A.07.23_Attachment_2--KSAAP_1206_Item_Schedule.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
KSAAP Bldg. 1206 Remediation
Solicitation number
W912DQ18R3010
Issued by

About this file

Item Schedule

View the file

Other files

File Type Posted
Appendix_B.pdf PDF
Appendix_E.pdf PDF
Amended_SOW.pdf PDF
Appendix_H_Geochem.pdf PDF
Table_1_-_Submittals.pdf PDF
1206_access.pdf PDF
AppGKSAAP1206.pdf PDF
KSAAP_Appendix_F_-_DUAR.pdf PDF
Appendix_A.pdf PDF
Amendment_2_Released.pdf PDF
Appendix_G.pdf PDF
Appendix_C.pdf PDF
A.07.24_Amendment_0001.pdf PDF
A.07.23Table_4_-_Soil_Excavation_Volumes_revised.xlsx XLSX spreadsheet
A.07.23_Attachment_3_-_Assumptions.xlsx XLSX spreadsheet
A.07.23_Solicitation_Figures_Combined.pdf PDF
A.07.23_1c_DRAFT_Building_1206_Investigation_Report.pdf PDF
A.07.23_Attachment_4_-_Schedule_Spec.PDF PDF
A.07.23_Attachment_5_revised--RMS_Spec.pdf PDF
A.07.23_1b_Final_Corrective_Measures.pdf PDF
W912DQ18R3010_KSAAP_Bldg_1206.pdf PDF
A.07.23_1a_Final_Remedial_Action_Report.pdf PDF
A.07.23_1d_Building_1206_Construction_Drawings_(various_years).pdf PDF
A.07.23_Table_1_-_Submittals.xlsx XLSX spreadsheet
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

BID SCHEDULE
Building 1206 Subslab Soil Removal
Former Kansas Army Ammunition Plant, Parsons, Kansas
ITEM NO.DESCRIPTIONQUANTITYUNITUNIT PRICEAMOUNT
0001General Conditions1JobN/A___________
FFP
The Contractor shall perform all the necessary work and services which is not explicitly covered under the other bid items in accordance with contract documents
0002Work Plans1JobN/A___________
FFP
The Contractor shall perform all the necessary work and services to prepare all required work plans in accordance with contract documents
0003Mobilization and Site Preparation1JobN/A___________
FFP
The Contractor shall perform all the necessary work and services to mobilize to the site and prepare the site for removal activities in accordance with contract documents
0004Concrete Slab Removal1JobN/A___________
FFP
The Contractor shall perform all the necessary work and services to remove the concrete slab in accordance with contract documents
0005Sub Slab Soil Removal1JobN/A___________
FFP
The Contractor shall perform all the necessary work and services to remove the contaminated soil underneath the concrete slab in accordance with contract documents
0006Transportation and Disposal of Contaminated Soil and Concrete1JobN/A___________
FFP
The Contractor shall perform all the necessary work and services to transport and dispose of the removed contaminated soil and concrete in accordance with contract documents
0007Sampling and Analysis1JobN/A___________
FFP
The Contractor shall perform all the necessary work and services to gather samples and analyze the samples for contaminates in accordance with contract documents
0008Site Restoration and Demobilization1JobN/A___________
FFP
The Contractor shall perform all the necessary work and services to restore the removal area in accordance with contract documents
0009Soils Corrective Measures Implementation Report1JobN/A___________
FFP
The Contractor shall perform all the necessary work and services to provide a report detailing implemented corrective measures in accordance with contract documents
TOTAL___________

Note: Any work not specifically noted shall be priced with the most closely related CLIN.