This solicitation is for the rehabilitation of turbine and generator units at the Robert S. Kerr Power Plant in Oklahoma. The scope of work involves replacing the Kaplan turbine runners with new units rated at 49,300 hp to accommodate rewound generators rated at 37,895 KVA. Work will also include refurbishing or replacing turbine components such as head covers, wicket gates, shafts, bearings, and facing plates. The generator stator windings will be replaced and stator cores optionally replaced. Field windings will be inspected and cleaned or reinsulated as an option. Additional work comprises refurbishing generator and thrust bearings. The solicitation was issued by the Department of the Army Corps of Engineers Tulsa District. The deadline to submit bids in response to solicitation number W912BV19R0042 was not specified in the document.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
ROBERT S. KERR POWERHOUSE TURBINE AND GENERATOR REHABILITATION
Amendment 0005 is hereby issued to extend the proposal due date from 12 November 2020 to 1 December 2020 at 2:00PM CST. Bidder inquiries w ill close on 16 November 2020 at 4:00PM CST. Davis-Bacon Act WD #OK20200054 has been updated to reflect Modification #3, revised 23 October 2020.
Offerors shall refer to the Summary of Changes for the complete list of revisions incorporated through Amendment 0005.
POC: Shay Hill - 918-669-7699 or julie.s.hill@usace.army.mil
1. CONTRACT ID CODE PAGE OF PAGES
1 8
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912BV19R0042
X 9B. DATED (SEE ITEM 11)
10-Jul-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0005
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Nov-2020
CODE
CONTRACTING DIV
US ARMY CORPS OF ENGINEERS, TULSA DISTRICT
2488 E. 81ST STREET
TULSA OK 74137-4290
W912BV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912BV19R0042
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 12-Nov-2020 02:00 PM to 01-Dec-2020 02:00 PM.
SECTION 00 72 00 - GENERAL CONDITIONS
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than __________* calendar days after issuance of the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.
*Final duration will be filled in at contract award.
(End of clause)
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been modified:
WAGE DETERMINATION
General Decision Number: OK20200054 10/23/2020
Superseded General Decision Number: OK20190054
State: Oklahoma
Construction Type: Building Building Construction -does not include residential construction consisting of single family homes and apartments up to and including 4 stories. (Including building projects on industrial sites and treatment plants)
Counties: Le Flore and Sequoyah Counties in Oklahoma.
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/03/2020 1 01/31/2020 2 06/26/2020 3 10/23/2020
* BROK0005-004 06/01/2020
Rates Fringes
BRICKLAYER.......................$ 25.37 11.34
ELEC0584-009 05/28/2018
LE FLORE (Entire County except Braden, Pocola and Spiro Townships) and SEQUOYAH (That portion west of Akins, Gans, Hansen, Long and Redland Townships) COUNTIES
Rates Fringes
ELECTRICIAN......................$ 30.43 7%+9.70
ELEC0700-004 10/01/2019
LEFLORE (Braden, Pocola and Spiro Townships only) and SEQUOYAH (that portion east of Brent, Prices Chapel, Rocky Mountain and Sallisaw Townships) COUNTIES
ELECTRICIAN......................$ 24.62 12.42
ENGI0627-020 06/01/2019
POWER EQUIPMENT OPERATOR:
Group 1.....................$ 31.05 13.75 Group 2.....................$ 29.35 13.75 Group 3.....................$ 28.80 13.75 Group 4.....................$ 28.00 13.75 Group 8.....................$ 23.65 13.75 Group10.....................$ 22.20 13.75
POWER EQUIPMENT OPERATOR
GROUP 1: All Crane Type Equipment 200 ton and larger and including 400 ton capacity cranes. All Tower Cranes.
GROUP 2: All Crane Type Equipment 100 ton capacity and larger cranes, and less than 200 ton capacity.
GROUP 3: All Crane Type Equipment 50 ton capacity and larger cranes, and less than 100 ton capacity. Crane Equipment (as rated by mfg.) 3 cu. yd. and over Guy derrick Whirley Power Driven Hole Digger (with 30' and longer mast).
GROUP 4: CRANES with Boom Incl. Jib less than 100 ft and less than 3 cu. Yd.; Overhead Monorail Crane
GROUP 8: FORK-LIFT
GROUP 10:OILER; SEMI-TRAILER TRUCK DRIVER
IRON0584-025 06/01/2019
Rates Fringes
IRONWORKER (Ornamental, Reinforcing and Structural)......$ 26.00 15.35
* PLUM0430-006 10/01/2020
Rates Fringes
PLUMBER..........................$ 32.25 13.98
* PLUM0430-011 10/01/2020
Rates Fringes
PIPEFITTER.......................$ 32.25 13.98
ROOF0143-001 06/01/2020
Rates Fringes
ROOFER...........................$ 22.30 8.35
SHEE0270-006 06/01/2017
SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 31.89 14.31
SUOK2012-034 07/30/2012
Rates Fringes
CARPENTER........................$ 15.86 0.00
CEMENT MASON/CONCRETE FINISHER...$ 14.26 1.27
LABORER: Common or General......$ 9.63 0.00
LABORER: Mason Tender - Brick...$ 12.52 0.00
LABORER: Mason Tender - Cement/Concrete..................$ 13.00 1.91
LABORER: Pipelayer..............$ 12.39 0.00
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 17.38 4.08
OPERATOR: Bulldozer.............$ 20.64 2.35
OPERATOR: Grader/Blade..........$ 14.28 1.70
OPERATOR: Loader (Front End)....$ 16.18 0.00
PAINTER: Brush, Roller and Spray............................$ 12.22 0.00
SHEET METAL WORKER, Excludes HVAC Duct Installation...........$ 22.18 5.06
TRUCK DRIVER: Dump and Flatbed Truck....................$ 11.00 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)
SUMMARY OF CHANGES - AMENDMENT 0005
SOLICITATION NO. W912BV19R0042
POWERHOUSE TURBINE/GENERATOR REHABILITATION
ROBERT S. KERR LOCK & DAM 15, OKLAHOMA
OCTOBER 31, 2020
Standard Form (SF) 30, Block 14 (continuation):
The proposal documents shall be revised as follows:
CONTRACT CLAUSES
Delete previously issued Proposal Schedule and replace with new Proposal Schedule attached hereto.
Attach new Attachment 3 MILESTONE TABLE to the end of Section 00 22 11.
In Section 00 22 11 delete previously issued 9.0 FACTOR 3 and replace it with file Factor 3 Revision.
In Section 00 22 11 Paragraph 8.2 add new Form 1B (filled in and submitted with the Contractor's proposal).
In Section 00 72 00 revise the total contract duration listed in clause FAR 52.211-10 from 2,710 calendar days to _______ calendar days. (Final duration will be filled in at contract award).
Delete previously issued Section 00 73 00 and replace with new Section 00 73 00 attached hereto.
SPECIFICATIONS
Remove the schedule table at the end of Section 01 11 10.00 26 in its entirety.
Delete previously issued Sections as follows:
01 11 10.00 26 01 22 00.00 26 01 50 00 05 05 33.20 26 48 13 13.00 26 48 13 13.01 26 48 13 13.02 26 48 13 13.04 26 48 13 13.07 26 48 13 13.08 26 48 13 16.20 26 and replace with new Sections of the same numbers attached hereto. Text and paragraphs containing revisions are highlighted by bold text.
Standard Form (SF) 30, Block 14 (continuation):
Delete previously issued Submittal Register and replace with new Submittal Register attached hereto.
New documents and attachments to be added to the end of the specifications
Attachment A - Amendment Chart (file AmendCharts.pdf) add to the end of Section 48 13 13.01 26.
Response to Bidder Inquiry 8756583 – Attach 3 Digital Photographs to the end of the specifications
Response to Bidder Inquiry ID 8756512 – Attach ten Reference Drawings to the end of the specifications
Response to Bidder Inquiry ID 8766318 – Attach four Technical Specifications Sheets to the end of the specifications
Attach new Water Quality Data File RSK_200_WQ_DATA_RM337 to the end of the specifications.
END OF SUMMARY OF CHANGES – AMENDMENT 0005
PROPOSAL SCHEDULE
SOLICITATION NO. W912BV19R0042
KERR POWERHOUSE GENERATOR/TURBINE REHABILITATION
10/31/2020 Item No. Description Est. Qty. UOM Unit Price Amount
0001-0099 SITE WORK AND STRUCTURAL
Design, Manufacture, Test and Deliver 49,300 hp Kaplan Runner Assembly Prototype
4 EA $ $
0002 Furnish and Install New Carbon Steel Wicket Gates 4 Set $ $ 0003 Design, Manufacture and Test Turbine Model 1 Job $ $ 0004 Ship Turbine Model 1 LS $ $
Site Mobilization to Accomplish Unit 3 Rewind Work; Site Demobilization to Remove Equipment, Cleanup and Restore the Site to Original Condition
1 Job $ $
Investigate the Condition of Generating Unit 3 Prior to Partial Disassembly
1 Job $ $
Partially Disassemble Hydraulic Turbine/Generator Unit 3 and Inspect Components 1 Job $ $
Partially Reassemble Generating Unit 3 with Rewound Generator
1 Job $ $
Operational Testing After Reassembly of Generating Unit 3
1 Job $ $
Site Mobilization to Accomplish Turbine/Generator Work;
Site Demobilization to Remove Equipment, Cleanup and Restore the Site to Original Condition
1 Job $ $
Investigate the Condition of Generating Unit Prior to Disassembly
4 EA $ $
Disassemble Hydraulic Turbine/Generator Unit and Inspect Components
4 EA $ $
Reassemble Generating Unit with New Runner and Components.
4 EA $ $
0014 Operational Testing After Reassembly of Generating Unit 4 EA $ $
0015 Design, Fabricate and Provide Center Hole Jacking System 1 Job $ $
0016 Painting 4 EA $ $ 0017 On-site Lead Based Paint Removal and Disposal 4 EA $ $ 0018 Provide New Draft Tube Platform 1 Job $ $
Flushing and Cleaning of Governor and Turbine Oil Systems
1 Job $ $
Furnish For Accelerated Life Test and Have Tested Prototype Coils Identical To Coils Supplied In Item 0200, 0400, 0600, and 0800
1 Job $ $
Furnish For Thermal Cycle Test and Have Tested Prototype Coils Identical To Coils Supplied In Item 0200, 0400, 0600, and 0800
1 Job $ $
0100-0199 UNIT 1 MECHANICAL WORK
0100 Ship Main Shaft to Contractor's Shop 1 Job $ $ 0101 Inspect Main Shaft 1 Job $ $ 0102 Machine Main Shaft Flange Face to Runner Hub 1 Job $ $ 0103 Machine Main Shaft Above Packing Box Sleeve 1 Job $ $
Machine Outer Diameter (OD) of New Turbine Shaft Sleeve
1 Job $ $
0105 Machine Main Shaft Below Packing Box Sleeve 1 Job $ $
Machine Shaft Mounting Location for Turbine Bearing Oil Slinger & Modify Oil Slinger to Fit Shaft
1 Job $ $
Inspect, Ship, and Refurbish Upper Generator Guide Bearing Pads
1 Job $ $
Inspect, Ship and Refurbish Lower Generator Guide Bearing Pads
1 Job $ $
0109 Inspect, Ship, and Refurbish Turbine Guide Bearing 1 Job $ $
Inspect, Ship, and Refurbish Spare Upper Generator Guide Bearing Pads
1 Job $ $
Inspect, Ship, and Refurbish Spare Lower Generator Guide Bearing Pads
1 Job $ $
0112 Inspect, Ship, and Refurbish Spare Turbine Guide Bearing 1 Job $ $ 0113 Inspect Generator Thrust Bearing Phase 1 1 Job $ $ 0114 Inspect Generator Thrust Bearing Phase 2 (Optional) 1 Job $ $ 0115 Inspect, Ship, and Refurbish Thrust Bearing Shoes 1 Job $ $ 0116 Machine Shoes Backside (Optional) 1 Job $ $ 0117 Provide One New Set of Spare Thrust Bearing Shoes 1 Job $ $ 0118 Inspect Generator Shaft 1 Job $ $
Ship Generator Shaft and Thrust Bearing Runner to Contractor's Shop (Optional)
1 Job $ $
0120 Resurface Thrust Bearing Collar (Optional) 1 Job $ $
Resurface Thrust Bearing Runner on Generator Shaft (Optional)
1 Job $ $
0122 Refurbish Thrust Bearing Runner (Optional) XXXX XXX XXX XXXXX
0122A Ship Thrust Bearing Runner (Optional)
1 Job $ $
0122B Resurface Running Face and Backside of Thrust Bearing Runner (Optional)
1 Job $ $
0122C Resurface Runner Face (Optional) 1 Job $ $
0122D Rework the Split Faces of the Thrust Bearing Runner (Optional)
1 Job $ $
0122E Furnish New Thrust Bearing Runner Split Line Keys and Perform Related Keywork (Optional)
1 Job $ $
0122F Furnish New Fasteners to Join Runner Halves (Optional) 1 Job $ $ 0123 Refurbish Spare Thrust Bearing Runner (Optional) XXXX XXX XXX XXXXX
0123A Ship Spare Thrust Bearing Runner (Optional) 1 Job $ $
0123B Resurface Spare Running Face and Backside of Thrust Bearing Runner (Optional)
1 Job $ $
0123C Resurface Spare Runner Face (Optional) 1 Job $ $
0123D Rework the Split Faces of the Spare Thrust Bearing Runner (Optional)
1 Job $ $
0123E Furnish New Spare Thrust Bearing Runner Split Line Keys and Perform Related Keywork (Optional)
1 Job $ $
0123F Furnish New Fasteners to Join Spare Runner Halves (Optional)
1 Job $ $
0124 Inspect and Refurbish Air Valve Assembly 1 Job $ $ 0125 Refurbish Wicket Gate Servomotors 1 Job $ $ 0126 Chrome Plate Wicket Gate Servo Piston Rod (Optional) 1 Job $ $ 0127 Remove Wicket Gate Mechanism Grease System 1 Job $ $
Provide New Greaseless Bushing/Bearing Plate for Wicket Gate Linkage, Operating Mechanism, Gate Stems, Wicket Gate Servos and Vacuum Valve
1 Job $ $
0129 Refurbish Wicket Gate Operating Mechanism 1 Job $ $ 0130 Inspect Stay Ring 1 Job $ $ 0131 Inspect, Ship and Refurbish Outer Headcover 1 Job $ $ 0132 Inspect and Ship Intermediate Headcover 1 Job $ $ 0133 Furnish New Headcover Facing Plates 1 Set $ $ 0134 Final Machine Headcover Facing Plates 1 Job $ $ 0135 Machine Stay Ring Mounting Flange and Surfaces 1 Job $ $ 0136 Inspect and Ship Inner Headcover 1 Job $ $ 0137 Furnish New Bottom Ring Facing Plates 1 Sets $ $ 0138 Final Machine Bottom Ring Facing Plates 1 Job $ $ 0139 Inspect Ship and Refurbish Operating Ring 1 Job $ $ 0140 Line Bore Wicket Gate Stem Bushing Housings 1 Job $ $ 0141 Furnish New Packing Box, Gland and Lantern Ring 1 Job $ $
0142 Furnish New Shaft Sleeve 1 Job $ $ 0143 Furnish Mandrel and Clamps for Shaft Sleeve (Optional) 1 Job $ $ 0144 Furnish Replacement Discharge Ring Liner Insert 1 Job $ $ 0145 Install Discharge Ring Liner Insert 1 Job $ $ 0146 Cavitation Spot Repair 50 Cubic In. Cubic In. $ $ 0147 Inspect and Refurbish Oil Head, Unit 1 1 Job $ $ 0148 Provide Turbine Guide Bearing Oil System 1 Job $ $ 0149 Provide Raw Water Piping & Appurtenances 1 Job $ $ 0150 Furnish New Spare Generator Air Cooler 1 Job $ $ 0151 Provide New Thrust Bearing Oil Cooler 1 Job $ $ 0152 Replace High Pressure Lift System 1 Job $ $ 0153 Refurbish Braking System 1 Job $ $ 0154 Brake and Jack Cylinder Repair (Optional) 1 Job $ $ 0155 Provide Thrust Bearing Oil Switch 1 Job $ $ 0156 Replace Check and Gate Valves 1 Job $ $ 0157 Spider Strengthening Inspection and Analysis 1 Job $ $ 0158 Weld Strengthening of Rotor Spider Est. 600 Cubic In. $ $ 0159 Structural Plate Stiffeners for Spider Strengthening Est. 3,000 Lbs. $ $ 0160 Turbine Oil Purification System 1 Job $ $ 0161 Design and Provide New Automatic/Manual Gate Lock 1 Job $ $ 0162 Replace Turbine Oil Transfer Pump and Motor 1 Job $ $ 0163 Furnish New Turbine Head Cover Sump Pumps 1 Job $ $ 0164 Disposal of Existing Unit 1 Oil Est 7,000 Gal $ $ 0165 Supply New Oil for Unit 1 Est. 7,000 Gal $ $
0200-0249 UNIT 1 ELECTRICAL WORK
Furnish Complete Set Of Stator Coils Including Supplies and Accessories For A Complete New Winding, Including Factory Testing
1 Job $ $
0201 RELOCATED/REASSIGNED TO 0020.
0202 RELOCATED/REASSIGNED TO 0021.
0203 Furnish Generator Spare Parts 1 Job $ $ 0204 Truing Collector Rings 1 Job $ $ 0205 Perform Minor Stator Iron Repair (Optional) 1 Job $ $ 0206 Provide New Stator Core (Optional) 1 Job $ $ 0207 Install and Test New Stator Winding 1 Job $ $ 0208 Provide New Generator Terminal Box 1 Job $ $ 0209 Rewire Turbine and Generator 1 Job $ $
DELETED
Provide Complete New Machine Condition Monitoring System
1 Job $ $
0212 Provide New Generator Heaters for Unit 1 1 Job $ $ 0213 Perform NERC Compliance Testing for Unit 1 1 Job $ $ 0214 Perform NERC Compliance Testing for Unit 2 1 Job $ $ 0215 Perform NERC Compliance Testing for Unit 3 1 Job $ $ 0216 Perform NERC Compliance Testing for Unit 4 1 Job $ $
0300-0399 UNIT 2 MECHANICAL WORK
0300 Ship Main Shaft to Contractor's Shop 1 Job $ $ 0301 Inspect Main Shaft 1 Job $ $ 0302 Machine Main Shaft Flange Face to Runner Hub 1 Job $ $ 0303 Machine Main Shaft Above Packing Box Sleeve 1 Job $ $
Machine Outer Diameter (OD) of New Turbine Shaft Sleeve
1 Job $ $
0305 Machine Main Shaft Below Packing Box Sleeve 1 Job $ $
Machine Shaft Mounting Location for Turbine Bearing Oil Slinger & Modify Oil Slinger to Fit Shaft
1 Job $ $
Inspect, Ship, and Refurbish Upper Generator Guide Bearing Pads
1 Job $ $
Inspect, Ship and Refurbish Lower Generator Guide Bearing Pads
1 Job $ $
0309 Inspect, Ship, and Refurbish Turbine Guide Bearing 1 Job $ $ 0310 Inspect Generator Thrust Bearing Phase 1 1 Job $ $ 0311 Inspect Generator Thrust Bearing Phase 2 (Optional) 1 Job $ $
0312 Inspect, Ship, and Refurbish Thrust Bearing Shoes 1 Job $ $ 0313 Machine Shoes Backside (Optional) 1 Job $ $ 0314 Inspect Generator Shaft 1 Job $ $
Ship Generator Shaft and Thrust Bearing Runner to Contractor's Shop (Optional)
1 Job $ $
0316 Resurface Thrust Bearing Collar (Optional) 1 Job $ $
Resurface Thrust Bearing Runner on Generator Shaft (Optional)
1 Job $ $
0318 Refurbish Thrust Bearing Runner (Optional) XXXX XXX XXX XXXXX 0318A Ship Thrust Bearing Runner (Optional) 1 Job $ $
0318B Resurface Running Face and Backside of Thrust Bearing Runner (Optional)
1 Job $ $
0318C Resurface Runner Face (Optional) 1 Job $ $
0318D Rework the Split Faces of the Thrust Bearing Runner (Optional)
1 Job $ $
0318E Furnish New Thrust Bearing Runner Split Line Keys and Perform Related Keywork (Optional)
1 Job $ $
0318F Furnish New Fasteners to Join Runner Halves (Optional) 1 Job $ $ 0319 Inspect and Refurbish Air Valve Assembly 1 Job $ $ 0320 Refurbish Wicket Gate Servomotors 1 Job $ $ 0321 Chrome Plate Gate Servo Piston Rod (Optional) 1 Job $ $ 0322 Remove Wicket Gate Mechanism Grease System 1 Job $ $
Provide New Greaseless Bushing/Bearing Plate for Wicket Gate Linkage, Operating Mechanism, Gate Stems, Wicket Gate Servos and Vacuum Valve
1 Job $ $
0324 Refurbish Wicket Gate Operating Mechanism 1 Job $ $ 0325 Inspect Stay Ring 1 Job $ $ 0326 Inspect, Ship and Refurbish Outer Headcover 1 Job $ $ 0327 Inspect and Ship Intermediate Headcover 1 Job $ $ 0328 Furnish New Headcover Facing Plates 1 Set $ $ 0329 Final Machine Headcover Facing Plates 1 Job $ $ 0330 Machine Stay Ring Mounting Flange and Surfaces 1 Job $ $ 0331 Inspect and Ship Inner Headcover 1 Job $ $ 0332 Furnish New Bottom Ring Facing Plates 1 Sets $ $ 0333 Final Machine Bottom Ring Facing Plates 1 Job $ $ 0334 Inspect. Ship and Refurbish Operating Ring 1 Job $ $ 0335 Line Bore Wicket Gate Stem Bushing Housings 1 Job $ $ 0336 Furnish New Packing Box, Gland and Lantern 1 Job $ $ 0337 Furnish New Shaft Sleeve 1 Job $ $ 0338 Furnish Replacement Discharge Ring Liner Insert 1 Job $ $ 0339 Install Discharge Ring Liner Insert 1 Job $ $ 0340 Cavitation Spot Repair 50 Cubic In. Cubic In. $ $ 0341 Inspect and Refurbish Oil Head, Unit 2 1 Job $ $ 0342 Provide Turbine Guide Bearing Oil System 1 Job $ $ 0343 Provide Raw Water Piping & Appurtenances 1 Job $ $ 0344 Provide New Thrust Bearing Oil Cooler 1 Job $ $ 0345 Replace High Pressure Lift System 1 Job $ $ 0346 Refurbish Braking System 1 Job $ $ 0347 Brake Ring Field Inspection Unit 2 1 Job $ $ 0348 Refurbish Brake Ring (Optional) 1 Job $ $ 0349 Provide Thrust Bearing Oil Switch 1 Job $ $ 0350 Replace Check and Gate Valves 1 Job $ $ 0351 Weld Strengthening of Rotor Spider Est 600 Cubic In. $ $ 0352 Structural Plate Stiffeners for Spider Strengthening Est. 3,000 Lbs. $ $
0353 Provide New Automatic/Manual Gate Lock 1 Job $ $ 0354 Furnish New Turbine Head Cover Sump Pumps 1 Job $ $ 0355 Disposal of Existing Unit 2 Oil Est 7,000 Gal $ $ 0356 Supply New Oil for Unit 2 Est. 7,000 Gal $ $
0400-0449 UNIT 2 ELECTRICAL WORK
Furnish Complete Set Of Stator Coils Including Supplies and Accessories For A Complete New Winding, Including Factory Testing
1 Job $ $
0401 DELETED.
0402 DELETED.
0403 Truing Collector Rings 1 Job $ $ 0404 Perform Minor Stator Iron Repair (Optional) 1 Job $ $ 0405 Provide New Stator Core (Optional) 1 Job $ $ 0406 Install and Test New Stator Winding 1 Job $ $ 0407 Provide New Generator Terminal Box 1 Job $ $ 0408 Rewire Turbine and Generator 1 Job $ $ 0409 Perform Special Field Tests 1 Job $ $
Provide Complete New Machine Condition Monitoring System
0411 Provide New Generator Heaters for Unit 2 1 Job $ $
0500-0599 UNIT 3 MECHANICAL WORK
0500 Ship Main Shaft to Contractor's Shop 1 Job $ $ 0501 Inspect Main Shaft 1 Job $ $ 0502 Machine Main Shaft Flange Face to Runner Hub 1 Job $ $ 0503 Machine Main Shaft Above Packing Box Sleeve 1 Job $ $
Machine Outer Diameter (OD) of New Turbine Shaft Sleeve
1 Job $ $
0505 Machine Main Shaft Below Packing Box Sleeve 1 Job $ $
Machine Shaft Mounting Location for Turbine Bearing Oil Slinger & Modify Oil Slinger to Fit Shaft
1 Job $ $
Inspect, Ship, and Refurbish Upper Generator Guide Bearing Pads
1 Job $ $
Inspect, Ship and Refurbish Lower Generator Guide Bearing Pads
1 Job $ $
0509 Inspect, Ship, and Refurbish Turbine Guide Bearing 1 Job $ $ 0510 Inspect Generator Thrust Bearing Phase 1 1 Job $ $ 0511 Inspect Generator Thrust Bearing Phase 2 (Optional) 1 Job $ $ 0512 Inspect, Ship, and Refurbish Thrust Bearing Shoes 1 Job $ $ 0513 Machine Shoes Backside (Optional) 1 Job $ $ 0514 Inspect Generator Shaft 1 Job $ $
Ship Generator Shaft and Thrust Bearing Runner to Contractor's Shop (Optional)
1 Job $ $
0516 Resurface Thrust Bearing Collar (Optional) 1 Job $ $
Resurface Thrust Bearing Runner on Generator Shaft (Optional)
1 Job $ $
0518 Refurbish Thrust Bearing Runner (Optional) XXXX XXX XXX XXXXX 0518A Ship Thrust Bearing Runner (Optional) 1 Job $ $
0518B Resurface Running Face and Backside of Thrust Bearing Runner (Optional)
1 Job $ $
0518C Resurface Runner Face (Optional) 1 Job $ $
0518D Rework the Split Faces of the Thrust Bearing Runner (Optional)
1 Job $ $
0518E Furnish New Thrust Bearing Runner Split Line Keys and Perform Related Keywork (Optional)
1 Job $ $
0518F Furnish New Fasteners to Join Runner Halves (Optional) 1 Job $ $ 0519 Inspect and Refurbish Air Valve Assembly 1 Job $ $ 0520 Refurbish Wicket Gate Servomotors 1 Job $ $ 0521 Chrome Plate Wicket Gate Servo Piston Rod (Optional) 1 Job $ $ 0522 Remove Wicket Gate Mechanism Grease System 1 Job $ $
Provide New Greaseless Bushing/Bearing Plate for Wicket Gate Linkage, Operating Mechanism, Gate Stems, Wicket Gate Servos and Vacuum Valve
1 Job $ $
0524 Refurbish Wicket Gate Operating Mechanism 1 Job $ $ 0525 Inspect Stay Ring 1 Job $ $ 0526 Inspect, Ship and Refurbish Outer Headcover 1 Job $ $ 0527 Inspect and Ship Intermediate Headcover 1 Job $ $ 0528 Furnish New Headcover Facing Plates 1 Set $ $ 0529 Final Machine Headcover Facing Plates 1 Job $ $ 0530 Machine Stay Ring Mounting Flange and Surfaces 1 Job $ $ 0531 Inspect and Ship Inner Headcover 1 Job $ $ 0532 Furnish New Bottom Ring Facing Plates 1 Sets $ $ 0533 Final Machine Bottom Ring Facing Plates 1 Job $ $ 0534 Inspect. Ship and Refurbish Operating Ring 1 Job $ $
0535 Line Bore Wicket Gate Stem Bushing Housings 1 Job $ $ 0536 Furnish New Packing Box, Gland and Lantern 1 Job $ $ 0537 Furnish New Shaft Sleeve 1 Job $ $ 0538 Furnish Replacement Discharge Ring Liner Insert 1 Job $ $ 0539 Install Discharge Ring Liner Insert 1 Job $ $ 0540 Cavitation Spot Repair 50 Cubic In. Cubic In. $ $ 0541 Inspect and Refurbish Oil Head, Unit 3 1 Job $ $ 0542 Provide Turbine Guide Bearing Oil System 1 Job $ $ 0543 Provide Raw Water Piping Appurtenances 1 Job $ $ 0544 Provide New Thrust Bearing Oil Cooler 1 Job $ $ 0545 Replace High Pressure Lift System 1 Job $ $ 0546 Refurbish Braking System 1 Job $ $ 0547 Provide Thrust Bearing Oil Switch 1 Job $ $ 0548 Replace Check and Gate Valves 1 Job $ $ 0549 Weld Strengthening of Rotor Spider Est 600 Cubic In. $ $ 0550 Structural Plate Stiffeners for Spider Strengthening Est. 3,000 Lbs. $ $ 0551 Provide New Automatic/Manual Gate Lock 1 Job $ $ 0552 Furnish New Turbine Head Cover Sump Pumps 1 Job $ $ 0553 Disposal of Existing Unit 3 Oil Est 7,000 Gal $ $ 0554 Supply New Oil for Unit 3 Est. 7,000 Gal $ $
