PRY PKO Fuel Station

Attachment - PRICE BREAKDOWN - Material List
GTM PKO Fuel Station Repair/Rebuild
ItemDescriptionUnitQuantityUnit CostPartial Cost
CLIN 001 and its Extended Line Item Numbers (ELIN)FUEL STATION REPAIR/REBUILD
ELIN 0001PRELIMINARY
0001ASoil StudyLS1.00
0001BDesign to include validation and as-builtLS1.00
0001CSite survey and layoutLS1.00
0001DRequired electrical, plumbing, density, water content, concrete, and other related testsLS1.00
ELIN 0002SITE PREPARATION
0002AExcavation and trenches for utilities (i.e. electrical, fuel pipes, and other required works) connectionsm100.00
0002BDemolition structure, and filling of existing tanksLS1.00
ELIN 003FUEL STATION
0003ALeakeage prevention poolsm90.00
0003BSubmersible pump systemLS1.00
0003CAutomatic shut off valvesLS1.00
0003DElectrical (all items shall be include outlets, switches, circuit breakers, ground system, lighting outdoor and anti-explosive rated to include protection system, outdoor/anti-explosive lights, conductors, transformer, distribution panel, registers boxes, and accessories)LS1.00
0003EDispenser pump systemEa2.00
0003FFuel storage tank 4000 galEa1.00
0003GFuel storage tank 3000 galEa1.00
0003HVenting systemLS1.00
0003IPiping and valvesLS1.00
0003JPumps and metersLS1.00
0003KFilterLS1.00
0003LFuel test kitEa2.00
0003MPump houseLS1.00
0003NDispenser houseLS1.00
0003OAccessoriesLS1.00
0003PPaint for fuel systemsm160.00
0003QPaint for pool, pump house and dispensersm100.00
Total for CLIN 0001TOTAL
CLIN 0002FUEL STATION COVER (OPTION 1)
Roof panel and structuresm1.00
Total for CLIN 0002TOTAL
MISCELLANEOUS ITEMS/DIRECT COST
Include any other indirect costs associated with this work on this sheet
Incluir otros costes indirectos asociados con este trabajo en esta hoja
Total
GRAND TOTAL PROJECT COST must total cost for CLINS 0001 and 0002GRAND TOTAL
GRAN COSTO TOTAL DEL PROYECTO debe sumar el costo de clins 0001 y 0002
Performance period180days
Quantities presented in this table are approximately and it is contractor responsibility to validate them to reflect actual site conditions, Statement of Work , and Technical Exhibits. Contractor shall adjust quantities and add any missing item. This table is only a guide for the contractor and it is not intent to be final.
Las cantidades que se presentan en esta tabla son aproximadamente y es responsabilidad contratista para validarlos para reflejar las condiciones reales en el lugar, especificaciones , y anexos técnicos. Contratista deberá ajustar las cantidades y añadir cualquier artículo que falta. Esta tabla es sólo una guía para el contratista y no es la intención de ser definitiva.