SM-1A Price Schedule 10 Feb 2022.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- Decommissioning and Disposal (D&D) Activities for the SM-1A reactor Facility located at Fort Greely, AK
- Solicitation number
- W912DR22R0027
About this file
This document contains a price sheet and details of a federal contract opportunity for decommissioning and disposal activities at the SM-1A reactor facility in Fort Greely, Alaska. The U.S. Army Corps of Engineers, Baltimore District is seeking proposals for a hybrid firm-fixed-price, cost reimbursable, and cost-plus incentive fee contract to complete planning, permitting, engineering, site preparation, building and structure disposition, surveys, and project closeout activities over a 72 month period of performance. Offerors must be registered in the System for Award Management to be eligible for award. Proposals are due in accordance with instructions for electronic submission via the Department of Defense Safe Access File Exchange site by 11 March 2022.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-4 March 2022 Site Visit Attendance Sheets.pdf | ||
| W912DR22R0027 Solicitation Amendment 4 - 03.08.2022.pdf | ||
| W912DR22R0027 Solicitation Amendment 3 - 03.04.2022.pdf | ||
| Revised Pricing Sheet TASK Cost Summary 03 Mar 2022.xlsx | XLSX spreadsheet | |
| W912DR22R0027 Solicitation Amendment 2 - 02.25.2022.pdf | ||
| W912DR22R0027 Solicitation Amendment 1 - 02.17.2022.pdf | ||
| PPQ-0 Form.pdf | ||
| SM-1A Matrix.xlsx | XLSX spreadsheet | |
| SM-1A PWS Attachment (figures).pdf | ||
| Pricing Sheet Travel Detail and Summary.xlsx | XLSX spreadsheet | |
| Pricing Sheet - Labor Detail by Contract Yr.xlsx | XLSX spreadsheet | |
| SM-1A PWS Attachment (figures).rtf | RTF text file | |
| Pricing Sheet Material Detail.xlsx | XLSX spreadsheet | |
| SBPP Template Format.docx | DOCX document | |
| B.08.02 W912DR22R0027 Solicitation.pdf | ||
| Pricing Sheet Subcontract Detail.xlsx | XLSX spreadsheet | |
| Pricing Sheet Equip_ODC Detail.xlsx | XLSX spreadsheet | |
| Pricing Sheet TASK Cost Summary.xlsx | XLSX spreadsheet |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Sheet
| Base Tasks | Contract Type | Cost | Target Fee | Min Fee | Max Fee | Price* |
| 3.2 PLANS, PERMITTING, AND ENGINEERING (WE 1) | ||||||
| 3.2.1- 3.2.6 Plans, Permitting, and Engineering (Section 3.2) | FFP | $ - 0 | ||||
| 3.3 MOBILIZATION AND SITE PREPARATION (WE 2) | ||||||
| 3.3.1 - 3.3.6 Mobilization and site preparation | CPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3.4 BUILDING 607 (J-5) DISPOSITION (WE 3) | ||||||
| 3.4.1 - 3.4.2.3 Building 607 (J-5) Disposition | CPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3.5 BUILDING 606 DISPOSITION (WE4) | ||||||
| 3.5.1 ASBESTOS ABATEMENT | CPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3.5.2UNRESTRICED AREA AND M&E REMOVAL AND DISPOSAL | CPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3.5.3 PIPE PIT REMOVAL AND DISPOSAL | CPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3.5.4 CONDENSATE RETURN TANK PIT REMOVAL AND DECONTAMINATION | CPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3.5.5 SIX INCH CONCRETE FLOOR REMOVAL AND DISPOSAL | CPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3.5.6 FUEL STORAGE VAULT DEMOLITION AND DISPOSAL | CPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3.5.7 RESTRICTED AREA SITE PREPARATION | CPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3.5.8 REMOVAL OF M&E IN THE DEMINERALIZER ROOM | CPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3.7 DEMOBILIZATION (WE 6) | ||||||
| 3.7.1 INTERIM DEMOBILIZATION | CPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Sub Total for FFP and CPIF Line Items | $ - 0 |
| Option Tasks | Contract Type | Cost | Target Fee | Min Fee | Max Fee | Price* |
| 3.5 BUILDING 606 DISPOSITION (WE 4) | ||||||
| 3.5.9 SPENT FUEL PIT/STAIRWAY DEMOLITION | CPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3.5.10 VC ACCESS | CPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3.5.11 REMOVAL OF UPPER SHIELD TANKS | CPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3.5.12 REMOVAL OF GROUT AND M&E OUTSIDE OF THE LOWER SHIELD TANK | CPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3.5.13 Removal of the Lower Shield Tanks, Shield Rings, and RPV | CPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3.5.14 Building 606 North MARSAME Release Surveys | CPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3.5.15 Removal of Tanks and Debris from Waste Tanks Pit | CPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3.5.16 Pipeline Removal and Restoration | CPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3.5.17 ORISE Verification Survey | CPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3.5.18 Building 606 North Demolition | CPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3.5.19 Interior VC Demolition | CPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3.5.20 Exterior VC Demolition and Base Concrete/Soil Removal | CPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3.5.21 Site Restoration | CPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3.6 OTHER EXTERIOR REMOVAL AND FINAL STATUS SURVEY (FSS) ACTIONS (WE 5) | ||||||
| 3.6.1 REMOVE/ABANDON WELLS | CPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3.6.2 CONDUCT FSS IN OCCUPIED AREAS | CPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3.6.3 REMOVAL OF THE WASTE STORAGE AREA | CPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3.7 DEMOBILIZATION (WE 6) | ||||||
| 3.7.2 FINAL DEMOBILIZATION | CPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3.8 PROJECT CLOSURE REPORTING (WE 7) | FFP |
| Total Proposed Price (All FFP Tasks and CPIF Tasks) | $ - 0 |
| *Proposed Cost Plus Proposed Target Fee |