W912BV20R0040-AM01.pdf
PDF 410 KB Posted
- Attached to
- Unit 1 & 2 Generator Stator Rewind Federal contract opportunity
- Solicitation number
- W912BV20R0040
About this file
This document provides an amendment to a solicitation for a generator stator rewind project. The Tulsa District Corps of Engineers is seeking to rewind two approximately 50 MVA hydroelectric generating units at the Keystone Powerhouse in Sand Springs, Oklahoma. Offerors must provide all labor, materials, equipment and services necessary to design, manufacture, test, deliver, install and commission new stator coils and accessories for the two generators. This will include prototype testing, on-site disassembly and reassembly of the units, refurbishment and repair work. The response due date is extended to December 19, 2020 by this amendment. An organized site visit is scheduled for November 19, 2020 at the project location to allow for inspection of the units.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912BV20R0040 - AM08.pdf | ||
| W912BV20R0040 - AM07.pdf | ||
| W912BV20R0040 - AM06.pdf | ||
| W912BV20R0040 - AM05 KeystoneGeneratorRewindAM0005 revised 30 Nov 20.pdf | ||
| W912BV20R0040 - AM04.pdf | ||
| W912BV20R0040 - AM03.pdf | ||
| W912BV20R0040-AM02.pdf | ||
| Pre-Proposal Site Visit Request Form.pdf | ||
| Drawings7_22_20.pdf | ||
| W912BV20R0040 ..pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Keystone Generator Rew ind
1. Amendment 0001 is hereby issued to update Bidder's Inquiry Key for Projnet and Site Visit informaton.
2. Request for Proposal due date is extended to 19 December 2020.
3. All other terms and conditions remain unchanged by this amendment.
4. The point of contact for this action is Shaw n Brady at (918)669-7670 or shaw n.brady@usace.army.mil.
1. CONTRACT ID CODE PAGE OF PAGES
1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-Sep-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912BV20R0040
X 9B. DATED (SEE ITEM 11)
10-Sep-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Sep-2020
CODE
CONTRACTING DIV
US ARMY CORPS OF ENGINEERS, TULSA DISTRICT
2488 E. 81ST STREET
TULSA OK 74137-4290
W912BV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912BV20R0040
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SECTION 00 11 00 - SF 1442 AND CLIN SCHEDULE
SUMMARY OF CHANGES
SECTION 00 11 00 - SF 1442 AND CLIN SCHEDULE
The required response date/time has changed from 14-Oct-2020 02:00 PM to 19-Dec-2020 02:00 PM.
SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS & NOTICES TO OFFERORS
The following have been modified:
INSTRUCTIONS TO OFFERORS
SECTION 00 21 00
INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
1.0 GENERAL INFORMATION
1.1 GENERAL DESCRIPTION OF WORK
1.2 GOVERNMENT SECURITY REQUIREMENTS
1.3 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
1.4 OFFEROR'S QUESTIONS AND COMMENTS
1.5 SMALL BUSINESS SIZE STANDARD/NAICS CODE
1.6 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
1.7 ACCURACY IN PROPOSALS
1.8 PROPOSAL SUBMITTALS
1.9 PROPOSAL FORMAT
1.10 JOINT VENTURE PROPOSAL REQUIREMENTS
1.11 DEVIATIONS AND EXCEPTIONS
1.0 GENERAL INFORMATION
1.1. GENERAL DESCRIPTION OF WORK
The Tulsa District Corps of Engineers has a requirement to perform all work required to rewind two approximately 50 MVA hydroelectric generating units at Keystone Powerhouse, Sand Springs, OK. The contractor shall furnish all labor, material, and equipment to perform this work in strict accordance with the detailed requirements of the specifications and associated drawings. The work described within these specifications shall include, but not necessarily be limited to, the following:
1. Design, manufacture, and perform Voltage Endurance test on prototype coils (or Roebel bars).
2. Perform Thermal Cycle test on prototype coils (or Roebel bars).
3. Design, manufacture, shop test, prepare and load for shipment, deliver f.o.b. destination, and unload two complete sets of stator coils (or Roebel bars) and specified accessories.
4. Pre-disassembly mechanical and electrical testing, and alignment checks of two hydroelectric generating units.
5. Disassemble two generator units, including the exciter equipment, air housing, and rotor.
6. Remove old stator coils, install and test new stator windings and accessories.
7. Clean, inspect, and test stator iron; perform necessary repairs to stator iron.
8. Furnish and Install new surge rings, circuit rings, main leads, and neutral leads.
9. Refurbish (machine) the collector rings.
10. Clean and inspect rotor, clean and test the rotor field poles winding.
11. Furnish spare parts.
12. Perform generator special field tests.
13. Furnish manufacturer’s representative on-site services to supervise installation of the generator stator coils (or Roebel bars), reassembly, and to perform start-up, commissioning, and testing of two generators.
1.2. GOVERNMENT SECURITY REQUIREMENTS
The Offeror(s) must ensure that ALL mail sent to the Tulsa District, U.S. Army Corps of Engineers, either pre-contract or post-contract award, has a return mailing address on the outside of the envelope, package, box, etc.
ANY MAIL addressed to the U.S. Army Corps of Engineers, including but not limited to bids, modifications to bids, proposals, revised proposals, bonds, correspondence, etc., WILL BE REJECTED by the US Army Corps of Engineers mail room facility located at 2488 E 81st Street, Tulsa, OK 74137-9998, if it does not contain a return mailing address. There will be no exceptions.
USACE Tulsa District Point of Contact is:
Shawn Brady Phone: 918-669-7670 Email: shawn.brady@usace.army.mil
Julie S. Hill Phone: 918-669-7699 Email: julie.s.hill@usace.army.mil
1.3. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation documents will be posted at https://beta.sam.gov.
Solicitation number: W912BV20R0040
It shall be the contractor’s responsibility to check the websites for any amendments. The Offeror shall submit in the proposal all requested information specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation.
Any information given to an Offeror which impacts the solicitation and/or offer will be given in the form of a written amendment to the solicitation.
1.4. OFFEROR'S QUESTIONS AND COMMENTS
All contractual matters, questions and or comments relative to these documents should be submitted via Bidder Inquiry in ProjNet at:
http://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=HomePagePublic
Instructions for registering in the ProjNet Bidder Inquiry system are available on the above web site.
The Bidder Inquiry Key for this project is: WR3DZV-QUJTQ7
Any information given to an offeror which impacts the solicitation and/or offer will be given in the form of a written amendment to the solicitation.
Note: All questions and/or comments should be entered in Bidder’s Inquiry no later than 14 calendar days prior to the proposal deadline, so they may be given consideration or action taken prior to receipt of offers.
1.5. SMALL BUSINESS SIZE STANDARD/NAICS CODE
See Section 00 45 00, FAR 52.204-8 for the small business size standard/NAICS Code.
1.6. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
This Request for Proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.
1.7. ACCURACY IN PROPOSALS
Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments).
The penalty for making false statements is prescribed in 18 U.S.C. 1001.
1.8. PROPOSAL SUBMITTALS
1.8.1 The submittal method for proposals is electronic via DoD SAFE or email ONLY (no mailed proposals). DoD SAFE web site: https://safe.apps.mil/
The following email address(es) must be entered for notification of proposal receipt and download availability:
shawn.brady@usace.army.mil julie.s.hill@usace.army.mil
1.8.2 Proposals will be received until the time and date shown on Standard Form SF 1442 or as amended on SF30.
Mail bid bonds to:
U.S. Army Corps of Engineers, Tulsa District ATTN: Shawn Brady, CESWT-CT-E 2488 E 81st Street, Tulsa, OK 74137-9998
1.8.3 The packaging shall be marked: “Solicitation Number: W912BV20R0040”
1.9. PROPOSAL FORMAT
See Section 00 22 11 for proposal requirements.
1.10. JOINT VENTURE PROPOSAL REQUIREMENTS
When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 and the bid bond unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. If this is an 8(a) or HubZone joint venture, the Offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124 and 13 CFR Part 126, respectively.
1.11. DEVIATIONS AND EXCEPTIONS
Deviations and exceptions to the terms and conditions of the solicitation in either the technical or price proposal are neither encouraged nor desired. Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined “unacceptable” and, thus, ineligible for award. Should the Offeror have any questions related to specific terms and conditions, these must be resolved prior to submission of the offer. Notwithstanding the above, if deviations and exceptions are included with the offer, the Offeror shall list and describe in detail the deviations and/or exceptions under Tab A. All deviations and exceptions shall be fully supported with the Offeror’s rationale and shall fully explain the impact, if any, on the performance and/or specific requirement of the RFP. Deviations from the minimum standard of quality required by the RFP shall not be accepted unless identified by the offeror’s proposal and specifically approved by the Contracting Officer in writing. If unapproved, the Contractor must provide the RFP requirements without additional cost to the Government. If approved, the accepted deviation will take precedence as a provision of the solicitation.
The Offeror shall also clearly describe on the Tab B submitted with the Price Proposal any exception to the contractual and/or technical terms and include the monetary impact on the solicitation with the price proposal. This information will not be evaluated separately but may impact the evaluation of other factors.
SECTION 00 72 00 - CONTRACT CLAUSES
The following have been modified:
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for-- 19 November 2020 will start at 0800
(c) Participants will meet at--
Keystone Powerhouse 23115 West Wekiwa Rd Sand Springs, OK 74063 (Tulsa County)
All in-person visitors will be required to follow CDC guidelines for manufacturing and all visitors will be screened for COVID-19 symptoms. Visitors will be required to certify in the English language they do not have symptoms including cough, shortness of breath or difficulty breathing, fever, chills, repeated shaking with chills, muscle pain, headache, sore throat, and new loss of taste or smell in the past 24 hours. Visitors body temperature may be checked prior to entry into the plant to identify anyone with a temperature of 100.4°F or greater (or reported feelings of feverishness). Visitors will be denied entry if exhibiting any of these symptoms. Visitors will be checked for appropriate PPE including hard hat, safety boots, and face covering. Once admitted into the plant, visitors must maintain a social distance of six (6) feet from one another and their assigned escort. The Government intends to have the Unit 1 rotor removed for access to the generator. Cameras and cell phones will be permitted in most areas, but visitors must not photograph security features of the plant. Visitors must remain with their assigned escort at all times. All questions shall be addressed in writing on the Projnet website as described in paragraph 1.5 above on Section 00 21 00, Instruction to Offerors.
Requirements to Attend the Site Visit In-Person Site Walk: Only registered persons will be permitted to attend the site visit in-person site walk. Only two persons from each business entity will be permitted to attend, and the site walk will be conducted with a maximum of 6 participants at a time.
U.S. Citizens:
To register, U.S. citizens interested in attending the site visit in-person site walk must submit a "SWT US Citizen Pre-Proposal Site Visit Request Form" to Shawn Brady shawn.brady@usace.army.mil no later than two (2) full business days prior to the site visit. If submitting the form in less than two days, the person may not receive approval for participation. Notification of approval or denial will be provided prior to the date of the site visit. The form is a pdf attachment on this amendment and is titled “SWT US Citizen Pre-Proposal Site Visit Request Form”.
Foreign Nationals (FNs):
FNs wishing to attend the in-person site walk shall request a “SWT Foreign Nationals Pre-Proposal Site Visit Request Form” from Shawn Brady by email to shawn.brady@usace.army.mil. Once the form is received and filled in, the form must be returned along with legible color copies of two of the following documents: Passport (unexpired or expired), Certificate of U.S. Citizenship (INS Form N-560 04 N-561), Certificate of Naturalization (INS Form N 550 or N-570), unexpired foreign Passport with I-551 stamp or attached INS Form I-94 indicating unexpired employment authorization, an Alien Registration Receipt Card with photo (INS Form I-151 or I-551), unexpired Temporary Resident Card (INS Form I-688), unexpired Employment Authorization Card (INS Form I- 688A), unexpired Reentry Permit (INS Form I-327), unexpired Refugee Travel Document (INS- Form I571), or unexpired Employment Authorization Documentation issued by the INS which contains a photograph (INS Form I- 688B) to Shawn Brady, by encrypted email to shawn.brady@usace.army.mil. These documents must be submitted and approved prior to visitation. Because of the current U.S. COVID-19 travel situation, additional processes require a waiver from the Department of Homeland Security for FNs who are not already in the U.S. For a waiver, the FN would already need to have an approved VISA in their passport. USACE is not responsible for coordinating travel or travel waivers.
(End of provision)
(End of Summary of Changes)