Drawings_-_Reference_-_RS_Kerr_Turbines_Part3.pdf
PDF 14 MB Posted
- Solicitation number
- W912BV19R0042
About this file
This document is a request for information concerning the rehabilitation of four turbine and generator units at the Robert S. Kerr Powerhouse in Oklahoma. The Army Corps of Engineers is seeking feedback from potential contractors on refurbishing the existing Kaplan-type turbines and rewinding the corresponding generators. The rehabilitation work will include replacing or refurbishing internal turbine components, rewinding the stator windings to a higher rating of 42,000 KVA at 0.9 power factor, and optionally replacing generator stator cores as needed. Respondents are requested to review the specifications and drawings to provide information on existing and emerging technologies that could support this project regarding maturity, manufacturability, sustainability and affordability. Sensitive information submitted will be protected from unauthorized disclosure. This request for information is not a solicitation and no contract will be awarded based on responses received.
RS Kerr Powerhouse Turbine and Generator Rehabilitation - Drawings Part 3
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .