Abstract of Bids W912DR21B0008 Dalecarlia Backwach Tanks Improvements.pdf

PDF 163 KB Posted

Attached to
Dalecarlia Backwash Water Tanks Improvements
Solicitation number
W912DR21B0008
Issued by

About this file

This abstract of bids document summarizes offers received in response to solicitation number W912DR21B0008 issued by the U.S. Army Corps of Engineers Baltimore District. The solicitation sought bids for improvements to the Dalecarlia Backwash Water Tanks at the Dalecarlia Water Treatment Plant operated by the Washington Aqueduct. Specific work requirements included upgrades to the elevated and underground backwash water storage tanks, miscellaneous valve replacements, the backwash recovery pump station, altitude valve modifications, and electrical work in the chlorine building. The government estimate for the work ranged from $3.96 million to $5.87 million. Two responsive bids were received by the July 7th deadline from Maverick Construction for $4.14 million and CPP Construction for $3.96 million.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4. ISSUING OFFICE Name and title of Certifying Official (Type) I CERTIFY that I have opened, read, and Sharon L. Alexander, Contracting Officer

USACE, BALTIMORE DISTRICT recorded on this abstract all offers Signature Date Signed 7 July 2021 2 HOPKINS PLAZA received in response to this solicitation.

BALTIMORE, MD 21201 Contracting Officer: SHARON L.ALEXANDER

5. PROJECT TITLE

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F.)

A. HIRED LABOR

B. REASONABLE CONTRACT B. Bid Security (Type and Amount) B. Bid Security (Type and Amount) (Without Profit)

X C. REASONABLE CONTRACT C. Amendment Acknowledged C. Amendment Acknowledged (Including Profit)

7A. 7B. 7C. D. E. F. E. F. E. F.

ITEM DESCRIPTION OF OFFERED ITEM EST. UNIT UNIT ESTIMATED UNIT ESTIMATED UNIT ESTIMATED

No. QUANTITY PRICE AMOUNT IGE PRICE AMOUNT PRICE AMOUNT 0001 All costs associated with Elevated Backwash Tank #2 1 Job LS $968,634.00 LS $1,100,000.00 LS $650,000.00 0002 All costs associated with Miscellaneous Valve Replacement 1 Job LS $80,991.71 LS $250,000.00 LS $600,000.00 0003 All costs associated with Underground Backwash Tank #1 1 Job LS $305,922.87 LS $650,000.00 LS $600,000.00 0004 All costs associated with Backwash Recovery Pump Station 1 Job LS $2,085,944.02 LS $2,980,000.00 LS $400,000.00 0005 All costs associated with Altitude Valve Modifications 1 Job LS $102,826.38 LS $395,000.00 LS $100,000.00 0006 All costs associated with Chlorine Building Electrical Room 1 Job LS $593,833.92 LS $497,000.00 LS $1,614,000.00

TOTAL ESTIMATED BASE BID AMOUNT $4,138,152.90 $5,872,000.00 $3,964,000.00

TOTAL ESTIMATED AMOUNT (BASE BID ITEMS) 4,138,152.90$ 5,872,000.00$ 3,964,000.00$

NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-1 OPTIONAL FORM 1419 (11-88)

Yes

No. 2

Maverick Construction 401 Greenwood Creek Lane

Grasonville, MD 21638

Bid Bond 20%

CPP Construction Company Inc.

362B Christopher Avenue Gaithersburg, VA 20879

ABSTRACT OF OFFERS - CONSTRUCTION 2. DATE ISSUED1. SOLICITATION NUMBER

6. NUMBER OF AMENDMENTS ISSUED: 6 (SIX)

Yes

Bid Bond 20%

07-Jul-21W912DR-21-B-0008

Dalecarlia Backwash Water Tanks Improvements Washington, D.C.

No. 1

9. OFFERS

3. DATE OPENED

07-Jul-21

2021-07-07T12:12:32-0400
ALEXANDER.SHARON.LAGENIECE.1229366145