PRY PKO Fuel Station
| Attachment - PRICE BREAKDOWN - Material List | |||||
| GTM PKO Fuel Station Repair/Rebuild | |||||
| Item | Description | Unit | Quantity | Unit Cost | Partial Cost |
| CLIN 001 and its Extended Line Item Numbers (ELIN) | FUEL STATION REPAIR/REBUILD | ||||
| ELIN 0001 | PRELIMINARY | ||||
| 0001A | Soil Study | LS | 1.00 | ||
| 0001B | Design to include validation and as-built | LS | 1.00 | ||
| 0001C | Site survey and layout | LS | 1.00 | ||
| 0001D | Required electrical, plumbing, density, water content, concrete, and other related tests | LS | 1.00 | ||
| ELIN 0002 | SITE PREPARATION | ||||
| 0002A | Excavation and trenches for utilities (i.e. electrical, fuel pipes, and other required works) connection | sm | 100.00 | ||
| 0002B | Demolition structure, and filling of existing tanks | LS | 1.00 | ||
| ELIN 003 | FUEL STATION | ||||
| 0003A | Leakeage prevention pool | sm | 90.00 | ||
| 0003B | Submersible pump system | LS | 1.00 | ||
| 0003C | Automatic shut off valves | LS | 1.00 | ||
| 0003D | Electrical (all items shall be include outlets, switches, circuit breakers, ground system, lighting outdoor and anti-explosive rated to include protection system, outdoor/anti-explosive lights, conductors, transformer, distribution panel, registers boxes, and accessories) | LS | 1.00 | ||
| 0003E | Dispenser pump system | Ea | 2.00 | ||
| 0003F | Fuel storage tank 4000 gal | Ea | 1.00 | ||
| 0003G | Fuel storage tank 3000 gal | Ea | 1.00 | ||
| 0003H | Venting system | LS | 1.00 | ||
| 0003I | Piping and valves | LS | 1.00 | ||
| 0003J | Pumps and meters | LS | 1.00 | ||
| 0003K | Filter | LS | 1.00 | ||
| 0003L | Fuel test kit | Ea | 2.00 | ||
| 0003M | Pump house | LS | 1.00 | ||
| 0003N | Dispenser house | LS | 1.00 | ||
| 0003O | Accessories | LS | 1.00 | ||
| 0003P | Paint for fuel system | sm | 160.00 | ||
| 0003Q | Paint for pool, pump house and dispenser | sm | 100.00 | ||
| Total for CLIN 0001 | TOTAL | ||||
| CLIN 0002 | FUEL STATION COVER (OPTION 1) | ||||
| Roof panel and structure | sm | 1.00 | |||
| Total for CLIN 0002 | TOTAL | ||||
| MISCELLANEOUS ITEMS/DIRECT COST | |||||
| Include any other indirect costs associated with this work on this sheet | |||||
| Incluir otros costes indirectos asociados con este trabajo en esta hoja | |||||
| Total | |||||
| GRAND TOTAL PROJECT COST must total cost for CLINS 0001 and 0002 | GRAND TOTAL | ||||
| GRAN COSTO TOTAL DEL PROYECTO debe sumar el costo de clins 0001 y 0002 | |||||
| Performance period | 180 | days | |||
| Quantities presented in this table are approximately and it is contractor responsibility to validate them to reflect actual site conditions, Statement of Work , and Technical Exhibits. Contractor shall adjust quantities and add any missing item. This table is only a guide for the contractor and it is not intent to be final. | |||||
| Las cantidades que se presentan en esta tabla son aproximadamente y es responsabilidad contratista para validarlos para reflejar las condiciones reales en el lugar, especificaciones , y anexos técnicos. Contratista deberá ajustar las cantidades y añadir cualquier artículo que falta. Esta tabla es sólo una guía para el contratista y no es la intención de ser definitiva. |