6- W912DS-09-R-00111- FUZE CIVIL - BLDG 6 - full size.pdf

PDF 8 MB Posted

Attached to
Construction of a Fuze Engineering Complex at Picatinny Arsenal, New Jersey.
Solicitation number
W912DS-09-R-0011
Issued by

About this file

Plans 6

View the file

Other files

File Type Posted
Amendment 8.pdf PDF
Amendment 7 Attach 7 Resp to Quest 69 70.pdf PDF
Amendment 7 Attach 3 Resp to Quest 59 .pdf PDF
Amendment 7 Attach 2 Resp to Quest 55 .pdf PDF
Amendment 7.pdf PDF
Amendment 7 Attach 5 Resp to Quest 61.pdf PDF
Amendment 7 Attach 1 Resp to Quest 54 .pdf PDF
Amendment 7 Attach 6 Resp to Quest 62.pdf PDF
Amendment 7 Attach 4 Resp to Quest 60.pdf PDF
Amendment 6 Attac 3 Resp to Quest 50.pdf PDF
Amendment 6 Attac2 Resp to Quest 50.pdf PDF
Amendment 6.pdf PDF
Amendment 6 Add Lighting Fixture to drawing 1E.doc DOC document
Amendment 6 Attac 1 Resp to Quest 37 Part A.pdf PDF
FUZE AMENDMENT 0005.pdf PDF
Amendment 4.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
How to download zip from fbo.gov.doc DOC document
12- W912DS-09-R-00111- FUZE Structural 100 Full.pdf PDF
AMENDMENT 0001.pdf PDF
16- W912DS-09-R-00111- FUZE_Electrical_100 _full_pdf.pdf PDF
12- W912DS-09-R-00111- FUZE Structural 100 Full.pdf PDF
13- MW912DS-09-R-00111- FUZE echanical_100 _Full_Size.pdf PDF
14-W912DS-09-R-00111- FUZE Plumbing_100 _Full_Size.pdf PDF
15- W912DS-09-R-00111- FUZE Fire Protection - Fullsize —
12- W912DS-09-R-00111- FUZE Structural 100 Full.pdf PDF
14-W912DS-09-R-00111- FUZE Plumbing_100 _Full_Size.pdf PDF
15- W912DS-09-R-00111- FUZE Fire Protection - Fullsize —
11- W912DS-09-R-00111- FUZE_100 Submittal_INTR_FULLSIZE.pdf PDF
16- W912DS-09-R-00111- FUZE_Electrical_100 _full_pdf.pdf PDF
13- MW912DS-09-R-00111- FUZE echanical_100 _Full_Size.pdf PDF
8- W912DS-09-R-00111- FUZE CIVIL - BLDG 3215 - full size.pdf PDF
7-W912DS-09-R-00111- FUZE CIVIL - BLDG 1516 - full size.pdf PDF
10-W912DS-09-R-00111- FUZE_100 Submittal_ARCH_FULLSIZE.pdf PDF
9- W912DS-09-R-00111- FUZE CIVIL - MAG 1215-1216 - full size.pdf PDF
4- W912DS-09-R-00111- FUZE CIVIL - NOTES - full size.pdf PDF
5-W912DS-09-R-00111- FUZE CIVIL - DETAILS - full size.pdf PDF
1-W912DS-09-R-00111- FUZE_100 Submittal_GENRL_FULLSIZE.pdf PDF
2-W912DS-09-R-00111- FUZE-G-003-3-16-09.pdf PDF
3-W912DS-09-R-00111- FUZE G-004-3-16-09.pdf PDF
Solicitation W912DS-09-R-0011.pdf PDF
W912DS-09-R-0011 Sp ec's.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M A

T C H

L I N E S H

E E T 1 C

- 0 0 2

REFER TO WETLANDS DELINEATION PLAN 1C-013

FOR WETLANDS AND BUFFER INFORMATION.

PRELIMINARY PENDING

FLOOD PLAIN DELINEATION

T C

H

L I N

E

S

E

T

REFER TO WETLANDS DELINEATION PLAN 1C-014

FOR WETLANDS AND BUFFER INFORMATION.

T C H

L I N E S H

E E T 1 C

- 0 0 4

NOTE:

EXISTING IMPROVEMENTS TO BE REMOVED (TBR) ARE SHOWN

AS DARK LINESTYLES. EXISTING IMPROVEMENTS TO REMAIN

ARE SHOWN SCREENED.

T

E

NOTE:

EXISTING IMPROVEMENTS TO BE REMOVED (TBR) ARE SHOWN

AS DARK LINESTYLES. EXISTING IMPROVEMENTS TO REMAIN

ARE SHOWN SCREENED.

T C H

L I N E S H

E E T 1 C

- 0 0 6

T

E

T C H

L I N E S H

E E T 1 C

- 0 0 8

T

E

T C H

L I N E S H

E E T 1 C

- 0 1 0

T

E

T C H

L I N E S H

E E T 1 C

- 0 1 2

T

E

PRELIMINARY PENDING

FLOOD PLAIN DELINEATION

Sequence of Construction:

1. Install perimeter silt fencing and inlet protection for building addition. 5 days

2. Disconnect all utilities to Buildings 4, 5, and 6. Demolish Buildings 4 and 5. 45 days

3. Relocate fiber optic primary service, provide temporary service to Building 12. 20 days

4. Install storm water management basin 15 days

5. Clear vegetation, strip topsoil, stockpile, temporarily stabilize and encompass with silt fence. 5 days

6. Remove existing pavements and install stabilized construction entrances. 15 days

7. Relocate water lines 20 days

8. Rough grade site including adjacent small parking area, provide permanent and temporary stabilization where possible 10 days

9. Begin Building construction -

10. Install storm water management drainage system 30 days

11. Extend utilities to building 20 days

12. Install site curbing and walkways 15 days

13. Install pavement base courses 4 days

14. Provide additional stabilization where possible 2 days

15. Begin construction of large parking area -

16. Install additional silt fencing and inlet protection as required 3 days

17. Install storm water management system and additional inlet protection 15 days

18. Remove pavements and rough grade site 5 days

19. Install site lighting 10 days

20. Install pavement base courses 5 days

21. Permanently stabilize disturbed areas where possible, temporarily stabilize all other disturbed areas. 5 days

22. Complete building construction 365 days

23. Permanently stabilize all disturbed areas 30 days

24. Complete paving operations 1 day

25. Remove all temporary stabilization methods once all areas are permanently stabilized 1 day

T C H

L I N E S H

E E T 1 C

- 0 1 4

T

E

NOTES:

1. WETLANDS / STATE OPEN WATERS LINES PER "US ARMY

TACOM-ARDEC (PICATINNY ARSENAL) BRAC WETLAND

DELINEATIONS FOR SIX (6) SITES" AS PREPARED BY THE RBA

GROUP, OCTOBER 2008.

2. LARGE PORTION OF SITE FALLS WITHIN 300' STATE OPEN WATERS

RIPARIAN BUFFER.

3. AREAS OF DISTURBANCE WITHIN RIPARIAN BUFFER:

EXISTING:

IMPERVIOUS 69,102.20 SF

GRAVEL SURFACE 12,545.50 SF

PERVIOUS (DISTURBED, GRASS) 58,017.92 SF

PERVIOUS (UNDISTURBED, WOODED) 0.00 SF

TOTAL AREA 139,695.31 SF

PROPOSED:

IMPERVIOUS 90,477.63 SF

GRAVEL SURFACE 350.92 SF

PERVIOUS (DISTURBED, GRASS) 48,866.76 SF

PERVIOUS (UNDISTURBED, WOODED) 0.00 SF

TOTAL AREA 139,695.31 SF

4. REFER TO DEVELOPMENT PLANS 1C-001 THROUGH 1C-012 FOR

ENLARGEMENT OF DEVELOPMENT AREA.

BLDG 6 - 03-SITE PLAN
001-EXG COND PLAN
002-EXG COND PLAN (2)
003-DEMOLITION PLAN
004-DEMOLITION PLAN (2)
005-SITE PLAN
006-SITE PLAN (2)
007-GRADING PLAN
008-GRADING PLAN (2)
009-DRAINAGE & UTILITY PLAN
010-DRAINAGE & UTILITY PLAN (2)
011-SOIL EROSION
012-SOIL EROSION (2)
013-WETLANDS
014-WETLANDS (2)

File details come from the government source that posted it. Updated .