W912BV20R0040 - AM08.pdf
PDF 901 KB Posted
- Attached to
- Unit 1 & 2 Generator Stator Rewind Federal contract opportunity
- Solicitation number
- W912BV20R0040
About this file
This document provides details for a federal solicitation seeking a contractor to rewind two hydroelectric generating units. The Tulsa District Corps of Engineers requires furnishing all labor, materials, and equipment to perform work including designing and testing prototype coils, manufacturing and installing new stator windings, refurbishing rotor and collector rings, performing electrical and mechanical tests, reassembling the generator units, and providing on-site services during installation and testing. Bidders must provide pricing for 16 base line items including design, manufacturing, installation of new stator bars, refurbishing various components, testing plans, and reassembly of the units. An additional 24 optional line items cover services such as welding, machining, painting, and shipping spare parts. The response deadline is January 14, 2021. The solicitation seeks to have the work completed at the Keystone Powerhouse in Sand Springs, Oklahoma.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912BV20R0040 - AM07.pdf | ||
| W912BV20R0040 - AM06.pdf | ||
| W912BV20R0040 - AM05 KeystoneGeneratorRewindAM0005 revised 30 Nov 20.pdf | ||
| W912BV20R0040 - AM04.pdf | ||
| W912BV20R0040 - AM03.pdf | ||
| W912BV20R0040-AM02.pdf | ||
| Pre-Proposal Site Visit Request Form.pdf | ||
| W912BV20R0040-AM01.pdf | ||
| Drawings7_22_20.pdf | ||
| W912BV20R0040 ..pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Keystone Generator Rew ind
1. Amendment 0008 is hereby issued replace the entirety of Section 00 11 00, CLIN Schedule. The RFP due date remains 14 January 2021 at 2:00 PM CST.
2. All other terms and conditions remains unchanged by this amendment.
3. The point of contact for this action is Shaw n Brady at (918) 669 - 7670 or shaw n.brady@usace.army.mil.
1. CONTRACT ID CODE PAGE OF PAGES
1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Jan-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912BV20R0040
X 9B. DATED (SEE ITEM 11)
05-Jan-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Jan-2021
CODE
CONTRACTING DIV
US ARMY CORPS OF ENGINEERS, TULSA DISTRICT
2488 E. 81ST STREET
TULSA OK 74137-4290
W912BV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
KEYSTONE GENERATOR REWIND FY20 KYSTNGNTRRWFY2
DOCUMENT 00 11 00 Page 2
W912BV20R0040
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SECTION 00 11 00 - SF 1442 AND CLIN SCHEDULE
SUMMARY OF CHANGES
SECTION 00 11 00 - SF 1442 AND CLIN SCHEDULE
The solicitation issue date has changed from 10-Sep-2020 to 05-Jan-2021.
The following have been added by full text:
CLIN SCHEDULE
Section 00 11 00 Replaced by *AM8 in its entirety
SECTION 00 11
00 BID SCHEDULE
PART 1 GENERAL
1.1 BID ITEMS
Item Description
Quantity
Unit
Unit Price
Amount
BASE BID ITEMS
01 All Other Work Not Listed Seperately 1
Job $ $
0002 Design, Manufacture, and Perform Voltage Endurance Testing on 8 Prototype Bars 1
Job
Manufacture and Cycling Test on
Perform Thermal 5 Prototype Bars
Furnish Complete Set of Stator Bars Including Supplies and Accessories for A Complete New Winding Including Factory Testing
Each
`0005 Furnish Spare Parts 1 Job $ $
0006 Remove Stator Winding 2 Each $ $
0007 Clean, Inspect and Test Stator Core
0008 Install and Test Stator Winding
KEYSTONE GENERATOR REWIND FY20 KYSTNGNTRRWFY2
DOCUMENT 00 11 00 Page 3
0009 Clean and Inspect Rotor, Clean and Test Field Winding
0010 Perform Generator Special Field Tests
0011 Disassemble Generating Unit Including Inspections of Components
0012 Operational Testing of Unit 2 Prior to Disassembly
0013 Reassemble the Generating Unit 2 Each $ $
0014 Operational Testing of Unit
After Reassembly 1 Job $ $
0015 Rotor Balancing Procedure And Materials 1 Job $ $
0016 Perform Model Validation Testing 1 Job $ $
OPTIONAL ITEMS
0017a Miscellaneous Welding 200 Pounds $ $
0017b Welding Service 320 MH $ $
0017c Machinist Hire 320 MH $ $
0017d Electrician Hire 320 MH $ $
0017e Painter Hire 320 MH $ $
0017f Millwright Hire 320 MH $ $ __
0017g General Laborer 320 MH $ $
0017h Liquid Penetrant
Method 160 MH $ $
0017i
Magnetic Particle Method
MH
0017j Ultrasonic Method 160 MH $ $
0018 Perform Additional Interlaminar Insulation Test
0019 Ship Turbine Guide Bearing 3 Each $ $
0020 Refurbish Turbine Guide Bearing 3 Each $ $
0021 Refurbish Turbine Guide Bearing Split Flange Face and Spigot Fit
0022 Ship and Refurbish Generator Guide Bearing Pads
0023 Replace Packing Box Assembly 2 Each $ $
0024 Miscellaneous Parts and Materials
1 NTE $50,000
-- End of Document --
SUMMARY OF CHANGES (AM08)
AMENDMENT 0008
W912BV20R0040
KEYSTONE GENERATOR REWIND
1. The revised/new sections/appendices/pages listed below are hereby added to or revised and made a part of the solicitation.
00 11 00, Bid Schedule, replace in entirety (CLINS 19, 20, and 22 quantities changed to “3”)
2. Delete the following sections in their entirety:
DELETED SECTIONS
N/A
3. The revised drawings listed below are hereby added to or revised and made a part of the solicitation:
REVISED DRAWINGS
N/A
ADDED DRAWINGS
N/A
-- END CONTINUATION SHEET --
The following have been deleted:
SUMMARY OF CHANGES
(End of Summary of Changes)
File details come from the government source that posted it. Updated .