W912BV20R0040 ..pdf

PDF 10 MB Posted

Attached to
Unit 1 & 2 Generator Stator Rewind Federal contract opportunity
Solicitation number
W912BV20R0040
Issued by
Department of the Army Corps of Engineers Engineering District Tulsa

About this file

This federal contract opportunity solicitation seeks a contractor to perform rewind work on two generator stators located at the Keystone Powerhouse in Sand Springs, Oklahoma. The selected contractor will be responsible for designing, manufacturing, and testing prototype coils, disassembling and cleaning the generator units, removing old and installing new stator coils and accessories, refurbishing collector rings, performing electrical tests, and providing on-site services during reassembly and commissioning. The contractor must furnish all labor, materials, and equipment to complete pre-disassembly testing, coil replacement, cleaning of stator and rotor components, refurbishment, reassembly, and post-installation testing. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Tulsa. Responses are due by the date specified in the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Unit 1 & 2 Generator Stator Rewind, newest first.
File Type Posted
W912BV20R0040 - AM08.pdf PDF
W912BV20R0040 - AM07.pdf PDF
W912BV20R0040 - AM06.pdf PDF
W912BV20R0040 - AM05 KeystoneGeneratorRewindAM0005 revised 30 Nov 20.pdf PDF
W912BV20R0040 - AM04.pdf PDF
W912BV20R0040 - AM03.pdf PDF
W912BV20R0040-AM02.pdf PDF
Pre-Proposal Site Visit Request Form.pdf PDF
W912BV20R0040-AM01.pdf PDF
Drawings7_22_20.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. W912BV20R0040

US Army Corps of Engineers Tulsa District Keystone Powerhouse Arkansas River Watershed

Unit 1 & 2 Generator Stator Rewind

100% Specifications

July 29, 2020

KEYSTONE GENERATOR REWIND FY20 KYSTNGNTRRWFY20

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 21 00 00 22 11 00 41 00 00 45 00 00 72 00 00 73 00

INSTRUCTIONS TO OFFERORS

EVALUATION FACTORS FOR AWARD

BID SCHEDULE

CLAUSES INCORPORTATED BY REFERENCE

CONTRACT CLAUSES

SPECIAL CONTRACT REQUIREMENTS

DIVISION 01 - GENERAL REQUIREMENTS

CONTRACTOR'S SITE OPERATIONS

01 11 00 SUMMARY OF WORK

01 22 00.00 10 PRICE AND PAYMENT PROCEDURES

01 30 01 ADDITIONAL ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 PROJECT BINDER, PROJECT SIGN, AND SAFETY SIGN

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 78 39.00 24 AS-BUILT DRAWINGS

01 91 00.00 26 UNIT COMMISSIONING

DIVISION 05 - METALS

05 05 23.20 26 WELDING

05 05 33.20 26 NON-DESTRUCTIVE TESTING

05 50 03.20 26 METALWORK FABRICATION, MACHINE WORK, AND MISCELLANEOUS

PROVISIONS

DIVISION 26 - ELECTRICAL

26 05 00.00 26 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 19.00 26 INSULATED WIRE AND CABLE

DIVISION 48 - ELECTRICAL POWER GENERATION

48 13 13.02 26 DISASSEMBLY AND REASSEMBLY OF HYDRAULIC TURBINE GENERATOR

UNIT

48 13 13.04 26 EXISTING TURBINE COMPONENT, REFURBISHMENT AND REPLACEMENT

48 13 13.07 26 GUIDE BEARING INSPECTION AND OPTIONAL REFURBISHMENT

48 13 13.11 26 MISCELLANEOUS PARTS, MATERIALS, AND SERVICES

48 13 16.00 26 REWIND OF HYDRAULIC-TURBINE DRIVEN GENERATORS

48 70 01.00 26 NERC COMPLIANCE FOR HYDROGENERATORS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

Keystone Generator Rew ind

This acquisition w ill proceed as Full and Open Competition.

The NAICS code for this project is 237130 Pow er and Communication Line and Related Structures Construction w hich has a small business size standard of $39.5M.

IAW FAR 36.204, the cost magnitude of this project is betw een $5M - $10M.

RFP is due 10 Oct 2020 by 2:00 PM CST

SHAWN BRADY 918.669.7670

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

10-Sep-2020

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________515 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time __10 Oct 20___ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

CONTRACTING DIV

US ARMY CORPS OF ENGINEERS, TULSA DISTRICT

2488 E. 81ST STREET

TULSA OK 74137-4290

W912BV

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

918-669-7436FAX:TEL: TEL: FAX:

W912BV20R0040 58

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912BV20R0040

Section 00 11 00 - SF 1442 and CLIN Schedule

CLIN SCHEDULE

CLIN SCHEDULE

Item Description Quantity Unit Unit Amount Price

BASE BID ITEMS

0001 Design, Manufacture, and Perform Voltage Endurance Testing on 8 Prototype Bars 1 Job $__________ $__________

0002 Manufacture and Perform Thermal Cycling Test on 5 Prototype Bars 1 Job $__________ $__________

0003 Furnish Complete Set of Stator Bars Including Supplies and Accessories for a Complete New Winding Including Factory Testing 2 Each $__________ $__________

0004 Furnish Spare Parts 1 Job $__________ $__________

0005 Remove Stator Winding 2 Each $__________ $__________

0006 Clean, Inspect and Test Stator Core 2 Each $__________ $__________

0007 Install and Test Stator Winding 2 Each $__________ $__________

0008 Clean and Inspect Rotor, Clean and Test Field Winding 2 Each $__________ $__________

0009 Perform Generator Special Field Tests 1 Job $__________ $__________

0010 Disassemble Generating Unit Including Inspections of Components 2 Each $__________ $__________

0011 Operational Testing of Unit 2 Prior to Disassembly 1 Job $__________ $__________

0012 Reassemble the Generating Unit 2 Each $__________ $__________

0013 Operational Testing of Unit After Assembly 1 Job $__________ $__________

0014 Rotor Balancing Procedure And Materials 1 Job $__________ $__________

Total Base Items $__________

OPTIONAL ITEMS

0015a Miscellaneous Welding 200 Pounds $__________ $__________

0015b Welding Service 320 MH $__________ $__________

0015c Machinist Hire 320 MH $__________ $__________

0015d Electrician Hire 320 MH $__________ $__________

0015e Painter Hire 320 MH $__________ $__________

0015f Millright Hire 320 MH $__________ $__________

0015g General Labor 320 MH $__________ $__________

0015h Liquid Penetran Method 160 MH $__________ $__________

0015i Magnetic Particle Method 160 MH $__________ $__________

0015j Ultrasonic Method 160 MH $__________ $__________

0016 Perform Additional Interlaminar Insulation Test 1 Job $__________ $__________

0017 Operational Testing of Unit 1 Prior to Disassembly 1 Job $__________ $__________

0018 Ship Turbine Guide Bearing 2 Each $__________ $__________

0019 Refurbish Turbine Guide Bearing 2 Each $__________ $__________

0020 Refurbish Turbine Guide Bearing Split Flange Face and Spigot Fit 2 Each $__________ $__________

0021 Ship and Refurbish Generator Guide Bearing Pads 2 Each $__________ $__________

0022 Replace Packing Box 2 Each $__________ $__________

Total Optional Items $__________

Total $__________

PRICING SCHEDULE NOTES:

1. Offerors must insert a price on all numbered items of the Pricing Schedule. Failure to comply with the pricing schedule will result in the Offeror being determined nonresponsive.

2. The Government will evaluate offers for award purposes by adding the total price for TOTAL OPTIONAL ITEMS to the total price for the TOTAL BASE PROPOSAL (TOTAL BASE PROPOSAL AND TOTAL OPTIONAL ITEMS). Evaluation of option will not obligate the Government to exercise the option.

3. Options may be exercised, at the option of the Government, from the time of the Notice to Proceed up to one calendar year after the date of Notice to Proceed.

4. Only one contract will be awarded under this solicitation.

-- End of Document --

Section 00 21 00 - Instructions, Conditions & Notices to Offerors

INSTRUCTIONS TO OFFERORS

SECTION 00 21 00

INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

1.0 GENERAL INFORMATION

1.1 GENERAL DESCRIPTION OF WORK

1.2 GOVERNMENT SECURITY REQUIREMENTS

1.3 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

1.4 OFFEROR'S QUESTIONS AND COMMENTS

1.5 SMALL BUSINESS SIZE STANDARD/NAICS CODE

1.6 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

1.7 ACCURACY IN PROPOSALS

1.8 PROPOSAL SUBMITTALS

1.9 PROPOSAL FORMAT

1.10 JOINT VENTURE PROPOSAL REQUIREMENTS

1.11 DEVIATIONS AND EXCEPTIONS

1.0 GENERAL INFORMATION

1.1. GENERAL DESCRIPTION OF WORK

The Tulsa District Corps of Engineers has a requirement to perform all work required to rewind two approximately 50 MVA hydroelectric generating units at Keystone Powerhouse, Sand Springs, OK. The contractor shall furnish all labor, material, and equipment to perform this work in strict accordance with the detailed requirements of the specifications and associated drawings. The work described within these specifications shall include, but not necessarily be limited to, the following:

1. Design, manufacture, and perform Voltage Endurance test on prototype coils (or Roebel bars).

2. Perform Thermal Cycle test on prototype coils (or Roebel bars).

3. Design, manufacture, shop test, prepare and load for shipment, deliver f.o.b. destination, and unload two complete sets of stator coils (or Roebel bars) and specified accessories.

4. Pre-disassembly mechanical and electrical testing, and alignment checks of two hydroelectric generating units.

5. Disassemble two generator units, including the exciter equipment, air housing, and rotor.

6. Remove old stator coils, install and test new stator windings and accessories.

7. Clean, inspect, and test stator iron; perform necessary repairs to stator iron.

8. Furnish and Install new surge rings, circuit rings, main leads, and neutral leads.

9. Refurbish (machine) the collector rings.

10. Clean and inspect rotor, clean and test the rotor field poles winding.

11. Furnish spare parts.

12. Perform generator special field tests.

13. Furnish manufacturer’s representative on-site services to supervise installation of the generator stator coils (or Roebel bars), reassembly, and to perform start-up, commissioning, and testing of two generators.

1.2. GOVERNMENT SECURITY REQUIREMENTS

The Offeror(s) must ensure that ALL mail sent to the Tulsa District, U.S. Army Corps of Engineers, either pre-contract or post-contract award, has a return mailing address on the outside of the envelope, package, box, etc.

ANY MAIL addressed to the U.S. Army Corps of Engineers, including but not limited to bids, modifications to bids, proposals, revised proposals, bonds, correspondence, etc., WILL BE REJECTED by the US Army Corps of Engineers mail room facility located at 2488 E 81st Street, Tulsa, OK 74137-9998, if it does not contain a return mailing address. There will be no exceptions.

USACE Tulsa District Point of Contact is:

Shawn Brady Phone: 918-669-7670 Email: shawn.brady@usace.army.mil

Julie S. Hill Phone: 918-669-7699 Email: julie.s.hill@usace.army.mil

1.3. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation documents will be posted at https://beta.sam.gov.

Solicitation number: W912BV20R0040

It shall be the contractor’s responsibility to check the websites for any amendments. The Offeror shall submit in the proposal all requested information specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation.

Any information given to an Offeror which impacts the solicitation and/or offer will be given in the form of a written amendment to the solicitation.

1.4. OFFEROR'S QUESTIONS AND COMMENTS

All contractual matters, questions and or comments relative to these documents should be submitted via Bidder Inquiry in ProjNet at:

http://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=HomePagePublic

Instructions for registering in the ProjNet Bidder Inquiry system are available on the above web site.

The Bidder Inquiry Key for this project is: TBD

Any information given to an offeror which impacts the solicitation and/or offer will be given in the form of a written amendment to the solicitation.

Note: All questions and/or comments should be entered in Bidder’s Inquiry no later than 14 calendar days prior to the proposal deadline, so they may be given consideration or action taken prior to receipt of offers.

1.5. SMALL BUSINESS SIZE STANDARD/NAICS CODE

See Section 00 45 00, FAR 52.204-8 for the small business size standard/NAICS Code.

1.6. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

This Request for Proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.

1.7. ACCURACY IN PROPOSALS

Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments).

The penalty for making false statements is prescribed in 18 U.S.C. 1001.

1.8. PROPOSAL SUBMITTALS

1.8.1 The submittal method for proposals is electronic via DoD SAFE or email ONLY (no mailed proposals). DoD SAFE web site: https://safe.apps.mil/

The following email address(es) must be entered for notification of proposal receipt and download availability:

shawn.brady@usace.army.mil julie.s.hill@usace.army.mil

1.8.2 Proposals will be received until the time and date shown on Standard Form SF 1442 or as amended on SF30.

Mail bid bonds to:

U.S. Army Corps of Engineers, Tulsa District ATTN: Shawn Brady, CESWT-CT-E 2488 E 81st Street, Tulsa, OK 74137-9998

1.8.3 The packaging shall be marked: “Solicitation Number: W912BV20R0040”

1.9. PROPOSAL FORMAT

See Section 00 22 11 for proposal requirements.

1.10. JOINT VENTURE PROPOSAL REQUIREMENTS

When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 and the bid bond unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. If this is an 8(a) or HubZone joint venture, the Offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124 and 13 CFR Part 126, respectively.

1.11. DEVIATIONS AND EXCEPTIONS

Deviations and exceptions to the terms and conditions of the solicitation in either the technical or price proposal are neither encouraged nor desired. Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined “unacceptable” and, thus, ineligible for award. Should the Offeror have any questions related to specific terms and conditions, these must be resolved prior to submission of the offer. Notwithstanding the above, if deviations and exceptions are included with the offer, the Offeror shall list and describe in detail the deviations and/or exceptions under Tab A. All deviations and exceptions shall be fully supported with the Offeror’s rationale and shall fully explain the impact, if any, on the performance and/or specific requirement of the RFP. Deviations from the minimum standard of quality required by the RFP shall not be accepted unless identified by the offeror’s proposal and specifically approved by the Contracting Officer in writing. If unapproved, the Contractor must provide the RFP requirements without additional cost to the Government. If approved, the accepted deviation will take precedence as a provision of the solicitation.

The Offeror shall also clearly describe on the Tab B submitted with the Price Proposal any exception to the contractual and/or technical terms and include the monetary impact on the solicitation with the price proposal. This information will not be evaluated separately but may impact the evaluation of other factors.

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

CLAUSES INCORPORATED BY REFERENCE

52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.215-20 Requirements for Certified Cost or Pricing Data or

Information Other Than Certified Cost or Pricing Data

OCT 2010

52.215-22 Limitations on Pass-Through Charges--Identification of Subcontract Effort

OCT 2009

52.217-5 Evaluation Of Options JUL 1990 52.222-5 Construction Wage Rate Requirements--Secondary Site of the

Work

MAY 2014

52.225-10 Notice of Buy American Requirement--Construction Materials

MAY 2014

52.232-38 Submission of Electronic Funds Transfer Information with Offer

JUL 2013

52.236-28 Preparation of Proposals--Construction OCT 1997 252.215-7010 Requirements for Certified Cost or Pricing Data and Data

Other Than Certified Cost or Pricing Data

JUL 2019

252.236-7006 Cost Limitation JAN 1997 252.236-7008 Contract Prices-Bidding Schedules DEC 1991

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a firm fixed price contract resulting from this solicitation.

(End of provision)

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer at 2488 E. 81st Street, Tulsa OK 74137 by obtaining written and dated acknowledgment of receipt from to be determined upon award.

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/browse/index/far

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any Defense Federal Regulation Supplement (DFARS) (48 CFR Chapter

2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

252.215-7012 REQUIREMENTS FOR SUBMISSION OF PROPOSALS VIA ELECTRONIC MEDIA (JAN 2018)

The Offeror shall submit the cost portion of the proposal via the following electronic media: https://safe.apps.mil/ or electronic mail.

Section 00 22 11 - Proposal Submission Requirements, Evaluation Criteria, Basis of Award One-Step-Best Value, Design-Build (Single Award)

EVALUATION CRITERIA

SECTION 00 22 11

PROPOSAL REQUIREMENTS AND EVALUATION FACTORS FOR AWARD

PART I - PROPOSAL REQUIREMENTS

1.0 PREPARATION OF PROPOSALS

1.1 Introduction.

Proposals shall be submitted in three (3) volumes as listed below:

Volume I: Technical Volume II: Past Performance Volume III: Price

To aid Offerors in the preparation of their proposal and to help lend to a uniform evaluation by the Government, the proposal format and content has been partially standardized for this solicitation. In response to this RFP, Offerors shall submit electronically one copy of each proposal containing the data and information described hereinafter.

1.2 Form and Contents. Proposals shall contain, as a minimum, the information specified below in accordance with the following guidelines:

1.2.1 The volumes shall have a cover labeled with the Offeror’s name, the solicitation number, the title of the solicitation, and the volume number. Pages containing text shall be consecutively numbered, doubled-spaced, typewritten or typeset, single sided, on 8 ½ x 11 paper with adequate margins of at least one inch. All requirements pertaining to Volume 3 of this solicitation shall be contained in the Cost Proposal binder.

1.2.2 It is the Offeror’s responsibility to ensure that his/her proposal is complete prior to submittal. The evaluation panel for the Government may evaluate solely on the information provided by the proposal and will not assume that an Offeror possesses any capability unless specified in the proposal. Proposals which are unrealistic in terms of technical or schedule commitments, or which are unrealistically low in costs, shall be considered indicative of a lack of understanding of the complexity, magnitude, and risk of the contract specification.

1.2.3 All information presented must be complete within itself and be supportive of a prompt and thorough evaluation. No material shall be incorporated into the binders by reference. In order for the Offeror’s proposal to receive an in-depth evaluation and considered responsive, it is necessary that the proposal be submitted and contain the information required and as specified. Any exceptions or disclaimers to the technical requirements of the solicitation shall be grounds for rejection of the Offeror’s proposal.

1.3 Offeror's Responsibility. It is the Offeror’s responsibility to ensure that his/her proposal is complete prior to submittal. Excepting arithmetic errors in the schedule (Section B), corrections will not be made by the Government. The evaluation panel for the Government may evaluate solely on the information provided by the proposal and will not assume that an Offeror possesses any capability unless specified in the proposal. Proposals which are unrealistic in terms of technical or schedule commitments, or which are unrealistically low in costs, shall be considered indicative of a lack of understanding of the complexity, magnitude, and risk of the contract specification. Errors in the proposal will be considered, among other factors, as a reflection of the Offeror's technical and management capability.

