Robert_S_Kerr_Generator_Test_Report Part 1.pdf

PDF 18 MB Posted

Attached to
Robert S Kerr Powerhouse Turbine/Generator Rehabilitation
Solicitation number
W912BV19R0042
Issued by

About this file

This document outlines a federal contract solicitation for turbine and generator rehabilitation work. The U.S. Army Corps of Engineers Engineering District Tulsa is seeking to refurbish the turbine generating units 1 through 4 at the R.S. Kerr Power Plant in Keota, Oklahoma. Work will include replacing the existing Kaplan turbine runners with new ones rated at 49,300 hp to accommodate rewound generators. Turbine work will focus on head covers, wicket gates, turbine shaft, runner, bearings, operating ring, servomotors, and facing plates. The generators' stator windings will be replaced and rated no less than 37,895 KVA at 0.95 power factor with a temperature rise of no more than 75 degrees C above 40 degrees C when operated at rated load. Generator stator core replacements and field winding refurbishment are optional. Upper and lower bearing pads, thrust bearing shoes, and runners will be refurbished. One new set of thrust bearing shoes will be fabricated as spares.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .