Instructions for Use of Cost Summary Workbook
| General | |
| ~ | Ensure all dollar amounts entered are rounded to the nearest whole dollar and hours entered are rounded to the nearest whole hour. |
| ~ | Figures entered into the Task Cost Summary should reconcile to with figures in the separate cost elements workbooks (Materials, Equip/ODCs, Subcontracts) |
| ~ | Include all costs associated with prime contractor, inter-divisional/other, and major subcontractor effort. |
| ~ | Major subcontractor's loaded costs to the prime contractor should reflect prices in the Attachment Labor Detail by Contract Year |
| ~ | Save the single file created from this template as: |
Attachment XX <prime contractor name> The Pricing Sheet maybe edited:
- To update formulas due to adjustments required to accommodate accounting system requirements.
- To add additional rows to accomodate costs elements.
| Multipliers | |
| ~ | "Subcontract Multiplier" includes corresponding G&A and/or subcontract handling rate, as applicable. |
| ~ | "Material Multiplier" includes corresponding G&A and/or material handling rate, as applicable. |
| ~ | "Equipment/ODC Multiplier" includes corresponding G&A and/or material handling rates, as applicable. |
| Other Task Information | |
| ~ | Full Time Equivalents (FTE) - FTEs must be calculated at 1912 hours per FTE |
| ~ | The Share Ratio shall be 75/25 for both cost overruns and underruns |
| ~ | Cost Share Overun (CSoverun) |
| ~ | Cost Share Underun (CSunderun) |
Solicitation No. W912DY-13-R-0004 &F &A
&A 13D-&P
FFP Tasks Information
| Tasks | | Price |
| 3.2.1 | Project Kick-Off Meeting | |
| 3.2.2 | Progress/Review Conferences and Reports | |
| 3.2.3 | Share Point Site | |
| 3.2.4 | Public Meeting | |
| 3.2.5 | Work Plans | |
| 3.2.6 | Security Plan | |
| 3.8 | Project Closure Reporting | |
Price
Solicitation No. W912DY-13-R-0004 &F &A
3.3.1 - 3.3.6
| Attachment | |
| Offeror: | 0 |
| TASK: | |
| | Contract Year 1 | | | | | | | | Contract Year 2 | | | | | | | | Contract Year 3 | | | | | | | | Contract Year 4 | | | | | | | | Contract Year 5 | | | | | | | | Contract Year 6 | | | | | | | |
| Skill Level | Labor Category | Labor Hours | Overtime Hours | Labor Rate | Overtime Rate | Labor $ | Overtime $ | Est Hours | Est Cost | Labor Hours | Overtime Hours | Labor Rate | Overtime Rate | Labor $ | Overtime $ | Est Hours | Est Cost | Labor Hours | Overtime Hours | Labor Rate | Overtime Rate | Labor $ | Overtime $ | Est Hours | Est Cost | Labor Hours | Overtime Hours | Labor Rate | Overtime Rate | Labor $ | Overtime $ | Est Hours | Est Cost | Labor Hours | Overtime Hours | Labor Rate | Overtime Rate | Labor $ | Overtime $ | Est Hours | Est Cost | Labor Hours | Overtime Hours | Labor Rate | Overtime Rate | Labor $ | Overtime $ | Est Hours | Est Cost |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| TARGET COST | | | | | $ - | $ - | 0.00 | $ - | | | | | $ - | $ - | 0.00 | $ - | | | | | $ - | $ - | 0.00 | $ - | | | | | $ - | $ - | 0.00 | $ - | | | | | $ - | $ - | 0.00 | $ - | | | | | $ - | $ - | 0.00 | $ - |
| Hours for FTE | Est FTEs | Man-Year | Est FTEs | Man-Year | Est FTEs | Man-Year | Est FTEs | Man-Year | Est FTEs | Man-Year | Est FTEs |
| 1,912 | 0.00 | 1,912 | 0.00 | 1,912 | 0.00 | 1,912 | 0.00 | 1,912 | 0.00 | 1,912 | 0.00 |
| | Contract Year 1 | Contract Year 2 | Contract Year 3 | Contract Year 4 | Contract Year 5 | Contract Year 6 |
| Subcontract Type | Subcontractors - Non Major | | | | | | |
a0ctomrc: a0ctomrc:
Identify Subcontractor by name
| Current Price | Quantity | | Ext Sub Price | Sub Multiplier | Sub Multiplier | | Sub Price | Current Unit Price | Quantity | | Ext Sub Price | Sub Multiplier | Sub Multiplier | | Sub Price | Current Unit Price | Quantity | | Ext Sub Price | Sub Multiplier | Sub Multiplier | | Sub Price | Current Unit Price | Quantity | | Ext Sub Price | Sub Multiplier | Sub Multiplier | | Sub Price | Current Unit Price | Quantity | | Ext Sub Price | Sub Multiplier | Sub Multiplier | | Sub Price | Current Unit Price | Quantity | | Ext Sub Price | Sub Multiplier | Sub Multiplier | | Sub Price | | |
| | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | $ - | |
| | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | $ - | |
| | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | $ - | |
| | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | $ - | |
| | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | $ - | |
| | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | $ - | |
| | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | $ - | |
| | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | $ - | |
| TARGET COST | | | | $ - | $ - | $ - | | $ - | | | | $ - | $ - | $ - | | $ - | | | | $ - | $ - | $ - | | $ - | | | | $ - | $ - | $ - | | $ - | | | | $ - | $ - | $ - | | $ - | | | | $ - | $ - | $ - | $ - | $ - |
| | Contract Year 1 | | | | | | Contract Year 2 | | | | | | Contract Year 3 | | | | | | Contract Year 4 | | | | | | Contract Year 5 | | | | | | Contract Year 6 | | | | | | |
| Materials | Material | Current Unit Price | Quantity | Ext Material Price | Material Multiplier | Material Multiplier | Price | Current Unit Price | Quantity | Ext Material Price | Material Multiplier | Material Multiplier | Price | Current Unit Price | Quantity | Ext Material Price | Material Multiplier | Material Multiplier | Price | Current Unit Price | Quantity | Ext Material Price | Material Multiplier | Material Multiplier | Price | Current Unit Price | Quantity | Ext Material Price | Material Multiplier | Material Multiplier | Price | Current Unit Price | Quantity | Ext Material Price | Material Multiplier | Material Multiplier | Price | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | TARGET COST | | $ - | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | $ - | $ - |
| | Contract Year 1 | | | | | Contract Year 2 | | | | | Contract Year 3 | | | | | Contract Year 4 | | | | | Contract Year 5 | | | | | Contract Year 6 | | | | | |
| Equipment/ODCs Supplier | Equipment/ODC | Current Unit Price | Quantity | Est ODCs | ODC Multiplier | Price | Current Unit Price | Quantity | Ext ODC Price | ODC Multiplier | Price | Current Unit Price | Quantity | Ext ODC Price | ODC Multiplier | Price | Current Unit Price | Quantity | Ext ODC Price | ODC Multiplier | Price | Current Unit Price | Quantity | Ext ODC Price | ODC Multiplier | Price | Current Unit Price | Quantity | Ext ODC Price | ODC Multiplier | Price | |
| | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | |
| | TARGET COST | | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | $ - |
| | Contract Year 1 | | | | | Contract Year 2 | | | | | Contract Year 3 | | | | | Contract Year 4 | | | | | Contract Year 5 | | | | | Contract Year 6 | | | | | |
| Travel | Travel | Current Unit Price | Quantity | Est Travel | Travel Multiplier | Price | Current Unit Price | Quantity | Est Travel | Travel Multiplier | Price | Current Unit Price | Quantity | Est Travel | Travel Multiplier | Price | Current Unit Price | Quantity | Est Travel | Travel Multiplier | Price | Current Unit Price | Quantity | Est Travel | Travel Multiplier | Price | Current Unit Price | Quantity | Est Travel | Travel Multiplier | Price | |
| | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - |
| | Contract Year 1 | | | | | | Contract Year 2 | | | | | | Contract Year 3 | | | | | | Contract Year 4 | | | | | | Contract Year 5 | | | | | | Contract Year 6 | | | | | | | | |
| Incentive Fee | TASK - Incentive Fee Components | | CSoverrun | CSunderrun | MinFeec | TFc | MaxFeec | | CSoverrun | CSunderrun | MinFeec | TFc | MaxFeec | | CSoverrun | CSunderrun | MinFeec | TFc | MaxFeec | | CSoverrun | CSunderrun | MinFeec | TFc | MaxFeec | | CSoverrun | CSunderrun | MinFeec | TFc | MaxFeec | | CSoverrun | CSunderrun | MinFeec | TFc | MaxFeec | | | |
| | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | |
| | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | |
| | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | |
| | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | |
| | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | |
| | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | |
| | TOTALS | | | $ - | $ - | $ - | TOTALS | | | $ - | $ - | $ - | TOTALS | | | $ - | $ - | $ - | TOTALS | | | $ - | $ - | $ - | TOTALS | | | $ - | $ - | $ - | TOTALS | | | $ - | $ - | $ - | MinFeec | TFc | MaxFeec |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | $ - | $ - | $ - |
Solicitation No. W912DY-13-R-0004 &F &A
3.4.1 - 3.4.2.3
| Attachment | |
| Offeror: | 0 |
| TASK: | |
| | Contract Year 1 | | | | | | | | Contract Year 2 | | | | | | | | Contract Year 3 | | | | | | | | Contract Year 4 | | | | | | | | Contract Year 5 | | | | | | | | Contract Year 6 | | | | | | | |
| Skill Level | Labor Category | Labor Hours | Overtime Hours | Labor Rate | Overtime Rate | Labor $ | Overtime $ | Est Hours | Est Cost | Labor Hours | Overtime Hours | Labor Rate | Overtime Rate | Labor $ | Overtime $ | Est Hours | Est Cost | Labor Hours | Overtime Hours | Labor Rate | Overtime Rate | Labor $ | Overtime $ | Est Hours | Est Cost | Labor Hours | Overtime Hours | Labor Rate | Overtime Rate | Labor $ | Overtime $ | Est Hours | Est Cost | Labor Hours | Overtime Hours | Labor Rate | Overtime Rate | Labor $ | Overtime $ | Est Hours | Est Cost | Labor Hours | Overtime Hours | Labor Rate | Overtime Rate | Labor $ | Overtime $ | Est Hours | Est Cost |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| TARGET COST | | | | | $ - | $ - | 0.00 | $ - | | | | | $ - | $ - | 0.00 | $ - | | | | | $ - | $ - | 0.00 | $ - | | | | | $ - | $ - | 0.00 | $ - | | | | | $ - | $ - | 0.00 | $ - | | | | | $ - | $ - | 0.00 | $ - |
| Hours for FTE | Est FTEs | Man-Year | Est FTEs | Man-Year | Est FTEs | Man-Year | Est FTEs | Man-Year | Est FTEs | Man-Year | Est FTEs |
| 1,912 | 0.00 | 1,912 | 0.00 | 1,912 | 0.00 | 1,912 | 0.00 | 1,912 | 0.00 | 1,912 | 0.00 |
| | Contract Year 1 | Contract Year 2 | Contract Year 3 | Contract Year 4 | Contract Year 5 | Contract Year 6 |
| Subcontract Type | Subcontractors - Non Major | | | | | | |
a0ctomrc: a0ctomrc:
Identify Subcontractor by name
| Current Price | Quantity | | Ext Sub Price | Sub Multiplier | Sub Multiplier | | Sub Price | Current Unit Price | Quantity | | Ext Sub Price | Sub Multiplier | Sub Multiplier | | Sub Price | Current Unit Price | Quantity | | Ext Sub Price | Sub Multiplier | Sub Multiplier | | Sub Price | Current Unit Price | Quantity | | Ext Sub Price | Sub Multiplier | Sub Multiplier | | Sub Price | Current Unit Price | Quantity | | Ext Sub Price | Sub Multiplier | Sub Multiplier | | Sub Price | Current Unit Price | Quantity | | Ext Sub Price | Sub Multiplier | Sub Multiplier | | Sub Price | | |
| | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | $ - | |
| | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | $ - | |
| | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | $ - | |
| | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | $ - | |
| | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | $ - | |
| | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | $ - | |
| | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | $ - | |
| | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | $ - | |
| TARGET COST | | | | $ - | $ - | $ - | | $ - | | | | $ - | $ - | $ - | | $ - | | | | $ - | $ - | $ - | | $ - | | | | $ - | $ - | $ - | | $ - | | | | $ - | $ - | $ - | | $ - | | | | $ - | $ - | $ - | $ - | $ - |
| | Contract Year 1 | | | | | | Contract Year 2 | | | | | | Contract Year 3 | | | | | | Contract Year 4 | | | | | | Contract Year 5 | | | | | | Contract Year 6 | | | | | | |
| Materials | Material | Current Unit Price | Quantity | Ext Material Price | Material Multiplier | Material Multiplier | Price | Current Unit Price | Quantity | Ext Material Price | Material Multiplier | Material Multiplier | Price | Current Unit Price | Quantity | Ext Material Price | Material Multiplier | Material Multiplier | Price | Current Unit Price | Quantity | Ext Material Price | Material Multiplier | Material Multiplier | Price | Current Unit Price | Quantity | Ext Material Price | Material Multiplier | Material Multiplier | Price | Current Unit Price | Quantity | Ext Material Price | Material Multiplier | Material Multiplier | Price | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | TARGET COST | | $ - | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | $ - | $ - |
| | Contract Year 1 | | | | | Contract Year 2 | | | | | Contract Year 3 | | | | | Contract Year 4 | | | | | Contract Year 5 | | | | | Contract Year 6 | | | | | |
| Equipment/ODCs Supplier | Equipment/ODC | Current Unit Price | Quantity | Est ODCs | ODC Multiplier | Price | Current Unit Price | Quantity | Ext ODC Price | ODC Multiplier | Price | Current Unit Price | Quantity | Ext ODC Price | ODC Multiplier | Price | Current Unit Price | Quantity | Ext ODC Price | ODC Multiplier | Price | Current Unit Price | Quantity | Ext ODC Price | ODC Multiplier | Price | Current Unit Price | Quantity | Ext ODC Price | ODC Multiplier | Price | |
| | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | |
| | TARGET COST | | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | $ - |
| | Contract Year 1 | | | | | Contract Year 2 | | | | | Contract Year 3 | | | | | Contract Year 4 | | | | | Contract Year 5 | | | | | Contract Year 6 | | | | | |
| Travel | Travel | Current Unit Price | Quantity | Est Travel | Travel Multiplier | Price | Current Unit Price | Quantity | Est Travel | Travel Multiplier | Price | Current Unit Price | Quantity | Est Travel | Travel Multiplier | Price | Current Unit Price | Quantity | Est Travel | Travel Multiplier | Price | Current Unit Price | Quantity | Est Travel | Travel Multiplier | Price | Current Unit Price | Quantity | Est Travel | Travel Multiplier | Price | |
| | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - |
| | Contract Year 1 | | | | | | Contract Year 2 | | | | | | Contract Year 3 | | | | | | Contract Year 4 | | | | | | Contract Year 5 | | | | | | Contract Year 6 | | | | | | | | |
| Incentive Fee | TASK - Incentive Fee Components | | CSoverrun | CSunderrun | MinFeec | TFc | MaxFeec | | CSoverrun | CSunderrun | MinFeec | TFc | MaxFeec | | CSoverrun | CSunderrun | MinFeec | TFc | MaxFeec | | CSoverrun | CSunderrun | MinFeec | TFc | MaxFeec | | CSoverrun | CSunderrun | MinFeec | TFc | MaxFeec | | CSoverrun | CSunderrun | MinFeec | TFc | MaxFeec | | | |
| | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | |
| | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | |
| | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | |
| | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | |
| | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | |
| | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | |
| | TOTALS | | | $ - | $ - | $ - | TOTALS | | | $ - | $ - | $ - | TOTALS | | | $ - | $ - | $ - | TOTALS | | | $ - | $ - | $ - | TOTALS | | | $ - | $ - | $ - | TOTALS | | | $ - | $ - | $ - | MinFeec | TFc | MaxFeec |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | $ - | $ - | $ - |
Solicitation No. W912DY-13-R-0004 &F &A
3.5.1
| Attachment | |
| Offeror: | 0 |
| TASK: | |
| | Contract Year 1 | | | | | | | | Contract Year 2 | | | | | | | | Contract Year 3 | | | | | | | | Contract Year 4 | | | | | | | | Contract Year 5 | | | | | | | | Contract Year 6 | | | | | | | |
| Skill Level | Labor Category | Labor Hours | Overtime Hours | Labor Rate | Overtime Rate | Labor $ | Overtime $ | Est Hours | Est Cost | Labor Hours | Overtime Hours | Labor Rate | Overtime Rate | Labor $ | Overtime $ | Est Hours | Est Cost | Labor Hours | Overtime Hours | Labor Rate | Overtime Rate | Labor $ | Overtime $ | Est Hours | Est Cost | Labor Hours | Overtime Hours | Labor Rate | Overtime Rate | Labor $ | Overtime $ | Est Hours | Est Cost | Labor Hours | Overtime Hours | Labor Rate | Overtime Rate | Labor $ | Overtime $ | Est Hours | Est Cost | Labor Hours | Overtime Hours | Labor Rate | Overtime Rate | Labor $ | Overtime $ | Est Hours | Est Cost |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| TARGET COST | | | | | $ - | $ - | 0.00 | $ - | | | | | $ - | $ - | 0.00 | $ - | | | | | $ - | $ - | 0.00 | $ - | | | | | $ - | $ - | 0.00 | $ - | | | | | $ - | $ - | 0.00 | $ - | | | | | $ - | $ - | 0.00 | $ - |
| Hours for FTE | Est FTEs | Man-Year | Est FTEs | Man-Year | Est FTEs | Man-Year | Est FTEs | Man-Year | Est FTEs | Man-Year | Est FTEs |
| 1,912 | 0.00 | 1,912 | 0.00 | 1,912 | 0.00 | 1,912 | 0.00 | 1,912 | 0.00 | 1,912 | 0.00 |
| | Contract Year 1 | Contract Year 2 | Contract Year 3 | Contract Year 4 | Contract Year 5 | Contract Year 6 |
| Subcontract Type | Subcontractors - Non Major | | | | | | |
a0ctomrc: a0ctomrc:
Identify Subcontractor by name
| Current Price | Quantity | | Ext Sub Price | Sub Multiplier | Sub Multiplier | | Sub Price | Current Unit Price | Quantity | | Ext Sub Price | Sub Multiplier | Sub Multiplier | | Sub Price | Current Unit Price | Quantity | | Ext Sub Price | Sub Multiplier | Sub Multiplier | | Sub Price | Current Unit Price | Quantity | | Ext Sub Price | Sub Multiplier | Sub Multiplier | | Sub Price | Current Unit Price | Quantity | | Ext Sub Price | Sub Multiplier | Sub Multiplier | | Sub Price | Current Unit Price | Quantity | | Ext Sub Price | Sub Multiplier | Sub Multiplier | | Sub Price | | |
| | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | $ - | |
| | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | $ - | |
| | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | $ - | |
| | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | $ - | |
| | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | $ - | |
| | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | $ - | |
| | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | $ - | |
| | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | $ - | |
| TARGET COST | | | | $ - | $ - | $ - | | $ - | | | | $ - | $ - | $ - | | $ - | | | | $ - | $ - | $ - | | $ - | | | | $ - | $ - | $ - | | $ - | | | | $ - | $ - | $ - | | $ - | | | | $ - | $ - | $ - | $ - | $ - |
| | Contract Year 1 | | | | | | Contract Year 2 | | | | | | Contract Year 3 | | | | | | Contract Year 4 | | | | | | Contract Year 5 | | | | | | Contract Year 6 | | | | | | |
| Materials | Material | Current Unit Price | Quantity | Ext Material Price | Material Multiplier | Material Multiplier | Price | Current Unit Price | Quantity | Ext Material Price | Material Multiplier | Material Multiplier | Price | Current Unit Price | Quantity | Ext Material Price | Material Multiplier | Material Multiplier | Price | Current Unit Price | Quantity | Ext Material Price | Material Multiplier | Material Multiplier | Price | Current Unit Price | Quantity | Ext Material Price | Material Multiplier | Material Multiplier | Price | Current Unit Price | Quantity | Ext Material Price | Material Multiplier | Material Multiplier | Price | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | TARGET COST | | $ - | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | $ - | $ - |
| | Contract Year 1 | | | | | Contract Year 2 | | | | | Contract Year 3 | | | | | Contract Year 4 | | | | | Contract Year 5 | | | | | Contract Year 6 | | | | | |
| Equipment/ODCs Supplier | Equipment/ODC | Current Unit Price | Quantity | Est ODCs | ODC Multiplier | Price | Current Unit Price | Quantity | Ext ODC Price | ODC Multiplier | Price | Current Unit Price | Quantity | Ext ODC Price | ODC Multiplier | Price | Current Unit Price | Quantity | Ext ODC Price | ODC Multiplier | Price | Current Unit Price | Quantity | Ext ODC Price | ODC Multiplier | Price | Current Unit Price | Quantity | Ext ODC Price | ODC Multiplier | Price | |
| | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | |
| | TARGET COST | | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | $ - |
| | Contract Year 1 | | | | | Contract Year 2 | | | | | Contract Year 3 | | | | | Contract Year 4 | | | | | Contract Year 5 | | | | | Contract Year 6 | | | | | |
| Travel | Travel | Current Unit Price | Quantity | Est Travel | Travel Multiplier | Price | Current Unit Price | Quantity | Est Travel | Travel Multiplier | Price | Current Unit Price | Quantity | Est Travel | Travel Multiplier | Price | Current Unit Price | Quantity | Est Travel | Travel Multiplier | Price | Current Unit Price | Quantity | Est Travel | Travel Multiplier | Price | Current Unit Price | Quantity | Est Travel | Travel Multiplier | Price | |
| | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - |
| | Contract Year 1 | | | | | | Contract Year 2 | | | | | | Contract Year 3 | | | | | | Contract Year 4 | | | | | | Contract Year 5 | | | | | | Contract Year 6 | | | | | | | | |
| Incentive Fee | TASK - Incentive Fee Components | | CSoverrun | CSunderrun | MinFeec | TFc | MaxFeec | | CSoverrun | CSunderrun | MinFeec | TFc | MaxFeec | | CSoverrun | CSunderrun | MinFeec | TFc | MaxFeec | | CSoverrun | CSunderrun | MinFeec | TFc | MaxFeec | | CSoverrun | CSunderrun | MinFeec | TFc | MaxFeec | | CSoverrun | CSunderrun | MinFeec | TFc | MaxFeec | | | |
| | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | |
| | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | |
| | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | |
| | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | |
| | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | |
| | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | |
| | TOTALS | | | $ - | $ - | $ - | TOTALS | | | $ - | $ - | $ - | TOTALS | | | $ - | $ - | $ - | TOTALS | | | $ - | $ - | $ - | TOTALS | | | $ - | $ - | $ - | TOTALS | | | $ - | $ - | $ - | MinFeec | TFc | MaxFeec |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | $ - | $ - | $ - |
Solicitation No. W912DY-13-R-0004 &F &A
3.5.2
| Attachment | |
| Offeror: | 0 |
| TASK: | |
| | Contract Year 1 | | | | | | | | Contract Year 2 | | | | | | | | Contract Year 3 | | | | | | | | Contract Year 4 | | | | | | | | Contract Year 5 | | | | | | | | Contract Year 6 | | | | | | | |
| Skill Level | Labor Category | Labor Hours | Overtime Hours | Labor Rate | Overtime Rate | Labor $ | Overtime $ | Est Hours | Est Cost | Labor Hours | Overtime Hours | Labor Rate | Overtime Rate | Labor $ | Overtime $ | Est Hours | Est Cost | Labor Hours | Overtime Hours | Labor Rate | Overtime Rate | Labor $ | Overtime $ | Est Hours | Est Cost | Labor Hours | Overtime Hours | Labor Rate | Overtime Rate | Labor $ | Overtime $ | Est Hours | Est Cost | Labor Hours | Overtime Hours | Labor Rate | Overtime Rate | Labor $ | Overtime $ | Est Hours | Est Cost | Labor Hours | Overtime Hours | Labor Rate | Overtime Rate | Labor $ | Overtime $ | Est Hours | Est Cost |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| TARGET COST | | | | | $ - | $ - | 0.00 | $ - | | | | | $ - | $ - | 0.00 | $ - | | | | | $ - | $ - | 0.00 | $ - | | | | | $ - | $ - | 0.00 | $ - | | | | | $ - | $ - | 0.00 | $ - | | | | | $ - | $ - | 0.00 | $ - |
| Hours for FTE | Est FTEs | Man-Year | Est FTEs | Man-Year | Est FTEs | Man-Year | Est FTEs | Man-Year | Est FTEs | Man-Year | Est FTEs |
| 1,912 | 0.00 | 1,912 | 0.00 | 1,912 | 0.00 | 1,912 | 0.00 | 1,912 | 0.00 | 1,912 | 0.00 |
| | Contract Year 1 | Contract Year 2 | Contract Year 3 | Contract Year 4 | Contract Year 5 | Contract Year 6 |
| Subcontract Type | Subcontractors - Non Major | | | | | | |
a0ctomrc: a0ctomrc:
Identify Subcontractor by name
| Current Price | Quantity | | Ext Sub Price | Sub Multiplier | Sub Multiplier | | Sub Price | Current Unit Price | Quantity | | Ext Sub Price | Sub Multiplier | Sub Multiplier | | Sub Price | Current Unit Price | Quantity | | Ext Sub Price | Sub Multiplier | Sub Multiplier | | Sub Price | Current Unit Price | Quantity | | Ext Sub Price | Sub Multiplier | Sub Multiplier | | Sub Price | Current Unit Price | Quantity | | Ext Sub Price | Sub Multiplier | Sub Multiplier | | Sub Price | Current Unit Price | Quantity | | Ext Sub Price | Sub Multiplier | Sub Multiplier | | Sub Price | | |
| | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | $ - | |
| | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | $ - | |
| | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | $ - | |
| | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | $ - | |
| | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | $ - | |
| | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | $ - | |
| | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | $ - | |
| | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | | $ - | $ - | | | $ - | $ - | $ - | $ - | |
| TARGET COST | | | | $ - | $ - | $ - | | $ - | | | | $ - | $ - | $ - | | $ - | | | | $ - | $ - | $ - | | $ - | | | | $ - | $ - | $ - | | $ - | | | | $ - | $ - | $ - | | $ - | | | | $ - | $ - | $ - | $ - | $ - |
| | Contract Year 1 | | | | | | Contract Year 2 | | | | | | Contract Year 3 | | | | | | Contract Year 4 | | | | | | Contract Year 5 | | | | | | Contract Year 6 | | | | | | |
| Materials | Material | Current Unit Price | Quantity | Ext Material Price | Material Multiplier | Material Multiplier | Price | Current Unit Price | Quantity | Ext Material Price | Material Multiplier | Material Multiplier | Price | Current Unit Price | Quantity | Ext Material Price | Material Multiplier | Material Multiplier | Price | Current Unit Price | Quantity | Ext Material Price | Material Multiplier | Material Multiplier | Price | Current Unit Price | Quantity | Ext Material Price | Material Multiplier | Material Multiplier | Price | Current Unit Price | Quantity | Ext Material Price | Material Multiplier | Material Multiplier | Price | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | |
| | TARGET COST | | $ - | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | $ - | $ - |
| | Contract Year 1 | | | | | Contract Year 2 | | | | | Contract Year 3 | | | | | Contract Year 4 | | | | | Contract Year 5 | | | | | Contract Year 6 | | | | | |
| Equipment/ODCs Supplier | Equipment/ODC | Current Unit Price | Quantity | Est ODCs | ODC Multiplier | Price | Current Unit Price | Quantity | Ext ODC Price | ODC Multiplier | Price | Current Unit Price | Quantity | Ext ODC Price | ODC Multiplier | Price | Current Unit Price | Quantity | Ext ODC Price | ODC Multiplier | Price | Current Unit Price | Quantity | Ext ODC Price | ODC Multiplier | Price | Current Unit Price | Quantity | Ext ODC Price | ODC Multiplier | Price | |
| | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | |
| | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | |
| | TARGET COST | | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | TARGET COST | | $ - | $ - | $ - | $ - |
| | Contract Year 1 | | | | | Contract Year 2 | | | | | Contract Year 3 | | | | | Contract Year 4 | | | | | Contract Year 5 | | | | | Contract Year 6 | | | | | |
| Travel | Travel | Current Unit Price | Quantity | Est Travel | Travel Multiplier | Price | Current Unit Price | Quantity | Est Travel | Travel Multiplier | Price | Current Unit Price | Quantity | Est Travel | Travel Multiplier | Price | Current Unit Price | Quantity | Est Travel | Travel Multiplier | Price | Current Unit Price | Quantity | Est Travel | Travel Multiplier | Price | Current Unit Price | Quantity | Est Travel | Travel Multiplier | Price | |
| | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - | | $ - | $ - | $ - | $ - |
| | Contract Year 1 | | | | | | Contract Year 2 | | | | | | Contract Year 3 | | | | | | Contract Year 4 | | | | | | Contract Year 5 | | | | | | Contract Year 6 | | | | | | | | |
| Incentive Fee | TASK - Incentive Fee Components | | CSoverrun | CSunderrun | MinFeec | TFc | MaxFeec | | CSoverrun | CSunderrun | MinFeec | TFc | MaxFeec | | CSoverrun | CSunderrun | MinFeec | TFc | MaxFeec | | CSoverrun | CSunderrun | MinFeec | TFc | MaxFeec | | CSoverrun | CSunderrun | MinFeec | TFc | MaxFeec | | CSoverrun | CSunderrun | MinFeec | TFc | MaxFeec | | | |
| | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | |
| | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | |
| | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | |
| | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | |
| | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | |
| | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | | $ - | $ - | $ - | | | |
| | TOTALS | | | $ - | $ - | $ - | TOTALS | | | $ - | $ - | $ - | TOTALS | | | $ - | $ - | $ - | TOTALS | | | $ - | $ - | $ - | TOTALS | | | $ - | $ - | $ - | TOTALS | | | $ - | $ - | $ - | MinFeec | TFc | MaxFeec |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | $ - | $ - | $ - |
Solicitation No. W912DY-13-R-0004 &F &A
3.5.3
| Attachment | |
| Offeror: | 0 |
| TASK: | |
| | Contract Year 1 | | | | | | | | Contract Year 2 | | | | | | | | Contract Year 3 | | | | | | | | Contract Year 4 | | | | | | | | Contract Year 5 | | | | | | | | Contract Year 6 | | | | | | | |
| Skill Level | Labor Category | Labor Hours | Overtime Hours | Labor Rate | Overtime Rate | Labor $ | Overtime $ | Est Hours | Est Cost | Labor Hours | Overtime Hours | Labor Rate | Overtime Rate | Labor $ | Overtime $ | Est Hours | Est Cost | Labor Hours | Overtime Hours | Labor Rate | Overtime Rate | Labor $ | Overtime $ | Est Hours | Est Cost | Labor Hours | Overtime Hours | Labor Rate | Overtime Rate | Labor $ | Overtime $ | Est Hours | Est Cost | Labor Hours | Overtime Hours | Labor Rate | Overtime Rate | Labor $ | Overtime $ | Est Hours | Est Cost | Labor Hours | Overtime Hours | Labor Rate | Overtime Rate | Labor $ | Overtime $ | Est Hours | Est Cost |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
| | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - | | | $ - | $ - | $ - | $ - | 0.00 | $ - |
This is the start of the file's text. The full file is on GovTribe.