SFAAP Munition and Explosives of Concern (MEC) Removal and Environmental Remediation, DeSoto, Kansas - W912DQ19R3008
Solicitation number
W912DQ19R3008
Issued by

About this file

SF 1442 - Solicitation

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DAVID F MILLER 816-389-3947

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

03-Jun-2019

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________1825 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________4 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________03 Jul 2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______365 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

USACE, KANSAS CITY +

FEDERAL BLDG CT-H 601 E 12TH ST RM 647

KANSAS CITY MO 64106-2896

W912DQ

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

816-389-2030FAX:TEL: 816-389-3812 TEL: FAX:

W912DQ19R3008 124

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued)

(Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912DQ19R3008

Section 00 10 00 - Solicitation

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Job General Requirements - Years 1 and 2

CPFF

This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the general requirements for years 1 and 2, as required in the associated Statement of Work. The period of performance is 2 years from the award date.

FOB: Destination

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

0002 Job Contractor Manpower Reporting

CPFF

This line item is used for the pricing of the collection and reporting of Contractor

Manpower Reporting data as described in the Statement of Work. If the contractor does not separately price this item, it shall enter zero (0).

0003 Job OPTION General Requirements - Year 3

CPFF

This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the general requirements for year 3, as required in the associated Statement of Work.

0004 Job OPTION Contractor Manpower Reporting - Year 3

CPFF

This line item is used for the pricing of the collection and reporting of Contractor

Manpower Reporting data as described in the Statement of Work. If the

0005 Job OPTION General Requirements - Year 4

CPFF

This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the general requirements for year 4, as required in the

0006 Job OPTION Contractor Manpower Reporting - Year 4

CPFF

This line item is used for the pricing of the collection and reporting of Contractor

Manpower Reporting data as described in the Statement of Work. If the

0007 Job OPTION General Requirements - Year 5

CPFF

This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the general requirements for year 5, as required in the

0008 Job OPTION Contractor Manpower Reporting - Year 5

CPFF

This line item is used for the pricing of the collection and reporting of Contractor

Manpower Reporting data as described in the Statement of Work. If the

0009 Job

SWMU-24

CPFF

This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the Removal of Foundations and Inside Sewers (including

Temp Burn Pads at SWMU-24), Removal of Environmental Soils, Removal of

Outside Sewer/Production Lines, Environmental Sampling & Analysis, Transportation and Offsite Disposal of Contaminated Soils, and Reporting at

SWMU-24 (5 Corners Paste Mix, G LINE Pre-Mix and NG Production Areas), as required by the associated Statement of Work.

0010 Job OPTION AOC 17 (NQ Production Lines)

CPFF

This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the Removal of Foundations and Inside Sewers (including

Temp Burn Pads at AOC 17), Removal of Environmental Soils, Removal of

Outside Sewer/Production Lines, Explosive Decontamination, Environmental

Sampling & Analysis, Transportation and Offsite Disposal of Contaminated

Soils, and Reporting for AOC 17 (NQ Production Area), as required by the

0011 Job OPTION SWMU-67 (South Acid Area)

CPFF

This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the Removal of Foundations and Inside Sewers (including

Temp Burn Pads at SWMU-67), Removal of Environmental Soils, Removal of

Outside Sewer/Production Lines, Explosive Decontamination, Environmental

Sampling & Analysis, Transportation and Offsite Disposal of Contaminated

Soils, and Reporting for SWMU-67 (South Acid area), as required by the

0012 Job OPTION SWMU-46 and SWMU-65

CPFF

This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the Removal of Foundations, Removal of Environmental Soils, Explosive Decontamination, Environmental Sampling & Analysis, Transportation and Offsite Disposal of Contaminated Soils, and Reporting for

SWMU-46 and SWMU-65. Costs for CLIN shall be tracked separately for

SWMU-46 and SWMU-65.

0013 Job OPTION AOC 12 (Paste Air Dry Facilities)

CPFF

This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the Removal of Foundations, Removal of Environmental Soils, Environmental Sampling & Analysis, Transportation and Offsite Disposal of

Contaminated Soils, and Reporting for AOC 12, as required by the associated

Statement of Work.

0014 Job SWMU-31 and SWMU-43

CPFF

This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the Removal of Foundations, Removal of Environmental Soils, Environmental Sampling & Analysis, Transportation and Offsite Disposal of

Contaminated Soils, and Reporting for SWMU-31 and SWMU-43, as required by the associated Statement of Work. Costs for CLIN shall be tracked separately for SWMU-31 and SWMU-43. The period of performance is 2 years from the award date.

0015 Job OPTION AOC 16 (NC Production Lines)

CPFF

This line item includes associated costs (direct, indirect, overhead, and fee) in order to complete the Removal of Temp Burn Pad Foundations, remaining Wet

NC Accounts, and associated Inside Sewers, Removal of Environmental Soils, Transportation and Offsite Disposal of Contaminated Soil, and Environmental

Sampling and Analysis at AOC 16 as required by the associated Statement of

Work. Temp Burn Pad & Wet NC Foundation Accounts are listed in Table 2.

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 29-SEP-2021 1 USACE, KANSAS CITY +

KATHY BAKER

PM-E RM 463 601 E 12TH FEDERAL BLDG.

KANSAS CITY MO 64106-2896

816-389-3906

W916TX

0002 29-SEP-2021 1 (SAME AS PREVIOUS LOCATION)

0003 29-SEP-2022 1 (SAME AS PREVIOUS LOCATION)

0004 29-SEP-2022 1 (SAME AS PREVIOUS LOCATION)

0005 29-SEP-2023 1 (SAME AS PREVIOUS LOCATION)

0006 29-SEP-2023 1 (SAME AS PREVIOUS LOCATION)

0007 29-SEP-2024 1 (SAME AS PREVIOUS LOCATION)

0008 29-SEP-2024 1 (SAME AS PREVIOUS LOCATION)

0009 29-SEP-2021 1 (SAME AS PREVIOUS LOCATION)

0010 29-SEP-2024 1 (SAME AS PREVIOUS LOCATION)

0011 29-SEP-2024 1 (SAME AS PREVIOUS LOCATION)

0012 29-SEP-2024 1 (SAME AS PREVIOUS LOCATION)

0013 29-SEP-2024 1 (SAME AS PREVIOUS LOCATION)

0014 29-SEP-2021 1 (SAME AS PREVIOUS LOCATION)

0015 29-SEP-2024 1 (SAME AS PREVIOUS LOCATION)

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit 1 Table 1 (Cross-walk) 1 15-FEB-2019

Exhibit 2 Table 2 (TBPs&Wet NC) 1 03-APR-2019

Attachment 1 Site Figures 5 22-MAR-2016

Attachment 2 ESS 59 06-FEB-2012

Attachment 3 Exemption from Open

Burning Prohibition

2 02-JAN-2019

Attachment 4 Sewer Line Details 51 15-MAR-2016

Attachment 5 SOP - DEM 7 15-FEB-2007

Attachment 6 Schedule Spec 6 15-MAR-2016

Attachment 7 RMS Spec 6 15-MAR-2016

Attachment 8 WAD Summary Page 1 03-APR-2019

Attachment 9 Wet NC Accounts Info 36 03-APR-2019

Attachment 10 MEC Completion Report Examples 4 03-APR-2019

Attachment 11 SMWU 24 Rind Soils Reports 2597 NOV-2017

Attachment 12 AOC 17 Accts 9040-9043 (Biased Sample Locs.) 4 APR-2019

Attachment 13 Explosive Project Action Limits (SW-846 8330) 2 APR-2019

Section 00 21 00 - Instructions

PROPOSAL SUBMISSION

1.0 GENERAL PROPOSAL INFORMATION

The proposal should be practical, legible, clear and coherent. Offerors are discouraged from providing information not required by the Solicitation.

2.0 GENERAL PROPOSAL SUBMISSION INSTRUCTIONS

All offerors shall be required to submit a proposal with the minimum content as specified herein. Proposals without the minimum content may be rejected. Proposals will be received until the date and time indicated on Standard

Form 1442 at the following address:

U.S. Army Engineer District, Kansas City

Federal Building Room 647

ATTN: CECT-NWK-M/David Miller

601 East 12th Street

Kansas City, Missouri 64106-2896

3.0 PROPOSAL FORMAT AND SUBMITTAL REQUIREMENTS

1. In order to be considered for award of a contract for the requirements of this solicitation, the offeror must submit a proposal with its offer. Failure to submit a complete proposal may result in the entire offer being rejected.

The proposals shall be submitted in Volumes as follows. Submit the proposal in tabbed, three-ring binders identified by the Solicitation Number, project title, name, address, and telephone number of the offeror.

Arrange tabs as follows:

Volume 1, Technical Proposal:

FACTOR 1 Company Experience

FACTOR 2 Past Performance

Volume 2: Cost Proposal

FACTOR 3 Cost Proposal

2. Proposal Characteristics

a) Each Volume shall contain a table of contents and all pages of each factor shall be sequentially numbered. All text must be legible and easily read. Submit the SF 1442, completed and signed by a person authorized by the offeror, in Volume 2. Offerors shall limit Volume 1, Technical Proposal, Factor 1, Company Experience, to a maximum of 10 pages (2 pages for each project), utilizing the form provided below. Pages in excess of 10 will not be evaluated. Factor 2 – Past

Performance will not be counted towards this page limitation. All text shall be a minimum of size

10 font and 1 inch margins should be used.

b) Volumes shall be submitted in both hard copy and electronic copy in the following quantities:

Volume 1 – Technical Proposal - Original & 4 copies. Electronic copies shall be submitted in PDF format.

Volume 2 – Cost Proposal - Original & 1 copy. Electronic copies shall be submitted in Excel and

PDF format.

Electronic copies should be identical in content to the printed original copy and be searchable or

Optical Character Recognition (OCR) formatted. OCR is a common method of digitizing printed texts so that they can be electronically searched, stored more compactly, displayed on-line, and used in machine processes such as machine translation, text-to-speech, key data extraction and text mining.

c) Each Volume of the proposal shall be identified by the Solicitation Number (W912DQ19R3008), project title (Former Sunflower Army Ammunition Plant – Explosive Decontamination and Removal of Outside Sewer Lines, DeSoto, Kansas), name, address, and telephone number of the offeror, and the following on the volume in bold letters:

VOLUME 1: TECHNICAL PROPOSAL

VOLUME 2: COST PROPOSAL

d) The Technical proposal shall not refer the reviewer to information contained in the Cost proposal.

e) Additional Information to be provided in Volume 1.

Tab 1 - For joint ventures, the information required by paragraph "Joint Ventures"

(if applicable).

Tab 2 - Subcontractor letters of commitment as required by paragraph

“Subcontractors” (if applicable).

Tab 3 - All offerors shall complete the resume template provided below for the proposed Senior UXO Supervisor. The resume shall not exceed 2 pages in length.

f) Additional Information to be provided in Volume 2.

Tab 1 - Adequate Accounting System, the information required by paragraph 12 below.

Tab 2 - Earned Value Management System, the information required by paragraph

12 below.

Tab 3 - Pro Forma Requirements. The following information should be submitted with Volume 2 and labled “Pro Forma Requirements”. This information consists of the following:

i. Offeror will submit a cover letter containing:

a. Solicitation number

b. Name, address, email, and telephone and fax numbers of the offeror

c. Names, title, email, and telephone and fax numbers of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this RFP.

d. Name, title and signature of the person authorized to sign the proposal

e. A statement specifying agreement with all terms, conditions and provisions included in the Solicitation

f. CAGE Codes for the offeror, and all teaming partners who participated in the Factor 1 – Company Experience projects.

ii. The Offer (the SF1442) duly executed with an original signature by an official authorized to bind the company. Include the offeror’s DUNS number in block

14.

iii. Acknowledgement of all amendments to the Solicitation in accordance with the instructions on the Standard Form 30 (amendment form).

iv. The completed Section 00 45 00 of the RFP (Representations and

Certifications), Printed Entity Record from System for Award Management

(SAM).

4.0 INQUIRIES/QUESTIONS

Technical inquiries and questions relating to this solicitation shall be submitted via Bidder Inquiry in ProjNet at

(https://www.projnet.org). To submit and review inquiry items, prospective offerors will need to use the Bidder

Inquiry Key presented below and follow the instructions listed below the key for access. A prospective offeror who submits a comment /question will receive an acknowledgement of their comment/question via email. Another email to the same address will notify the prospective offeror once the reply is available for viewing.

***Please Note: Offerors shall only submit one question per inquiry. All inquiries containing multiple questions shall be rejected.

The Solicitation Number is: W912DQ-19-R-3008

The Bidder Inquiry Key is: UF4WYM-7R77E9

Instructions for first-time ProjNet Bid Inquiry Access:

1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

2. Identify the Agency. Select agency USACE.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Email. Enter the email address you would like to use for communication.

