W912C3-18-R-0006-0004__Amendment_04.pdf

PDF 204 KB Posted

Attached to
Replacement of Asbestos Cement Water Pipes Phase III
Solicitation number
W912C3-18-R-0006
Issued by

About this file

W912C3-18-R-0006-0004 Amendment 04

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0011154604

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

a. This is issued for the follow ing:

(1) This amendment provides clarifications for Basis of Aw ard. The language for Basis of Aw ard now aligns w ith the language provided in the Evaluation Factor description.

(2) Provide answ ers to questions submitted.

b. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Aug-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912C318R0006

X 9B. DATED (SEE ITEM 11)

25-Jul-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Aug-2018

CODE

MICC - FT BUCHANAN

FT BUCHANAN

DIRECTORATE OF CONTRACTING

34 SOUTH GATE RD, STE 1104

FORT BUCHANAN PR 00934-4206

W912C3 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912C318R0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

BASIS FOR AWARD

The award will be made to the lowest priced technically acceptable proposal. Proposals will be evaluated for recent and relevant past performance, but will not be ranked using the non-price Factors. A proposal receiving a rating of “Unacceptable” in any non-price Factor will not be eligible for award.

The evaluation criteria detailing the Factors are contained in this Request for Proposal (RFP).

INSTRUCTIONS / EVALUATION

A. SUPPLEMENT INFORMATION

1. Purpose. The Government's intention is to procure the Design - Build Replace Old Asbestos Cement Water Pipes-Phase III at Fort Buchanan, Puerto Rico. The contractor shall provide labor, equipment, tools, materials, supplies, transportation, management, supervision, insurance, and all necessary effort to perform the Replace Old Asbestos Cement Water Pipes-Phase III at Fort Buchanan, Puerto Rico. All work shall be in accordance with the Statement of Work, Specifications, Drawing, Environmental and Labor Laws, and all terms and conditions stated in the solicitation and resultant contract. The contract will be Firm-Fixed Price.

1.1. Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available.

2. Set Aside. This requirement is 100% small business set-aside for HubZone certified under Small Business Administration (SBA) program for firms within Puerto Rico Only. Contractor’s certification will be verified by the Contracting Officer. THE AWARD UNDER THIS REQUIREMENT WILL BE MADE

PURSUANT TO THE ROBERT T. STAFFORD DISASTER RELIEF AND EMERGENCY ASSISTANCE

ACT AS AMENDED BY THE LOCAL COMMUNITY RECOVERY ACT OF 2006, P.L. 109-218.

The applicable NAICS Code is 237110. The Contractor shall have experience in performance of work similar as described under NAICS. Contractors ensure your System for Award Management (SAM) Certification is up-to-date. Contractors with expired SAM registration may not be eligible for further consideration for award.

2.1. Joint Ventures. Ensure that all documentation and agreements are in conformance with SBA's requirements before the solicitation closes. A copy of the fully executed agreements shall be provided with the solicitation package. The agreement shall include information, which identifies the responsibilities for each entity under this contract. The agreement shall demonstrate the relationship between firms and identify contractual relationships and authorities to bind each entity of the teaming/partnering or joint venture relationship.

3. Any information regarding any documentation in this solicitation shall be directed to the Fort Buchanan contracting officer. Any remarks, explanations, or answers provided by any other government representative shall not change or qualify any of the terms or conditions of the solicitation. Any changes to the solicitation shall only be made via a written amendment issued by the MICC Fort Buchanan Contracting Office.

4. Site Visit. A site visit has been scheduled as follows:

Date: Aug 9, 2018 at 9:00 AM Location: MICC Suite 1104 - Conference Room Directorate of Public Works 34 South Gate Road, Fort Buchanan, PR 00934

For Site Visit information, see Site Visit clause 52.236-27, unless you already have a permanent vehicle pass, you will be required to obtain a vehicle pass.

Due to restricted access to a military installation, offerors interested in participating in the Site

Visit shall submit a DD Form 369, Police Record Check for each personnel. The Government will conduct a background check on all personnel interested in participating in this site visit. The form can be obtained at the following address:

http://www.dtic.mil/whs/directives/forms/eforms/dd0369.pdf. This form shall be provided in original hard copy only. Ensure you complete the following blocks only: 1, 2, 3, 4, 5, 6, 7, 8, 9, and 11. DO NOT FILL BLOCK 10. Only original hard copies will be accepted. In addition contractor shall provide a letter requesting access for the individual participating on the site visit to include the following information: Company name, address, name of individual, phone number and email address. Information will be use for the government response of the approval of disapproval of the installation access. Government will notify each contractor via email. The dates the Government will provide to deliver the forms are: Aug 3 & 7, 2018 at 9:00 AM at the Visitor Control Center in Fort Buchanan, Puerto Rico. Mr. Santana will be accepting the forms. Please be on time. No other form will be accepted after these dates.

Remarks, explanations and answers provided by Government representatives before, during and after the site visit shall not change or qualify any of the terms or conditions of the solicitation. Any changes shall be made via a written Amendment to the solicitation.

4.1 Supplemental Information Access to Fort Buchanan. Process to request access passes to Fort Buchanan.

a. Contractors are required to submit a DD Form 369 for each personnel attending the site visit.

Submission of these forms does not grant access to individual. Each personnel will be subject to a background check before access is granted.

b. On or around one calendar days after the DD Forms 369 are processed, Mr. Ray Santana and/or Ms. Christine Davis will notify each contractor via email. Personnel will be granted 30 calendar days access to Fort Buchanan (PLEASE NOTE THAT SEVERAL AREAS WITHIN THE

INSTALLATION ARE RESTRICTED TO CONTRACTORS AND CONTRACTOR’S PERSONNEL.

CONTRACTORS SHALL ABIDE TO ALL POLICIES AND REGULATIONS OF FORT

BUCHANAN).

c. Once the contractors are notified, each individual personnel will be required to go to the VCC with driving license and vehicle registration to solicit the Access Pass to Fort Buchanan. VCC hours of operations are Monday through Friday 7:00 AM - 4:00 PM CONTRACTORS ARE

RESPONSIBLE FOR SOLICITING THE PASSES PRIOR TO THE SITE VISIT DATE.

5. All questions shall be in writing. Questions shall be emailed to Mr. Ray Santana at ray.santana.civ@mail.mil and Christine Davis at christine.davis1.civ@mail.mil. Date for final submission of questions is Aug 13, 2018 at 10:00 am (local PR time). Answers to questions will be submitted via an Amendment releasable to all as incorporated via the Federal Business Opportunity (FedbizOpps) website at https://www.fbo.gov. Contractors ensure that you submit all your questions under one email.

6. The proposal is due no later than the date and time specified in Block 8, Page 1 of the solicitation or as amended. It is the offeror's responsibility that proposal submitted, is received in this office prior to the time and date for receipt of offer. Proposal should be sent to the address below:

Mission & Installation Contracting Command 412th Contracting Support Brigade MICC - Fort Buchanan ATTN: Ray Santana 34 South Gate Road, Suite 1104 Fort Buchanan, PR 00934-4206

7. AMENDMENTS: All Amendments, if any, shall be acknowledge by signing and returning to this office one (1) copy of each. The acknowledgement must be received in this office no later than the closing date and time.

8. Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 90 calendar days from the date specified for receipt of offers.

9. Ensure you comply with the proposal Submission instructions and provide all documents requested with proposal. Ensure Past performance questionnairs are submitted to Mr. Ray Santana directly from the person completing the form via email at ray.santana.civ@mail.mil and Christine Davis at christine.davis1.civ@mail.mil on or before the solcitation closing date, otherwise will not be consider with offerors package. No Questionnaries will be accepted directly from bidders. Ensure you comply with the Evaluation factors and all other required in the solicitation.

10. Contractor shall ensure compliance with FAR 52.223-2, affirmative procurement of bio-based products under service and construction contracts, contractors are required to submit annual bio-based reports to the reporting module in the system for award management (SAM) at https://www.sam.gov."

11. REQUIRED:

a. Complete blocks 14, 17, 19 and 30a, b & c of the SF 1442. Signed originals shall be included for all documents requiring offeror’s signature. In doing so, the offeror accedes to the contract terms and conditions as written in the solicitation.

b. Insert proposed fixed-price unit and extended prices for each Contract Line Item Number (CLIN) or Sub-Contract Line Item Number (SUBCLIN), as required. Prices shall not extend past the second decimal point for unit and extended amounts. The proposed price shall include all personnel labor, supplies, materials, management, overhead, other directs costs, G&A, and profit to fulfill the contractual requirements of Statement of Work. Offerors are cautioned to clearly print intended prices. All extensions of the unit prices shown will be subject to verification by the Government. In case of a discrepancy between the unit price and the totals, the unit price will prevail. Contractors are cautioned to clearly print intended prices. Verify/Re-verify your math.

THIS IS ALL OR NONE: PROPOSAL SHALL INCLUDE PRICING FOR ALL CLINS/SUBCLINS.

IF A CLIN IS LEFT BLANK, THE PROPOSAL PACKAGE MAY BE REJECTED.

LEGAL COMPLIANCE: The Contractor shall comply with all Federal, State, and Local Laws, codes and regulations applicable to his performance under this contract, and shall be solely responsible for all costs associated with said compliance.

12. You must be registered in the system for award management (SAM) in order to be awarded a department of defense contract. If you need to register in SAM, go to the website https://www.sam.gov.

13. All representations and certifications must include:

Duns and Bradstreet #__________________________

Cage (commercial and government entity) code ___________________

TIN # ____________________________.

Ensure your certifications are completed in this solicitation and in your SAM registration.

14. Due to restricted access to Fort Buchanan, if the offeror will be hand carrying the proposal, it is required to submit to the contracting officer a DD Form 369 for each person planning to deliver the package not later than 3 days prior to the due date. On the day prior to offeror requiring access to installation, an e-mail shall be sent to Ray Santana in order for a reply to be submitted providing further access information. Offeror is cautioned that there may be delays at the gates and should allow adequate time for entering the installation to ensure packages are received prior to the time and date for receipt of proposal. All individuals must have a valid driver’s license and no substitutions are authorized.

Vehicles are also subject to search.

15. The “Equal Employment Opportunity Is the Law” notice (poster) referenced in FAR clause 52.222- 26(b) (3), Equal Opportunity, is located at http://www.dol.gov/ofccp/regs/compliance/posters/ofccpost.htm.

16. Notice to DoD employees and contractors on protecting classified information and the integrity of unclassified government information technology (it) systems:

The recent disclosure of U.S. Government documents by WikiLeaks has caused damage to our national security. Each DoD employee and contractor is obligated to protect classified information and the integrity of government IT systems in accordance with applicable laws and DoD policies.

Unauthorized disclosures of classified documents (whether in print, on a blog, or on websites) do not alter the documents’ classified status or automatically result in declassification of the documents. To the contrary, classified information, whether or not already posted on public websites or disclosed to the media, remains classified, and must be treated as such by DoD employees and contractors, until it is declassified by an appropriate original classification authority.

DoD employees and contractors are reminded of the following obligations with respect to protecting classified information and the integrity of unclassified government IT systems.

DoD employees or contractors shall not access classified information unless they have: Received a favorable determination of eligibility for access by an appropriate authority, Signed an approved nondisclosure agreement, Demonstrated a need to know the information, and Received training on proper safeguarding of classified information and on the criminal, civil, and administrative sanctions that may be imposed on an individual who fails to protect classified information from unauthorized disclosure.

DoD employees or contractors shall not remove classified information from official premises or disclose it without proper authorization.

Except as authorized by DoD policy and procedures, DoD employees or contractors shall not, while accessing the web on unclassified government systems (including BlackBerries or other smartphones), access or download documents that are marked classified (including classified documents publicly available on WikiLeaks.org and other websites), as doing so risks putting classified information on unclassified IT systems.

This requirement applies to accessing or downloading that occurs using government computers or employees’ or contractors’ personally owned computers that access unclassified government systems, either through remote Outlook access or other remote access capabilities that enable connection to these government systems.

This requirement does not restrict employee or contractor access to unclassified, publicly available news reports (and other unclassified material) that may in turn discuss classified material, as distinguished from access to the underlying classified documents available on public websites or otherwise in the public domain.

DoD employees or contractors shall refer all public queries on this matter to their servicing Public Affairs office; they shall neither confirm nor deny the presence of classified information in articles or websites in the public domain.

DoD employees or contractors shall refer Congressional queries pertaining to the presence of classified information in articles or websites in the public domain to their servicing Congressional Affairs office.

DoD employees and contractors who believe they have inadvertently accessed or downloaded classified information from a public website via an unclassified government IT system, or without prior authorization, shall contact their information assurance manager (IAM) or information assurance office (IAO) for assistance.

Note: In the case of classified documents inadvertently accessed or downloaded from the WikiLeaks website or other websites posting WikiLeaks-related classified documents, the IAM will document each occurrence and delete the affected file (s) by holding down the SHIFT key while pressing the DELETE key for Windows-based systems. No incident report or further sanitization of government IT systems is required. This guidance pertains only to the accessing or downloading of the classified documents described above because of the extent of the compromise and the prohibitive cost of standard sanitization procedures. All other classified spillages must be handled in accordance with existing regulations.

17. Offerors may not submit Facsimile or E-Mail Proposals - Proposals received by email or fax will not be considered. Offerors shall provide one original, two copies, and one electronic copy (CD) of the solicitation package.

B. EVALUATION FACTORS FOR AWARD

1. The solicitation requires the evaluation of price and the following non-price factors:

Factor 1 - Experience Factor 2 - Past Performance The distinction between experience and past performance is experience pertains to the types of work and volume of work completed by a contractor that is comparable to the type of work covered by this requirement, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.”

2. Basis of Evaluation and Submittal Requirements for Each Factor.

(a) Price:

Provide one original, two copies, and one electronic copy (CD) of the solicitation requirements for pricing identified below. Any spreadsheet must be provided in both PDF and an editable format.

(1) Solicitation Submittal Requirements:

(i) Cover letter containing the following information: Authorized negotiator’s (POC) name with middle initial POC telephone number POC email address CAGE code DUNS number TIN (taxpayer ID number)

(ii) Executed SF1442. Offeror shall insert its company name and address in Block #14, telephone number in Block #15, acknowledge all amendments in Block #19 (if applicable), name and title of person authorized to sign in Block #20A, signature in Block #20B, and offer date in Block #20C of the SF1442. In addition, offeror shall provide its DUNS Number, CAGE code, and Federal Tax ID number with its proposal.

(iii) The Offeror shall submit their prices using Section 00010 CLIN Pricing.

(iv) Bid bond (SF-24). Offeror shall submit a bid bond (SF-24) in the amount of 20% of total bid price or $3 million, whichever is less.

(v) SAM registration. Offeror shall ensure current registration on the SAM Website, www.sam.gov, including Annual Representations and Certifications are complete and updated for this procurement.

(2) Basis of Evaluation:

The Government will evaluate price based on the total price. Total price consists of the sum of all CLINs.

Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price.

(i) Comparison of proposed prices received in response to the RFP.

(ii) Comparison of proposed prices with the IGCE.

(iii) Comparison of proposed prices with available historical information.

(iv) Comparison of market survey results.

(b) Non-cost/price (Technical) Factors:

Provide one original, 2 copies, and one electronic copy (CD) of the solicitation submittal requirements for Factor 1.

(1) Factor 1, Experience:

(i) Solicitation Submittal Requirements:

The Offeror shall submit the following information:

(a) Construction Experience: Submit at least one (1) relevant construction project for which your firm was the prime contractor. Multiple acceptable projects do not equate to a higher rating. These projects shall be similar in size, scope and complexity to the proposed Replace Old Asbestos Cement Pipes Phase III NAICS Code 237110. A relevant project is further defined as a single project containing both horizontal and vertical elements of approximately $2,000,000 or greater for the design/build of potable water system. Projects shall have been awarded within the last five years.

The total length for the revelant project data sheet shall not exceed one (1) double-sided page or two (2) single-sided pages per project.

A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors should submit the work performed under a single task order as a project.

For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e.: unique features, area, construction methods).

If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity or the Joint Venture partners. Offerors are still limited a total of five

(5) projects combined.

If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), The Offer must provide a letter of commitment and shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract.

The Offeror may utilize experience of a subcontractor that will perform major or critical aspects of the requirement to demonstrate construction experience under this evaluation factor. The Offeror must provide a letter of commitment and an explanation of the meaningful involvement that the subcontractor will have in performance of this contract.

(b) Construction Narrative: Submit a narrative describing the proposed primary construction firm and the primary subcontractors, for this contract and the rationale of proposing this arrangement. Provide the role, responsibilities, and contractual relationships between the various firms. The narrative shall also include a simple organizational chart that clearly identifies the lines of authority between the entities. The technical narrative shall not exceed one (1) double-sided page or two (2) single-sided pages. Chart is not in this page count.

(ii) Basis of Evaluation:

The basis of evaluation will include the Offeror’s demonstrated experience and depth of experience in performing relevant construction projects as defined in the solicitation submittal requirements. The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. The Government will only review up to three (3) projects. Any projects submitted in excess of the three (3) for Construction Experience will not be considered.

A relevant project is farther defined as a single project containing both horizontal and vertical elements of approximately $2,000,000 or greater for the design/build of potable water system. Projects shall have been awarded within the last five years.

This Factor will be evaluated on an “acceptable” or “unacceptable” basis.

(2) Factor 2, Past Performance:

(i) Solicitation Submittal Requirements: Contractor shall submit three (3) to include design/build projects.

– one project must have a value of at least $2M. Projects shall be submited using the Past Performance Questionnaires (Attachment B) for each project included in Factor 1 for Construction Experience.

Questionnaires shall be submitted directly to the Government’s point of contact, Ray Santana, via email at ray.santana.civ@mail.mil and Christine Davis at christine.davis1.civ@mail.mil on or before the solcitation closing date, otherwise will not be consider with offerors package.

Offerors should follow-up with clients/references to help ensure timely submittal of PPQ questionnaires.

Offerors may provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 1 – Experience. Offerors may also address any adverse past performance issues. Explanations shall not exceed one (1) double-sided page (or two (2) single-sided pages) in total.

The Government reserves the right to contact references for verification or additional information. The Government’s inability to contact any of the Offeror’s references or the references unwillingness to provide the information requested may affect the Government’s evaluation of this factor.

In addition to the above, the Government reserves the right to obtain information for use in the evaluation of past performance from any and all sources including sources outside of the Government. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS) using all CAGE/DUNS numbers of Contractors who are part of a partnership or joint venture identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), and any other known sources not provided by the Offeror.

Performance award or additional information submitted will not be considered.

A copy of the blank Past Performance Questionnaire to be used for requesting client references is included as Attachment B.

(ii) Basis of Evaluation:

This factor will be evaluated from questionnaires submitted directly by the person completing the questionnaires. Evidence of SATISFACTORY performance must be provided for three separate projects.

This evaluation focuses on how well the Offeror performed on the relevant projects submitted under Factor 2 - Past Performance or other projects currently documented in known sources. Based on the Offeror’s performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort, or the Offeror’s performance record is unknown. The Government will consider the currency and relevance of the information, the source of the information, context of the data, and general trends in the Contractor’s performance. This evaluation is separate and distinct from the Contracting Officer’s responsibility determination. The assessment of the Offeror’s past performance will be used as a means of evaluating the Offeror’s probability to successfully meet the requirements of the RFP. In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available, the offeror may not be evaluated favorably or unfavorably on past performance.

This Factor will be evaluated on an “acceptable”, “neutral” or “unacceptable” basis.

(End of Summary of Changes)

The following items are applicable to this modification:

QUESTIONS & ANSWERS

Solicitation #: W912C3-18-R-0006 Water Piping Replacement Phase III

QUESTIONS AND ANSWERS:

1. As it relates to asphalt paving Question #13 (a & c) on Amendment 003, please clarify the following:

• Please confirm that the answer provided does not indicate that 8”of asphalt plus 8” of concrete 8” shall be considered for trenches along paving surfaces. Only 8” of asphalt or 8” of concrete is the assumption to be considered for paving saw cuts, demolition and disposal.

Answer: Correct

File details come from the government source that posted it.