Begin Building construction -
10. Install storm water management drainage system 30 days
11. Extend utilities to building 20 days
12. Install site curbing and walkways 15 days
13. Install pavement base courses 4 days
14. Provide additional stabilization where possible 2 days
15. Begin construction of large parking area -
16. Install additional silt fencing and inlet protection as required 3 days
17. Install storm water management system and additional inlet protection 15 days
18. Remove pavements and rough grade site 5 days
19. Install site lighting 10 days
20. Install pavement base courses 5 days
21. Permanently stabilize disturbed areas where possible, temporarily stabilize all other disturbed areas. 5 days
22. Complete building construction 365 days
23. Permanently stabilize all disturbed areas 30 days
24. Complete paving operations 1 day
25. Remove all temporary stabilization methods once all areas are permanently stabilized 1 day
T C H
L I N E S H
E E T 1 C
- 0 1 4
T
E
NOTES:
1. WETLANDS / STATE OPEN WATERS LINES PER "US ARMY
TACOM-ARDEC (PICATINNY ARSENAL) BRAC WETLAND
DELINEATIONS FOR SIX (6) SITES" AS PREPARED BY THE RBA
GROUP, OCTOBER 2008.
2. LARGE PORTION OF SITE FALLS WITHIN 300' STATE OPEN WATERS
RIPARIAN BUFFER.
3. AREAS OF DISTURBANCE WITHIN RIPARIAN BUFFER:
EXISTING:
IMPERVIOUS 69,102.20 SF
GRAVEL SURFACE 12,545.50 SF
PERVIOUS (DISTURBED, GRASS) 58,017.92 SF
PERVIOUS (UNDISTURBED, WOODED) 0.00 SF
TOTAL AREA 139,695.31 SF
PROPOSED:
IMPERVIOUS 90,477.63 SF
GRAVEL SURFACE 350.92 SF
PERVIOUS (DISTURBED, GRASS) 48,866.76 SF
PERVIOUS (UNDISTURBED, WOODED) 0.00 SF
TOTAL AREA 139,695.31 SF
4. REFER TO DEVELOPMENT PLANS 1C-001 THROUGH 1C-012 FOR
ENLARGEMENT OF DEVELOPMENT AREA.
| BLDG 6 - 03-SITE PLAN |
| 001-EXG COND PLAN |
| 002-EXG COND PLAN (2) |
| 003-DEMOLITION PLAN |
| 004-DEMOLITION PLAN (2) |
| 005-SITE PLAN |
| 006-SITE PLAN (2) |
| 007-GRADING PLAN |
| 008-GRADING PLAN (2) |
| 009-DRAINAGE & UTILITY PLAN |