1.4 Policy on Requests by Prospective Offerors for Assistance in the Preparation of Proposals. It is the policy of the Corps of Engineers to not provide any assistance to prospective Offerors in the preparation of their proposals.

However, this is not meant to preclude Offeror's requests for information or clarification. Information will be provided if it is available and releasable, while clarification will be provided in all cases.

2.0 TECHNICAL PROPOSAL

2.1 VOLUME I – TECHNICAL

FACTOR 1 – GENERATOR STATOR REWIND

Subfactor 1a: Company Experience

The Offerors shall provide documentation supporting that they are regularly engaged in the design, manufacture, installation, and testing of stator bars for hydroelectric generators of 35,000 kVA or larger for a period of time of ten years or greater or identify partnering or subcontracting agreements with firms other than the Offeror providing this experience. The Offeror shall provide a list of five stator winding replacement contracts held within the last ten years. The projects selected should represent work similar to that proposed, whereby they have designed, manufactured, installed and tested a complete winding for a large hydroelectric generator. Project examples should be completed (or are substantially complete at the time of this offer), have the same or similar insulation system as the proposed to be supplied under this solicitation, be of separate design and/or location (i.e. not three contracts in one powerhouse). Project examples shall identify the firms providing this experience and their relationship to the Offeror during said project, e.g. prime contractor (same as Offeror), subcontractor, material supplier, not associated with the Offeror, etc. Fill in attached experience information sheets.

Subfactor 1b: Stator Winding Design

The Offeror shall provide a complete description of the stator winding design process. The stator winding design process shall include winding rating and maximum winding temperature rise at rated load.

Subfactor 1c: Stator Winding Losses

The Offerors shall present guaranteed combined DC I2R (R corrected to 75 °C) loss and stray load loss for their proposed winding in kW at 42,368 kVA, 0.90 power factor.

Subfactor 1d: Stator Winding Manufacturing and Installation Process

The Offeror shall provide a complete description of the stator winding manufacturing and installation process. The stator winding manufacturing process shall include details such as bar insulation system including groundwall insulation material and thickness; cross sectional dimensions; and the ground wall insulation application method, The manufacturing process shall also include factory tests and test methods. The Offeror shall identify the location and name(s) of the owning interest in the winding manufacturing facility. The stator winding installation process shall include details of side packing system, wedging system including type, dimensions, and materials of wedges, total number of wedges per slot, number of check wedges per slot and end wedge securing method, spring deflection measurement method, brazing method and quality assurance procedures. The stator winding installation process shall also include field tests and test methods.

FACTOR 2 – SCHEDULE

The Offeror shall provide a schedule showing how they will complete the contract within the timeframe designated in the specification.

The Offeror’s proposed schedule will be evaluated according to evaluation criteria.

2.2 VOLUME II – PAST PERFORMANCE

2.2.1 Offeror’s past performance shall demonstrate previous unit rewinds. At a minimum, the Offeror shall provide questionnaires for the past performance of three projects within the past ten years of hydroelectric generator rewinds of 35,000 kVA or above, using Roebel bar windings.

2.2.2 Offerors are reminded that both independent data and data provided by offerors in their proposals may be used by the Government to evaluate offeror past performance. Since the Government may not necessarily interview all the sources provided by the offerors, it is incumbent upon the offeror to explain the relevance of the data provided. The Government does not assume the duty to search for data to cure problems it finds in the proposal.

The burden of providing thorough and complete Past Performance information remains with the offerors. Proposals that do not contain the information requested risk rejection or less than acceptable performance rating by the Government.

2.2.3 Past Performance Questionnaire. For all contracts identified, a Past Performance Questionnaire (attached) must be completed and submitted. The offeror shall complete Part 1 of the Past Performance Questionnaire and email/mail the questionnaire to at least two (2) points of contact (POC’s) per contract including the Contracting Activity and the Technical Representative responsible for the past/current contract. All POC’s shall be instructed to electronically complete Part II of the questionnaire and email to Shawn.G.Brady@usace.army.mil. The offerors shall also email a reference list of all the POC’s who were sent a questionnaire. The Government shall receive this list no later than close of business on the date established for receipt of proposals. The POC list shall be submitted in Word for Windows Table Format to include the following fields: Solicitation Number, Offeror Company Name, Contract Number, Customer that received your services, POC last name, first name, and POC Title. The responsibility to send out and track the completion of the Questionnaire rests solely with the Offeror and shall not be delegated to any subcontractors, team contractors, or joint venture partners.

2.2.4 Offerors shall include in their proposal the written consent of the proposed subcontractors to allow the Government to discuss the subcontractors’ past performance evaluation with the offeror during any discussions. The Government will verify/ validate information on both prime and subcontractors that an offeror provides in its proposal. It is the offeror’s responsibility to contact each reference to: 1) obtain authorization to release the information identified in the past performance submission, and 2) provide authorization to the references to release performance information to the Government.

2.2.5 New Corporate Entities. New corporate entities may submit data on prior relevant and recent contracts (within the last 3 calendar years) involving its officers and employees. However, in addition to the other requirements in this section, the offeror shall discuss in detail the role performed by such persons in the prior contracts cited. Past performance information on work for state and local governments, private sector clients, and subcontractors that are similar to the Government requirement will be evaluated equally with similar federal contracts. Offeror may submit information on key personnel, major subcontractors, work performed as part of a team or joint venture and other previous reincarnation of its current organization.

2.2.6 Submit completed questionnaires by electronic mail.

2.2.7 If an offeror has no relevant past performance history, the offeror must affirmatively state that it possesses no relevant directly related or similar past performance.

2.2.8 The Government wants to ensure timely contract award. To that end, offerors are encouraged to submit Past Performance information before the solicitation closing date to enable the Government to begin contacting references.

2.3 VOLUME III – PRICE

The price proposal (Volume 3) shall include the following and be submitted in the following format:

Volume 3 Tab 1 – Proposal Cover Sheet Volume 3 Tab 2 – SF 1442 and Acknowledgment of Amendments Volume 3 Tab 3 – Section 00 11 00, Pricing Schedule Volume 3 Tab 4 – Representations and Certifications Volume 3 Tab 5 – JV Agreement (if applicable)

Price proposals will be evaluated for reasonableness by price analysis, including option bid items, and items the Contractor believes are not itemized. The total contract price will be considered as an independent element from the technical evaluation

PART II - EVALUATION FACTORS

1.0 GENERAL

Award will be made to the responsible Offeror submitting a proposal which conforms to the solicitation and is determined to be the lowest price technically acceptable (LPTA), considering the factors listed in this SECTION.

The Government will make the determination on the basis of the merits of the offer. The Government will determine the merits of each offer on the basis of its technical acceptability and price reasonableness. An offer that meets or exceeds the technical requirements is acceptable when it manifests the Offeror’s assent, without exception, to the terms and conditions of the solicitation, including attachments. The Government will evaluate the reasonableness of the price of each acceptable offer. Tradeoffs are not permitted. Proposals are evaluated for acceptability but not ranked using non-cost/price factors. The Government will not award a contract to a Firm whose proposal contains a deficiency, as defined in FAR 15.001. The Government reserves the right to reject any offer if the offer is not in the best interest of the Government.

2.0 DISCUSSIONS

The Government does not intend to enter into discussions with offerors prior to making an award. Offerors are encouraged to present their best technical proposal and prices in their initial proposal submission. However, in accordance with FAR Part 15.306, should discussions become necessary, the Government reserves the right to hold them. If this occurs, a competitive range will be determined and offerors notified. The competitive range may be limited for purposes of efficiency in accordance with (IAW) FAR Part 15.306(c)(2).

3.0 EVALUATION FACTORS FOR AWARD

Offerors’ proposals will be evaluated for technical content as identified below. Evaluation will be solely on the basis of these identified factors. Each factor will be evaluated. All factors must be technically acceptable for the offer to be technically acceptable. Offerors are advised that extraneous materials that do not directly address the evaluation factors will have no bearing on determining the recipient of the contract award. All factors are of equal importance.

The evaluation factors for award of the contract are as follows:

3.1 VOLUME I – TECHNICAL

FACTOR SUBFACTOR

1 GENERATOR STATOR REWIND 1a Company Experience 1b Stator Winding Design 1c Stator Winding Losses

1d Stator Winding Manufacturing and Installation Process

2 SCHEDULE

FACTOR 1 – GENERATOR STATOR REWIND

Subfactor 1a – Company Experience: Those Offerors identifying 10 years of experience in the design, fabrication, installation and testing of stator windings hydroelectric generators 35,000 kVA or larger in size as described in Section 00 22 11 Part I will be considered acceptable for this subfactor. Those proposals not meeting this minimum requirement will be judged not technically acceptable.

Subfactor 1b – Stator Winding Design: Those Offerors providing the required detail of the stator winding design process as defined in 00 22 11 Part I will be considered acceptable for this subfactor. Proposals not meeting this minimum requirement will be judged technically not acceptable.

Subfactor 1c – Stator Winding Losses: Those Offerors guaranteeing the losses equal to or less than the combined stator DC I²R (copper) and stray load losses in kW at 42,268 kVA and 0.95 PF as defined in Section 48 13 16.00 26, paragraph 1.4.3(b) will be considered acceptable for this subfactor. Proposals not meeting this minimum requirement will be judged not technically acceptable.

Subfactor 1d – Stator Winding Manufacturing and Installation Details: Those offerors providing the required detail of the stator winding manufacturing and installation process as defined in Section 00 22 11 Part I will be considered acceptable for this subfactor. Proposals not meeting this minimum requirement will be judged technically not acceptable.

FACTOR 2 – SCHEDULE

Offerors shall provide a schedule that clearly identifies the durations required for winding manufacturing, including design (include design review meeting within 60 days after contract award); accelerated life testing period; winding delivery including accessories and spare parts, f.o.b. Keystone Powerhouse (storage location); field testing; O&M Manual submittals; special field testing and the ability of the Offeror to complete the contract within the specified time.

Those Offerors whose proposals meet the requirements of the specifications will be considered acceptable for this factor. Those proposals lacking these minimum requirements will be judged not technically acceptable.

3.2 VOLUME II – PAST PERFORMANCE

3.2.1 The evaluation of past performance is a subjective assessment of the Offeror’s past performance on contracts of a similar nature, size, scope, and complexity, utilizing a comparable number of personnel with like skills. The Government will consider the Offeror’s previous and current record of contractual performance. In this context, “Offeror” refers to the proposed prime contractor and major subcontractors. Major subcontractors are defined as those intended to perform a critical contract function, and/or whose annual subcontract revenue is expected to exceed ten percent (10 %) of the anticipated prime contract revenue.

3.2.2 The Government will consider the combined Offeror’s and proposed subcontractor’s experience and performance in providing services consistent with the scope and complexity of our requirement during the last ten

(10) years. The Government will assess the Offeror’s team to determine whether the team displays the depth and breadth of experience necessary to demonstrate a satisfactory history of performance relative to the solicitation requirements.

3.2.3 The Government’s assessment will focus on contracts that meet the following conditions:

Recent – Only contracts that were performed or awarded within the last ten (10) years of a similar type and size of hydroelectric generator will be considered.

Relevancy – Only contracts which were/are relevant in scope to the rewind of generators will be considered.

3.2.4 Failure to demonstrate the minimally acceptable criteria under this factor will result in an “Unacceptable” rating and elimination from further consideration for contract award. In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305(a)(2)(iv)). Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability “unknown” shall be considered “acceptable”.

3.2.5 The Government will examine the Offeror’s record of satisfying requirements, including consideration of the Offeror’s previous unit rewinds.

3.2.6 Any significant achievement, problem, or lack of relevant data in any element of the work can become an important consideration in the source selection process. A rating lower than satisfactory under any element on the past performance questionnaire may result in a “technically unacceptable” rating. Therefore, Offerors are reminded to include all relevant past efforts, including demonstrated corrective actions, in their proposal.

3.2.7 The Government will use data provided in the Offeror’s proposal and data obtained from other sources. The Offeror is cautioned that while the Government will consider data from other sources, the burden of demonstrating satisfactory past performance rests with the Offeror.

4.0 EVALUATION PROCEDURES

4.1 Source Selection Board (SSEB)

The SSEB will be established to conduct the evaluation of proposals received in response to this solicitation. The evaluation will be based on the content of the proposal and any subsequent discussions required, as well as information obtained from other sources, e.g. past performance information. The SSEB will not consider any information incorporated by reference, except as expressly allowed by this solicitation.

4.2 Evaluation Procedures

a. The SSEB will evaluate the proposals and assign a consensus rating for each evaluation factor.

b. The Government intends to award without discussions. Firms are cautioned to put forth their best efforts, and to furnish all information clearly to allow the Government to evaluate proposals. Firms should not assume that they will have an opportunity to clarify or correct anything in their proposal after submitting it.

c. A “competitive range” is a subjective determination of the most highly rated proposals in the event that the

Government decides that discussions with competing firms are required or are considered to be in the Government’s best interests. In such an event, the Contracting Officer will establish a competitive range of all the most highly rated proposals.

d. If discussions are held, the Government may engage in a broad give and take with those firms in the competitive range, in accordance with FAR 15.306 (d). The Government will provide the Firm an advance agenda for the discussions. During discussions, the Government may ask the Firm to further explain its proposal and to answer questions about it.

e. Upon conclusion of discussions, those firms still in the competitive range, will be afforded an opportunity to submit their proposal revisions for final evaluation and selection.

4.3 General Technical Criteria

a. Material omission(s) may cause the technical proposal to be rejected as unacceptable.

b. Proposals which are generic, vague, or lacking in detail may be considered unacceptable. The offeror’s failure to include information that the Government has indicated should be included may result in the proposal being found deficient if inadequate detail is provided.

c. The Government cannot make award based on a deficient offer. Therefore, receipt of an

“UNACCEPTABLE” determination of acceptability for any factor will make the offer ineligible for award, unless the Government elects to enter into discussions with that Offeror and all deficiencies are remedied in a revised proposal. Note: It is the Government’s intent to award without discussions.

EXPERIENCE INFORMATION FOR GENERATOR REWIND

Offeror’s name:

Project name and location:

Contracting contact:

Name:

Address:

Telephone:

Fax:

Email:

Contract name and number:

Brief description of project and relevancy to this Offeror

Generator ratings:

Contract dollar value:

Status: Active Complete

Date of award:

Scheduled contract completion date:

Actual contract completion date:

Work performed as: Prime contractor Subcontractor

PAST PERFORMANCE QUESTIONNAIRE

You have been named as a reference for the Contractor in Part I, below, for Request for Proposal W912BV20R0040 to supply and install two hydroelectric generator stator windings at Keystone Powerplant.

Please complete the information required in Part II, and rate the Contractor in Part III, below, and return this questionnaire to .Shawn.G.Brady@usace.army.mil by the date and time shown on the Standard Form SF 1442 or as amended on an SF 30. The information you provide will be used in the awarding of a federal contract.

Therefore it is important that your information be as factual and accurate as possible. We guarantee confidentiality of all the responses.

Part I

Contractor: (Check if Prime or Subcontractor)

Prime _______ Subcontractor _______

Contract name and number:

Description of work:

Period of performance:

Contract value:

What was your involvement in this project?

Part II

Your name:

Your organization:

Your phone number:

Your position title:

Actual contract completion date:

PAST PERFORMANCE QUESTIONNAIRE PART III

(continued)

Please indicate the appropriate ratings in the box and provide comments, below.

PART III

Quality of Site Workmanship Outstanding Good Satisfactory Marginal Unsatisfactory

The site workmanship was of exceptional quality.

The site workmanship was of high quality.

The site workmanship was of satisfactory quality.

Problems were experienced with the quality of the site workmanship.

Dissatisfied with the quality of the site workmanship. Many problems were encountered.

Comments:

Quality of Factory Workmanship and Winding Components

Outstanding Good Satisfactory Marginal Unsatisfactory The factory workmanship and qualify of winding components were of exceptional quality.

The factory workmanship and qualify of winding components of high quality.

The factory workmanship and qualify of winding components of satisfactory quality.

Problems were experienced with the factory workmanship and qualify of winding components.

Dissatisfied with the quality of the factory workmanship and qualify of winding components Many problems were encountered.

Satisfaction with the overall performance of the Contractor

Very happy overall with performance.

Only minor problems were encountered, and the contractor was very eager to correct any problems.

Would highly recommend this contractor to others.

The contractor performed above average, with a minor amount of problems noted.

Contractor showed initiative in resolving any problems.

The contractor performed average, with the usual number of problems noted. The Contractor showed typical enthusiasm in resolving any problems.

Not entirely happy with the contractor.

There were more than the usual number of problems noted. Would only recommend this contractor with reservations.

Do not recommend use of this contractor.

PAST PERFORMANCE QUESTIONNAIRE PART III

(continued)

Please indicate the appropriate ratings in the box and provide comments below.

Timely performance of the site work performed (Schedule)

Contractor completed the contract ahead of schedule.

Contractor met the contract schedule.

Contractor came close to meeting the contract schedule.

Contract deadlines sometimes dismissed.

Attempts at regaining schedules only partly successful.

Deadlines consistently missed with no corrective actions taken by the contractor.

Maintaining Budget

Contractor found innovative ways to substantially cut costs or increase value to owner, and there were no contract modifications due to contractor problems.

Contractor completed the job under budget, and there were no contract modifications.

Contractor completed the job within budget, and there were either no or minor contract modifications.

Small cost-increasing contract modifications due to poor contractor oversight or poor planning.

Major cost-increasing contract modifications.

Contractor works hard to generate extra cost modifications for profit enhancement.

Section 00 45 00 - Representations & Certifications

52.204-7 System for Award Management OCT 2018 52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-20 Predecessor of Offeror AUG 2020 52.204-24 Representation Regarding Certain Telecommunications and

Video Surveillance Services or Equipment.

AUG 2020

52.204-26 Covered Telecommunications Equipment or Services-- Representation.

DEC 2019

252.203-7003 Agency Office of the Inspector General AUG 2019 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

NOV 2011

252.204-7004 Antiterrorism Awareness Training for Contractors. FEB 2019 252.204-7007 Alternate A, Annual Representations and Certifications APR 2020 252.204-7016 Covered Defense Telecommunications Equipment or Services

-- Representation

DEC 2019

252.204-7017 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services -- Representation

DEC 2019

252.247-7022 Representation of Extent of Transportation by Sea. JUN 2019

52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 237130.

(2) The small business size standard is $39,500,000.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:

( ) Paragraph (d) applies.

( ) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—

(A)…

This is the start of the file's text. The full file is on GovTribe.