Volume 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912BV19R0040_0005.pdf | ||
| _AM4_Binder_McAAP_Bulk_Diesel.pdf | ||
| W912BV19R0040_0004.pdf | ||
| W912BV19R0040_0003.pdf | ||
| _AM3_Binder_MCAAP_Diesel.pdf | ||
| W912BV19R0040_0002.pdf | ||
| _AM2_Binder_McAAP_Diesel.pdf | ||
| W912BV19R0040_P1.pdf | ||
| AM1_Binder_McAAP_Diesel_Storage.pdf | ||
| W912BV19R0040_VOL_2_Plans.pdf | ||
| Visit_Request_MF190-20.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VOL 1 of 2 - SPECIFICATIONS
SOLICITATION NO. W912BV-19-R-0040
REPLACE BULK DIESEL SYSTEM
DESC18S2
VOL 1 - DIVISIONS 00 - 33
VOL 2 - Contract Drawings
MCALESTER AAP, OKLAHOMA
JUNE 2019
Prepared for:
Tulsa District
Prepared By:
This page was intentionally left blank for duplex printing.
00 01 10 (TABLE OF CONTENTS) - 1
REPLACE BULK DIESEL SYSTEM
MCALESTER AAP, OKLAHOMA
PROJECT TABLE OF CONTENTS
TECHNICAL VOLUME 1 OF 2 – DIVISIONS 00 - 33
DIVISION 01 - GENERAL REQUIREMENTS
PROJECT SCHEDULE
SUBMITTAL PROCEDURES
SUBMITTAL REGISTER
SUSTAINABILITY REPORTING
HPSB – GUIDING PRINCIPLES COMPLIANCE WORKSHEET CHECKLIST
GOVERNMENTAL SAFETY REQUIREMENTS
01 32 01.00 10 01 33 00
REGISTER
01 33 29 01 33 29-A 01 35 26
01 35 29.13 HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES FOR
CONTAMINATED SITES
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS 3.0
CM)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL
01 58 00 PROJECT IDENTIFICATION
01 58 00AT PROJECT SAFETY SIGN
01 60 00.00 50 MATERIAL AND EQUIPMENT
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 00ATA INITIAL RED ZONE MEETING CHECKLIST
01 78 00ATB DD1354 CHECKLIST FOR PROJECT CLOSEOUT
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 23.33 OPERATION AND MAINTENANCE MANUALS FOR AVIATION FUEL
SYSTEMS
01 30 01 ADDITIONAL ADMINISTRATIVE REQUIREMENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 10 00 00 21 00
00 45 00 00 72 00 00 73 00 00 73 46
PRICING (CLIN) SCHEDULE
INSTRUCTIONS, CONDITIONS & NOTICES TO OFFERORS
PROPOSAL SUBMISSION REQUIREMENTS
REPRESENTATIONS AND CERTIFICATIONS
CONTRACT CLAUSES
SPECIAL CONTRACT REQUIREMENTS
WAGE DETERMINATION
00 22 11
00 01 10 (TABLE OF CONTENTS) - 2
02 83 00 LEAD REMEDIATION
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 05 - METALS
05 05 23.16 STRUCTURAL WELDING
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES 06 10 00
ROUGH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 02 81 00 02 82 00
DEMOLITION
TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS
ASBESTOS REMEDIATION
DIVISION 09 - FINISHES
09 90 00 09 97 13.27
PAINTS AND COATINGS
EXTERIOR COATING OF STEEL STRUCTURES
DIVISION 10 - SPECIALTIES
10 44 16 FIRE EXTINGUISHERS
00 01 10 (TABLE OF CONTENTS) - 3
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 32 14.00 10 DIESEL-GENERATOR SET, STATIONARY 15-300 KW, STANDBY
APPLICATIONS
26 41 00 LIGHTNING PROTECTION SYSTEM
26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 METAL BUILDING SYSTEMS AND CANOPY
DIVISION 31 - EARTHWORK
31 00 00 31 05 21 31 05 22 31 63 29
EARTHWORK
GEOGRID SOIL REINFORCEMENT
GEOTEXTILES USED AS FILTERS
DRILLED CONCRETE PIERS AND SHAFTS
00 01 10 (TABLE OF CONTENTS) - 4
DIVISION 33 - UTILITIES
33 01 50.60 CLEANING OF PETROLEUM STORAGE TANKS
33 05 23 TRENCHLESS UTILITY INSTALLATION
33 08 55 COMMISSIONING OF FUEL FACILITY SYSTEMS
33 09 52 FUEL PUMP CONTROL AND ANNUNCIATION SYSTEM (NON-
HYDRANT)
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 40 00 STORM DRAINAGE UTILITIES
33 46 16 SUBDRAINAGE PIPING
33 52 43.13 AVIATION FUEL PIPING
33 52 43.14 AVIATION FUEL CONTROL VALVES
33 56 10 FACTORY-FABRICATED FUEL STORAGE TANKS
33 57 55 FUEL SYSTEM COMPONENTS (NON-HYDRANT)
33 58 00 LEAK DETECTION FOR FUELING SYSTEMS
33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19
32 11 20 32 13 13.03 32 15 00 32 16 19 32 31 13.53 32 92 19
FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID
PAVEMENTS
BASE COURSE FOR RIGID PAVING
CONCRETE PAVEMENT
AGGREGATE SURFACING
CONCRETE CURBS, GUTTERS AND SIDEWALKS
CHAIN LINK FENCES AND GATES
SEEDING
TECHNICAL VOLUME 2 OF 2 – CONTRACT DRAWINGS
Replace Bulk Diesel System, DESC18S2, McAlester AAP, Oklahoma OK21
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/11
PART 1 GENERAL
1.1 SUMMARY
1.2 CONTRACT DRAWINGS
1.3 SUPPLEMENTARY DRAWINGS
1.3.1 Boring Logs
1.3.2 Subsurface Data
-- End of Section Table of Contents --
DOCUMENT 00 01 15 Page 1
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/11
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
Drawings
GENERAL
OK21G-001.DGN G-001 COVER
OK21G-002.DGN G-002 INDEX
OK21G-003.DGN G-003 ABBREVIATIONS
OK21G-004.DGN G-004 LEGEND
OK21G-005.DGN G-005 ELECTRICAL LEGEND
OK21GC101.DGN GC101 VICINITY MAPS & LOCATION PLAN
OK21GC102.DGN GC102 TEMPORARY FUELING & STAGING AREA PLAN
OK21GI101.DGN GI101 GENERAL INFORMATION - SHEET 1 OF 2
OK21GI102.DGN GI102 GENERAL INFORMATION - SHEET 2 OF 2
SITE/CIVIL
OK21B-101.DGN B-101 SOIL BORING LOCATION PLAN
OK21B-301.DGN B-301 SOIL BORING LOGS, LEGEND AND NOTES - MA18-01 &
MA18-02
OK21B-302.DGN B-302 MILCON SOIL BORING LOGS - MA18-03 THROUGH
MA18-05, MA18-07
OK21B-303.DGN B-303 MILCON SOIL BORING LOGS - MA18-08 & MA18-09,
MA18-11 & MA18-12
OK21VF100.DGN VF100 OVERALL EXISTING SURVEY
OK21VF101.DGN VF101 EXISTING SURVEY - AREA 1
OK21VF102.DGN VF102 EXISTING SURVEY - AREA 2
OK21VF103.DGN VF103 EXISTING SURVEY - AREA 3
OK21CD101.DGN CD101 DEMOLITION PLAN - AREA 1
OK21CD102.DGN CD102 DEMOLITION PLAN - AREA 2
OK21CS101.DGN CS101 CIVIL SITE PLAN - AREA 1
OK21CS401.DGN CS401 ENLARGED AREA - FILLSTAND / OFFLOAD
OK21CS402.DGN CS402 ENLARGED AREA - ABOVEGROUND STORAGE TANK PAD
OK21CS403.DGN CS403 ENLARGED AREA - POL BUILDING
OK21CS501.DGN CS501 REMOTE CONTAINMENT BASIN DETAILS
OK21CS502.DGN CS502 BASIN GUARDRAIL DETAILS
OK21CS503.DGN CS503 FE6 CHAINLINK SECURITY FENCING DETAILS
OK21CS504.DGN CS504 FE6 DOUBLE SWING GATE DETAILS
OK21CS505.DGN CS505 SIGNAGE DETAILS
OK21CP101.DGN CP101 CIVIL PAVING PLAN - AREA 1
OK21CP201.DGN CP201 ACCESS ROAD PROFILE
OK21CP301.DGN CP301 ROADWAY TYPICAL SECTIONS
OK21CP501.DGN CP501 CONCRETE PAVEMENT DETAILS
DOCUMENT 00 01 15 Page 2
Drawings
OK21CP502.DGN CP502 MISCELLANEOUS PAVEMENT DETAILS
OK21CG101.DGN CG101 GRADING & DRAINAGE PLAN - AREA 1
OK21CG201.DGN CG201 STORM DRAINAGE PROFILES
OK21CG202.DGN CG202 SUBDRAIN OUTFALL PIPING PROFILES
OK21CG501.DGN CG501 BIORETENTION BASIN DETAILS
OK21CG502.DGN CG502 PIPE BEDDING DETAILS
OK21CG503.DGN CG503 CATCH BASIN STRUCTURE DETAILS
OK21CG504.DGN CG504 AREA INLET STRUCTURE DETAILS
OK21CG505.DGN CG505 MISCELLANEOUS DRAINAGE DETAILS
OK21CG506.DGN CG506 HEADWALL DETAILS
OK21CE001.DGN CE001 EROSION CONTROL PLAN - GENERAL INFORMATION -
SHEET 1 OF 2
OK21CE002.DGN CE002 EROSION CONTROL PLAN - GENERAL INFORMATION -
SHEET 2 OF 2
OK21CE101.DGN CE101 EROSION CONTROL PLAN - AREA 1 - PHASE 1
OK21CE102.DGN CE102 EROSION CONTROL PLAN - AREA 1 - PHASE 2
OK21CE501.DGN CE501 EROSION CONTROL DETAILS
OK21CE502.DGN CE502 INLET PROTECTION DETAILS
OK21CU101A.DGN CU101A CIVIL UTILITY PLAN (BASE BID) - SHEET 1 OF 1
OK21CU101B.DGN CU101B CIVIL UTILITY PLAN (BID OPTION) - SHEET 1 OF 2
OK21CU102B.DGN CU102B CIVIL UTILITY PLAN (BID OPTION) - SHEET 2 OF 2
OK21CU201.DGN CU201 WATER LINE PROFILES (BID OPTION)
OK21CU501.DGN CU501 WATER SYSTEM DETAILS
OK21CU502.DGN CU502 CASING PIPE DETAILS (BID OPTION)
MECHANCICAL SITE
OK21MD101.DGN MD101 MECHANICAL REMOVAL PLAN
OK21MS101.DGN MS101 FUELING SYSTEM SITE LAYOUT
OK21MS102.DGN MS102 TEMPORARY FUELING SYSTEM
OK21MS201.DGN MS201 PIPING PROFILES - SHEET 1 OF 3
OK21MS202.DGN MS202 PIPING PROFILES - SHEET 2 OF 3
OK21MS203.DGN MS203 PIPING PROFILES - SHEET 3 OF 3
OK21MS401.DGN MS401 ENLARGED FUELING SYSTEM SITE LAYOUT - SHEET 1 OF 3
OK21MS402.DGN MS402 ENLARGED FUELING SYSTEM SITE LAYOUT - SHEET 2 OF 3
OK21MS403.DGN MS403 ENLARGED FUELING SYSTEM SITE LAYOUT - SHEET 3 OF 3
OK21MS501.DGN MS501 TRUCK FILLSTAND DETAILS - SHEET 1 OF 2
OK21MS502.DGN MS502 TRUCK FILLSTAND DETAILS - SHEET 2 OF 2
OK21MS503.DGN MS503 TRUCK OFFLOAD DETAILS
ELECTRICAL SITE
OK21ED101.DGN ED101 ELECTRICAL SITE DEMOLITION PLAN
OK21ED501.DGN ED501 ELECTRICAL SITE DEMOLITION DETAILS SHEET 1 OF 4
OK21ED502.DGN ED502 ELECTRICAL SITE DEMOLITION DETAILS SHEET 2 OF 4
OK21ED503.DGN ED503 ELECTRICAL SITE DEMOLITION DETAILS SHEET 3 OF 4
OK21ED504.DGN ED504 ELECTRICAL SITE DEMOLITION DETAILS SHEET 4 OF 4
OK21EC101A.DGN EC101A CATHODIC PROTECTION PLAN (BASE BID)
OK21EC101B.DGN EC101B CATHODIC PROTECTION PLAN (BID OPTION) SHEET 1 OF
OK21EC102B.DGN EC102B CATHODIC PROTECTION PLAN (BID OPTION) SHEET 2 OF
OK21EC501.DGN EC501 CATHODIC PROTECTION DETAILS SHEET 1 OF 2
OK21EC502.DGN EC502 CATHODIC PROTECTION DETAILS SHEET 2 OF 2
OK21ES101.DGN ES101 ELECTRICAL SITE PLAN SHEET 1 OF 2
OK21ES103.DGN ES103 ELECTRICAL SITE PLAN SHEET 2 OF 2
OK21ES501.DGN ES501 ELECTRICAL SITE DETAILS SHEET 1 OF 8
OK21ES502.DGN ES502 ELECTRICAL SITE DETAILS SHEET 2 OF 8
OK21ES503.DGN ES503 ELECTRICAL SITE DETAILS SHEET 3 OF 8
OK21ES504.DGN ES504 ELECTRICAL SITE DETAILS SHEET 4 OF 8
DOCUMENT 00 01 15 Page 3
OK21ES505.DGN ES505 ELECTRICAL SITE DETAILS SHEET 5 OF 8
OK21ES506.DGN ES506 ELECTRICAL SITE DETAILS SHEET 6 OF 8
OK21ES507.DGN ES507 ELECTRICAL SITE DETAILS SHEET 7 OF 8
OK21ES508.DGN ES508 ELECTRICAL SITE DETAILS SHEET 8 OF 8
OK21ES509.DGN ES509 ELECTRICAL HAZARDOUS AREA DETAILS SHEET 1 OF 4
OK21ES510.DGN ES510 ELECTRICAL HAZARDOUS AREA DETAILS SHEET 2 OF 4
OK21ES511.DGN ES511 ELECTRICAL HAZARDOUS AREA DETAILS SHEET 3 OF 4
OK21ES512.DGN ES512 ELECTRICAL HAZARDOUS AREA DETAILS SHEET 4 OF 4
STRUCTURAL
OK21S-001.DGN S-001 STRUCTURAL NOTES
OK21S-002.DGN S-002 POL BUILDING COMPONENTS AND CLADDING / WIND
PRESSURE LOADS
OK21S-101.DGN S-101 POL BUILDING PLAN
OK21S-111.DGN S-111 (OPTION) CANOPY FOUNDATION PLAN & DETAIL
OK21S-501.DGN S-501 TYPICAL CONCRETE DETAILS
OK21S-502.DGN S-502 VERTICAL PIPE BRACE
OK21SB301.DGN SB301 POL BUILDING FOUNDATION DETAILS
OK21SS201.DGN SS201 TANK SUPPORT PIERS
OK21SS202.DGN SS202 MISCELLANEOUS SITE FOUNDATIONS
OK21SS301.DGN SS301 TANK PIER SECTIONS / TANK SLAB DETAIL
OK21SS401.DGN SS401 TANK PLATFORM PLAN
OK21SS402.DGN SS402 TANK FOUNDATION AND SLAB LAYOUT
ARCHITECTURAL
OK21A-101.DGN A-101 OPERATIONS BUILDING - FLOOR PLAN, ROOF PLAN, AND
BUILDING ELEVATIONS
OK21A-101CP1.DGN A-101CP1 OFFLOAD CANOPY 1 - FLOOR PLAN AND BUILDING
ELEVATIONS
OK21A-112CP1.DGN A-112CP1 OFFLOAD CANOPY 1 - REFLECTED CEILING PLAN
OK21A-113CP1.DGN A-113CP1 OFFLOAD CANOPY 1 - ROOF PLAN
OK21A-301.DGN A-301 OPERATIONS BUILDING - WALL SECTIONS AND DETAILS
OK21A-501.DGN A-501 OPERATIONS BUILDING - ROOF, DOOR, AND WINDOW
DETAILS
OK21A-601.DGN A-601 OPERATIONS BUILDING - ROOM FINISH SCHEDULE -
DOOR SCHEDULE - DOOR AND FRAME TYPES
MECHANICAL
OK21M-001.DGN M-001 FUELING SYSTEM LEGEND AND NOTES
OK21M-201.DGN M-201 FLOW DIAGRAM - SHEET 1 OF 2
OK21M-202.DGN M-202 FLOW DIAGRAM - SHEET 2 OF 2
OK21M-501.DGN M-501 ABOVEGROUND STORAGE TANK DETAILS
OK21M-502.DGN M-502 TOP LOADING FILLSTAND PLATFORM DETAIL
OK21M-503.DGN M-503 MECHANICAL DETAILS - SHEET 1 OF 3
OK21M-504.DGN M-504 MECHANICAL DETAILS - SHEET 2 OF 3
OK21M-505.DGN M-505 MECHANICAL DETAILS - SHEET 3 OF 3
OK21M-506.DGN M-506 SEQUENCE OF OPERATION
OK21M-601.DGN M-601 FUEL PUMP SCHEDULE
OK21MH101.DGN MH101 POL BLDG FOUNDATION MECHANICAL PLAN
OK21MH501.DGN MH501 MECHANICAL DETAILS
OK21MH601.DGN MH601 MECHANICAL SCHEDULES
ELECTRICAL
OK21E-001.DGN E-001 ELECTRICAL LEGEND
OK21EG101.DGN EG101 ELECTRICAL POL BLDG GROUNDING/LIGHTNING
PROTECTION PLAN
OK21EG102.DGN EG102 TANK AREA GROUNDING AND LIGHTNING PROTECTION PLAN
(EQUIPMENT CANOPY OPTION)
DOCUMENT 00 01 15 Page 4
OK21EG103.DGN EG103 TANK AREA GROUNDING AND LIGHTNING PROTECTION PLAN
(BASE BID)
OK21EG501.DGN EG501 ELECTRICAL LIGHTNING PROTECTION AND GROUNDING
DETAILS SHEET 1 OF 2
OK21EG502.DGN EG502 ELECTRICAL LIGHTNING PROTECTION AND GROUNDING
DETAILS SHEET 2 OF 2
OK21EI501.DGN EI501 TERMINAL BLOCK CONNECTIONS SHEET 1 OF 2
OK21EI502.DGN EI502 TERMINAL BLOCK CONNECTIONS SHEET 2 OF 2
OK21EI601.DGN EI601 CONTROL SYSTEMS DIAGRAM SHEET 1 OF 3
OK21EI602.DGN EI602 CONTROL SYSTEMS DIAGRAM SHEET 2 OF 3
OK21EI603.DGN EI603 CONTROL SYSTEMS DIAGRAM SHEET 3 OF 3
OK21EL101.DGN EL101 POL BLDG LIGHTING PLAN
OK21EL102.DGN EL102 TANK AREA LIGHTING PLAN (EQUIPMENT CANOPY OPTION)
OK21EL103.DGN EL103 TANK AREA LIGHTING PLAN (BASE BID)
OK21EL501.DGN EL501 LIGHTING DETAILS SHEET 1 OF 3
OK21EL502.DGN EL502 LIGHTING DETAILS SHEET 2 OF 3
OK21EL503.DGN EL503 LIGHTING DETAILS SHEET 3 OF 3
OK21EL701.DGN EL701 POL BLDG LIGHTING CALCULATIONS FOR INFORMATION
ONLY
OK21EL702.DGN EL702 SITE LIGHTING CALCULATIONS (EQUIPMENT CANOPY
OPTION) FOR INFORMATION ONLY
OK21EL703.DGN EL703 SITE LIGHTING CALCULATIONS (BASE BID) FOR
INFORMATION ONLY
OK21EP101.DGN EP101 POL BLDG POWER PLAN
OK21EP102.DGN EP102 TANK AREA POWER PLAN
OK21EP501.DGN EP501 FUEL PUMP DETAILS
OK21EP601.DGN EP601 ELECTRICAL ONE LINE DIAGRAM
OK21EP602.DGN EP602 ELECTRICAL PANEL SCHEDULE
OK21EP603.DGN EP603 EPDS CONTROL DIAGRAM
OK21EP604.DGN EP604 WIRING DIAGRAM
OK21EP605.DGN EP605 CONDUIT AND CONDUCTOR SCHEDULES
OK21ET101.DGN ET101 POL BLDG TELECOMMUNICATIONS PLAN
OK21ET501.DGN ET501 TELECOMMUNICATIONS DETAILS SHEET 1 OF 2
OK21ET502.DGN ET502 TELECOMMUNICATIONS DETAILS SHEET 2 OF 2
OK21FA-001.DGN FA-001 FIRE ALARM LEGEND
OK21FA101.DGN FA101 FIRE ALARM PLAN
OK21FA501.DGN FA501 FIRE ALARM MATRIX
OK21FA502.DGN FA502 FIRE ALARM RISER DIAGRAM
1.3 SUPPLEMENTARY DRAWINGS
These supplementary drawings may not be a part of the contract but are included with the drawings for information.
1.3.1 Boring Logs
The Government does not guarantee that borings indicate actual conditions, except for the exact locations and the time that they were made.
Subsurface data, not specified or indicated, have been obtained by the Government at this station.
1.3.2 Subsurface Data
DOCUMENT 00 01 15 Page 5
Subsurface data, not specified or indicated, have been obtained by the Government at the station. The data are available for examination by prospective bidders. The soils report is included as part of the solicitation.
-- End of Document --
DOCUMENT 00 01 15 Page 6
McAAP Bulk Diesel Fuel Facility, McAlester, OK
This is an small business set aside under NAICS 236220.
Contract Type: Firm Fixed-Price (FFP)
SHAWN BRADY 918.669.7670
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
31-May-2019
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
CONTRACTING DIV
US ARMY CORPS OF ENGINEERS, TULSA DISTRICT
2488 E. 81ST STREET
TULSA OK 74137-4290
W912BV
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
(hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
918-669-7436FAX:TEL: TEL: FAX:
W912BV19R0040 63
Replace Bulk Diesel System McAlester AAP, OK
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
00 10 00 - CONTRACT LINE ITEM PRICING SCHEDULE
BASIC ITEMS
ITEM
NO.
DESCRIPTION QUANTITY UNIT UNIT
PRICE
AMOUNT
0001 All work complete to provide three 50,000 gallon UL 2085 Factory Fabricated Diesel fuel storage tanks including concrete pad, foundation, and associated appurtenances.
1 Job XXX $_____________________
0002 All work complete to provide new POL Building including associated appurtenances.
1 Job. XXX $_____________________
0003 All work complete to provide new truck offload, fill stand and top load associated appurtenances, excluding Option Item 0007.
1 Job. XXX $_____________________
0004 All work complete for temporary fuel storage system and appurtenances.
1 Job. XXX $_____________________
0005 Demolition Work required for site.
Includes removal and disposal of 585k gallon bulk vertical fuel storage tank, four horizontal above ground fuel tanks, one truck offload facility, one truck fill stand, two pump houses, the existing POL building, foundations, aboveground piping, supports & appurtenances, underground piping, gravel surfacing and associated site clearing.
1 Job XXX $_____________________
0006 All work complete for remaining site preparation, earthwork, paving, roadways, sidewalks, electrical improvements, water system improvements, generator, drainage facilities, spill containment, cybersecurity measures, and all other work not included in other Basic Items.
1 Job XXX $_____________________
TOTAL AMOUNT BASIC ITEMS 0001 THROUGH 0006 $_____________________________
OPTION ITEMS
0007 All work complete to provide canopy, canopy foundation, and associated appurtenances. 1 Job XXX
Replace Bulk Diesel System
00 10 00 - 1
0008 Additional amount for providing new 10-inch PVC water line, cathodic protection and associated appurtenances in lieu of basic water line work covered under basic item 0006.
1 Job XXX
0009 Additional amount for Disposal of Petroleum Contaminated Soil in lieu of basic work for working with uncontaminated soil (includes final testing for disposal).
0009AA First 100 Cubic Yards 100 Cubic Yards
(CY)
CY
0009AB Over 100 Cubic Yards 100 Cubic Yards
(CY)
CY
0010 Additional amount for Disposal of Petroleum Contaminated Water in lieu of basic work for working with uncontaminated water.
0010AA First 5000 gallons 5000 Gallons
(GAL)
GAL
0010AB Over 5000 gallons 5000 Gallons
(GAL)
GAL
All work complete to provide subgrade reinforcement including geogrid and 1.5-inch minus aggregate.
100 Square Yards
(SY)
SY $_____________________
All work complete to provide Automatic Tank Gauging System, excluding electrical connections, wiring, backboard and conduit included in CLIN Item 0001.
1 Job. XXX $_____________________
TOTAL AMOUNT OPTION ITEMS 0007 THROUGH 0012 $_____________________________
TOTAL AMOUNT (ALL BASIC PLUS ALL OPTION ITEMS) $_____________________________
NOTES:
1. The Government reserves the right to exercise Option 0012 within 240 calendar days after notice to proceed. The Government reserves the right to exercise Option Item 0009, 0010 and 0011 anytime during performance of work for this project. For Items 0009 and 0010, See VARIATIONS IN ESTIMATED QUANTITIES - SUBDIVIDED ITEMS below. The Government reserves the right to exercise Option items 0007 and 0008 within 60 days after Notice to Proceed. See FAR 52.217-5 Evaluation of Options.
For CLIN Item 0005. See Section 01 60 00.00 50 MATERIAL AND EQUIPMENT.
2. (UAI 5152.211-9001) VARIATIONS IN ESTIMATED QUANTITIES - SUBDIVIDED ITEMS (MAR 1995)
This Variation in Estimated Quantities Clause is applicable only to Items Nos. 0009 and 0010.
(a) Variation from the estimated quantity in the actual work performed under any second or subsequent sub-item or elimination of all work under such a second or subsequent sub-item will not be the basis for an adjustment in contract unit price.
Replace Bulk Diesel System
00 10 00 - 2
(b) Where the actual quantity of work performed for Items Nos. 0009 and 0010 is less than 85 percent of the quantity of the first sub-item listed under such item, the Contractor will be paid at the contract unit price for that sub-item for the actual quantity of work performed and, in addition, an equitable adjustment shall be made in accordance with the clause FAR 52.211-18, Variation in Estimated Quantity.
(c) If the actual quantity of work performed under Items Nos. 0009 and 0010 exceeds 115% or is less than 85% of the total estimated quantity of the sub-items under that item and/or if the quantity of work performed under the second sub-item or any subsequent sub-item under Items Nos. 0009 and 0010 exceeds 115% or is less than 85% of the estimated quantity of any such sub-item, and if such variation causes an increase or a decrease in the time required for performance of this contract the contract completion time will be adjusted in accordance with the clause FAR 52.211-18, Variation in Estimated Quantity.
3. Prices must be entered for all line items on the Pricing Schedule. Total amount prices submitted without prices for individual line items will not be evaluated. Additions will be subject to verification by the Government. In case of variation between the lump-sum prices and the total amount, the lump-sum prices will be considered the price. In case of variation between the unit price(s) multiplied by the indicated quantity of units and the extension(s), the unit price(s) multiplied by the indicated quantity of units will be considered the price submitted.
Replace Bulk Diesel System
00 10 00 - 3
00 21 11 - 1
SECTION 00 21 00
INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
1.1. GENERAL DESCRIPTION OF WORK.
This construction project includes removal of one 4,000 bbl bulk API fuel storage tank, removal of four 12,000 gallon STI fuel storage tanks, removal of one truck offload facility, removal of one truck fill stand facility, removal of pump house/POL storage building, removal of all aboveground associated piping and appurtenances, and removal of underground issue piping. New construction includes three new 50,000 gallon horizon AST's (UL listed 2085) fuel tanks, combined truck offload facility/truck fill stand facility include top loading capabilities, and a new POL storage building. Support facilities include storm water management, spill containment systems, roadways, fencing and gates, and general site improvements. The project includes a base bid and six (6) bid options for additional items.
The bulk diesel storage facility site is located west of the Main Gate along C Tree Road on McAlester Army Ammunition Plant, McAlester, Pittsburg County, Oklahoma.
1.2. GOVERNMENT SECURITY REQUIREMENTS.
The Offeror(s) must ensure that ALL mail sent to the Tulsa District, U.S. Army Corps of Engineers, either pre-contract or post-contract award, has a return mailing address on the outside of the envelope, package, box, etc. ANY MAIL addressed to the U.S. Army Corps of Engineers, including but not limited to bids, modifications to bids, proposals, revised proposals, bonds, correspondence, etc., will be REJECTED by the US Army Corps of Engineers mail room facility located at 2488 E. 81st Street, Tulsa, OK 74137-4290, if it does not contain a return mailing address. There will be no exceptions.
USACE Tulsa District Point of Contact is:
Diane M. Cianci Phone: (918)669-7458 Email: diane.cianci@usace.army.mil
1.3. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS.
Copies of the solicitation and any amendments will be posted electronically on FedBizOpps.gov.
1.4. OFFEROR'S QUESTIONS AND COMMENTS.
All contractual matters, questions and or comments relative to these documents should be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=HomePagePublic no later than five (5) calendar days prior to the proposal due date so that they may be given consideration or actions taken prior to receipt of proposals.
The Bidder Inquiry Key for this project is: 2R3ZQS-4K28YW
Instructions for registering in the ProjNet Bidder Inquiry system are available on the above website.
1.5. SMALL BUSINESS SIZE STANDARD/NAICS CODE.
The Small Business NAICS Code is 236220, and the size standard is $36,500,000.00. Also see FAR 52.204-8.
1.6. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS.
This request for proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal
00 21 11 - 2
1.7. SITE VISIT.
1.7. All vendors are highly encouraged to attend a pre-proposal site visit, which is scheduled for 23 July 2019 at 10:00 am CT in the Building 1 West Wing Basement. Parking will be south of Building 1, and the entrance to the basement is on the south side of the west wing. See map for reference. Contractors shall provide a completed McAAP Visitor Access Request (MCAAP FORM 190-20) and submit via email to shawn.brady@usace.army.mil NO LATER THAN 5:00 pm on Thursday, 18 July 2019.
1.8. ACCURACY IN PROPOSALS.
Proposals must set forth full, accurate, and complete information as required by this RFP (including attachments). The penalty for making false statements is prescribed in 18 U.S.C. 1001.
1.9 PROPOSAL SUBMITTAL.
1.9.1 The submittal method for proposals is electronic via AMRDEC SAFE or email ONLY (no mailed proposals).
AMRDEC SAFE web site: https://safe.amrdec.army.mil/safe.
The following email addresses must be entered for notification of proposal receipt and download availability:
diane.cianci@usace.army.mil shawn.brady@usace.army.mil
1.9.2 Proposals will be received until the time and date shown on Standard Form SF1442 or as amended on an SF30.
Mail bid bonds to:
U.S. Army Corps of Engineers, Tulsa District ATTN: CESWT-CT-E (Mr. Brady) 2488 E. 81st Street Tulsa, OK 74137-4290
1.9.3 The packaging shall be marked:
Solicitation Number: W912BV19R0040
1.10. PROPOSAL FORMAT.
See Section 00 22 00 for Phase I proposal requirements.
1.11. JOINT VENTURE PROPOSAL REQUIREMENTS.
When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 and the bid bond unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. If this is an 8(a) or HubZone joint venture, the offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124 and 13 CFR Part 126, respectively.
1.12 DEVIATIONS AND EXCEPTIONS.
Deviations and exceptions to the terms and conditions of the solicitation are neither encouraged nor desired. Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined “unacceptable” and thus ineligible for award. Should the offeror have any questions related to specific terms and conditions, these must be resolved prior to submission of the offer.
Notwithstanding the above, if deviations and exceptions are included with the offer, the offeror shall list and describe in detail the deviations and/or exceptions as required by Sections 00 21 00 and/or 00 22 11 of this RFP. All deviations and exceptions shall be fully supported with the offeror’s rationale and shall fully explain the impact, if any, on the performance and/or specific requirement of the RFP.
00 21 11 - 3
1.13 GENERAL INSTRUCTIONS.
1.13.1 Offers will be evaluated using the criteria under Section 00 22 11, Proposal Submission Requirements, Evaluation Criteria and Basis for Award and compliance with the RFP technical requirements. Noncompliance with the RFP requirements will raise serious questions regarding an offeror’s technical ability to perform the services and may be grounds to eliminate the proposal from further consideration for contract award.
1.13.2 The Offer. The submission of the documentation specified under Section 00 22 11, Proposal Submission Requirements, Evaluation Criteria and Basis for Award, will constitute the offeror’s acceptance of the terms and conditions of the RFP, concurrence with the plans and specifications, and the proposed contract type.
1.13.3 It is the Government’s intention to award without discussions. Offerors are encouraged to present their best technical proposal and prices in their initial proposal submission. However, in accordance with FAR Part 15.306, should discussions become necessary, the Government reserves the right to hold them. If this occurs, a competitive range will be determined and offerors notified. The competitive range may be limited for purposes of efficiency in accordance with (IAW) FAR Part 15.306(c)(2).
1.13.4 In accordance with FAR Subpart 4.8 (Government Contract Files), the Government will retain one copy of all unsuccessful proposals. Unless the offeror requests otherwise, the Government will destroy extra copies of such unsuccessful proposals.
1.13.5 If an offeror believes that the requirements in these instructions contain an error, an ambiguity, omission, or are otherwise unsound, the offeror shall immediately notify the contracting officer (KO) in writing with supporting rationale. The offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussion.
1.13.6 All referenced documents are available from the Contract Specialist, Shawn Brady at shawn.brady@usace.army.mil.
1.13.7 Debriefings. The contracting officer will promptly notify offerors of any decision to exclude them from the competitive range, whereupon they may request and receive a debriefing in accordance with FAR 15.505. The contracting officer will notify unsuccessful offerors in the competitive range of the source selection decision in accordance with FAR 15.506. Upon such notification, unsuccessful offerors may request and receive a debriefing.
Offerors desiring debriefing must make their request in accordance with the requirements of FAR 15.505 or 15.506, as applicable. All debriefings will be provided officially in writing.
--End of Section 00 21 00
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.
regulation.
(End of provision)
(b) The use in this solicitation of any Defense Federal Acquisition Regulations Supplement (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the
Replace Bulk Diesel System
00 21 00 - 4
Section 00 22 11 - Proposal Submission Requirements, Evaluation Criteria, Basis of Award One-Step-Best Value, Design-Build (Single Award)
PROPOSAL SUB REQUIREMENTS
SECTION 00 22 11
PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA, AND BASIS OF AWARD
1.0 OVERVIEW
This is a competitive best value solicitation for a construction contract for the FY19 Construct Bulk Diesel Facility project located at McAlester Army Ammunition Plant, McAlester, Pittsburg County, Oklahoma. The Government will evaluate proposals in accordance with the criteria described herein and award a firm fixed-price contract to the responsible firm whose proposal conforms to all the terms and conditions of the solicitation and whose proposal is determined to represent the overall best value to the Government.
1.1 WHO CAN SUBMIT.
a. Only firms Small Business firms are authorized to submit proposals.
b. Organization Conflicts of Interest (OCI) Disclosure: The Offeror shall provide a disclosure statement with its proposal which concisely describes all the relevant facts concerning the past or present organizational conflicts of interest relating to work on this project. In the same statement, and if applicable, the Offeror shall provide information to assure the Government that the conflicts of interest have been mitigated and/or neutralized to the maximum extent possible. If a conflict of interest is discovered after award of this contract, the Contracting Office will make a decision whether to terminate the contract.
2.0 BASIS OF AWARD
Award will be made to the acceptable proposal meeting or exceeding the technical acceptability standards for non-cost factors and is the lowest price of all acceptable proposals and is found fair and reasonable by the Contracting Officer. Tradeoffs are not permitted. Proposals are evaluated for acceptability but not ranked using non-cost/price factors. The Government will not award a contract to a Firm whose proposal contains a deficiency, as defined in FAR
15.001. The Government reserves the right to reject any offer if the offer is not in the best interest of the Government.
3.0 PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS
3.1 REQUIREMENT FOR SEPARATE PRICE AND TECHNICAL PROPOSALS.
3.1.1 Each offeror must submit both a price proposal and a technical proposal. The price proposal and the technical proposal must be submitted as separate volumes. Ensure that the outside of each separate volume is clearly marked to indicate its contents; and the identity of the offeror.
Additionally, clearly identify the “original” price proposal and the “original” technical proposal on the outside cover.
3.1.2 Both the price proposal and the technical proposal must be received by the closing date and time set for receipt of proposals.
3.1.3 No dollar amounts from the price proposal are to be included in the technical proposal.
Replace Bulk Diesel System
00 22 11 - 1
3.1.4 All information intended to be evaluated as part of the Technical Proposal must be submitted as part of the Technical Proposal (Volume 1). Do not merely cross-reference similar material in the Price Proposal, or vice versa. Also, do not include links to websites in lieu of incorporating information into your proposal.
3.1.5 Deviations, Exception and Assumptions
Deviations and exceptions to the terms and conditions of the solicitation are not allowed.
Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be deemed “unacceptable” and thus ineligible for award. Should the Offeror have any questions related to specific terms and conditions, these must be resolved prior to submission of the offer. If the Offeror must make any assumptions prior to submitting the proposal, the Offeror shall list and describe in detail the assumptions on the first page of each Tab. All assumptions shall be fully supported with the Offeror’s rationale and shall fully explain the impact, if any, on the performance and/or specific requirement of the RFP. The Offeror shall clearly describe on the Proposal Cover Sheet submitted with the Price Proposal any assumption to the contractual and/or technical terms and include the monetary impact on the solicitation with the price proposal. This information will not be evaluated separately but may impact the evaluation of other factors.
3.2 DISCUSSIONS.
The Government does not intend to enter into discussions with offerors prior to making an award. Offerors are encouraged to present their best technical proposal and prices in their initial proposal submission. However, in accordance with FAR Part 15.306, should discussions become necessary, the Government reserves the right to hold them. If this occurs, a competitive range will be determined and offerors notified. The competitive range may be limited for purposes of efficiency in accordance with (IAW) FAR Part 15.306(c)(2).
3.3 GENERALINSTRUCTIONS.
3.3.1 Submit only the hard-copy paper documents and the electronic files specifically authorized and/or required elsewhere in this section. Do not submit excess information, to include audio-visual materials, electronic media, etc. All pages should be numbered.
3.3.2 Use only 8 ½ by 11 inch paper for hard copy submissions, unless another paper size is specifically authorized elsewhere in this section for a particular submission. Do not use fold-outs (e.g., 11” x 14” or 11” x 17” sheets) unless specifically authorized in this section for a particular submission. Do not use a font size smaller than 10, an unusual font style such as script, or condensed print for any submission. All page margins must be at least 1 inch wide, but may include headers and footers.
3.3.3 Use three-ring binders to assemble your proposal. Do not use spring clamps or exceed the recommended capacity of the fastener or binder.
3.3.4 “Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can be provided to the Government as part of the Offeror’s technical proposal. Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must be clearly marked in accordance with the instructions at FAR 52.215-1, “Instructions to Offerors—Competitive Acquisition”, paragraph (e), “Restriction on disclosure and use of data.”
3.3.5 For submissions with page limitations, the pages will be counted as follows: One
Replace Bulk Diesel System
00 22 11 - 2 side of the paper is one page; information on both the back and front of one sheet of paper will be counted as two pages. Where authorized, fold-out pages (11" x 14" or 11" x 17") will count as one page. Tables of content, proposal cover letters, and tabs between proposal information do not count toward any page limitations in the proposal.
3.3.6 Proposal revisions shall be submitted as page replacements with revised text readily identifiable, e.g., bold face print or underlining. The source of the revision, e.g., Error, Omission, or Clarification, or amendment shall be included and be annotated for each revision.
Proposal replacement pages shall be numbered, shall be clearly marked “REVISED”, shall show the date of revision, shall be submitted in appropriate number of copies (e.g., if two (2) copies of the original page was required, then two (2) copies of the revised page will also be required, and shall be a different color than the original pages they are to replace).
3.4 SPECIFIC INSTRUCTIONS FOR THE TECHNICAL PROPOSAL (VOLUME 1).
3.4.1 Number of Sets of the Technical Proposal. Submit one (1) electronic copy of the Technical Proposal. Submission shall contain the entire proposal in .pdf format using Adobe Acrobat software to print to a .pdf file; do NOT scan the document(s) into a .pdf file. The text portion of the complete proposal shall be contained as a single .pdf file. Sections of the proposal shall be bookmarked (linked to the index) in logical order.
3.4.2 Format and Contents of the Technical Proposal and List of Tabs
The proposal shall be organized using the tabs specified in the chart below.
3.4.3 Page Limitations. The following page limitations are established for each Factor:
Factor 1, Specialized Experience – Limited to 20 pages (1 page per project;
maximum 5 forms per contactor/subcontractor, see paragraph 5.1) Factor 2, Proposed Contract Duration and Summary Schedule – No page limitation Factor 3, Past Performance – No page limitation
3.5 SPECIFIC INSTRUCTIONS FOR THE PRICE PROPOSAL – FACTOR 4
(VOLUME 2).
3.5.1. Number of Sets of the Price Proposal.
Submit an ORIGINAL set of the price proposal electronically.
3.5.2. Size Restrictions and Page Limits.
Use only 8 ½” x 11” pages. There are no page limits set for the price proposal. However, limit your response to information required by this solicitation. Excess information will not be considered in the Government’s evaluation.
3.5.3 Format and Contents of the Price Proposal and List of Tabs. The price proposal shall be appropriately labeled as such and shall be organized as indicated in the following chart.
Note: If the Offeror is not required to submit any information under a listed Tab in accordance with the instructions below, that tab can be omitted. However, do not renumber the subsequent tabs.
4.0 PROPOSAL CONTENTS AND RELATED EVALUATION FACTORS
VOLUME 1 – TECHNICAL PROPOSAL
Replace Bulk Diesel System
00 22 11 - 3
Factor LOCATION DESCRIPTION
FACTOR 1 Vol 1 Tab A Specialized Experience
FACTOR 2 Vol 1 Tab B Proposed Contract Duration and Summary Schedule
FACTOR 3 Vol 1 Tab C PAST PERFORMANCE
VOLUME 2 – PRICE PROPOSAL
Factor
LOCATION DESCRIPTION
N/A Vol 2 Tab 1 Proposal Cover Sheet
N/A Vol 2 Tab 2 SF1442 and Acknowledgement of Amendments
FACTOR 4 Vol 2 Tab 3 SECTION 00 11 00, PRICING
SCHEDULE
N/A Vol 2 Tab 4 Bid Guarantee (Bid Bond)
N/A Vol 2 Tab 5 Representations & Certifications
N/A Vol 2 Tab 6 JV Agreement (if applicable)
5.0 VOLUME 1
5.1 VOLUME 1 – TAB A: FACTOR 1 - SPECIALIZED EXPERIENCE.
5.1.1 Submission Requirements:
Demonstrate the specialized experience of the Offeror and/or proposed team on projects same/similar in size and complexity to that described in the solicitation for same/similar construction services.
The Contractor shall complete a minimum of three (3), but no more than five (5) “Experience Information” forms, attached at the end of this section (Attachment 1), in response to this factor per contractor/subcontractor. All blocks must be filled in and all data should be accurate, current, and complete. All projects submitted must be at least 50% complete and completed within the last five (5) years. If the Offeror’s firm has multiple locations, projects should have been completed by the regional office that will be performing the work. The Government preference is that project examples submitted be of completed projects (i.e., construction complete). At least two (2) of the projects provided must be valued at over $3,000,000.
5.1.2 Evaluation Criteria:
a. The Government will evaluate the extent of recent, relevant experience of the Offeror (including subcontractors) in regard to their role on this project. Federal Government project experience will not be rated inherently more important than non-Federal Government project experience. The Government will evaluate the experience submitted to see that it demonstrates capability to execute projects that are similar in size, scope, and complexity to this requirement. Projects still under construction will be evaluated only if they are at least 50% complete.
(1) The Offeror must submit the requested information to demonstrate a record of recent, related experience in construction, for the project (which may include similar state or local government or private counterparts) included in this solicitation. Recent experience
Replace Bulk Diesel System
00 22 11 - 4 includes projects well underway (see above criteria) or those completed and turned over within five (5) years of the proposal issue date for this RFP for construction experience. Joint Venture partners should each demonstrate experience commensurate with their role on this project or how their experience qualifies them for their role on this project. If any of the information required is not included in the form (Attachment 1), then the Contractor will be considered non-responsive and evaluated as unacceptable.
(2) The Government reserves the right to verify the experience record of cited projects or other recent projects by reviewing the Contractor Performance Assessment Reporting System (CPARS), other DOD or Government appraisal systems or to interview owners or references. The Government may check any or all cited references to verify supplied information.
(3) The Government will consider extent of recent experience, degree of relationship of such experience to this project, demonstrated familiarity with applicable codes and local conditions. Some examples of relevancy to this project may include, but not be limited to:
(a) Number, size, type work, complexity, location
(b) Dates (well under way or completed no more than 5 years preceding date of Solicitation)
(c) Firm's role and extent of work self-performed.
(d) Experience with tank foundations in corrosive environments.
5.2 VOLUME 1 - TAB B: FACTOR 2 – PROPOSED CONTRACT DURATION AND
SUMMARY SCHEDULE.
5.2.1 Submission Requirements:
a. The Offeror shall propose a contract duration in the appropriate location on the Pricing Schedule not to exceed the maximum contract duration specified in the SCR entitled COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK. The proposed duration shall become the required contract duration.
b. Submit a summary level schedule for construction including any construction phasing. Schedules or diagrams may be provided separately in a size that is easily read, but shall be bound and clearly labeled as Tab 2. Summary schedule may be presented as an 11”x17” foldout sheet, counted as one (1) page. This summary schedule will, after contract award, be replaced with a project schedule as required by Section 01 32 01.00 10 PROJECT SCHEDULE. The summary schedule shall be task oriented, indicating the number of calendar days, after notice to proceed, by which milestones are to be achieved. Offeror may use a critical path or other method of his choice; however, schedules shall be graphically represented. The proposed summary schedule shall reflect the proposed contract duration.
Give attention to the following features:
(1) Show the overall construction phase for major item(s).
(2) Show turnover of the project. Identify any proposed phased turnovers (if applicable). The time to complete the project and turnover to the Government must consider the requirement for the Contractor’s CQC completion inspection and the subsequent joint Contractor-Government turnover inspection.
(3) Show as-built submissions.
(4) Constraints: Offeror must demonstrate the capability and flexibility to plan and schedule the complete project to meet the proposed contract completion period. Clearly identify any constraints on the schedules presented (e.g., labor or material availability, Replace Bulk Diesel System
00 22 11 - 5 permits, weather, etc.). Indicate the anticipated overall critical path on the schedule.
c. The Offerors shall provide a narrative explanation to include the following:
(1) Proposed Phasing Plan
(2) Crew Assembly and Work Schedule(s)
(3) Safety Plan
The intent…