oologah21Bulkhead_PLANS_2AUG_FINAL.pdf
PDF 1 MB Posted
- Solicitation number
- W912BV21R0036
About this file
This solicitation is for sluice gate and butterfly valve repair services at Oologah Lake in Oklahoma. The contractor will be required to furnish all equipment, labor, tools, and supervision necessary to complete several tasks. This includes developing a crane placement plan, installing a bulkhead, inspecting and repairing a butterfly valve, repacking a knife valve stem, blasting and painting gates and piping, inspecting and repairing a dogging device, and rehabilitating service gates. For the service gate rehabilitation, the contractor must remove and reinstall seals and rollers, blast and paint gates, install new materials, and perform leakage tests. There are also three options to blast and paint additional service gates and perform the same rehabilitation work. The soliciting agency is the Department of the Army Corps of Engineers Engineering District Tulsa. The response due date and award date are not specified in the document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FLANGE AND PIPE.
4" VALVE WITH
SKIN PL
" 8
INSTALLATION.
BULKHEAD VALVE
SEE NOTE #4 IN
SHEET ID
T U
L S
A O
K L
A H
O M
A
E s t
S T
R E
E T
T U
L S
A D
IS
T
R
IC
T
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T
E D
B Y
S I Z
E
A N
S I
D
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
C A
T E
G O
R Y
C O
D E of Engineers ® US Army Corps
A
D E
S
IG
N E
D B
Y
F
IL
E N
A M
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
F Y
O O
L O
G A
H L
A K
E B
U L
K H
E A
D R
E P
L A
C E
M E
N T
O O
L O
G A
H D
A M
R
O G
E R
S C
O U
N T
Y O
K L
A H
O M
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
B/ SKIN PL
T/ SKIN PL
S-001
M .H
A R
V E
Y
M .H
A R
V E
Y
D J A
R V
IS
P
.E
J O
E L
A R
G E
P
.E
J U
L Y
S T
R U
C T
U R
A L
N O
T E
S
O O
L O
G A
H B
U L
K H
E A
D
FABRICATION NOTES
GENERAL NOTESOOLOGAH LAKE BULKHEAD DESIGN DATA
(NGVD29).
4. ALL ELEVATIONS IN THIS SET ARE BASED ON THE NATIONAL GEODETIC VERTICAL DATUM OF 1929
ELEVATION 580.5 FT, RESPECTIVELY.
HEAD OF 93.5 FT. THE BOTTOM AND TOP ELEVATION OF THE BULKHEAD IS ELEVATION 572.5 FT AND
3. THE BULKHEAD IS DESIGNED FOR A MAXIMUM ELEVATION OF 666.0 FT RESULTING IN A MAXIMUM
HYDRAULIC STEEL STRUCTURES".
2. THE BULKHEAD IS DESIGNED FOLLOWING THE REQUIREMENTS OF ETL-1110-2-584, "DESIGN OF
BOLTS IS 3,400 LBS.
1. THE ESTIMATED DRY WEIGHT OF THE BULKHEAD, INCLUDING, RUBBER SEALS, PAINT, WELDS AND
LENGTH, AND SWAGE SLEEVE LOOP WITH HEAVY DUTY THIMBLE.
" Ø 6x19 GALVANIZED WIRE ROPE 9'-6" IN 4
" Ø PIN, 8
" Ø OPEN SPELTER SOCKET WITH 14
S-201:
3. PROVIDE TWO OF THE FOLLOWING FOR LIFTING CABLE CONNECTION AS SHOWN IN DETAIL ON
MUST BE UTILIZED DURING ANY LIFTING OPERATIONS.
2. BULKHEAD MUST NEVER BE LIFTED UTILIZING ONLY ONE LIFTING LUG. BOTH LIFTING LUGS
THE HORIZONTAL WHEN BEING LIFTING FROM THE HORIZONTAL OR VERTICAL POSITION.
1. SLINGS USED TO PICK UP BULKHEAD MUST HAVE CABLES SLOPING NOT LESS THAN 45° WITH
FLUOROCARBON FILM NO. 4508 AND MUST HAVE A TENSILE STRENGTH OF 2,000 PSI (ASTM D 412).
DUROMETER HARDNESS (SHORE TYPE A) OF 60 TO 70 (ASTM D 2240). THE FILM MUST BE
21. THE RUBBER SEALS MUST HAVE A TENSILE STRENGTH OF 3,000 PSI (ASTM D 412) AND A
".32
ANY POINT FROM TRUE PLANE MUST NOT EXCEED
" PER FOOT AND THE MAXIMUM DEVIATION AT 64
DEVIATE FROM A TRUE PLANE BY MORE THAN
20. THE SURFACES OF ALL SEAL BACK UP BARS AFTER WELDING TO THE BULKHEAD MUST NOT
ALL DIMENSIONS, INCLUDING LENGTH OF FASTENERS BEFORE START OF FABRICATION.
19. CORRECT FIT OF PARTS IS THE FABRICATOR'S RESPONSIBILITY. THE FABRICATOR MUST VERIFY
AS THE BULKHEAD. PAINTING OF BOLT HOLES MUST BE APPLIED BY BRUSH.
18. ENSURE THAT THE INSIDE OF ALL BOLT HOLES ARE PAINTED USING THE SAME COATING SYSTEM
WELDS AND WT BEAM WEBS.
17. AVOID PLACING BOLT HOLES (CENTER OF HOLE) WITHIN ONE INCH OF VERTICAL DIAPHRAGM
SNUG TIGHT.
AND SEAL BOLT SPACING SHALL NOT EXCEED 5 INCHES ON CENTER, AND SHALL BE INSTALLED
LOCKING WASHER, AND HEX NUTS CONFORMING TO ASTM F594 (ALLOY GROUP 1, CONDITION AF)
" Ø, WITH COUNTERSUNK HEADS, STANDARD STAINLESS STEEL WASHERS, 2
16. SEAL BOLTS MUST BE
SYSTEM AS THE BULKHEAD.
CONDITION AF. ALL STAINLESS STEEL FASTNERS AND PLATES MUST BE PAINTED USING THE SAME
ASTM A240, TYPE 304L. SEAL BOLTS MUST CONFORM TO ASTM F593, ALLOY GROUP 1,
15. ALL SEAL BOLTS AND SEAL PLATES MUST BE STAINLESS STEEL. SEAL PLATES MUST CONFORM TO
SMOOTH AND SHALL BE 100% UT TESTED.
OF RECORD. ALL SPLICES MUST BE COMPLETE JOINT PENETRATION GROOVE WELDS GROUND
14. SPLICES ARE NOT PERMITTED IN PLATES UNLESS SUBMITTED AND APPROVED BY THE ENGINEER
WELDS, FASTNERS, AND SIMILAR SURFACE IRRGULARITIES.
MUST CONSIST OF A PRELIMINARY STRIPE COAT APPLIED BY BRUSH ON EDGES, CORNERS,
AND COVERAGE RATE MUST BE CONSISTENT WITH MANUFACTURER'S INSTRUCTIONS. EACH COAT
13. BULKHEAD MUST BE PAINTED USING A VINYL-ZINC RICH PAINT SYSTEM (5-E-Z). FILM THICKNESS
SURFACE PROFILE IN ACCORDANCE WITH ASTM D4417, METHOD C.
12. BULKHEAD SURFACE PREPARATION MUST BE WHITE METAL BLASTED (SSPC-SP5). MEASURE
RUBBER SEALS.
BE PAINTED. ALLOW FOR A MINIMUM DRYING PERIOD OF 6 DAYS PRIOR TO INSTALLATION OF
11. AFTER ALL WELDING AS BEEN COMPLETED, AND ALL WELDS INSPECTED, THE BULKHEAD MUST
TO THE CENTER OF GRAVITY OF THE BULKHEAD TO ENSURE THAT THE BULKHEAD HANGS LEVEL.
GRAVITY PRIOR TO LOCATING THE LIFTING LUGS. ADJUST THE LOCATION OF THE LIFTING LUGS
10. THE BULKHEAD FABRICATOR MUST HANG THE BULKHEAD AND DETERMINE THE CENTER OF
" RADIUS PRIOR TO COATING.8
9. ALL CORNERS AND EDGES OF PLATES IN CONTACT WITH RUBBER SEALS MUST BE ROUNDED
COOLING TIMES IN AWS D1.5 SECTION 12.16.4.
PROVIDE REPORT TO GOVERNMENT IN ACCORDANCE WITH AWS D1.5. NOTE INSPECTION
LEVEL II OR LEVEL III NDT TECHNICIAN WITH CERTIFIED WELDING INSPECTOR (CWI). CWI MUST
PENETRATION WELDS MUST BE 100% ULTRASONIC TESTED. TESTING MUST BE PERFORMED BY
8. ALL FILLET WELDS MUST BE 100% MAGNETIC PARTICLE TESTED. ALL COMPLETE JOINT
7. ALL WELDS MUST BE CONTINUOUS AND WATERTIGHT TO SEAL THE STRUCTURE.
PERMISSION FROM THE ENGINEER OF RECORD. ALL FAYING SURFACES MUST BE SEAL WELDED.
6. WELDING THAT IS NOT SHOWN ON THE PLANS WILL NOT BE PERMITTED EXCEPT BY WRITTEN
5. ALL WELDING MUST CONFORM TO AWS D1.5 8TH EDITION (2020).
4. ALL WELDS TO FRACTURE CRITICAL MEMBERS ARE CONSIDERED FRACTURE CRITICAL.
DIAPHRAGMS, SEAL FILLER PLATES, BEARING SEAL PLATES, AND MECHANICAL VALVE.
OTHERWISE. THE FOLLOWING MEMBERS ARE NOT CONSIDERED FRACTURE CRITICAL: VERTICAL
3. ALL MEMBERS MUST BE CONSIDERED FRACTURE CRITICAL MEMBERS UNLESS NOTED
CRITICAL MEMBERS AND ASTM A572 T2 GRADE 50 FOR ALL OTHER MEMBERS.
2. ALL STRUCTURAL STEEL, MUST CONFORM TO ASTM A709 F2 GRADE 50 STEEL FOR FRACTURE
1. FABRICATE AND DELIEVER ONE (1) BULKHEAD AS SHOWN.
A9
ELEVATION VIEW
OOLOGAH BULKHEAD - LOADING
SCALE: N.T.S.
S K
IN
P
L A
T E
S
ID
E
D9
OOLOGAH BULKHEAD DOWNSTREAM
ISOMETERIC VIEW -
SCALE: N.T.S.
D7
4 INCH VALVE
BULKHEAD ELEVATION-
SCALE: N.T.S.
BULKHEAD VALVE INSTALLATION
SKIN PLATE ONCE VALVE HAS BEEN SELECTED.
4. FABRICATOR MUST PROVIDE, FOR GOVERNMENT APPROVAL, CONNECTION DETAIL FOR VALVE TO
3. VALVE MUST FIT A SCHEDULE 40, 4 INCH PIPE. PIPE MUST MEET SPECIFICATION ASTM A53.
PIPE BALL VAVLE AND MEET SPECIFICATION ASTM A105.
2. INSTALL VALVE WITH A SLIP-ON FLANGE. FLANGE MUST BE SUITABLE FOR SCHEDULE 40, 4 INCH
TOWARDS TOP OF GATE FOR THE OPEN POSITION.
INSTALLED LEVER MUST BE HORIZONTAL FOR THE CLOSED POSITION AND ROTATE VERTICAL
316 STAINLESS STEEL. VALVE AND COMPONENTS DO NOT REQUIRE PAINT COATING. WHEN
VALVE MUST HAVE A MANUAL, LOCKABLE LEVER. SELECT LEVER WITH HOLE IN THE END. USE
1. 4 INCH BALL VALVE MUST BE FLANGED STYLE AND MEET SPECIFICATION ASTM B16.10, CLASS 150.
ABBREVIATIONS
WELDING PROCEDURE SPECIFICATIONSWPS
VERTICALVERT.
ULTRASONIC TESTINGUT
TYPICALTYP.
TOPT/
SIMILARSIM.
RADIUSR
QUALITY ASSURANCEQA
PLATEPL
ON CENTERO.C.
MAGNETIC PARTICLE TESTINGMT
MAXIMUMMAX
FRACTURE CRITICAL MEMBERFCM
FRACTURE CONTROL PLANFCP
FEETFT
ENGINEER OF RECORDEOR
DIAPHRAGMDIAP.
COMPLETE JOINT PENETRATIONCJP
CERTIFIED WELDING INSPECTORCWI
CENTER OF GRAVITYCOG
CENTER LINECL
BOTTOMB/
BEARINGBEAR SURCHARGE POOL
TOP OF
ELEV. 666.0'
SUBMITTAL REQUIREMENTS
DIMENSIONS AND SUBMIT DOCUMENT. VERIFY CONTROL DIMENSIONS PRIOR TO WITNESS POINTS.
AFTER FABRICATION OF STRUCTURE BUT, PRIOR TO PAINTING RECORD AND SUBMIT THE ACTUAL
CONTROL DIMENSIONS:
CAMPAIGN, IL 61822
2902 NEWMARK DRIVE
ATTN: PAINT LABORATORY
US ARMY CERL
BEFORE PAINTING COMMENCES.
ADDRESS FOR GOVERNMENT TESTING. ALLOW FOR GOVERNMENT TESTING OF SAMPLES TO OCCUR
SUBMIT PRODUCT SAMPLES OF EACH BATCH OF THINNER, SOLVENT, AND PAINT TO THE FOLLOWING
PAINT SAMPLING:
CERTIFICATE.
PROVIDE A CERTIFIED SSPC QP 1 PAINTING CONTRACTOR. SUBMIT A COPY OF THE SSPC QP 1
QUALIFIED PAINTING CONTRACTOR:
AN ACCURACY OF +/- 3% OR BETTER AS CERTIFIED BY THE MANUFACTURER.
ALL COATING THICKNESS MEASUREMENTS ON FERROUS METAL SUBSTRATES. GAGES MUST HAVE
GAGES. MAGNETIC FLUX THICKNESS GAGES AS DESCRIBED IN ASTM D7091 MUST BE USED TO MAKE
SUBMIT DOCUMENTATION OF MANUFACTURER'S CERTIFICATION FOR ALL COATING THICKNESS
PAINT COATING THICKNESS GAGE QUALIFICATIONS:
MEASURED FILM THICKNESS AND SPREADING RATE.
PREPARATION AND APPLICATION, ELAPSED TIME FOR RECOAT, NUMBER OF COATS APPLIED, AND
RELATIVE HUMIDITY, TYPE OF PAINT WITH BATCH NUMBER, ELAPSED TIME BETWEEN SURFACE
INCLUDE MODE OF APPLICATION, AMBIENT TEMPERATURE, SUBSTRATE TEMPERATURE, DEW POINT, PERFORMED, SURFACE PROFILE MEASUREMENTS, AND APPLICATION OPERATIONS PERFORMED TO
SUBMIT A REPORT OF INSPECTIONS PERFORMED, SURFACE PREPARATION OPERATIONS
PAINT INSPECTION REPORTS:
SUBMIT PRODUCT DATA SHEET OR OTHER WRITTEN INSTRUCTIONS FOR EACH TYPE OF PAINT USED.
PAINT MANUFACTURER'S PRODUCT DATA SHEET:
COMPLETE. SUBMIT A RECORD OF WITNESS POINTS.
THE HANG TEST. FINAL QA INSPECTION SHALL OCCUR AFTER PAINTING AND STRUCTURE IS
COMPLETED AND PRIOR TO BLASTING. INTERMEDIATE TWO QA INSPECTION SHALL OCCUR DURING
WELDING. INTERMEDIATE ONE QA INSPECTION SHALL OCCUR AFTER ALL WELDING HAS BEEN
OCCUR AFTER ALL STRUCTURAL COMPONENTS ARE FABRICATED AND FITTED BUT, PRIOR TO
INTERMEDIATE ONE, INTERMEDIATE TWO, AND FINAL QA INSPECTION. INITIAL QA INSPECTION MUST
AT MINIMUM ALLOW EOR TO INSPECT STRUCTURE AT FOUR WITNESS POINTS FOR INITIAL,
WITNESS POINTS:
INSPECTORS AND NDT PERSONNEL.
LEVEL II OR III. SUBMIT COPIES OF CERTIFICATES SHOWING QUALIFICATIONS FOR WELDING
PERSONNEL PERFORMING NDT MUST BE QUALIFIED IN ACCORDANCE WITH ANSI/ASNT CP-189 NDT
PROVIDE AN AWS CWI AS THE PRIMARY POINT OF CONTACT FOR QUALITY CONTROL OF WELDING.
INSPECTOR QUALIFICATIONS:
REQUIREMENTS.
PROCEDURES, QUALIFICATIONS, AND CERTIFICATES SHOWING COMPLIANCE WITH FCP
SUBMIT A FCP FOR WELDING ON ALL FCM IN ACCORDANCE WITH AWS D1.5. SUBMIT WELDING
FRACTURE CONTROL PLAN:
IDENTIFY EACH WPS AND REFERENCE IT ON THE SHOP DRAWINGS.
EACH WELD, INCLUDING PREQUALIFIED WELDS BEFORE FABRICATION IS COMMENCED. INDIVIDUALLY
DOCUMENTATION ON FORMS SIMILAR OR EQUIVALENT TO THE SAMPLE FORMS IN AWS D1.5 FOR
SUBMIT A WPS, WITH SUPPORTING PROCEDURE QUALIFICATION RECORDS AND SUPPORTING TEST
WELDING PROCEDURE SPECIFICATIONS (WPS):
WHETHER THE WELD IS ACCEPTABLE.
DATE OF INSPECTION, NDT PERFORMED, DEFECTS FOUND AND CORRECTIVE ACTION TAKEN, AND
TYPE OF WELD, WELD POSITION, APPLICABLE WPS REFERENCE, WELD OPERATOR, CWI NAME AND
PROJECT. INCLUDE IN THE LOG THE MEMBER TO BE WELDED, MEMBER TYPE (FCM AND NON-FCM), SUBMIT A LOG CAPABLE OF INDIVIDUALLY IDENTIFYING AND TRACKING EVERY WELD ON THE
WELD TRACKING LOG:
SUBMIT ERECTION DRAWINGS SHOWING COMPLETE INFORMATION.
ERECTION DRAWINGS:
OR A QUALIFIED PERSON.
ASME B30.9-2018. PROOF LOAD TESTING SHALL BE PREFORMED BY THE PRODUCT MANUFACTURER
SUBMIT PROOF LOAD TEST REPORTS FOR THE WIRE ROPE AND SOCKET IN ACCORDANCE WITH
PROOF LOAD TESTING:
DEVELOPED BY THE FABRICATOR ON THE SHOP DRAWINGS.
WELD. CLOUD ANY ITEMS INADVERTENTLY OMITTED ON PROVIDED DRAWINGS AND ALL DETAILS
AS WELL AS ALL TEMPORARY WELDS. IDENTIFY WELD PROCEDURES AND NDE REQUIRED FOR EACH
AND CLASS OF MATERIAL. IDENTIFY ALL FCM, INCLUDING ATTACHMENTS THAT MEET FCM DEFINITION
INCLUDE CATALOG CUTS, TEMPLATES, FABRICATION, AND ASSEMBLY DETAILS, AND TYPE, GRADE, PRIOR TO PERFORMING ANY HSS FABRICATION SUBMIT COMPLETE, DETAILED SHOP DRAWINGS.
SHOP DRAWINGS:
ALL SUBMITTALS MUST BE SUBMITTED TO THE EOR FOR APPROVAL.
"2
SOCKET
OPEN SPELTER 4
HOLE FOR�" 2
"4
(FCM)
" PL4
"41 2R
WEB PLATE
EDGE BEAM
W8 WEB
"21 1R
8'-0" OUTSIDE EDGES OF SKIN PLATE
CL DIAPHRAGM
CL BULKHEAD
4'-0"
DETAIL THIS SHEET
LIFTING LUG, SEE
" SKIN PLATE (FCM)8
DIAPHRAGM
" x 6" VERTICAL8
WT8x28.5, TYP. (FCM)
(FCM)
FLANGE PLATE
" EDGE BEAM2
LOCKING WASHER AND THEN NUT.
PLAIN WASHER FOLLOWED BY
BOLTS SHALL BE INSTALLED WITH
SPACED AT 5" O.C. MAX, TYP.
COUNTERSUNK SEAL BOLTS �" 2
" BEARING SEAL PLATE2
1" x 18
" BEARING SEAL PLATE2
1" x 18
1'-3"
ADDITIONAL DETAILS
SEE S-001 FOR
BULKHEAD VALVE,
" x 0'-7"4 3" x 4
3PL
EDGE BEARING
EDGE OF J-BULB SEAL
", TYP.16
8'-0" OUTSIDE EDGES OF SKIN PLATE
"2
14WEB PL, TYP.
" EDGE BEAM 8
J-BULB SEAL
WT8x28.5
" LENGTH OF HORIZONTAL WT BEAM8
17'-10
PL, TYP.
BEAM FLANGE
" x 5" EDGE 2
8PLATE SEAL
" BEARING 2
1 x 1"8
" x 3" x 7'-2" FILLER PLATE2
DIAPHRAGM
" VERTICAL8
"4
3" x 4
3PL
EDGE BEAR
"4
8'-0" OUTSIDE EDGES OF SKIN PLATE
", TYP.16
"16 13'-11"16
13'-11
BEAMS 2,3,&4.
DRAIN HOLE AT �2"
AT BEAMS 2,3,&4
ACCESS HOLE
" RADIUS2
" " SKIN PLATE8
WT8x28.5
"2 11'-6 "2
11'-7 "16 19 "16
19 "2 11'-7 "2
11'-6
DIAPHRAGM
" VERTICAL8
"4
"2 1±3
"16
SEE NOTE ON S-001
BULKHEAD COG,
O
U T
S
ID
E E
D G
E S
O F
J -B
U L
B S
E A
L
(FCM)
WEB PL
BEAM
" EDGE 8
SKIN PL
" 8
TYP.
WT8x28.5, SEAL PL
" BEAR8
PLATE
" FILLER 2
SEAL PL
" BEAR8
DIAPHRAGM
" x 6" VERT8
6"
HOLE
ACCESS
" R 2
TYP.
WT8x28.5, SKIN PL
"8
2" DRAIN HOLE
"2
10"
3"
"16 91"16
FLANGE PL
EDGE BEAM
SKIN PLATE
WT8x28.5
"4
WEB PL
BEAM
EDGE
SPLICED CORNER
HOT VULCANIZED
90° J-BULB
STRAIGHT PIECE
J-BULB
6"
5"
SEAL BOLT, TYP.
" LONG4
3 x 2�" 2
"2
"16
7 3
LIFTING LUG
GALVANIZED
PIN MUST BE HOT DIPPED
SOCKET, COTTER PIN AND
PIN�" 8
3SOCKET WITH 1
OPEN SPELTER �" 4
WIRE ROPE
6X19 GALVANIZED
x 120'-0" LONG�"4
HEAVY DUTY THIMBLE
SWAGE SLEEVE LOOP WITH
"2
1" R
" PLATE8
"4
EDGE WEB PL
FLANGE
GIRDER
"2
5"
FLANGE PL
EDGE
BEAM 1
CL
BEAM 2
CL
BEAM 3
CL
BEAM 4
CL
BEAM 5
CL
T/ SKIN PL
B/ SKIN PL
B/ EDGE BEAR PL
SHEET ID
T U
L S
A
O K
L A
H O
M A
E s t
S T
R E
E T
T U
L S
A D
IS
T
R
IC
T U
.S A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
A N
S I
D
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
C A
T E
G O
R Y
C O
D E of Engineers ® US Army Corps
A
D E
S
IG
N E
D B
Y
F
IL
E N
A M
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
F Y
O O
L O
G A
H L
A K
E B
U L K
H E
A D
R E
P L A
C E
M E
N T
O O
L O
G A
H D
A M
R
O G
E R
S C
O U
N T
Y O
K L A
H O
M A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
FLANGE
EDGE BEAM
FILLER PL TO
CJP, TYP.
1 TYP.
1 TYP.
TO WT FLANGE, TYP.
FLANGE PLATE
EDGE BEAM
PL
T/ SKIN
PL
B/ SKIN
1 TYP.
PL
B/ SKIN
PL
T/ SKIN
TYP.
SKIN PL,
WT TO
1 TYP.
TYP.
PLATE
B/ SKIN
M .H
A R
V E
Y
M .H
A R
V E
Y
D .J
A R
V
IS
P
.E
J O
E L
A R
G E
P
.E
J U
L Y
S-201
O O
L O
G A
H B
U L
K H
E A
D D
E T
A
IL
S
BULKHEAD PLAN VIEWB1
SCALE: 1 1/2" = 1'-0"S-201
C1
OOLOGAH BULKHEAD DOWNSTREAM ELEVATION
SCALE: 1 1/2" = 1'-0"
TYP. SECTION - BEAMS, 2,3,&4A1
SCALE: 1 1/2" = 1'-0"S-201
LIFTING LUG DETAIL
SCALE: 6" = 1'-0"
SECTIONC7
SCALE: 1 1/2" = 1'-0"S-201
SECTIONC8
SCALE: 1 1/2" = 1'-0"S-201
CORNER J-BULB DETAILD9
SCALE: 3" = 1'-0"S-201
F9
J-BULB AND SEAL PL DETAILC9
SCALE: 3" = 1'-0"S-201
A7
LIFTING CABLE DETAIL
SCALE: 3" = 1'-0"
VERTICAL DIAPHRAGM PL
TOP & BOTTOM
A9
SCALE: 3" = 1'-0"S-201
CLARITY.
NOT SHOWN FOR
NOTE: VERT. DIAP. PL
SIM. DETAIL TOP SEAL & PL
FACTOR OF 5.
ON S-001. ALL RIGGING COMPONENTS MUST HAVE A DESIGN
SOCKET MUST BE PROOF TESTED, SEE SUBMITTAL REQUIREMENTS
NOTE: ALL MATERIALS PROVIDED MUST BE NEW. WIRE ROPE AND
NOT SHOWN FOR CLARITY.
NOTE: EDGE BEARING PLATE
EDGE BEARING PL DETAILB9
SCALE: 3" = 1'-0"S-201
S-201
A1
S-201
B1 S-201
C7
S-201
C8
S-201
D9
S-201
C9
S-201
A9
S-201
B9
| S-001 |
| S-201 |
File details come from the government source that posted it. Updated .