SM-1A Price Schedule 10 Feb 2022.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
Decommissioning and Disposal (D&D) Activities for the SM-1A reactor Facility located at Fort Greely, AK
Solicitation number
W912DR22R0027
Issued by

About this file

This document contains a price sheet and details of a federal contract opportunity for decommissioning and disposal activities at the SM-1A reactor facility in Fort Greely, Alaska. The U.S. Army Corps of Engineers, Baltimore District is seeking proposals for a hybrid firm-fixed-price, cost reimbursable, and cost-plus incentive fee contract to complete planning, permitting, engineering, site preparation, building and structure disposition, surveys, and project closeout activities over a 72 month period of performance. Offerors must be registered in the System for Award Management to be eligible for award. Proposals are due in accordance with instructions for electronic submission via the Department of Defense Safe Access File Exchange site by 11 March 2022.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Sheet

Base TasksContract TypeCostTarget FeeMin FeeMax FeePrice*
3.2 PLANS, PERMITTING, AND ENGINEERING (WE 1)
3.2.1- 3.2.6 Plans, Permitting, and Engineering (Section 3.2)FFP$ - 0
3.3 MOBILIZATION AND SITE PREPARATION (WE 2)
3.3.1 - 3.3.6 Mobilization and site preparationCPIF$ - 0$ - 0$ - 0$ - 0$ - 0
3.4 BUILDING 607 (J-5) DISPOSITION (WE 3)
3.4.1 - 3.4.2.3 Building 607 (J-5) DispositionCPIF$ - 0$ - 0$ - 0$ - 0$ - 0
3.5 BUILDING 606 DISPOSITION (WE4)
3.5.1 ASBESTOS ABATEMENTCPIF$ - 0$ - 0$ - 0$ - 0$ - 0
3.5.2UNRESTRICED AREA AND M&E REMOVAL AND DISPOSALCPIF$ - 0$ - 0$ - 0$ - 0$ - 0
3.5.3 PIPE PIT REMOVAL AND DISPOSALCPIF$ - 0$ - 0$ - 0$ - 0$ - 0
3.5.4 CONDENSATE RETURN TANK PIT REMOVAL AND DECONTAMINATIONCPIF$ - 0$ - 0$ - 0$ - 0$ - 0
3.5.5 SIX INCH CONCRETE FLOOR REMOVAL AND DISPOSALCPIF$ - 0$ - 0$ - 0$ - 0$ - 0
3.5.6 FUEL STORAGE VAULT DEMOLITION AND DISPOSALCPIF$ - 0$ - 0$ - 0$ - 0$ - 0
3.5.7 RESTRICTED AREA SITE PREPARATIONCPIF$ - 0$ - 0$ - 0$ - 0$ - 0
3.5.8 REMOVAL OF M&E IN THE DEMINERALIZER ROOMCPIF$ - 0$ - 0$ - 0$ - 0$ - 0
3.7 DEMOBILIZATION (WE 6)
3.7.1 INTERIM DEMOBILIZATIONCPIF$ - 0$ - 0$ - 0$ - 0$ - 0
Sub Total for FFP and CPIF Line Items$ - 0
Option TasksContract TypeCostTarget FeeMin FeeMax FeePrice*
3.5 BUILDING 606 DISPOSITION (WE 4)
3.5.9 SPENT FUEL PIT/STAIRWAY DEMOLITIONCPIF$ - 0$ - 0$ - 0$ - 0$ - 0
3.5.10 VC ACCESSCPIF$ - 0$ - 0$ - 0$ - 0$ - 0
3.5.11 REMOVAL OF UPPER SHIELD TANKSCPIF$ - 0$ - 0$ - 0$ - 0$ - 0
3.5.12 REMOVAL OF GROUT AND M&E OUTSIDE OF THE LOWER SHIELD TANKCPIF$ - 0$ - 0$ - 0$ - 0$ - 0
3.5.13 Removal of the Lower Shield Tanks, Shield Rings, and RPVCPIF$ - 0$ - 0$ - 0$ - 0$ - 0
3.5.14 Building 606 North MARSAME Release SurveysCPIF$ - 0$ - 0$ - 0$ - 0$ - 0
3.5.15 Removal of Tanks and Debris from Waste Tanks PitCPIF$ - 0$ - 0$ - 0$ - 0$ - 0
3.5.16 Pipeline Removal and RestorationCPIF$ - 0$ - 0$ - 0$ - 0$ - 0
3.5.17 ORISE Verification SurveyCPIF$ - 0$ - 0$ - 0$ - 0$ - 0
3.5.18 Building 606 North DemolitionCPIF$ - 0$ - 0$ - 0$ - 0$ - 0
3.5.19 Interior VC DemolitionCPIF$ - 0$ - 0$ - 0$ - 0$ - 0
3.5.20 Exterior VC Demolition and Base Concrete/Soil RemovalCPIF$ - 0$ - 0$ - 0$ - 0$ - 0
3.5.21 Site RestorationCPIF$ - 0$ - 0$ - 0$ - 0$ - 0
3.6 OTHER EXTERIOR REMOVAL AND FINAL STATUS SURVEY (FSS) ACTIONS (WE 5)
3.6.1 REMOVE/ABANDON WELLSCPIF$ - 0$ - 0$ - 0$ - 0$ - 0
3.6.2 CONDUCT FSS IN OCCUPIED AREASCPIF$ - 0$ - 0$ - 0$ - 0$ - 0
3.6.3 REMOVAL OF THE WASTE STORAGE AREACPIF$ - 0$ - 0$ - 0$ - 0$ - 0
3.7 DEMOBILIZATION (WE 6)
3.7.2 FINAL DEMOBILIZATIONCPIF$ - 0$ - 0$ - 0$ - 0$ - 0
3.8 PROJECT CLOSURE REPORTING (WE 7)FFP
Total Proposed Price (All FFP Tasks and CPIF Tasks)$ - 0
*Proposed Cost Plus Proposed Target Fee

File details come from the government source that posted it. Updated .