Attachment 3 - Revised Section 03 35 00.00 10
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MCMILLAN NORTH CLEARWELL MAINTENANCE AND IMPROVEMENTS
SECTION 03 35 00.00 10
CONCRETE FINISHING
05/14
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONCRETE INSTITUTE INTERNATIONAL (ACI)
ACI 305R (2010) Guide to Hot Weather Concreting
ASTM INTERNATIONAL (ASTM)
ASTM C881/C881M (2014) Standard Specification for Epoxy-Resin-Base Bonding Systems for Concrete
NSF INTERNATIONAL (NSF)
NSF/ANSI 61 (2015) Drinking Water System Components - Health Effects
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Epoxy Resin
1.3 QUALITY ASSURANCE
1.3.1 Field Test Panels
Construct field test panels prior to beginning of work using the materials and procedures proposed for use on the job, to demonstrate the results to be attained. The quality and appearance of each panel is subject to the approval of the Contracting Officer, and, if not judged satisfactory, construct additional panels until approval is attained. Formed or finished surfaces in the completed structure must match the quality and appearance of the approved field example.
1.3.1.1 Slab Panels
Construct a slab panel at least 4 feet by 5 feet and 4 inches thick to demonstrate exposed aggregate slab finish. Contractor shall coordinate with waterproof membrane manufacturer and installer on top of new elevated slab
SECTION 03 35 00.00 10 Page 1 to confirm floated finish is acceptable.
PART 2 PRODUCTS
2.1 EPOXY RESIN
Epoxy resin for use in repairs shall conform to ASTM C881/C881M, Type III, Grade I or II. Submit samples as required.
2.2 SEALANT
Sealant shall comply with NSF/ANSI 61, be low odor, and FDA acceptable for use in the waterproofing of the South Clearwell Effluent Meter Vault. The sealant shall be used as a wall coating within the meter vault and shall be a high build flexible epoxy coating system conforming to the following properties:
PHYSICAL PROPERTIES
Adhesion, elcometer 900 psi ASTM D7234
Tensile Strength 1409 psi ASTM D2370
Flexural Strength 4819 psi ASTM D790
Hardness, Shore D 75-85 ASTM D2240
All other sealants for the project shall be as specified in Section
07 92 00 JOINT SEALANTS.
PART 3 EXECUTION
3.1 FINISHING FORMED SURFACES
Forms, form materials, and form construction are specified in Section 03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING. Finish formed surfaces as specified herein. Unless another type of architectural or special finish is specified, leave surfaces with the texture imparted by the forms except that defective surfaces must be repaired.
3.1.1 Class D Finish
Class D finish is required. Fins, ravelings, and loose material shall be removed, and, except as otherwise indicated or as specified in Section 03 11 13.00 10 STRUCTURAL CONCRETE FORMWORK, holes left by removal of form ties shall be reamed and filled. Honeycomb and other defects more than 1/2 inch deep or more than 2 inches in diameter shall be repaired. Defects more than 2 inches in diameter shall be cut back to sound concrete, but in all cases at least 1 inch deep.
3.1.2 Sealant Application
Over primed surfaces, provide a uniform, wet, monolithic coating of fluid-applied membrane, 60 mils thick, plus or minus 5 mils, or 20-30 mils thick for the interior waterproofing of the South Clearwell Effluent Meter Vault by following manufacturer's printed instructions. Apply material by trowel, squeegee, roller, brush, spray apparatus, or other method recommended by membrane manufacturer. Measure wet film thickness every 100
SECTION 03 35 00.00 10 Page 2 square feetduring application by placing flat metal plates on the substrate or using a mil-thickness gage especially manufactured for the purpose.
Adjust application rate as necessary to provide a uniform coating of the thickness specified. Where possible, mark off surface to be coated in equal units to facilitate proper coverage. At expansion joints, control joints, prepared cracks, flashing, and terminations, carry membrane over preformed elastomeric sheet in a uniform 60 mil thick, plus or minus 5 mils, wet thickness to provide a monolithic coating. If membrane cures before next application, wipe previously applied membrane with a solvent to remove dirt and dust that could inhibit adhesion of overlapping membrane coat. Use solvent recommended by the membrane manufacturer, as approved.
3.2 REPAIRS
3.2.1 Damp-Pack Mortar Repair
Form tie holes requiring repair and other defects, whose depth is at least as great as their surface diameter but not over 4 inches, shall be repaired by the damp-pack mortar method. Form tie holes shall be reamed and other similar defects shall be cut out to sound concrete. The void shall then be thoroughly cleaned, thoroughly wetted, brush-coated with a thin coat of neat cement grout and filled with mortar. Mortar shall be a stiff mix of 1 part portland cement to 2 parts fine aggregate passing the No. 16 mesh sieve, and minimum amount of water. Use only sufficient water to produce a mortar which, when used, will stick together on being molded into a ball by a slight pressure of the hands and will not exude water but will leave the hands damp. Mortar shall be mixed and allowed to stand for 30 to 45 minutes before use with remixing performed immediately prior to use. Mortar shall be thoroughly tamped in place in thin layers using a hammer and hardwood block. Holes passing entirely through walls shall be completely filled from the inside face by forcing mortar through to the outside face. All holes shall be packed full. Damp-pack repairs shall be moist cured for at least 48 hours.
3.3 FORMED SURFACE REPAIR
After removal of forms, all ridges, lips, and bulges on surfaces permanently exposed shall be removed. All repairs shall be completed within 48 hours after form removal.
3.3.1 Class D Finish
Surfaces listed in Section 03 11 13.00 10 STRUCTURAL CONCRETE FORMWORK and as shown to have class D finish shall have surface defects repaired as follows: defective areas, voids, and honeycombs greater than 48 square inches in area or more than 2 inches deep shall be defined by 1/2 inch deep dovetailed saw cuts in a rectangular pattern, the defective concrete removed by chipping and the void repaired with replacement concrete. The prepared area shall be brush-coated with an epoxy resin meeting the requirements of paragraph EPOXY RESIN in PART 2.
3.3.2 Material and Procedure for Repairs
The cement used in the dry-packed mortar or replacement concrete shall be a blend of the cement used for production of project concrete and white portland cement properly proportioned so that the final color of the mortar or concrete will match adjacent concrete. Trial batches shall be used to determine the proportions required to match colors. Dry-packed mortar shall consist of one part cement to two and one-half parts fine aggregate. The
SECTION 03 35 00.00 10 Page 3 fine aggregate shall be that used for production of project concrete. The mortar shall be remixed over a period of at least 30 minutes without addition of water until it obtains the stiffest consistency that will permit placing. Mortar shall be thoroughly compacted into the prepared void by tamping, rodding, ramming, etc. and struck off to match adjacent concrete. Replacement concrete shall be produced using project materials and shall be proportioned by the Contracting Officer. It shall be thoroughly compacted into the prepared void by internal vibration, tamping, rodding, ramming, etc. and shall be struck off and finished to match adjacent concrete. Forms shall be used to confine the concrete. If an expanding agent is used in the repair concrete, the repair shall be thoroughly confined on all sides including the top surface. Metal tools shall not be used to finish permanently exposed surfaces. The repaired areas shall be cured for 7 days. The temperature of the in situ concrete, adjacent air, and replacement mortar or concrete shall be above 40 degrees F during placement, finishing, and curing. Other methods and materials for repair may be used only when approved in writing by the Contracting Officer. Repairs of the so called "plaster-type" will not be permitted.
3.4 FINISHING UNFORMED SURFACES
The finish of all unformed surfaces must meet the requirements of paragraph TOLERANCES in Section 03 30 00.00 10 CAST-IN-PLACE CONCRETE , when tested as specified herein.
3.4.1 General
The ambient temperature of spaces adjacent to unformed surfaces being finished and of the base on which concrete will be placed must not be less than 50 degrees F. In hot weather meet all requirements of Section 03 30 00.00 10 CAST-IN-PLACE CONCRETE paragraphs HOT WEATHER REQUIREMENTS and PREVENTION OF PLASTIC SHRINKAGE CRACKING. In hot weather when the rate of evaporation of surface moisture, as determined by use of Figure 2.1.5 of ACI 305R, may reasonably be expected to exceed 0.2 pounds per square foot per hour. Make provisions for windbreaks, shading, fog spraying, or wet covering with a light-colored material in advance of placement, and take such protective measures as quickly as finishing operations will allow.
Float finish unformed surfaces that are not to be covered by additional concrete or backfill, with additional finishing as specified below, and true to the elevation indicated. Bring surfaces to receive additional concrete or backfill to the elevation indicated, properly consolidate, and leave true and regular. Unless otherwise indicated, evenly slope exterior surfaces for drainage. Where drains are provided, evenly slope interior floors to the drains. Carfully make joints with a jointing or edging tool.
Protect the finished surfaces from stains or abrasions. Grate tampers or "jitterbugs" cannot be used for any surfaces. The dusting of surfaces with dry cement or other materials or the addition of any water during finishing is not be permitted. If bleedwater is present prior to finishing, carefully drag off the excess water or remove by absorption with porous materials such as burlap. During finishing operations, take extreme care to prevent over finishing or working water into the surface; this can cause "crazing" (surface shrinkage cracks which appear after hardening) of the surface.
Remove and replace any slabs with surfaces which exhibit significant crazing. During finishing operations, check surfaces with a 10 foot straightedge, applied in both directions at regular intervals while the concrete is still plastic, to detect high or low areas.
SECTION 03 35 00.00 10 Page 4
3.4.2 Float Finish
Slabs to receive more than a rough slab finish shall next be given a wood float finish. The following areas -- new elevated slab shall be given only a float finish. The screeding shall be followed immediately by darbying or bull floating before bleeding water is present, to bring the surface to a true, even plane. No water, cement, or mortar shall be added to the surface during the finishing operation. Then, after the concrete has stiffened so that it will withstand a man's weight without imprint of more than 1/4 inch and the water sheen has disappeared, it shall be floated to a true and even plane free of ridges. Perform floating by use of suitable hand floats or power driven equipment. Use sufficient pressure on the floats to bring a film of moisture to the surface. Hand floats shall be made of wood, magnesium, or aluminum. Concrete that exhibits stickiness shall be floated with a magnesium float. Care shall be taken to prevent over-finishing or incorporating water into the surface.
3.5 EXTERIOR SLAB AND RELATED ITEMS
3.5.1 Sidewalks
Apply a lightly broomed finish.
3.5.2 Curbs and Gutters
Finish exposed surfaces using a stiff bristled brush.
-- End of Section --
SECTION 03 35 00.00 10 Page 5
| 03 35 00.00 10 - CONCRETE FINISHING |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 QUALITY ASSURANCE |
| 1.3.1 Field Test Panels |
| 1.3.1.1 Slab Panels |
| PART 2 PRODUCTS |
| 2.1 EPOXY RESIN |
| 2.2 SEALANT |
| PART 3 EXECUTION |
| 3.1 FINISHING FORMED SURFACES |
| 3.1.1 Class D Finish |
| 3.1.2 Sealant Application |
| 3.2 REPAIRS |
| 3.2.1 Damp-Pack Mortar Repair |
| 3.3 FORMED SURFACE REPAIR |
| 3.3.1 Class D Finish |
| 3.3.2 Material and Procedure for Repairs |
| 3.4 FINISHING UNFORMED SURFACES |
| 3.4.1 General |
| 3.4.2 Float Finish |
| 3.5 EXTERIOR SLAB AND RELATED ITEMS |
| 3.5.1 Sidewalks |
| 3.5.2 Curbs and Gutters |