5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Instructions for future ProjNet Bid Inquiry Access:

1. For future access to ProjNet, you will not be provided any type of password. You will utilize your Secret

Question and Secret Answer to log in.

2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

3. Identify the Agency. Select agency USACE.

4. Key. Enter the Bidder Inquiry Key listed above.

5. Email. Enter the email address you used to register previously in ProjNet.

6. Click Continue. A page will then open asking you to enter the answer to your Secret Question.

7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

The Bidder Inquiry System will be unavailable for new inquiries at 4:00 pm, local Kansas City time on

June 17, 2019 in order to ensure adequate time is allotted to form an appropriate response to inquiries and amend the solicitation if necessary.

Offerors are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

The ProjNet call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago) or by appointment for OCONUS. The telephone number for the Call Center is 1-800-428-HELP. Email to staff@rcesupport.com.

5.0 JOINT VENTURES

https://www.projnet.org/ mailto:staff@rcesupport.com

Joint Ventures shall submit the following additional documentation regarding their business entities:

1) A certified copy of their Joint Venture agreement.

2) A detailed statement outlining the following in terms of percentages, where appropriate.

a. The relationship of the joint venture parties in terms of business ownership, capital contribution, and profit distribution or loss sharing.

b. The management approach of the joint venture in terms of who will conduct, direct, supervise and control the project and have custody and control of the assets of the Joint Venture and perform the duties necessary to complete the work.

c. The structure of the joint venture and decision-making responsibilities of the Joint Venture parties in terms of who will control the manner and method of performance of the work.

d. Identification of the key personnel having authority to legally bind the Joint Venture to subcontracts and state who will provide or contract for the labor and materials for the Joint Venture.

e. Identification of party maintaining the Joint Venture bank accounts for the payment of all expenses and the deposits of all receipts, keep the books and records, and pay applicable taxes for the Joint

Venture.

f. Identification of party furnishing the facilities, such as office supplies and telephone service.

g. Identification of party having overall control of the Joint Venture.

Other sections of the proposal shall identify, where appropriate, whether key personnel are employees of the individual Joint Venture parties and identify the party, or hired as employees of the Joint Venture.

The Joint Venture parties’ experience and/or past experience will be included as the experience and/or past experience of the Joint Venture.

6.0 SUBCONTRACTORS

If an offeror wishes to receive credit for the experience or past performance of a subcontractor, the offeror must submit a letter of commitment to use the proposed subcontractor on the project, signed both by the subcontractor and the offeror. The commitment letter must be submitted even if the subcontractor is in some way affiliated with the offeror (for example, the subcontractor is a subsidiary of a joint venture partner, or a subsidiary of a firm to which the joint venture partner is also a subsidiary). Include the subcontractor letters of commitment in Volume 1, Factor

1, Company Experience. Subcontractor letters of commitment will not be counted towards the page limit for that

Factor.

SAMPLE LETTER OF COMMITMENT to USE SUBCONTRACTOR

[COMPANY LETTERHEAD]

TO: Contracting Officer, Kansas City District, United States Army Corps of Engineers

SUBJECT: Letter of Commitment for Proposed Contract for [insert project name]

Dear Sir or Madam:

[Insert name of offeror] and [insert name of subcontractor] hereby make the unequivocal commitment that, in the event that the company receives award of the Contract for [insert project name], [insert name of subcontractor] will perform the following work required by the Contract.

[Insert list of tasks to be performed by the subcontractor]

Sincerely, [Authorized Official]

[Legal Name of Offeror]

Date: __________

[Subcontractor]

[Legal Name of Subcontractor]

Date: ______

7.0 BASIS FOR AWARD

The award will be made based on the best value proposal that is determined to be the most beneficial to the

Government, with appropriate consideration given to the three (3) evaluation factors: Company Experience, Past

Performance, and Cost. All technical factors are listed in descending order of importance with Factor 1- Company

Experience being the most important. Offerors will be cautioned that the award may not necessarily be made to the lowest cost offered. NOTE: ALL EVALUATION FACTORS, OTHER THAN COST, WHEN COMBINED, ARE

SIGNIFICANTLY MORE IMPORTANT THAN COST.

8.0 SOURCE SELECTION PROCESS

All proposals received in response to this solicitation will be evaluated in accordance with informal source selection procedures. The principal objective of this process is to select a responsible offeror who submits the offer that is the

Best Value to the Government, utilizing the tradeoff process. The process is designed to ensure the impartial, equitable, and comprehensive evaluation of all proposals received in response to this solicitation.

(a) Source Selection Organization

The source selection organization is established as a separate organization and management chain of command whose only purpose is to accomplish the objective above. The organization consists of a Source

Selection Authority (SSA) and a Source Selection Evaluation Board (SSEB). The SSEB is comprised of separate Technical Evaluation and Cost Evaluation teams. The organization is designed to ensure active ongoing involvement of appropriate contracting, technical, logistics, legal, cost analysis, small business, and other functional staff management expertise.

(b) Source Selection Procedure

The source selection procedures will begin with an initial review of proposals and continue with a technical and cost evaluation conducted by the SSEB. The SSEB shall evaluate the proposals based solely on the evaluation factors identified above. The proposals received in response to this solicitation will be evaluated individually to select the most advantageous proposal. The Government reserves the right to consider and evaluate information regarding past performance from sources outside the proposal. The results of the

SSEB evaluations will be presented to the SSA, who will make the final source selection decision or determine whether it is appropriate to engage in clarifications or communications prior to the establishment of a competitive range, or to establish a competitive range and conduct discussions with those offerors that are included in the competitive range. All communications leading to establishment of the competitive range will be conducted in accordance with FAR Part 15.306(b).

If a competitive range is established, discussions will be conducted with offerors who are included in the competitive range. After conclusion of discussions and receipt of final revised proposals (if applicable), the

SSEB will complete the evaluation and establish the final technical ratings and present them to the SSA.

The SSA will then review the proposals and make the final source selection decision.

The Government is not responsible for information overlooked during the evaluation which is not located in the appropriate proposal section.

To ensure the evaluation credit is appropriately received for proposal material submitted, do not incorporate by reference documents not contained in the proposal.

9.0 DEBRIEFING OFFERORS

Offerors may request a debriefing in accordance with FAR 15.505 Pre-award Debriefing of Offerors, and FAR

15.506 Post-award Debriefing of offerors.

10.0 FACTORS TO BE EVALUATED

1. VOLUME 1 – TECHNICAL

Factor Location Description Relative Importance

FACTOR 1 Vol. 1 Company Experience Most Important Technical Factor

FACTOR 2 Vol. 1 Past Performance Least Important Technical Factor

3. VOLUME 2 – COST

Factor Location Description Relative Importance

FACTOR 3 Vol. 2 Cost (Standard Form 1442 and

Supplemental Bid Schedule)

Technical Factors, when combined, are significantly more important than cost

VOLUME 1, FACTOR 1 – Company Experience.

Submission Requirements

The offeror shall submit a project portfolio of up to five (5) relevant projects to be evaluated for this factor. If more than five projects are submitted, only the first five projects will be evaluated. A project is defined as work performed at one site, or at a single installation. An Indefinite Delivery Contract (IDC) is not a project. The projects should describe the specific work, identify whether it was performed as the prime, or subcontractor. The projects should demonstrate experience with similar contaminants, materials and construction techniques necessary to complete the requirements included under this solicitation. Cost and schedule control methods employed during the projects should also be described. A project will be considered relevant only if it is similar in size, scope, and complexity to the work described in this solicitation. These projects must have been completed in the eight (8 year period preceding the date of this solicitation or started within the past eight (8) year period and be at least 50% complete at the time of this solicitation.

Projects included in the portfolio shall demonstrate the breadth and depth of the offeror’s experience as it relates to the work described in this solicitation.

The offeror shall use the form provided below in providing this information.

If the offeror is a Joint Venture combining two or more companies, state whether each project was performed by the same Joint Venture. Each member of a Joint Venture shall demonstrate experience commensurate with its proposed role on this project.

The Government may contact and interview project references. Reference information will not be revealed to other parties

Company Experience (Up to 5 projects)

SFAAP Outside Sewer and Foundation Removal – Similar Experience to SOW

Project Name: Client: USACE USEPA Other Offeror: Prime SubContractor

If other than Prime Offeror, name of Team

Subcontractor or Contractor:

Site Location (City/State):

Client Name/Company: Client Phone:

Start Date: mm/yyyy Completion Date: : mm/yyyy % of Project Compete: Project Cost:

Contract Type: Cost Reimbursable Firm Fixed Other – Describe:

Contaminant(s):

Media: : Soil Groundwater

Active Industrial Area: YES NO

Munitions of Explosive Concern: YES NO

Excavation : YES NO

Project Description

VOLUME 1, FACTOR 2 - Past Performance.

For each of the projects submitted under Factor 1, the offeror shall provide a Past Performance Questionnaire (Form

PPQ) included in the solicitation to a representative of the owner that can provide the owner’s opinion of the offeror’s past performance for the project. Completed PPQ forms should be submitted with your proposal. The PPQ does not have to be sent directly from the client. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). Ensure correct phone numbers and email addresses are provided for the client point of contact. Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, David Miller via email at david.f.miller@usace.army.mil prior to proposal closing date. The offeror is responsible for ensuring that the completed questionnaires are submitted by the closing date. If you have questions regarding the attached questionnaire, or require assistance, please contact the Contract Specialist at (816) 389-2258.

For each of the projects submitted under Factor 1, to ensure the agency has all relevant past performance information, the offeror also should submit copies of Federal/DoD/Navy/Army performance reviews that are likely already in the agency’s databases or likely within the agency’s arm’s reach, i.e., Contractor’s copy of CCASS or

CPARS evaluations. To improve accuracy of database searches, the offeror will also provide the CAGE Codes for the prime contractor and all teaming partners, i.e. key subcontractors, Joint Venture Partners, whose experience is being relied upon for Factor 1.

Offerors should organize all Past Performance Information based on the Factor 1 Projects, which normally have project titles and are numbered 1-5, so that reviewers can match the owner’s opinion with the corresponding Factor

1 Project. There is no page limit for this factor.

The Government will evaluate the responses from the customers from which Past Performance Questionnaires have been received. The Government may contact and interview the owner’s representative on the PPQ, and reserves the right to interview other individuals acting for the owner’s representative, if the owner’s representative is not available. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the offeror.

In addition to the above, the Government may review any other sources of information for evaluating past performance. Past performance information may be obtained from any other sources available to the Government, to include, but not limited to, the Past Performance Information Retrieval System (PPIRS), Construction Contractor

Appraisal Support System (CCASS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases; interviews with Program Managers, Contracting Officers, and Fee Determining Officials; and the Defense Contract Management Agency.

At no time during this process, nor during the debriefing, nor after award, will the names of the individuals providing reference information about an offeror’s past performance be revealed to the offerors or to any other party. If discussions are held, offerors may be afforded the opportunity to respond to adverse comments made by references in accordance with guidelines identified in FAR Part 15.3. In this case, comments will be extracted and provided to the offeror. Copies of the questionnaires will not be furnished to the offeror and will remain confidential.

mailto:david.f.miller@usace.army.mil

SAMPLE TRANSMITTAL LETTER

AND

PAST PERFORMANCE QUESTIONAIRE

Date_______________

To: _________________________________

We have listed your firm as a reference for work we have performed for you as listed below. Our firm has submitted a proposal under a project advertised by the U.S. Army Corps of Engineers, Kansas City District. In accordance with Federal Acquisition Regulations (FAR), an evaluation of our firm’s past performance will be completed by the Corps of Engineers. Your candid response to the attached questionnaire will assist the evaluation team in this process.

We understand that you have a busy schedule and your participation in this evaluation is greatly appreciated. Please complete the enclosed questionnaire as thoroughly as possible. Space is provided for comments.

Please respond in time for us to include the questionnaire with our proposal, which is due on _____________. Only one response from each office is required. If at all possible, we suggest that you individually answer this questionnaire and then coordinate your responses with that of _________________, to forge a consensus on one overall response from your organization. Please return completed questionnaires to the following:

If you would prefer to respond directly to USACE, your completed questionnaire may be sent to the following address:

U.S. Army Engineer District, Kansas City

ATTN: CECT-NWK-H/David Miller

Federal Building Room 647

601 East 12 th

Street

Kansas City, Missouri 64106-2896

The questionnaires can also be e-mailed to david.f.miller@usace.army.mil.

mailto:%20david.f.miller@usace.army.mil

NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)

CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information

Firm Name: CAGE Code:

Address: DUNs Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain)

Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information

Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine

How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information

Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND

SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED

QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS

QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS. CLIENTS ARE

HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR.

HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT

THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT

TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the

Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the

Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the

Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per

DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than

Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the

Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not

Applicable

No information or did not apply to your contract

Rating will be neither positive nor negative.

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS YOUR EVALUATION OF THE

CONTRACTOR’S PERFORMANCE.

1. QUALITY:

a) Quality of technical data/report preparation efforts E VG S M U N

b) Ability to meet quality standards specified for technical performance E VG S M U N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance

E VG S M U N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E VG S M U N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

E VG S M U N

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract

E VG S M U N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? E VG S M U N

b) Contractor was reasonable and cooperative in dealing with your staff

(including the ability to successfully resolve disagreements/disputes;

responsiveness to administrative reports, businesslike and communication)

E VG S M U N

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

E VG S M U N

d) Overall customer satisfaction E VG S M U N

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?

E VG S M U N

b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N

c) Government Property Control E VG S M U N

d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N

e) Utilization of Small Business concerns E VG S M U N

f) Ability to simultaneously manage multiple projects with multiple disciplines

E VG S M U N

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes

E VG S M U N

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)

E VG S M U N

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)?

E VG S M U N

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

E VG S M U N

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

E VG S M U N

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.

Yes No

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

Yes No

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.

Yes No

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?

(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

E VG S M U N

b) Contractor complied with all security requirements for the project and personnel security requirements.

E VG S M U N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations

(including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

E VG S M U N

b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N

c) Would you hire or work with this firm again? (If no, please explain below) Yes No

d) In summary, provide an overall rating for the work performed by this contractor.

E VG S M U N

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

VOLUME 2, FACTOR 3 – Cost

Offerors shall submit the bid schedule, and WAD summary page (Attachment 8) consisting of the original signed

Standard Form 1442 “Solicitation, Offer, and Award” providing a cost for all line items in the corresponding bid schedule and acknowledgement of all amendments to the solicitation. Proposed costs must be entered for all items of the bid schedule and the supplemental bid schedule. The bid schedule, supplemental bid schedule, and WAD summary page (Attachment 8) shall be submitted in excel format.

Offerors shall also submit a detailed cost proposal to cover all items described in the Work Breakdown Structure

(WBS) of the Scope of Work. The WAD summary page shall include a summary page (a template has been provided as Attachment 8) breaking out the cost elements for each line item in the Bid Schedule to include: 1) Direct labor hours; 2) Direct labor costs; 3) Direct materials and supplies; 4) Subcontractor costs; 5) Subcontractor Labor

Hours; 6) Travel; 7) Other direct costs; 8) Overhead; 9) General and administrative costs; and 10) Fee. The offeror shall also submit any assumptions and detailed backup information for each WBS item including, but not limited to labor hours, labor rates and specific disciplines performing the task, specific subcontract costs and services provided under the subcontract, a breakdown of material quantities and unit rates, and travel costs upon which the cost proposal is based.

Subcontracts in excess of $150,000 should provide a backup which includes labor hours and labor, equipment and materials cost.

*Supplemental Information below is required for informational purposes only

SUPPLEMENTAL INFORMATION

WAD

WAD Title Base/Option Cost CLIN

1 General Requirements

Year One and Two Base $ 0001

Contractor Manpower Reporting

Base 0002

Year Three Option $ 0003

Contractor Manpower Reporting

Option 0004

Year Four Option $ 0005

Contractor Manpower Reporting

Option 0006

Year Five Option $ 0007

Contractor Manpower Reporting

Option $ 0008

WAD 1 Total $

WAD Title Base/Option Cost CLIN

2 Outside Sewer/Production Lines

SWMU-24 (5 Corners Paste Mix)

Base $ 0009

SAAP- 24 (NG Production) Base $ 0009

SWMU-24 (G LINE Pre-Mix) Base $ 0009

AOC 17 (NQ Production) Option $ 0010

SWMU-67 (South Acid) Option $ 0011

SWMU-65 (Solvent Tank Farm)

Option $ 0012

WAD 2 Total $

WAD Title Base/Option Cost CLIN

3 Removal of Foundations (Slab and Subsurface) and I- Sewers

Base $ 0009

SAAP- 24 (NG Production) Base $ 0009

AOC 17 (NQ Production) Option $ 0010

SWMU-67 (S. Acid Area - TBPs)

Option $ 0011

SWMU-46 (Decon. Oven) Option $ 0012

SWMU-65 (Tank Farm - TBPs) Option $ 0012

AOC 12 (Paste Air Dry Facil.) Option $ 0013

SWMU-31(CWP/Evap.

Lagoon)

Base $ 0014

SWMU-43 (Tunnel Dryers) Base $ 0014

AOC 16 (NC Production): TBPs & Wet NC Accts)

Option $ 0015

WAD 3 Total $

WAD Title Base/Option Cost CLIN

4 Removal of Environmental Soils

Base $ 0009

SAAP- 24 (NG Production) Base $ 0009

AOC 17 (NQ Production) Option $ 0010

SWMU-67 (S. Acid Area - TBPs)

Option $ 0011

SWMU-46 (Decon. Oven) Option $ 0012

SWMU-65 (Tank Farm - TBPs) Option $ 0012

AOC 12 (Paste Air Dry Facil.) Option $ 0013

SWMU-31(CWP/Evap.

Lagoon)

Base $ 0014

SWMU-43 (Tunnel Dryers) Base $ 0014

AOC 16 (NC Production): TBPs & Wet NC Accts)

WAD 4 Total $

WAD Title Base/Option Cost CLIN

5 Transportation and Offsite Disposal of Contaminated Soil

WAD 4 Total

SWMU-24 (5 Corners Paste Mix)

Base $ 0009

SAAP- 24 (NG Production) Base $ 0009

AOC 17 (NQ Production) Option $ 0010

SWMU-67 (S. Acid Area - TBPs)

Option $ 0011

SWMU-46 (Decon. Oven) Option $ 0012

SWMU-65 (Tank Farm - TBPs) Option $ 0012

AOC 12 (Paste Air Dry Facil.) Option $ 0013

SWMU-31(CWP/Evap.

Lagoon)

Base $ 0014

SWMU-43 (Tunnel Dryers) Base $ 0014

AOC 16 (NC Production): TBPs & Wet NC Accts)

WAD 5 Total $

WAD Title Base/Option Cost CLIN

6 Environmental Sampling and Analysis

Base $ 0009

SAAP- 24 (NG Production) Base $ 0009

AOC 17 (NQ Production) Option $ 0010

SWMU-67 (S. Acid Area - TBPs)

Option $ 0011

SWMU-46 (Decon. Oven) Option $ 0012

SWMU-65 (Tank Farm - TBPs) Option $ 0012

AOC 12 (Paste Air Dry Facil.) Option $ 0013

SWMU-31(CWP/Evap.

Lagoon)

Base $ 0014

SWMU-43 (Tunnel Dryers) Base $ 0014

AOC 16 (NC Production): TBPs & Wet NC Accts)

WAD 6 Total $

WAD Title

Base/Option

Cost

CLIN

7 Pre-Construction Planning and Site-Specific Reporting

Pre-Construction Planning Base $ 0001

SWMU-24 (All) Base $ 0009

AOC 17 (NQ Production) Option $ 0010

SWMU-67 (S. Acid Area - TBPs)

Option $ 0011

SWMU-46 (Decon. Oven) Option $ 0012

SWMU-65 (Tank Farm - TBPs) Option $ 0012

AOC 12 (Paste Air Dry Facil.) Option $ 0013

SWMU-31(CWP/Evap.

Lagoon)

Base $ 0014

SWMU-43 (Tunnel Dryers) Base $ 0014

AOC 16 (NC Production): TBPs & Wet NC Accts)

WAD 7 Total $

Base Total $

Options Total $

Base Plus All Options Total $

11.0 ADDITIONAL INFORMATION TO BE PROVIDED IN VOLUME 1

SUXOS RESUME

Name:

Company:

Currently Employed By:

Prime ____Yrs Team Member/Sub Contractor: _____Yrs

Education and Training (include relevant specialized training):

Professional Registration/Certification(s):

Please Demonstrate the Following Below:

1) 10 yrs experience as a SUXOS (multiple projects may be used to demonstrate experience)

2) A minimum of one (1) project which identifies role as either a UXO Technician II, UXO Technician III or SUXOUS, which required inspection, removal and thermal decontamination of explosive contaminated sewers and foundations from explosive production facilities.

Documented Years as a SUXOS:

Project Name and Location:(City and State):

Owner Name, Organization/Company, Contact Information:

Start Date: Completion Date:

Description And Specific Role:

Other Relevant Information/Experience

12.0 ADDITIONAL INFORMATION TO BE PROVIDED IN VOLUME 2

In accordance with FAR 16.301-3(a)(3), a cost reimbursement contract may be used only when the contractor’s accounting system is adequate for determining costs applicable to…