Sheet1 Bid Item Site/Parameter Units Amount Comments

1GENERAL CONDITIONS
Onsite facilities (including storage, electrical, wifi, etc.)daysAmount to be developed by Contractor.
Water purchasegallonsAmount to be developed by Contractor.
Level C PPE for all intrusive indoor workls
3Mobilization and Site Preparation
Mob equipment/materials/etc.ls
Remove concrete slablsAssumes contaminated based on PDI
Remove overhead steel trolley systemlsAssumes no characterization/XRF/wipe samples required
Prepare staging area(s)eachAssume 3 staging areas (clean fill, contaminated concrete, contaminated soil)
Structural Stabilityls
4Floor Slab Removal
Remove and haul concrete slabbcy60Table 4
Remove and haul gravel sub-basebcy60Table 4
5Soil Removal
Removal of contaminated soilbcy600Table 4
Surveyeach2
7Environmental Soil Sampling and Analysis
Hexavalent Chromium confirmation soil samples (24-hour turn around)each31
Clean Fill Samples (standard turn around):eachAmount to be developed by Contractor.
SW 846 Method 8270C TCL SVOCSeachAmount to be developed by Contractor.
SW 846 Method 8260 TCL VOCseachAmount to be developed by Contractor.
SW 846 Method 8081A/8082 pesticides and PCBseachAmount to be developed by Contractor.
SW 846 Method 6010 B and 7000 series TAL metalseachAmount to be developed by Contractor.
Waste Characterization Samples:
SW 846 Method 8270C TCLP SVOCSeach3
SW 846 Method 8260 TCLP VOCseach3
SW 846 Method 8081/8151 TCLP PCBs, pesticides/herbicideseach3
SW 846 Method 6020/7470 series RCRA metals/mercuryeach3
8Site Restoration and Demobilization
Placement of fill materialbcy600Assumes equal to the assumed excavation vojume
Compaction testsea16minimum 2 per lift, approximately 8 lifts
Restore concrete floorlsAmount to be developed by Contractor.
Demobilizaiton
bcy - bank cubic yard
ls - lump sum