View the file

Other files

File Type Posted
Attachment 9 - 32 31 13.53 HIGH SECURITY CHAIN LINK FENCES AND GATES.pdf PDF
Attachment 8 - 01 57 20.00 10 ENVIRONMENTAL PROTECTION.pdf PDF
Attachment 4 - FENCING SOW TOC.pdf PDF
23-B-0002 Amendment 4 SF 1442 Conformed.pdf PDF
23-B-0002 Amendment 4 SF 30.pdf PDF
Attachment 1 Excel Bid Sheet Attachment.xlsx XLSX spreadsheet
Attachment 6 - 01 33 00 SUBMITTAL PROCEDURES.pdf PDF
W912CN 23-B-0002 SF 1442 Amendment 4 -RFI Responses 12.23.22.pdf PDF
Attachment 7 - 01 45 00.00 40 QUALITY CONTROL.pdf PDF
Attachment 1 Excel Bid Sheet.xlsx XLSX spreadsheet
23-B-0002 Amendment 3 SF 1442 Conformed.pdf PDF
Attachment 3 RFI Responses.pdf PDF
23-B-0002 Amendment 3 SF 30.pdf PDF
Attachment 2 Bid Attachment.docx DOCX document
23-B-0002 Amendment 2 SF 30.pdf PDF
23-B-0002 Amendment 2 SF 1442 Conformed.pdf PDF
SF 1442 23-B-0002 Amendment Conformed.pdf PDF
Excel Bid Sheet Attachment - Revised.xlsx XLSX spreadsheet
23-B-0002 SF 30 Amendment.pdf PDF
RFI Responses.pdf PDF
12 - ufc_4_022_03-Fences.pdf PDF
11 - FE 7 Fence.pdf PDF
BID ATTACHMENT.docx DOCX document
Excel Bid Sheet Attachment.xlsx XLSX spreadsheet
STATEMENT OF WORK.doc DOC document
23-B-0002 SF 1442.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASE O/E RPR/INST CHAIN-LINK FENCE

SECTION 01026

STATEMENT OF WORK

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

No references this section.

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

Furnish all labor, equipment, materials, and all incidental related services to perform replacement of Repairs/Installation of Chain-link Fencing and related work at Various Army Installations, on the Island of Oahu, Hawaii in accordance with the technical provisions prepared by the Directorate of Public Works, U.S. Army Garrison, Hawaii. Fence installation shall conform to UFC 4-022-03 Security Fences and Gates and FE-7 Chain Link Security Fence Details. The scope of work includes by this contract does not cover Fence Posts, Chain-Link Fencing or Chain-Link Fence related work which might arise as part of the contract to repair or renovate a building or group of buildings. The work covered by this contract does not include projects awarded by The U.S. Army Engineering District, Honolulu, excluding the Medical Facilities under Tripler (TAMC), to be designated during the contract period.

1.3 ESTIMATED QUANTITIES

The estimated quantities of work, indicated herein, are for information of The prospective Contractors. The actual quantities ordered may be more or Less than the estimated quantities.

1.4 LOCATIONS

The location of work sites shall be as follows:

Fort Shafter Area Fort Shafter Fort DeRussy Tripler Army Medical Center Aliamanu Military Reservation

Schofield Barracks Area Schofield Barracks (includes East Range & Leilehua Golf Course, Wheeler Army Airfield, and Helemano Military Reservation

The exact locations will be shown by the Contracting Officer.

1.5 ITEMS OF WORK

BASE O/E RPR/INST CHAIN-LINK FENCE

See Contract Schedule.

1.6 EXISTING WORK

In addition to "FAR 52.236-9, Protection of Existing Structures, Equipment, Utilities, and Improvements":

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.

PART 1 GENERAL
1.1 REFERENCES
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
1.3 ESTIMATED QUANTITIES
The estimated quantities of work, indicated herein, are for information of
The prospective Contractors. The actual quantities ordered may be more or
Less than the estimated quantities.
1.4 LOCATIONS

1.6 EXISTING WORK

File details come from the government source that posted it. Updated .