7-W912DS-09-R-00111- FUZE CIVIL - BLDG 1516 - full size.pdf

PDF 3 MB Posted

Attached to
Construction of a Fuze Engineering Complex at Picatinny Arsenal, New Jersey.
Solicitation number
W912DS-09-R-0011
Issued by

About this file

Plans 7

View the file

Other files

File Type Posted
Amendment 8.pdf PDF
Amendment 7 Attach 7 Resp to Quest 69 70.pdf PDF
Amendment 7 Attach 3 Resp to Quest 59 .pdf PDF
Amendment 7 Attach 2 Resp to Quest 55 .pdf PDF
Amendment 7.pdf PDF
Amendment 7 Attach 5 Resp to Quest 61.pdf PDF
Amendment 7 Attach 1 Resp to Quest 54 .pdf PDF
Amendment 7 Attach 6 Resp to Quest 62.pdf PDF
Amendment 7 Attach 4 Resp to Quest 60.pdf PDF
Amendment 6 Attac 3 Resp to Quest 50.pdf PDF
Amendment 6 Attac2 Resp to Quest 50.pdf PDF
Amendment 6.pdf PDF
Amendment 6 Add Lighting Fixture to drawing 1E.doc DOC document
Amendment 6 Attac 1 Resp to Quest 37 Part A.pdf PDF
FUZE AMENDMENT 0005.pdf PDF
Amendment 4.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
How to download zip from fbo.gov.doc DOC document
12- W912DS-09-R-00111- FUZE Structural 100 Full.pdf PDF
AMENDMENT 0001.pdf PDF
16- W912DS-09-R-00111- FUZE_Electrical_100 _full_pdf.pdf PDF
12- W912DS-09-R-00111- FUZE Structural 100 Full.pdf PDF
13- MW912DS-09-R-00111- FUZE echanical_100 _Full_Size.pdf PDF
14-W912DS-09-R-00111- FUZE Plumbing_100 _Full_Size.pdf PDF
15- W912DS-09-R-00111- FUZE Fire Protection - Fullsize —
12- W912DS-09-R-00111- FUZE Structural 100 Full.pdf PDF
14-W912DS-09-R-00111- FUZE Plumbing_100 _Full_Size.pdf PDF
15- W912DS-09-R-00111- FUZE Fire Protection - Fullsize —
11- W912DS-09-R-00111- FUZE_100 Submittal_INTR_FULLSIZE.pdf PDF
16- W912DS-09-R-00111- FUZE_Electrical_100 _full_pdf.pdf PDF
13- MW912DS-09-R-00111- FUZE echanical_100 _Full_Size.pdf PDF
8- W912DS-09-R-00111- FUZE CIVIL - BLDG 3215 - full size.pdf PDF
10-W912DS-09-R-00111- FUZE_100 Submittal_ARCH_FULLSIZE.pdf PDF
9- W912DS-09-R-00111- FUZE CIVIL - MAG 1215-1216 - full size.pdf PDF
6- W912DS-09-R-00111- FUZE CIVIL - BLDG 6 - full size.pdf PDF
4- W912DS-09-R-00111- FUZE CIVIL - NOTES - full size.pdf PDF
5-W912DS-09-R-00111- FUZE CIVIL - DETAILS - full size.pdf PDF
1-W912DS-09-R-00111- FUZE_100 Submittal_GENRL_FULLSIZE.pdf PDF
2-W912DS-09-R-00111- FUZE-G-003-3-16-09.pdf PDF
3-W912DS-09-R-00111- FUZE G-004-3-16-09.pdf PDF
Solicitation W912DS-09-R-0011.pdf PDF
W912DS-09-R-0011 Sp ec's.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTE: REFER TO WETLANDS DELINEATION PLAN 2C-004

FOR WETLANDS AND BUFFER INFORMATION.

Sequence of Construction:

1. Disconnect all utilities 1 day

2. Install silt fencing and inlet protection 2 days

3. Install stabilized construction entrance 2 days

4. Demolish existing building and walks, remove debris from site 3 days

5. Strip topsoil, stockpile, temporarily stabilize, and encompass with silt fence 3 days

6. Begin new building construction -

7. Rough grade site 5 days

8. Relocate overhead utilities 5 days

9. Extend utilities to building 15 days

10. Install curbing and pavement base courses 20 days

11. Permanently stabilize disturbed areas where possible, temporarily stabilize all other areas 5 days

12. Complete building construction 270 days

13. Complete paving operations 1 day

14. Permanently stabilize all disturbed areas 30 days

15. Remove all temporary stabilization measures once all disturbed areas are stabilized 1 day

NOTES:

1. WETLANDS / STATE OPEN WATERS LINES PER "US ARMY

TACOM-ARDEC (PICATINNY ARSENAL) BRAC WETLAND

DELINEATIONS FOR SIX (6) SITES" AS PREPARED BY THE RBA

GROUP, OCTOBER 2008.

2. ENTIRE DEVELOPMENT SITE FALLS WITHIN 300' STATE OPEN

WATERS RIPARIAN BUFFER.

3. AREAS WITHIN LIMIT OF DISTURBANCE:

EXISTING:

IMPERVIOUS 10,923 SF

PERVIOUS (DISTURBED, GRASS) 9,933 SF

PERVIOUS (UNDISTURBED, WOODED) 0 SF

TOTAL AREA 20,856 SF

PROPOSED:

IMPERVIOUS 10,702 SF

PERVIOUS (GRASS) 10,154 SF

PERVIOUS (WOODED) 0 SF

TOTAL AREA 20,856 SF

4. REFER TO DEVELOPMENT PLANS 2C-001 THROUGH 2C-003 FOR

ENLARGEMENT OF DEVELOPMENT AREA.

EXISTING IMPERVIOUS AREA

PROPOSED IMPERVIOUS AREA

BLDG 1516 - 03-SITE PLAN
001-SURVEY & DEMO
002-SITE & GRADING
003-DRAINAGE & UTILITY
004-WETLANDS