W912DR22R0027 Solicitation Amendment 3 - 03.04.2022.pdf
PDF 1 MB Posted
- Attached to
- Decommissioning and Disposal (D&D) Activities for the SM-1A reactor Facility located at Fort Greely, AK
- Solicitation number
- W912DR22R0027
About this file
This federal contract opportunity notice solicits proposals for decommissioning and dismantlement activities at the SM-1A reactor facility located at Fort Greely, Alaska. The U.S. Army Corps of Engineers seeks a contractor to remove radioactive and hazardous materials, conduct radiological surveys, and restore the site according to permit requirements. Offerors must plan to transport all waste to approved disposal facilities in the lower 48 states. The period of performance is 72 months from award. The acquisition uses full and open competition set aside for small businesses. Proposals are due in accordance with amendments to the solicitation posted on SAM.gov. The government provides background documents on the site for offerors via a secure file sharing system requiring non-disclosure agreements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-4 March 2022 Site Visit Attendance Sheets.pdf | ||
| W912DR22R0027 Solicitation Amendment 4 - 03.08.2022.pdf | ||
| Revised Pricing Sheet TASK Cost Summary 03 Mar 2022.xlsx | XLSX spreadsheet | |
| W912DR22R0027 Solicitation Amendment 2 - 02.25.2022.pdf | ||
| W912DR22R0027 Solicitation Amendment 1 - 02.17.2022.pdf | ||
| PPQ-0 Form.pdf | ||
| SM-1A Matrix.xlsx | XLSX spreadsheet | |
| SM-1A PWS Attachment (figures).pdf | ||
| Pricing Sheet Travel Detail and Summary.xlsx | XLSX spreadsheet | |
| Pricing Sheet - Labor Detail by Contract Yr.xlsx | XLSX spreadsheet | |
| SM-1A PWS Attachment (figures).rtf | RTF text file | |
| Pricing Sheet Material Detail.xlsx | XLSX spreadsheet | |
| SBPP Template Format.docx | DOCX document | |
| B.08.02 W912DR22R0027 Solicitation.pdf | ||
| Pricing Sheet Subcontract Detail.xlsx | XLSX spreadsheet | |
| Pricing Sheet Equip_ODC Detail.xlsx | XLSX spreadsheet | |
| SM-1A Price Schedule 10 Feb 2022.xlsx | XLSX spreadsheet | |
| Pricing Sheet TASK Cost Summary.xlsx | XLSX spreadsheet |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment:
1. Fully remove clause 252.204-7021; and
2. Provide responses to the next round of Request for Information (RFIs); and
3. Provide an update to Section L, Instructions to the Offerors.
1. CONTRACT ID CODE PAGE OF PAGES
1 67
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Mar-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DR22R0027
X 9B. DATED (SEE ITEM 11)
10-Feb-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-Mar-2022
CODE
USACE, BALTIMORE
2 HOPKINS PLAZA
BALTIMORE MD 21201
W912DR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
RFIS #2
Controlled Unclassified Information (CUI) Only
Bid Inquiry Contractor Report All Inquiries
Information for this report is procurement sensitive.
9619054 Environmental Page 37 Arctic Environment Volume III, Past Performance
Comment Classification: Controlled Unclassified Information (CUI)
Ft Greely's location adjacent to Delta Junction, Alaska would be considered semi-remote because it is located on a publicly-maintained road system. Alaskans consider remote locations to be off the road system and not serviced by commercial air carriers or ferries. Delta Junction is located at the intersection of two major Alaskan highways. Delta Junction, Alaska is classified as a sub-arctic climate by the Köppen climate classification system and by Alaskans. Alaskans would consider an arctic environment, or polar environment, to be north of the Brooks Range, approximately 250 miles north of Ft Greely. Would the government consider changing this requirement to "Experience in a semi-remote, sub-arctic climate?"
On: Feb 25 2022.
Government Response. . Please refer to Amendment 2 posted to SAM.gov. On: Mar 01 2022 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9619065 Environmental Engineering
Page 16 Site Restoration RFP Amd 0001, Section 3.4.2.3
Comment Classification: Controlled Unclassified Information (CUI)
Can the government provide backfill sampling analyses and frequencies, quality control sample specifications, and a list of approved sources? Additionally, is all backfill and topsoil referenced elsewhere in the RFP subject to these requirements?
Government Response. . All backfill and topsoil referenced is subject to the requirements of the RFP. Should additional information be made available regarding the specifics to backfill requirements, an Amendment to the RFP will be issued providing the documentation. On: Mar 03 2022
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9619071 General Table of Contents Section L a.2
Comment Classification: Controlled Unclassified Information (CUI)
Section L a.2 requires tables of content for each volume. For the volumes that have page count limits, is the required table of contents excluded from the page count?
Government Response. . Table of contents do not count towards the page count. On: Mar 01 2022 Current Request Status: Request Closed
9619075
Geographic Information
System
Procedures/Processes to Ensure Services
Section L a.2.ii
Comment Classification: Controlled Unclassified Information (CUI)
Procedures/Processes to Ensure Services: This requirement is included with other requirements that are excluded from the page count of volume II. These procedures and processes could take several pages by themselves. Are these pages excluded from the 5 page limit for Volume II?
Government Response. . These procedures and processes are not excluded in the applicable page counts. On: Mar
03 2022 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9619127 Transportation RFP Amd 0001, Section 3.3 1st Paragraph
Comment Classification: Controlled Unclassified Information (CUI)
Section 3.3 states "Offerors shall plan to coordinate waste activities with the installation and USACE as required (e.g. reporting, inspections, shipments, etc.) and shall plan to operate as a RCRA Large Quantity Generator for planning and estimating purposes." Does USACE desire the project team to become a Large Quantity Generator with a RCRA ID? Should the DOD be the generator?
Government Response. . USACE does not desire the project team to be a Large Quantity Generator. However
Offerors shall plan to operate as a RCRA Large Quantity Generator. DOD will obtain the RCRA ID and be the generator of record. On: Mar 03 2022
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9619130 General RFP Amendment 0001, Section 3.3 2nd Paragraph
Comment Classification: Controlled Unclassified Information (CUI)
Section 3.3 states "Limited Government Furnished Equipment (GFE) may be provided to the contractor to support the project (depends on the completion of SM-1A D&D). What GFE may become available following the completion of SM-1A D&D? What is the expected completion date of the SM-1A D&D?
Government Response. . The anticipated completion of SM-1 D&D is 2025. However, the Government will assess one year prior to the SM-1 completion as to whether any GFE will be available for use on this proposed SM-1A D&D project. On: Mar 03 2022
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9619133 Safety RFP Amendment 0001, Section 3.3.2 Last Paragraph
Comment Classification: Controlled Unclassified Information (CUI)
Is it the government's intent that a health clinic, staffed by a Registered Nurse (RN), a certified Emergency Medical Technician (EMT), Intermediate/Paramed ic, or a Licensed Practical Nurse (LPN), with physician oversight, be established for this project? Is a first aid station with CPR/AED/First Aid-trained attendants sufficient? Note there is a private clinic in Delta Junction.
Government Response. . Per the requirements of Section 3.3.2, the Offeror shall plan to provide medical coverage for the project in accordance with EM 385-1-1 Sections 03.C.01-05, and 03.C.03. b-d in addition to other applicable requirements. On: Mar 03 2022
Current Request Status: Request Closed
9619139 General RFP Amendment 0001, Section 3.3.3
Section 3.3.3 1st paragraph states, "The Contractor will reside on the first floor of Building 609 (adjacent to Bldg. 606) with the USACE staff. The Contractor will need to work with USACE to pay the monthly utilities for the building (approx. $10K per month)." Should $10K per month be included in all offeror's cost proposals for the utility fee for the entirety of the project?
Government Response. . For proposal purposes, utilization of $10,000 per month may be included in all Offeror's cost proposals for the utility fee for the entirety of the project. On: Mar 03 2022
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9619148 Site RFP Amendment 0001, Section 3.3.5
Comment Classification: Controlled Unclassified Information (CUI)
Section 3.3.5 states the waste storage area "shall be fenced with 8-foot high security fencing with adequate cameras to secure the site." Does the government intend for contractor to remove the security fence at the the close of the project?
Government Response. . Per the requirements of section 3.3 of the PWS, "Areas utilized by the Contractor for laydown areas and waste disposal shall be returned to their original conditions prior to site demobilization." On: Mar 03
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9619152 Environmental Engineering
RFP Amendment 0001, Section 3.5.2
Section 3.5.2 Last Sentence states "All of the above items should be considered LLRW wastes with the exception of the nickel cadmium batteries and the charging station." The list includes Treated Water Tank and Water Softening Equipment - 34 CY non-radioactive waste and Unused Electrical Controls - 12 units for 80 CY non-radioactive electronic waste. Should these quantities be considered LLRW?
Government Response. . Please refer to the Amendment 2 posted to SAM.gov for clarification of LLRW wastes. On:
Mar 03 2022
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9619156 Environmental Engineering
Remove/Abandon Wells
RFP Amendment 0001, Section 3.6.1
Comment Classification: Controlled Unclassified Information (CUI)
Section 3.6.1 states, "Well removal will consist of the abandonment of the wells in accordance with local regulations including the well screen and casing the 6- to 16-inch wells. In addition to the well screen and casing, the Contractor will be responsible for the removal of each of the concrete wall housings." Is it permissible to decommission wells in place, in accordance with local regulations?
Government Response. . Per the PWS Section 3.6.1 requirements, Well removal will consist of the abandonment of the wells in accordance with local regulations including well screen and casing for the 6- to 16-inch wells. On: Mar 03
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9623438 General Pricing Spreadsheet
Font Section L A.1.b
Per the Government provided Excel Pricing Sheets, the instruction tab clearly states that, "The Pricing Sheet may not be edited," with the exception of a few items within the spreadsheets. However, the RFP section L A.1.b states that only Times New Roman can be used. The provided spreadsheets have Arial font. Can we leave the fonts as provided? Or should the spreadsheets be changed to Times New Roman per the requirements?
On: Mar 01 2022.
Government Response. . The cost sheets are provided in Arial font which should remain. All other submitted documentation to support the proposal submission shall follow the required Times New Roman font. On: Mar 03 2022 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9623442 General Pricing Sheet
Formatting RFP Section L A.2.a
Comment Classification: Controlled Unclassified Information (CUI)
Per the Government provided Excel Pricing Sheets, the instruction tab clearly states that, "The Pricing Sheet may not be edited," with the exception of a few items within the spreadsheets. However, the RFP section L A.2.a requires header and footer information. Are we allowed to insert this required header and footer information into the spreadsheets?
Government Response. . Yes. However no other changes shall be made to the sheets outside the instruction tab's instructions On: Mar 03 2022 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9623812 Environmental Engineering
Page 34 of
Remove/Abandon Wells
RFP Amendment 002, Section 3.6.1
Comment Classification: Controlled Unclassified Information (CUI)
RFP Amendment 002, Section 3.6.1 Page 34 of 90 states that Recharge Well No. 13 is to be abandoned. Can the USACE provide assurance that the Alaska Department of Environmental Conservation and the US EPA have approved this abandonment and will not require additional investigation or permitting, due to it being possibly being classified as a Class IV injection well?
Government Response. . The PWS 3.6.1, "Well removal will consist of the abandonment of the wells in accordance with local regulations..." thus the Offeror shall submit the proposal as such to ensure all local regulations are met. On:
Mar 03 2022
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9623818 Environmental Concrete/Soil PWS 3.5.21
Engineering Removal
Comment Classification: Controlled Unclassified Information (CUI)
Work element 3.5.21 refers to the "Removal of subgrade concrete and contaminated soil (807.5 CY of subgrade concrete and
807.5 of sub-slab soil." This work element refers to contaminated soil. Should the bidders assume the referenced quantity of subgrade concrete is also contaminated, since the "contaminated soil" will be in contact with the concrete?
Government Response. . Yes. The offeror shall assume that the contaminated soil is in contact with the concrete.
On: Mar 03 2022 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9625747 General Price Schedule Section B
Comment Classification: Controlled Unclassified Information (CUI)
On the Price Schedule in Section B, Option Task "3.5.16 Waste Tanks Pit Structure Removal" was omitted from the schedule and the Option Tasks 3.5.16 through 3.5.21 that were included in the schedule need to be renumbered 3.5.17 through 3.5.22.
Can the offerors simply add a row to include Option Task "3.5.16 Waste Tanks Pit Structure Removal" and renumber the subsequent Option Tasks, or will a new Price Schedule be provided?
On: Mar 02 2022.
Government Response. . Refer to the forthcoming Amendment on SAM.gov for a revision to the Price Schedule that makes the correction. On: Mar 03 2022
Current Request Status: Request Closed
Information for this report is procurement sensitive.
9625750 General Pricing Task Cost
Summary Worksheet
Comment Classification: Controlled Unclassified Information (CUI)
The Pricing Task Cost Summary Worksheet does not have a worksheet for task 3.5.22. Can the offerors add a worksheet to the workbook titled 3.5.22 or will a new Pricing Task Cost Summary Worksheet be provided?
On: Mar 02 2022.
Government Response. . Refer to the forthcoming Amendment on SAM.gov for a revision to the Price Schedule that makes the correction. On: Mar 03 2022
Current Request Status: Request Closed
Information for this report is procurement sensitive.
Report Complete
Controlled Unclassified Information (CUI) Only Patent 11/892,984 ProjNet property of ERDC since 2004.
W912DR22R0027
PREPARATION (WE
2)
3.3.1 - 3.3.6 Mobilization and site preparation
CPIF
3.4 BUILDING 607 (J-
5) DISPOSITION (WE
3)
3.4.1 - 3.4.2.3 Building 607 (J-5) Disposition
CPIF
3.5 BUILDING 606
DISPOSITION (WE4)
3.5.1 ASBESTOS
ABATEMENT
CPIF
3.5.2UNRESTRICED
AREA AND M&E
REMOVAL AND
DISPOSAL
CPIF
3.5.3 PIPE PIT
REMOVAL AND
DISPOSAL
CPIF
3.5.4 CONDENSATE
RETURN TANK PIT
REMOVAL AND
DECONTAMINATION
CPIF
3.5.5 SIX INCH
CONCRETE FLOOR
REMOVAL AND
DISPOSAL
CPIF
3.5.6 FUEL STORAGE
VAULT
DEMOLITION AND
DISPOSAL
CPIF
3.5.7 RESTRICTED
AREA SITE
PREPARATION
CPIF
3.5.8 REMOVAL OF
M&E IN THE
DEMINERALIZER
ROOM
CPIF
3.7
DEMOBILIZATION
(WE 6)
3.7.1 INTERIM
DEMOBILIZATION
CPIF
Sub Total for FFP and CPIF Line Items
Option Tasks Contract Type
Cost Target Fee Min Fee Max Fee Price*
3.5 BUILDING 606
DISPOSITION (WE 4)
3.5.9 SPENT FUEL
PIT/STAIRWAY
DEMOLITION
CPIF
3.5.10 VC ACCESS CPIF
3.5.11 REMOVAL OF
UPPER SHIELD
TANKS
CPIF
3.5.12 REMOVAL OF
GROUT AND M&E
OUTSIDE OF THE
LOWER SHIELD
TANK
CPIF
3.5.13 Removal of the
Lower Shield Tanks, Shield Rings, and RPV
CPIF
3.5.14 Building 606
North MARSAME Release Surveys
CPIF
3.5.15 Removal of
Tanks and Debris from Waste Tanks Pit
CPIF
3.5.16 Waste Tanks Pit
Structure Removal
CPIF
3.5.17 Pipeline
Removal and Restoration
CPIF
3.5.18 ORISE
Verification Survey
CPIF
3.5.19 Building 606
North Demolition
CPIF
3.5.20 Interior VC
Demolition
CPIF
3.5.21 Exterior VC
Demolition and Base Concrete/Soil Removal
CPIF
3.5.22 Site Restoration CPIF
3.6 OTHER
EXTERIOR
REMOVAL AND
FINAL STATUS
SURVEY (FSS)
ACTIONS (WE 5)
3.6.1
REMOVE/ABANDON
WELLS
CPIF
3.6.2 CONDUCT FSS
IN OCCUPIED AREAS
CPIF
3.6.3 REMOVAL OF
THE WASTE
STORAGE AREA
CPIF
3.7
DEMOBILIZATION
(WE 6)
3.7.2 FINAL
DEMOBILIZATION
CPIF
3.8 PROJECT
CLOSURE
REPORTING (WE 7)
FFP
Total Proposed Price (All FFP Tasks and CPIF Tasks)
*Proposed Cost Plus Proposed Target Fee
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT
FOR
DECOMMISSIONING AND DISMANTLEMENT ACTIVITIES FOR THE SM-1A REACTOR FACILITY
LOCATED AT FORT GREELY, AK
10 February 2022
Amendment 0001: 17 February 2022 Amendment 0002: 25 February 2022
1.0 INTRODUCTION
The Department of the Army (DA) is authorized to build and operate nuclear reactors under Section 91.b. of the Atomic Energy Act of 1954. Section 91.b authorizes DOD to procure and utilize special nuclear material in the interest of national defense and to acquire utilization facilities, i.e., reactors for military purposes. Section 110.b of the Atomic Energy Act excludes such utilization facilities acquired by DOD from any of the licensing requirements of the Atomic Energy Act. As part of the Army Reactor Program, the United States Army Corps of Engineers (USACE) is responsible for nuclear reactor engineering and design, reactor construction, and decommissioning design and implementation.
2.0 GENERAL BACKGROUND
The SM-1A Reactor Facility is situated within the boundaries of Fort Greely which covers approximately 6,840 acres near Delta Junction, Alaska. Fort Greely is located approximately 100 miles southeast of Fairbanks and 225 miles northeast of Anchorage.
The SM-1A Reactor Facility is located approximately in the middle of Fort Greely (See attached Figure 1 Fort Greely, AK). SM-1A occupies an approximately 1.5-acre fenced site in the central portion of Fort Greely along the northern side of Arctic Avenue between First Street and East Fifth Street. The deactivated reactor and associated systems are primarily in a cylindrical structure known as the Vapor Container (VC) adjacent to Building 606 North. Building 606 North and Building 606 South also contain critical infrastructure associated with Fort Greely’s existing utility systems.
Building J-5 (also known as Building 607; immediately east of the VC) is used for storage by Fort Greely’s utility privatization (UP) contractor (Doyon Utilities, LLC). Doyon operates and maintains Fort Greely utility systems under a 50-year utility privatization (UP) contract that will expire in 2058. Access to and conveyance of the utility systems and infrastructure facilities, including those in Building 606 North, is granted to the UP contractor by Army Easement DACA85-08-00124. The federal government maintains ownership of SM-1A reactor components and associated radioactive materials and waste. Access to restricted areas containing radioactive materials and waste is controlled by USACE. The Army owns the land underlying the facilities associated with SM-1A.
The SM-1A Reactor Facility, shown in attached Figure 2, includes Building 606 (North and South), Building J-5, and Supply Well No. 11 contained within a fenced perimeter. The area inside the fence is generally paved asphalt or concrete with small areas of grass. Primary access to the SM-1A Reactor Facility is through one of several locked entry gates located around the reactor security fence. Entry into Building 606 is currently controlled by the UP contractor. The selected Contractor will take over security of the SM-1A facility after developing acceptable Security Plans prior to the start of site work. Within the security fence, aboveground and below ground structures and foundation materials from Building 606 North, Building J-5, and the groundwater supply Well No. 11 pump house and associated utilidor will be removed during decommissioning activities. Additionally, supply Well No. 12 and recharge Well No. 13, located outside of the perimeter fence will be part of this project.
Construction of the SM-1A Reactor Facility at Fort Greely began in 1958 and was completed in 1962, with first criticality achieved on 13 March 1962. The design was based on the concept of the SM-1 reactor at Fort Belvoir, Virginia, a prototype for stationary medium-power plants. SM-1A was a single-loop, 20.2 megawatt-thermal pressurized water reactor that used highly enriched uranium dioxide fuel to generate 2,000 kilowatts of electrical power and 37,850 pounds of extraction steam per hour. SM-1A’s primary mission was to supply electrical power and heating steam for on-post buildings and facilities at Fort Greely; it was also used as an in-service test facility to understand how the equipment would function in an arctic environment. The primary mission of the SM-1A reactor deployment was the establishment of a cold-weather nuclear power plant to supply power to Fort Greely as part of the Army Nuclear Power Program (ANPP). The secondary mission was to study the economics of operating a nuclear electric power plant as compared to operating a conventional oil-fired system in a remote area where fuel costs are high and refueling logistics are challenging. In 1970, the Chief of Engineers decided the SM-1A reactor would be shut down for the last time following the normal end-of-life after its fourth core (U.S. Army, 1974a).
During plant operation, radioactive wastewater was stored in two hot waste tanks located in the waste tank pit. The wastewater was stored until the Spring season to avoid wastewater freezing in the discharge pipeline. During the warmer months, the weather allowed the contents of the tanks to be pumped out and processed through a Dilution Station (diluting water supplied by Well No. 14) and discharged to Jarvis Creek in accordance with approved procedures and permits (Jacobs, 2002). In mid-1968, discharges to Jarvis Creek were halted and a skid-mounted Radioactive Waste Disposal System (RWDS) was installed in Building 606 North where treated wastewater was discharged into a recharge well, Well No. 13. The concentrated wastes were packaged and disposed of at appropriate facilities in the lower 48 contiguous states.
The final shutdown of the SM-1A reactor was performed in March 1972. Deactivation and initial decommissioning were performed at the SM-1A Reactor Facility following shutdown and in accordance with the U.S. Army Engineer Power Group Plan for The Decommissioning of the SM-1A Nuclear Power Plant (U.S. Army, 1972). The initial deactivation of SM-1A consisted of placing the facility in a SAFSTOR configuration by removing the nuclear fuel, conducting minor decontamination, shipping some radioactive waste for disposal, sealing the VC, and installing appropriate warning signs and monitoring devices. Much of the reactor’s primary system components were dismantled, and components inside the VC were encased in concrete and an acrylamide grout-sand-soil mixture. This mixture was capped with 36 inches of reinforced concrete to a finished elevation of about 10 feet above the bottom of the VC and the VC hatch was sealed. Waste generated during the initial deactivation activities was placed in the spent fuel pit and waste tanks pit. These pits were then filled with an acrylamide grout-sand-soil mixture and capped with reinforced concrete. Debris in these pits is assumed to be radiologically contaminated. Estimates of the remaining waste volumes and isotopic compositions of the remaining radioactive wastes are detailed within the PWS and the enclosed documentation.
Following these deactivation activities, SM-1A was placed under a routine monitoring program that is currently implemented by USACE. SM-1A has been maintained in a SAFSTOR condition since 1972 to allow residual radioactivity to decay and minimize worker exposure to radiation to the extent possible during final decommissioning and dismantlement activities. Since its placement in SAFSTOR, SM-1A has been subject to regular inspection and monitoring by USACE in accordance with AR 50-7 and SM-1A Reactor Possession Permit Number SM1A-1-19, Amendment 1-20, issued by the U.S. Army Deputy Chief of Staff G-3/5/7 through the Army Reactor Office (ARO).
In general, Building 606 North has remained occupied by government personnel and/or contractors operating Fort Greely’s conventional steam and power plant since SM-1A’s deactivation in 1972.
2.1 PRIOR STUDIES
The decommissioning strategy developed in the 1970's recommended that the deactivated reactors be placed into a safe storage mode that would allow the shorter-lived radionuclides to decay. It was expected that delaying decommissioning would reduce radioactive waste volumes and worker exposures. However, preliminary studies indicated that the levels of contamination present within the reactors would not be sufficiently reduced by decay to allow for the release of the facilities without significant decontamination being performed. Additionally, concern regarding the increasing cost and decreasing availability of radioactive waste disposal led the Army Reactor Office (ARO) to recommend that an assessment be performed of the SM-1A reactor to allow for a more accurate decommissioning cost estimate to be developed which addresses projected changes in disposal options.
USACE developed a management plan for conducting an All-Hazards Assessment (AHA), which contained provisions for four phases of work to be performed. Phase I included a Historical Records Review and Disposal Alternatives Investigation. Phase II, included performing a characterization survey and decommissioning cost estimate. Phases III and IV deal with decommissioning planning, design, and execution.
• Phase I - Review SM-1A historical design, operations, decommissioning, and surveillance related documents in order to prepare: Data Quality Objectives for a hazards assessment/characterization survey of the SM-1A Reactor Facility; initial waste classification of large components based on an activation analysis to estimate radionuclide concentrations; and identify those areas of the SM-1A site that are impacted by residual radioactive contamination and those that may contain other hazardous materials.
• Phase II - Conduct radiological and non-radiological sampling and analysis, hazards assessment, disposal alternatives evaluation, and cost estimates for the decommissioning and disposal of the SM-1A.
• Phase III - Develop detailed plans and execute the selected approach for hazards reduction, facility decommissioning, and waste disposal options.
• Phase IV - Terminate the nuclear reactor decommissioning permit.
Upon completion of initial decommissioning, Fort Greely was assigned operational and maintenance responsibility for the remaining SM-1A ancillary systems, beyond those associated with the primary nuclear plant. Fort Greely was to operate the secondary system with steam from the boiler in the adjacent post power plant and assume full use of all available space and structures external to the vapor container. The outward physical appearance would remain unchanged (USAEPG, 1971c). After the completion of the facility deactivation and conversion, a third-party radiological survey by a private contractor, as well as the U.S. Army Environmental Hygiene Agency (USAEHA), verified that known areas of radioactive contamination had been decontaminated to acceptable levels or were properly controlled (Suntac, 1973). An Army Reactor Systems Health and Safety Review Committee (ARCHS)-approved SM- 1A Post-Decommissioning Environmental Monitoring Plan was initiated to provide on-going surveillance of the decommissioned facility. In June of 1997, the U. S. Army Center for Health Promotion and Preventive Medicine (USACHPPM) performed extensive surveys of the SM-1A and surrounding environment to determine the radiological status of the facility at that time (USACHPPM, 1997). In preparation for full decommissioning of the site, a Characterization Survey Report (CSR) for the All-Hazards Analysis was completed in 2011 (USACE, 2014).
Objectives for the Phase III planning efforts that will be completed by late 2021 include obtaining the necessary information to support the application for a decommissioning permit in accordance with Table 2-1 of AR 50-7 Army Reactor Program. The following information is needed to support the permit application:
• Approved Environmental Assessment. – Completed 28 Jun 2021
• Historical Site Assessment. – Completed
• Coordination documents with State Historic Preservation Office. – Completed 28 Jun 2021
• Compliance agreements/consent decrees, and so forth, that involve other regulators and stakeholders in the decommissioning.
• Proposed classification of areas for cleanup.
• Any applicable agreements between responsible commander and garrison organizations to be in place during decommissioning. – Ongoing
• Safety and health framework, identifying how personnel and radiation safety will be managed.
• Waste Management and Disposal Plan. – ARO approval granted 20 Dec 2021
• Final Decommissioning Plan. - ARO approval granted 20 Dec 2021
The final, or most recent version of the above documents will be provided as enclosures to the PWS.
2.2 OBJECTIVES
For the purposes of this Performance Work Statement (PWS) the scope of services includes the following activities related to the decommissioning and dismantlement of the SM-1A Deactivated Nuclear Power Plant. This includes byproduct materials produced as a result of SM-1A operations at locations where facility equipment or materials were utilized within Fort Greely, AK:
1) Prepare plans that will support the decommissioning of the SM-1A Reactor Facility in accordance with this PWS and the ARO Decommissioning Permit;
2) Decommission/dispose of materials in accordance with final plans, decommissioning permits, and relevant Federal and State requirements;
3) Perform and document the necessary post-decommissioning radiological surveys to demonstrate all affected areas of Fort Greely are suitable for unrestricted release; and
4) Adherence to U.S. Nuclear Regulatory Commission (NRC) and Army, as well as other relevant Federal/State permits, standards, and guidance.
To assist in meeting the objectives of the PWS, the Government is providing the following documents:
• Final Fort Greely Building 670 Final Status Survey (Enclosure 1)
• Final Fort Greely Building 675 Technical Memo (Enclosure 2)
• Final SM-1A December 2019 Data Quality and Usability Assessment (Enclosure 3)
• Final SM-1A Decommissioning Plan (Enclosure 4)
• Final SM-1A Large Component Transportation Technical Memo (Enclosure 5)
• Final SM-1A Routine Waste Memo (Enclosure 6)
• Final SM-1A September 2020 Data Quality and Usability Assessment (Enclosure 7)
• Pre-Final SM-1A Waste Management Disposal Plan (Enclosure 8)
• Final SM-1A Building 606N Memo (Enclosure 9)
• Final SM-1A Paint Impacts Memo ((Enclosure 10)
• Final SM-1A Soil Sampling Tech Memo (Enclosure 11)
• SM-1A Section 106 MOA (Enclosure 12)
• SM-1A Draft HAER Level II Interview Transcripts, and Draft Historical Marker (Enclosure 13)
• SM-1A Draft HAER Photo Captions and Scanned Negatives (Enclosure 14)
• SM-1A Interview Transcripts (not available at this time, Enclosure 15)
• SM-1A Draft Historical Marker (Enclosure 16)
• SM-1A Final EA w/FNSI (Enclosure 17)
• SM-1A Final EA_NOA (Enclosure 18)
• SM-1A Cultural Resources Report (Enclosure 19)
• SM-1 Decommissioning Permit (Enclosure 20)
• Value Engineering Study Report for the SM-1A Dismantlement Activities (Enclosure 21)
• 2018 TPP Presentation Day 1 (Enclosure 22)
• 2018 TPP Presentation Day 2 (Enclosure 22, cont.)
• 2018 TPP Meeting Minutes (Enclosure 23)
• 2020 June TPP Presentation (Enclosure 24)
• 2020 June Meeting Minutes (Enclosure 25)
• 2020 August TPP Agency Meetings Presentation (Enclosure 26)
• 2020 August TPP ADEC_EPA Meeting Minutes (Enclosure 27)
• 2021 January TPP Presentation (Enclosure 28)
• 2021 Meeting Minutes (Enclosure 29)
• SM-1A Decommissioning Plan References (108 Files) (Enclosure 30-137)
• Pre-Final Waste Management and Disposal Plan References (30 Files) (Enclosure 138-1678)
• SM-1A Cost Estimate (Enclosure 1689)
• SM-1A Basis of Estimate (Enclosure 16970)
• SM-1A BLDG 606 Final Drawings (Enclosure 17071)
The Decommissioning Permit for the site is anticipated to be issued in June of 2022. The Decommissioning Permit will be provided once it is received from the Army Reactor Office
The Government provided documents will be made available via the DOD Safe site https://safe.apps.mil/ approved file sharing site for USACE. The documents will be loaded to the site, and you will receive an email notification from the site with instructions on how to access and download the documents. The documents will only be available for 7 days from the date of the Request for Proposal. All Offerors will need to sign a Non-Disclosure Agreement prior to the release of any documents for bidding purposes. All documents provided by the Government must be protected from distribution and destroyed after the proposal process. (Please send the Contract Specialist email addresses for the points of contact to receive this information.)
The selected Contractor will execute the decommissioning and dismantlement activities in accordance with the proposed action identified in the Final Environmental Assessment (EA) and Finding of No Significant Impact (FNSI) and in accordance with the Decommissioning Permit and Decommissioning Plan.
3.0 WORK STATEMENT
The Contractor shall conduct all activities in compliance with applicable federal, state, and local laws, regulations, and guidance. The Contractor shall comply with the provisions of the basic contract, this PWS, and other Government provided documentation.
The Government team will utilize Technical Direction (TD) letters to control the release of project funding for the duration of the contract. The Contractor will work with the Project Manager and COR to develop a draft of the TD letter and the Government will finalize the letter and authorize spending accordingly. Typically, the Government will authorize the funds needed to support the project efforts on a quarterly basis. This approach will be utilized by the team to ensure project funds are being properly executed.
The work breakdown structure (WBS) and Work Elements (WE) for this project is as follows:
WE 1 Plans, Permitting, and Engineering
• Project Management (PM for WE1 only)
• Project Kick-off Meeting
• Progress Review/Conferences and Reports
• SharePoint Site
• Public Meeting
• Work Plans
• Security Plan WE 2 Mobilization and Site Preparation
• Mobilization of Site Personnel
• Training
• Mobilization of Site Equipment and Materials
• Initial Site Preparation
• Project Offices (including IT and furnishings)
• Construct Waste Storage Area
• Establish Exterior Controlled Area Boundary and Radiological Control Points WE 3 Building 607 (J-5) Disposition
• Pre-demolition Activities
• Structure Demolition
• Demolition to Slab
• Removal of Slab
• Site Restoration WE 4 Building 606 North Disposition
• Asbestos, Lead, PCB, Universal Waste Abatement (including disposal)
• Unrestricted Area Materials and Equipment (M&E) Removal and Disposal
• Pipe Pit Removal and Disposal
• Condensate Return Tank Pit Removal and Decontamination
• Six (6) Inch Concrete Floor Removal and Disposal
• Fuel Storage Vault Demolition and Disposal
• Restricted Area Site Preparation
• Spent Fuel Pit/Stairway Demolition
• VC Access
• Removal of Upper Shield Tanks
• Removal of Grout and M&E Outside the Lower Shield Tank
• Removal of the Lower Shield Tanks, Shield Rings, and Reactor Pressure Vessel (RPV)
• Building 606 North MARSAME Release Surveys
• Removal of Tanks and Debris from Waste Tanks Pit
• Pipeline Removal and Restoration
• ORISE Verification Survey
• Building 606 North Demolition
• Interior VC Demolition
• Exterior VC Demolition and Base Concrete/Soil Removal
• Site Restoration
WE 5 Other Exterior Removal and FFS Actions
• Remove/Abandon Wells
• Conduct Final Status Surveys (FSS) in Occupied Areas
• Removal of the Waste Storage Area WE 6 Demobilization
• Interim Demobilization
• Final Demobilization WE 7 Project Closeout and License Termination Reporting
3.1 Project Constraints:
The following are government required project constraints:
1) Decommissioning, site restoration, and reporting work must be completed by 30 September 2028.
2) Offerors will propose a year-round work schedule clearly detailing number of days and hours to be worked in each season, specifically with a focus on the winter and summer seasons. The work schedule shall detail indoor and outdoor work sequences by season.
3) Contractors will manage and utilize personnel dosimetry from the Army Dosimetry System (Redstone Arsenal).
4) The Government intends to award the following Work Elements under the Base contract. All items/task/subtasks associated with the following WE are Firm Fixed Price or Cost Reimbursable.
WE 1 - Plans, Permitting, and Engineering (Section 3.2) – Firm Fixed Price
WE 2 Mobilization and Site Preparation – Cost Plus Incentive Fee
• Mobilization of Site Personnel
• Training
• Mobilization of Site Equipment and Materials
• Initial Site Preparation
• Project Offices (including IT and furnishings)
• Construct Waste Storage Area
• Establish Exterior Controlled Area Boundary and Radiological Control Points
WE 3 Building 607 (J-5) Disposition - Cost Plus Incentive Fee
• Pre-demolition Activities
• Structure Demolition
• Demolition to Slab
• Removal of Slab
• Site Restoration
WE 4 Building 606 North Disposition – Cost Plus Incentive Fee •Asbestos, Lead, PCB, Universal Waste Abatement (including disposal) •Unrestricted Area M&E Removal and Disposal •Pipe Pit Removal and Disposal •Condensate Return Tank Pit Removal and Decontamination •Six (6) Inch Concrete Floor Removal and Disposal •Fuel Storage Vault Demolition and Disposal •Restricted Area Site Preparation
WE 6 Demobilization – Cost Plus Incentive Fee
• Interim Demobilization
It is the intent of the Government to award the base contract plus CPIF subtasks up to the funds available in FY22.
Remaining CPIF WEs will be identified in the contract award as optional items to be exercised in the subsequent two years of funding (FY23 and FY24). As such, the Base contract may include some of the following subtasks from the following WE as Cost-Plus Incentive Fee task items:
WE 4 Building 606 North Disposition
• Spent Fuel Pit/Stairway Demolition
• VC Access
• Removal of Upper Shield Tanks
• Removal of Grout and M&E Outside the Lower Shield Tank
• Removal of the Lower Shield Tanks, Shield Rings, and RPV
• Building 606 North MARSAME Release Surveys
• Removal of Tanks and Debris from Waste Tanks Pit
• Pipeline Removal and Restoration
• ORISE Verification Survey
• Building 606 North Demolition
• Interior VC Demolition
• Exterior VC Demolition and Base Concrete/Soil Removal
• Site Restoration
WE 5 Other Exterior Removal and FFS Actions
• Remove/Abandon/Cap Wells
• Conduct FSSs in Occupied Areas
• Removal of the Waste Storage Area
WE 6 Demobilization
• Final Demobilization
WE 7 Project Closeout and License Termination Reporting
For costing purposes for each WE listed in the PWS, the contractor shall account for all project management (PM) requirements and cost, plus all travel associated with WE 2 to WE 7 for the duration of the world element. Travel and Per Diem will be Cost Reimbursable (no fee). The contractor shall utilize methods to minimize project costs associated with travel (local trades/craft if possible, use/hire local staff, move staff vs. long term temporary duty, etc.). For any personnel on long term travel, the costs to the project shall not exceed the per diem rates authorized in the JTR. All travel assumptions to/from the site must be clearly outlined in the proposal costs, to include costs for personnel on long term travel to mobilize, demobilize and travel home throughout the project. It should be noted that the availability of commercial lodging (i.e., hotels, motels, etc.) in the Fort Greely, AK area is limited. The project will only allow the costs to travel home on a quarterly basis. Costs to travel home on a more frequent basis will not be applied to the project costs. Calculate and present all travel associated with all work elements (WE 2-WE7) described in the PWS.
For each work element in the PWS, additional PM requirements and costs should account for but are not limited to the following:
• Safety and Health Program
• Environmental Management Program
• Quality Control Program
• Operations
• Updating Project Plans/Engineering
• Project Controls/Administrative/Personnel Retention
For WE 3 - 6 of the PWS, Offerors shall provide a technical approach that requires ALL decommissioning and demolition waste identified in the PWS to be disposed of in the lower 48 contiguous states at one or more of the six
(6) disposal facilities listed in the Final Environmental Assessment Decommissioning and Dismantlement of the Deactivated SM-1A Nuclear Power Plant published in June 2021. At a minimum, the technical approach must outline the approach to remove all decommissioning & demolition waste, properly package the waste, and ship the waste to the disposal facility(ies). The Government reserves the right to have final approval authority for any disposal facilities throughout project implementation.
For WE 3 - 6 of the PWS, for waste transportation and disposal costing purpose, Offerors should provide one technical approach that requires ALL decommissioning and demolition waste identified in the PWS to be disposed of at Waste Control Specialists in Andrews County, Texas. At a minimum, the technical approach must outline the approach to remove all decommissioning & demolition waste, properly package the waste, and ship the waste to WCS as requested.
The Government reserves the right to have final approval authority for the disposal facility selected throughout the project implementation.
3.2 PLANS, PERMITTING, AND ENGINEERING (WE 1) (FIRM FIXED PRICE):
The Contractor shall provide project management support and travel as necessary to perform the activities detailed in WE 1. It is assumed that this task will provide the overall project management and support services for the preparation of the work plans. The Contractor shall provide technical, public relations, and management support to meetings required to fulfill the objectives of this WE. The Contractor shall prepare minutes of the review conferences, conference calls, and meetings conducted for this WE. The minutes for each meeting shall be prepared and submitted by email to USACE, initially in draft form for review and comment, and shall be finalized based on review comments received. The final minutes shall be submitted by email to each meeting attendee.
As part of the management plans for the project, planning documents must address administrative procedures to be followed throughout the project (to include but not limited to the following: control of government property, documentation of communications, project controls [scheduling, invoicing, earned value management, change management, risk management], periodic status reporting/monthly reports, personnel retention and other planning documents required to implement the project). Additionally, a SharePoint site must be established by the Contractor to allow for team collaboration, document sharing and as a file repository for the project files during the implementation of the project. The site must be accessible by DoD computers, must be password controlled, and have the ability to store all project data (no issues with files sizes, files with “Controlled Unclassified Information” information, files with “Personally Identifiable Information” etc.).
3.2.1 Project Kick-Off Meeting
Two kick-off meetings will be scheduled after award. The purpose of the meetings will be to answer questions and provide approach to the overall project and planned activities for SM-1A, plus to review the specifics of the site prior to the start of engineering, work planning, etc. Assume one (1) 4-hour meeting with six (6) individuals from the contractor attending; one meeting to be held in Baltimore, MD at the USACE District Office. The second meeting will be held at Fort Greely at the site to ensure a thorough understanding of site constraints, working conditions, and the like prior to the start of deliverables. Assume key personnel attend this meeting. Plan for a minimum one-week trip (travel Monday, meeting Tuesday thru Thursday, travel home Friday).
Key Personnel as defined in the Decommissioning Plan Sections 8.4.1-8.4.7 are:
1. Project Manager (onsite)
2. Quality Control Manager
3. Site Safety and Health Manager
4. Site Safety and Health Officer (onsite)
5. Radiation Safety Officer (onsite)
6. Site Manager (onsite)
7. Quality Control System Manager (onsite)
8. Waste Transportation and Disposal Coordinator (onsite)
Key Personnel should be assigned to the project for the duration. If a change to Key Personnel is required, the change must be coordinated with the COR and subsequently the Contracting Officer.
3.2.2 Progress/Review Conferences and Reports
Following receipt of review comments on a deliverable, the contractor shall prepare and distribute draft responses. A review conference will be held with USACE to discuss the comments and responses. Based on the agreements reached during the review conferences, the contractor shall prepare and distribute a set of responses for the comments.
The contractor shall prepare and submit reports (format to be agreed upon after award) and monthly progress reports for the duration of the contract and submit to the Project Manager. The reports shall include details concerning the project management and fieldwork activities conducted, deliverables submitted, cost information/tracking, invoice status, communications initiated and received, and meetings attended. Additional information may be added by the parties after award and throughout implementation.
The contractor shall host at least one weekly overall project team progress meeting with USACE for the duration of the project. This will be done via conference call and/or on-site. The contractor will prepare the weekly agenda, with input from USACE, host the meeting and prepare all necessary minutes as described above. A management team meeting will also be implemented on a weekly basis as needed.
3.2.3 SharePoint Site
The contractor shall set up and maintain a project SharePoint site for all team members to utilize. All meeting minutes, correspondence, invoicing, project deliverables, etc., shall be uploaded and stored on the project SharePoint site in a timely manner. The site will be maintained throughout the duration of the project then provided to the Government at the end of the project. The site shall include all necessary protocols to maintain Controlled Unclassified Information (CUI) and Personal Identifiable Information (PII).
3.2.4 Public Meeting
The contractor shall prepare for and assist USACE in hosting up to four public meetings with community members to discuss the SM-1A Decommissioning and Dismantlement project at or near Fort Greely, AK. The contractor shall identify and contact community groups and advertising venues and shall secure a meeting location near the project location. The contractor shall assume an hour meeting with four (4) professional staff in attendance at the meeting.
The contractor shall also assist USACE with preparation of presentation materials, to include, but not limited to, the compilation of a fact sheet summarizing the implementation process for the decommissioning/dismantlement effort.
3.2.5 Work Plans
The Contractor shall prepare all management plans for the project. Planning documents must address administrative procedures to be followed throughout the project (to include but not limited to the following: control of government property, documentation of communications, project controls [scheduling, invoicing, earned value management, change management], periodic status reporting/monthly reports, and other planning documents required to implement the project). The Contractor shall prepare all required work plans necessary to support decommissioning activities as described in the permit and this PWS.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .