This amendment modifies a solicitation for sluice gate and butterfly valve repair work at Oologah Lake, Oklahoma. The work includes developing a crane placement plan and diving plan, inspecting and rehabilitating a butterfly valve, repacking a knife valve stem, blasting and painting gate valves and associated piping, inspecting and repairing a service gate dogging device, and blasting and painting a service gate located at Bay 4. There are also optional items to blast and paint service gates located at Bays 3, 2, and 1. The response due date is extended to September 10, 2021. Pricing is to be provided for the base work and each optional item using the modified price schedule included in the amendment. The soliciting agency is the Tulsa District of the U.S. Army Corps of Engineers.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Oologah Sluice Gate and Butterfly Valve
1. Amendment 0003 is hereby issued to incorporate changes to revised CLIN Schedule, insert Low Flow Valve Submittal Document and to extend the Request for Proposal (RFP) due date to 10 Sep 21 at 2:00 PM CST.
2. All other terms and conditions remain unchanged.
3. Point of contract for this amendment is Shaw n Brady at shaw n.brady@usace.army.mil.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Aug-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912BV21R0036
X 9B. DATED (SEE ITEM 11)
22-Jul-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Aug-2021
CODE
CONTRACTING DIV
US ARMY CORPS OF ENGINEERS, TULSA DISTRICT
2488 E. 81ST STREET
TULSA OK 74137-4290
W912BV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912BV21R0036
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 30-Aug-2021 02:00 PM to 10-Sep-2021 02:00 PM.
The following have been modified:
PRICE SCHEDULE
PROPOSAL SCHEDULE
SOLICITATION NO. W912BV21R0036
Date: , Revised: August 19, 2021
CLIN
No.
Description QTY Unit Amount
BASE PROPOSAL
0001 CRANE PLACEMENT PLAN 1 Job $
0002 BUTTERFLY VALVE INSPECTION AND REHAB 1 Job $
0003 GATE VALVES PAINTING AND REHAB 1 Job $
0004 BAY #4 DOGGING DEVICE INSPECTION AND
REHAB
1 Job $
0005 BAY #4 SERVICE GATE PAINTING AND
REHAB
1 JOB $
Total Base Proposal - CLIN 0001-0005 $
OPTION 1
BAY #3 SERVICE GATE PAINTING AND
REHAB 1 Job $
Total Option 1 Proposal - CLIN 0006 $
OPTION 2
BAY #2 SERVICE GATE PAINTING AND
REHAB 1 Job $
Total Option 2 Proposal - CLIN 0007 $
OPTION 3
BAY #1 SERVICE GATE PAINTING AND
REHAB
1 Job $
Total Option 3 Proposal - CLIN 0008 $
Total Base Proposal Plus All Options - CLIN 0001-008 $
PROPOSAL SCHEDULE NOTES
1. All costs for items of work not listed separately in the Proposal Schedule
W912BV21R0036
or specifically mentioned to be included in a particular item price must be included in the listed item price most closely associated with the work involved.
2. This solicitation requires submission of a price on all items. Failure to do so will result in the proposal being rejected without further consideration.
3. All quantities are estimated except where the unit is given as Job.
4. Only one contract for the entire schedule will be awarded under this solicitation.
5. Optional bid items may be awarded, at the option of the Government, at the time of contract award or may be exercised at any time from the date of contract award until 90 days after the date of contract award.
6. 60 additional calendar days will be added to the Base Bid Period of
Performance for each Option exercised.
(End of Summary of Changes)