0600-0649 UNIT 3 ELECTRICAL WORK
Furnish Complete Set Of Stator Coils Including Supplies and Accessories For A Complete New Winding, Including Factory Testing
1 Job $ $
0601 DELETED
0602 DELETED
0603 Truing Collector Rings 1 Job $ $ 0604 Perform Minor Stator Iron Repair (Optional) 1 Job $ $ 0605 Provide New Stator Core (Optional) 1 Job $ $ 0606 Install and Test New Stator Winding 1 Job $ $ 0607 Provide New Generator Terminal Box 1 Job $ $ 0608 Rewire Turbine and Generator 1 Job $ $
DELETED
Provide Complete New Machine Condition Monitoring System
1 Job $ $
0611 Provide New Generator Heaters for Unit 3 1 Job $ $
0700-0799 UNIT 4 MECHANICAL WORK
0700 Ship Main Shaft to Contractor's Shop 1 Job $ $ 0701 Inspect Main Shaft 1 Job $ $ 0702 Machine Main Shaft Flange Face to Runner Hub 1 Job $ $ 0703 Machine Main Shaft Above Packing Box Sleeve 1 Job $ $
Machine Outer Diameter (OD) of New Turbine Shaft Sleeve
1 Job $ $
0705 Machine Main Shaft Below Packing Box Sleeve 1 Job $ $
Machine Shaft Mounting Location for Turbine Bearing Oil Slinger & Modify Oil Slinger to Fit Shaft
1 Job $ $
Inspect, Ship, and Refurbish Upper Generator Guide Bearing Pads
1 Job $ $
Inspect, Ship and Refurbish Lower Generator Guide Bearing Pads
1 Job $ $
0709 Inspect, Ship, and Refurbish Turbine Guide Bearing 1 Job $ $ 0710 Inspect Generator Thrust Bearing Phase 1 1 Job $ $ 0711 Inspect Generator Thrust Bearing Phase 2 (Optional) 1 Job $ $ 0712 Inspect, Ship, and Refurbish Thrust Bearing Shoes 1 Job $ $ 0713 Machine Shoes Backside (Optional) 1 Job $ $ 0714 Inspect Generator Shaft 1 Job $ $
Ship Generator Shaft and Thrust Bearing Runner to Contractor's Shop (Optional)
1 Job $ $
0716 Resurface Thrust Bearing Collar (Optional) 1 Job $ $
Resurface Thrust Bearing Runner on Generator Shaft (Optional)
1 Job $ $
0718 Refurbish Thrust Bearing Runner (Optional) XXXX XXX XXX XXXXX 0718A Ship Thrust Bearing Runner (Optional) 1 Job $ $
0718B Resurface Running Face and Backside of Thrust Bearing Runner (Optional)
1 Job $ $
0718C Resurface Runner Face (Optional) 1 Job $ $
0718D Rework the Split Faces of the Thrust Bearing Runner (Optional)
1 Job $ $
0718E Furnish New Thrust Bearing Runner Split Line Keys and Perform Related Keywork (Optional)
0718F Furnish New Fasteners to Join Runner Halves (Optional) 1 Job $ $
0719 Inspect and Refurbish Air Valve Assembly 1 Job $ $ 0720 Refurbish Wicket Gate Servomotors 1 Job $ $ 0721 Chrome Plate Wicket Gate Servo Piston Rod (Optional) 1 Job $ $ 0722 Remove Wicket Gate Mechanism Grease System 1 Job $ $
Provide New Greaseless Bushing/Bearing Plate for Wicket Gate Linkage, Operating Mechanism, Gate Stems, Wicket Gate Servos and Vacuum Valve
1 Job $ $
0724 Refurbish Wicket Gate Operating Mechanism 1 Job $ $ 0725 Inspect Stay Ring 1 Job $ $ 0726 Inspect, Ship and Refurbish Outer Headcover 1 Job $ $ 0727 Inspect and Ship Intermediate Headcover 1 Job $ $ 0728 Furnish New Headcover Facing Plates 1 Set $ $ 0729 Final Machine Headcover Facing Plates 1 Job $ $ 0730 Machine Stay Ring Mounting Flange and Surfaces 1 Job $ $ 0731 Inspect and Ship Inner Headcover 1 Job $ $ 0732 Furnish New Bottom Ring Facing Plates 1 Sets $ $ 0733 Final Machine Bottom Ring Facing Plates 1 Job $ $ 0734 Inspect. Ship and Refurbish Operating Ring 1 Job $ $ 0735 Line Bore Wicket Gate Stem Bushing Housings 1 Job $ $ 0736 Furnish New Packing Box, Gland and Lantern 1 Job $ $
0737 Furnish New Shaft Sleeve 1 Job $ $
0738 Furnish Replacement Discharge Ring Liner Insert 1 Job $ $ 0739 Install Discharge Ring Liner Insert 1 Job $ $ 0740 Cavitation Spot Repair 50 Cubic In. Cubic In. $ $ 0741 Inspect and Refurbish Oil Head, Unit 4 1 Job $ $ 0742 Provide Turbine Guide Bearing Oil System 1 Job $ $ 0743 Provide Raw Water Piping & Appurtenances 1 Job $ $
0744 Provide New Thrust Bearing Oil Cooler 1 Job $ $ 0745 Replace High Pressure Lift System 1 Job $ $ 0746 Refurbish Braking System 1 Job $ $ 0747 Provide Thrust Bearing Oil Switch 1 Job $ $ 0748 Replace Check and Gate Valves 1 Job $ $ 0749 Weld Strengthening of Rotor Spider Est 600 Cubic In. $ $ 0750 Structural Plate Stiffeners for Spider Strengthening Est. 3,000 Lbs. $ $ 0751 Provide New Automatic/Manual Gate Lock 1 Job $ $ 0752 Furnish New Turbine Head Cover Sump Pumps 1 Job $ $ 0753 Disposal of Existing Unit 4 Oil Est 7,000 Gal $ $ 0754 Supply New Oil for Unit 4 Est. 7,000 Gal $ $ 0755 Furnish Spare Mechanical Parts 1 Job $ $
0800-0849 UNIT 4 ELECTRICAL WORK
Furnish Complete Set Of Stator Coils Including Supplies and Accessories For A Complete New Winding, Including Factory Testing
1 Job $ $
0801 DELETED
0802 DELETED $
0803 Truing Collector Rings 1 Job $ $ 0804 Perform Minor Stator Iron Repair (Optional) 1 Job $ $ 0805 Provide New Stator Core (Optional) 1 Job $ $
0806 Install and Test New Stator Winding 1 Job $ $ 0807 Provide New Generator Terminal Box 1 Job $ $
0808 Rewire Turbine and Generator 1 Job $ $
0809 DELETED
0810 Provide Complete New Machine Condition Monitoring System
1 Job $ $
Provide New Generator Heaters for Unit 4
1 Job $ $
0900-0949 OPTIONAL LABOR
0900 Miscellaneous Welding (Optional) 320 LBS $ $ 0901 Machinist Hire (Optional) 320 HRS $ $ 0902 Electrician Hire (Optional) 320 HRS $ $ 0903 Welding Services (Optional) 320 HRS $ $ 0904 Painter Hire (Optional) 200 HRS $ $ 0905 Other Skilled Craftsmen Hire (Optional) 320 HRS $ $ 0906 General Laborer Hire (Optional) 320 HRS $ $ 0907 Liquid Penetrant Method (Optional) 160 HRS $ $ 0908 Magnetic Particle Method (Optional) 160 HRS $ $ 0909 Ultrasonic Method (Optional) 160 HRS $ $ 0910 Radiographic Method (Shop Only) (Optional) 30 HRS $ $ 0911 Thermal Spraying (Optional) 100 HRS $ $ 0912 Miscellaneous Parts and Materials (Optional) 1 Job NTE $200,000 0913 Asbestos Coordination 4 EA $ $
BASE ITEMS
AS NEEDED ITEMS
ESTIMATED ITEM
NOT TO EXCEED
The term "Provided" is to be representative of "Furnish and Install"
Items not identified in the Price Schedule as an "(Optional)" item are considered base items. Base items are those required for
The Government may require the delivery of the item(s) identified in the Price Schedule as an "(Optional)" item. The
The quantity for Item's marked EST is estimated and may be increased or decreased at the discretion of the Government.
The quantity for Item's marked NTE is the maximum allowed by the Government for that Item without modification to the
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 11 PAGES
BVTO
Kerr Turbine/Generator Rehabilitation FY20
01 50 00 SD-01 Preconstruction Submittals
1.4 GConstruction Site Plan
3.1.1 GTraffic Control Plan
SD-09 Manufacturer’s Field
Reports
3.11 GGas, Vapor, Fume, Dust, and
Mist Control Program
05 05 33.20 26 SD-06 Test Reports
3.1.1 G HDCNDT Inspection Reports
SD-07 Certificates
3.1.1 G HDCQualifications of Nondestructive
Testing Personnel
3.1.5 G HDCIndependent Party's Ultrasonic
Inspection Qualifications
3.1.6 G HDCIndependent Party's Radiographic
Inspection Qualifications
3.1.1 G HDCWitness NDT Testing
SD-08 Manufacturer’s Instructions
3.1.1 G HDCManufacturer's Methods and
Procedures of Inspection
48 13 13.00 26 SD-02 Shop Drawings
1.6 GDrawings Of The Model
1.6 GAdditional Drawings
3.3Witness Model Testing Schedule
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 11 PAGES
Kerr Turbine/Generator Rehabilitation FY20
48 13 13.00 26 1.4 GAnalysis Comparing Performance and Efficiency of Existing Vs.
Optimized Wicket Gate
3.2.1 GMeasurements Of Dimensions Of
The Model Components And
Assemblies
1.7.2 GField Measurement Report
3.2.1 GPre-test Information
3.2.2.1 GPreliminary Model Test Report
3.2.3 GFinal Model Test Report
1.7.2Field Measurements
48 13 13.01 26 SD-02 Shop Drawings
2.1.2.2 GDrawings of All Steel Castings, Showing the Location of Tension and Bend Test Specimens
3.1 GDetailed, Assembly, Sectional, Etc. Drawings of All New, Modified and Refurbished Components
3.9 GRunner Nameplate Drawing
SD-03 Product Data
2.1.2.2Notification Of Coupon Removal
2.1.2.2Notification Of Coupon Removal
SD-04 Samples
2.1.1.1Samples of materials
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 11 PAGES
Kerr Turbine/Generator Rehabilitation FY20
48 13 13.01 26 2.1.1.1 GDeviations In Material
Specifications
3.1 GDesign Data and Calculations
3.6.17 GStatic Balancing Results
3.6.15 GBlade Shape Numerical File
Wicket Gate Modification Stress
Analysis And Procedure
SD-06 Test Reports
3.3 GContractor's Internal Quality, NDT
and Dimensional Inspection
Reports
3.5.3 GPrototype Blade Geometric
Similarity / Uniformity Report
3.6.2 GRunner Stress Analysis
3.6.18 GFinished Runner Shop Inspection
Report
SD-07 Certificates
2.1.2.3Notified of Final Casting NDT
Inspection
3.6.18Notice of Finished Runner
Inspection
SD-08 Manufacturer’s Instructions
1.5.3.2 GMethod and procedure For
determining the volume of cavitation damage
1.5.3.3 GCavitation Repair Procedure
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 11 PAGES
Kerr Turbine/Generator Rehabilitation FY20
48 13 13.01 26 2.1.2.4 GWelding Repair Procedure
3.5.3 GProcedure For Checking
Geometric Similarity Between
Design And Prototype
3.6.10 GRunner Construction Plan and
Work Schedule
48 13 13.02 26 SD-03 Product Data
3.1Notification Of Damaged Or
Unserviceable Items
3.1Notification Of Damaged Or
Unserviceable Items
SD-04 Samples
2.1 G HDCSamples of Materials
SD-05 Design Data
3.2.5 GPre-Disassembly Wicket Gate
Measurements
3.5.1 GLaydown Plan
3.10.16 GProposed fastener elongation or
torque
3.10.16 GFastener elongation or torque
3.3.12Center Hole Jacking System
3.3.12.1Center Hole Jacking System
Design
3.3.12.1Center Hole Jacking System
Design
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 11 PAGES
Kerr Turbine/Generator Rehabilitation FY20
48 13 13.02 26 3.2.6 GPre-Disassembly Watered
Operational Testing Report
3.3.5.2Stationary Alignment Report and
Recommendations
3.3.6.1 GDisassembly
Measurement/Inspection Report
3.3.9 GDisassembly
Measurement/Inspection Report
3.6.2 GContractor's As-Found Inspection
Report And Repair
Recommendations
3.10.19 GReassembly Measurement
Report
3.10.21 GReassembly Measurement
Report
3.12.6Start-Up And Test Procedure
3.12.4Wet Test Data
3.12.6Wet Test Data
3.10.19Hpois Lift And Timing
3.10.19Hpois Lift And Timing
3.12.1Post Reassembly Checks And
Testing Procedure
3.12.1Post Reassembly Checks And
Testing Procedure
1.1.7 GDrawings And Design
Calculations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 11 PAGES
Kerr Turbine/Generator Rehabilitation FY20
48 13 13.02 26 SD-07 Certificates
3.3.2 GDisassembly Procedure
3.10.2 GReassembly Procedure
3.6.3 GProcedures for repair of defects
SD-09 Manufacturer’s Field
Reports
3.2.1Pre-disassembly operational testing schedule and testing plan
48 13 13.04 26 SD-02 Shop Drawings
3.1 GDetailed, Assembly, Sectional, Etc. Drawings Of All New, Modified
And Refurbished Components
3.5.1 GOffsite Refurbishment Work Plan
3.13.9New Wicket Gate Drawings
SD-04 Samples
2.9Samples Of Materials
SD-05 Design Data
3.1 GUpon Written Request, Design
Data And Calculations On Specific
Systems or Components
2.9 GDeviations In Material
Specifications
3.2Miscellaneous On-Site
Measurements
3.21.9Shear Pin Calculations and
Testing Results
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 11 PAGES
Kerr Turbine/Generator Rehabilitation FY20
48 13 13.04 26 3.22.5 GPost-Boring Bushing Bore
Inspection Report
3.25.4Shaft Sleeve shall be Measured
3.20.2.2Self-Lubricating Bearing
Calculations
3.20.2.2Self-Lubricating Bearing
Calculations
SD-06 Test Reports
3.4.3 GAs-Found Inspection Report and
Refurbishment Recommendations
3.5.2 GFor Each Component, A Finished
Inspection Report
3.10 GReport Of Thermal Repair
Findings
SD-07 Certificates
3.4.2For Each Component, Notice Of
As-Found Inspection
3.7Notice Of Final Inspection
Following Refurbishment
3.10Provide Notice Of Thermal Repair
SD-08 Manufacturer’s Instructions
3.4.4 GProcedures For Repair Of
Defects
3.10 GProcedure for Thermal Repair or
Refurbishment
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 11 PAGES
Kerr Turbine/Generator Rehabilitation FY20
48 13 13.04 26 3.4Measurement and Inspection
Plans
3.25.4 GShaft Sleeve Welding Procedure
48 13 13.07 26 SD-01 Preconstruction Submittals
3.3.2Schedule for Turbine Bearing
Refurbishment
3.4.1Schedule for Generator Guide
Bearing Refurbishment
SD-03 Product Data
2.1Certified Chemical Analysis of
Babbitt and Tin
2.3Proof of ISO 9000 Certification or
Equivalence
3.2.1 G HDCPre-Shipment Damage Inspection
3.5.2.1NDT Personnel/Laboratory
Qualifications
SD-04 Samples
2.2Samples of Materials
SD-07 Certificates
3.3.4Notice of Turbine Guide Bearing
Finished Inspection
3.4.7Notice of Generator Guide
Bearing Finished Inspections
3.6.2Notification of Welding Repair
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL…