Drawings_-_Reference_-_RS_Kerr_Turbines_Part7.pdf

PDF 10 MB Posted

Attached to
Robert S Kerr Powerhouse Turbine/Generator Rehabilitation
Solicitation number
W912BV19R0042
Issued by

About this file

This announcement is a request for information for the rehabilitation of four existing turbine and generator units at the Robert S. Kerr Powerhouse in Oklahoma. The Army Corps of Engineers is seeking feedback from potential contractors on refurbishing the Kaplan-type turbines and rewinding the corresponding generators. The project requires replacement of stator windings rated at 42,000 KVA and rehabilitation of internal turbine components. Replacements of generator stator cores will be included as an option. The goal of the RFI is to provide industry an opportunity to review specifications and drawings, and provide information on existing and emerging technologies that could support the rehabilitation. Responses will be protected from unauthorized disclosure, and no contract will be awarded based on the RFI.

RS Kerr Powerhouse Turbine and Generator Rehabilitation - Drawings Part 7

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .