_AM4_Binder_McAAP_Bulk_Diesel.pdf
PDF 8 MB Posted
- Attached to
- McAAP Bulk Diesel Facility Federal contract opportunity
- Solicitation number
- w912bv19r0040
About this file
Amendment 04
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912BV19R0040_0005.pdf | ||
| W912BV19R0040_0004.pdf | ||
| _AM3_Binder_MCAAP_Diesel.pdf | ||
| W912BV19R0040_0003.pdf | ||
| W912BV19R0040_0002.pdf | ||
| _AM2_Binder_McAAP_Diesel.pdf | ||
| W912BV19R0040_P1.pdf | ||
| AM1_Binder_McAAP_Diesel_Storage.pdf | ||
| W912BV19R0040_VOL_2_Plans.pdf | ||
| Visit_Request_MF190-20.pdf | ||
| W912BV19R0040_VOL_1_Specifications_(1).pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT 0004
W912BV19R0040
REPLACE BULK DIESEL SYSTEM
MCALESTER AAP, OKLAHOMA
1. The revised/new sections/appendices/pages listed below are hereby added to or revised and made a part of the solicitation. Revised or added/deleted information can be located in the specifications by searching for an asterisk and amendment number (i.e., *AM4).
REVISED/NEW SECTIONS/APPENDICES
00 01 10 PROJECT TABLE OF CONTENTS
00 01 15 LIST OF DRAWINGS
REGISTER SUBMITTAL REGISTER (Includes added Section 09 97 13.17)
00 41 00 DEMOLITION
02 83 00 LEAD REMEDIATION
09 97 13.17 THREE COAT EPOXY INTERIOR COATING OF WELDED STEEL
PETROLEUM FUEL TANKS (New Section Added)
33 56 10 FACTORY-FABRICATED FUEL STORAGE TANKS
2. Delete the following sections in their entirety:
DELETED SECTIONS
N/A
3. The revised drawings listed below are hereby added to or revised and made a part of the solicitation.
REVISED AND NEW DRAWINGS
GENERAL
G-002 INDEX
SITE/CIVIL
CD101 DEMOLITION PLAN - AREA 1
MECHANCICAL SITE
MS102 TEMPORARY FUELING SYSTEM
ELECTRICAL SITE
ES101 ELECTRICAL SITE PLAN SHEET 1 OF 2
STRUCTURAL
S-111 (OPTION) CANOPY FOUNDATION PLAN & DETAIL
SS501 TEMPORARY FUELING SYSTEM PLATFORM (New Drawing Added)
ELECTRICAL
EL501 LIGHTING DETAILS SHEET 1 OF 3
EL503 LIGHTING DETAILS SHEET 3 OF 3
-- END CONTINUATION SHEET -
00 01 10 (TABLE OF CONTENTS) - 1
SPECIFICATIONS FOR CONSTRUCTION OF
REPLACE BULK DIESEL SYSTEM
DESC18S2
MCALESTER AAP, OKLAHOMA
PROJECT TABLE OF CONTENTS
TECHNICAL VOLUME 1 OF 2 – DIVISIONS 00 -22
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
01 01 10 PROJECT TABLE OF CONTENTS
00 01 15 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 30 01 OTHER ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
REGISTER SUBMITTAL REGISTER
01 33 29 SUSTAINABILITY REPORTING
01 33 29-A HPSB – GUIDING PRINCIPLES COMPLIANCE WORKSHEET CHECKLIST
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 35 29.13 HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES FOR
CONTAMINATED SITES
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS 3.0
CM)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL
01 58 00 PROJECT IDENTIFICATION
01 58 00AT PROJECT SAFETY SIGN
01 60 00.00 50 MATERIAL AND EQUIPMENT
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 00ATA INITIAL RED ZONE MEETING CHECKLIST
01 78 00ATB DD1354 CHECKLIST FOR PROJECT CLOSEOUT
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 23.33 OPERATION AND MAINTENANCE MANUALS FOR AVIATION FUEL
SYSTEMS
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS
*AM4
Revised in Accordance with Am #0004
00 01 10 (TABLE OF CONTENTS) - 2
02 82 00 ASBESTOS REMEDIATION
02 83 00 LEAD REMEDIATION
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 05 - METALS
05 05 23.16 STRUCTURAL WELDING
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
DIVISION 09 - FINISHES
09 90 00 PAINTS AND COATINGS
09 97 13.17 THREE COAT EPOXY INTERIOR COATING OF WELDED STEEL
PETROLEUM FUEL TANKS
09 97 13.27 EXTERIOR COATING OF STEEL STRUCTURES
DIVISION 10 - SPECIALTIES
10 44 16 FIRE EXTINGUISHERS
DIVISION 13 - SPECIAL CONSTRUCTION
*AM4
Revised in Accordance with Am #0004
ADDED BY AM4*
00 01 10 (TABLE OF CONTENTS) - 3
13 34 19 METAL BUILDING SYSTEMS AND CANOPY
TECHNICAL VOLUME 2 OF 2 – DIVISIONS 23 -33
DIVISION 22 – PLUMBING
00 22 00 PLUMBING
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 32 14.00 10 DIESEL-GENERATOR SET, STATIONARY 15-300 KW, STANDBY
APPLICATIONS
26 41 00 LIGHTNING PROTECTION SYSTEM
26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 21 GEOGRID SOIL REINFORCEMENT
31 05 22 GEOTEXTILES USED AS FILTERS
31 63 29 DRILLED CONCRETE PIERS AND SHAFTS
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID
PAVEMENTS
32 11 20 BASE COURSE FOR RIGID PAVING
32 13 13.03 CONCRETE PAVEMENT
00 01 10 (TABLE OF CONTENTS) - 4
32 15 00 AGGREGATE SURFACING
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 31 13.53 CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
DIVISION 33 - UTILITIES
33 01 50.60 CLEANING OF PETROLEUM STORAGE TANKS
33 05 23 TRENCHLESS UTILITY INSTALLATION
33 08 55 COMMISSIONING OF FUEL FACILITY SYSTEMS
33 09 52 FUEL PUMP CONTROL AND ANNUNCIATION SYSTEM (NON-
HYDRANT)
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 40 00 STORM DRAINAGE UTILITIES
33 46 16 SUBDRAINAGE PIPING
33 52 43.13 AVIATION FUEL PIPING
33 52 43.14 AVIATION FUEL CONTROL VALVES
33 56 10 FACTORY-FABRICATED FUEL STORAGE TANKS
33 57 55 FUEL SYSTEM COMPONENTS (NON-HYDRANT)
33 58 00 LEAK DETECTION FOR FUELING SYSTEMS
33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
Replace Bulk Diesel System, DESC18S2, McAlester AAP, Oklahoma OK21
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/11
PART 1 GENERAL
1.1 SUMMARY
1.2 CONTRACT DRAWINGS
1.3 SUPPLEMENTARY DRAWINGS
1.3.1 Boring Logs
1.3.2 Subsurface Data
-- End of Section Table of Contents --
DOCUMENT 00 01 15 Page 1
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/11
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
Drawings
GENERAL
OK21G-001.DGN G-001 COVER
OK21G-002.DGN G-002 INDEX
OK21G-003.DGN G-003 ABBREVIATIONS
OK21G-004.DGN G-004 LEGEND
OK21G-005.DGN G-005 ELECTRICAL LEGEND
OK21GC101.DGN GC101 VICINITY MAPS & LOCATION PLAN
OK21GC102.DGN GC102 TEMPORARY FUELING & STAGING AREA PLAN
OK21GI101.DGN GI101 GENERAL INFORMATION - SHEET 1 OF 2
OK21GI102.DGN GI102 GENERAL INFORMATION - SHEET 2 OF 2
SITE/CIVIL
OK21B-101.DGN B-101 SOIL BORING LOCATION PLAN
OK21B-301.DGN B-301 SOIL BORING LOGS, LEGEND AND NOTES - MA18-01 &
MA18-02
OK21B-302.DGN B-302 MILCON SOIL BORING LOGS - MA18-03 THROUGH
MA18-05, MA18-07
OK21B-303.DGN B-303 MILCON SOIL BORING LOGS - MA18-08 & MA18-09,
MA18-11 & MA18-12
OK21VF100.DGN VF100 OVERALL EXISTING SURVEY
OK21VF101.DGN VF101 EXISTING SURVEY - AREA 1
OK21VF102.DGN VF102 EXISTING SURVEY - AREA 2
OK21VF103.DGN VF103 EXISTING SURVEY - AREA 3
OK21CD101.DGN CD101 DEMOLITION PLAN - AREA 1
OK21CD102.DGN CD102 DEMOLITION PLAN - AREA 2
OK21CS101.DGN CS101 CIVIL SITE PLAN - AREA 1
OK21CS401.DGN CS401 ENLARGED AREA - FILLSTAND / OFFLOAD
OK21CS402.DGN CS402 ENLARGED AREA - ABOVEGROUND STORAGE TANK PAD
OK21CS403.DGN CS403 ENLARGED AREA - POL BUILDING
OK21CS501.DGN CS501 REMOTE CONTAINMENT BASIN DETAILS
OK21CS502.DGN CS502 BASIN GUARDRAIL DETAILS
OK21CS503.DGN CS503 FE6 CHAINLINK SECURITY FENCING DETAILS
OK21CS504.DGN CS504 FE6 DOUBLE SWING GATE DETAILS
OK21CS505.DGN CS505 SIGNAGE DETAILS
OK21CP101.DGN CP101 CIVIL PAVING PLAN - AREA 1
OK21CP201.DGN CP201 ACCESS ROAD PROFILE
OK21CP301.DGN CP301 ROADWAY TYPICAL SECTIONS
OK21CP501.DGN CP501 CONCRETE PAVEMENT DETAILS
DOCUMENT 00 01 15 Page 2 Revised in Accordance with Am #0004
*AM4 Updated by AM4*
*AM4 Changed by AM4*
Drawings
OK21CP502.DGN CP502 MISCELLANEOUS PAVEMENT DETAILS
OK21CG101.DGN CG101 GRADING & DRAINAGE PLAN - AREA 1
OK21CG201.DGN CG201 STORM DRAINAGE PROFILES
OK21CG202.DGN CG202 SUBDRAIN OUTFALL PIPING PROFILES
OK21CG501.DGN CG501 BIORETENTION BASIN DETAILS
OK21CG502.DGN CG502 PIPE BEDDING DETAILS
OK21CG503.DGN CG503 CATCH BASIN STRUCTURE DETAILS
OK21CG504.DGN CG504 AREA INLET STRUCTURE DETAILS
OK21CG505.DGN CG505 MISCELLANEOUS DRAINAGE DETAILS
OK21CG506.DGN CG506 HEADWALL DETAILS
OK21CE001.DGN CE001 EROSION CONTROL PLAN - GENERAL INFORMATION -
SHEET 1 OF 2
OK21CE002.DGN CE002 EROSION CONTROL PLAN - GENERAL INFORMATION -
SHEET 2 OF 2
OK21CE101.DGN CE101 EROSION CONTROL PLAN - AREA 1 - PHASE 1
OK21CE102.DGN CE102 EROSION CONTROL PLAN - AREA 1 - PHASE 2
OK21CE501.DGN CE501 EROSION CONTROL DETAILS
OK21CE502.DGN CE502 INLET PROTECTION DETAILS
OK21CU101A.DGN CU101A CIVIL UTILITY PLAN (BASE BID) - SHEET 1 OF 1
OK21CU101B.DGN CU101B CIVIL UTILITY PLAN (BID OPTION) - SHEET 1 OF 2
OK21CU102B.DGN CU102B CIVIL UTILITY PLAN (BID OPTION) - SHEET 2 OF 2
OK21CU201.DGN CU201 WATER LINE PROFILES (BID OPTION)
OK21CU501.DGN CU501 WATER SYSTEM DETAILS
OK21CU502.DGN CU502 CASING PIPE DETAILS (BID OPTION)
MECHANCICAL SITE
OK21MD101.DGN MD101 MECHANICAL REMOVAL PLAN
OK21MS101.DGN MS101 FUELING SYSTEM SITE LAYOUT
OK21MS102.DGN MS102 TEMPORARY FUELING SYSTEM
OK21MS201.DGN MS201 PIPING PROFILES - SHEET 1 OF 3
OK21MS202.DGN MS202 PIPING PROFILES - SHEET 2 OF 3
OK21MS203.DGN MS203 PIPING PROFILES - SHEET 3 OF 3
OK21MS401.DGN MS401 ENLARGED FUELING SYSTEM SITE LAYOUT - SHEET 1 OF 3
OK21MS402.DGN MS402 ENLARGED FUELING SYSTEM SITE LAYOUT - SHEET 2 OF 3
OK21MS403.DGN MS403 ENLARGED FUELING SYSTEM SITE LAYOUT - SHEET 3 OF 3
OK21MS501.DGN MS501 TRUCK FILLSTAND DETAILS - SHEET 1 OF 2
OK21MS502.DGN MS502 TRUCK FILLSTAND DETAILS - SHEET 2 OF 2
OK21MS503.DGN MS503 TRUCK OFFLOAD DETAILS
ELECTRICAL SITE
OK21ED101.DGN ED101 ELECTRICAL SITE DEMOLITION PLAN
OK21ED501.DGN ED501 ELECTRICAL SITE DEMOLITION DETAILS SHEET 1 OF 4
OK21ED502.DGN ED502 ELECTRICAL SITE DEMOLITION DETAILS SHEET 2 OF 4
OK21ED503.DGN ED503 ELECTRICAL SITE DEMOLITION DETAILS SHEET 3 OF 4
OK21ED504.DGN ED504 ELECTRICAL SITE DEMOLITION DETAILS SHEET 4 OF 4
OK21EC101A.DGN EC101A CATHODIC PROTECTION PLAN (BASE BID)
OK21EC101B.DGN EC101B CATHODIC PROTECTION PLAN (BID OPTION) SHEET 1 OF
OK21EC102B.DGN EC102B CATHODIC PROTECTION PLAN (BID OPTION) SHEET 2 OF
OK21EC501.DGN EC501 CATHODIC PROTECTION DETAILS SHEET 1 OF 2
OK21EC502.DGN EC502 CATHODIC PROTECTION DETAILS SHEET 2 OF 2
OK21ES101.DGN ES101 ELECTRICAL SITE PLAN SHEET 1 OF 2
OK21ES103.DGN ES103 ELECTRICAL SITE PLAN SHEET 2 OF 2
OK21ES501.DGN ES501 ELECTRICAL SITE DETAILS SHEET 1 OF 8
OK21ES502.DGN ES502 ELECTRICAL SITE DETAILS SHEET 2 OF 8
OK21ES503.DGN ES503 ELECTRICAL SITE DETAILS SHEET 3 OF 8
OK21ES504.DGN ES504 ELECTRICAL SITE DETAILS SHEET 4 OF 8
DOCUMENT 00 01 15 Page 3 Revised in Accordance with Am #0004
OK21ES505.DGN ES505 ELECTRICAL SITE DETAILS SHEET 5 OF 8
OK21ES506.DGN ES506 ELECTRICAL SITE DETAILS SHEET 6 OF 8
OK21ES507.DGN ES507 ELECTRICAL SITE DETAILS SHEET 7 OF 8
OK21ES508.DGN ES508 ELECTRICAL SITE DETAILS SHEET 8 OF 8
OK21ES509.DGN ES509 ELECTRICAL HAZARDOUS AREA DETAILS SHEET 1 OF 4
OK21ES510.DGN ES510 ELECTRICAL HAZARDOUS AREA DETAILS SHEET 2 OF 4
OK21ES511.DGN ES511 ELECTRICAL HAZARDOUS AREA DETAILS SHEET 3 OF 4
OK21ES512.DGN ES512 ELECTRICAL HAZARDOUS AREA DETAILS SHEET 4 OF 4
*AM4
STRUCTURAL
OK21S-001.DGN S-001 STRUCTURAL NOTES
OK21S-002.DGN S-002 POL BUILDING COMPONENTS AND CLADDING / WIND
PRESSURE LOADS
OK21S-101.DGN S-101 POL BUILDING PLAN
OK21S-111.DGN S-111 (OPTION) CANOPY FOUNDATION PLAN & DETAIL
OK21S-501.DGN S-501 TYPICAL CONCRETE DETAILS
OK21S-502.DGN S-502 VERTICAL PIPE BRACE
OK21SB301.DGN SB301 POL BUILDING FOUNDATION DETAILS
OK21SS201.DGN SS201 TANK SUPPORT PIERS
OK21SS202.DGN SS202 MISCELLANEOUS SITE FOUNDATIONS
OK21SS301.DGN SS301 TANK PIER SECTIONS / TANK SLAB DETAIL
OK21SS401.DGN SS401 TANK PLATFORM PLAN
OK21SS402.DGN SS402 TANK FOUNDATION AND SLAB LAYOUT
OK21SS501.DGN SS501 TEMPORARY FUELING SYSTEM PLATFORM
ARCHITECTURAL
OK21A-101.DGN A-101 OPERATIONS BUILDING - FLOOR PLAN, ROOF PLAN, AND
BUILDING ELEVATIONS
OK21A-101CP1.DGN A-101CP1 OFFLOAD CANOPY 1 - FLOOR PLAN AND BUILDING
ELEVATIONS
OK21A-112CP1.DGN A-112CP1 OFFLOAD CANOPY 1 - REFLECTED CEILING PLAN
OK21A-113CP1.DGN A-113CP1 OFFLOAD CANOPY 1 - ROOF PLAN
OK21A-301.DGN A-301 OPERATIONS BUILDING - WALL SECTIONS AND DETAILS
OK21A-501.DGN A-501 OPERATIONS BUILDING - ROOF, DOOR, AND WINDOW
DETAILS
OK21A-601.DGN A-601 OPERATIONS BUILDING - ROOM FINISH SCHEDULE -
DOOR SCHEDULE - DOOR AND FRAME TYPES
MECHANICAL
OK21M-001.DGN M-001 FUELING SYSTEM LEGEND AND NOTES
OK21M-201.DGN M-201 FLOW DIAGRAM - SHEET 1 OF 2
OK21M-202.DGN M-202 FLOW DIAGRAM - SHEET 2 OF 2
OK21M-501.DGN M-501 ABOVEGROUND STORAGE TANK DETAILS
OK21M-502.DGN M-502 TOP LOADING FILLSTAND PLATFORM DETAIL
OK21M-503.DGN M-503 MECHANICAL DETAILS - SHEET 1 OF 3
OK21M-504.DGN M-504 MECHANICAL DETAILS - SHEET 2 OF 3
OK21M-505.DGN M-505 MECHANICAL DETAILS - SHEET 3 OF 3
OK21M-506.DGN M-506 SEQUENCE OF OPERATION
OK21M-601.DGN M-601 FUEL PUMP SCHEDULE
OK21MH101.DGN MH101 POL BLDG FOUNDATION MECHANICAL PLAN
OK21MH501.DGN MH501 MECHANICAL DETAILS
OK21MH601.DGN MH601 MECHANICAL SCHEDULES
ELECTRICAL
OK21E-001.DGN E-001 ELECTRICAL LEGEND
OK21EG101.DGN EG101 ELECTRICAL POL BLDG GROUNDING/LIGHTNING
PROTECTION PLAN
OK21EG102.DGN EG102 TANK AREA GROUNDING AND LIGHTNING PROTECTION PLAN
DOCUMENT 00 01 15 Page 4 Revised in Accordance with Am #0004
*AM4 Changed AM4*
*AM4 Added by AM4*
(EQUIPMENT CANOPY OPTION)
OK21EG103.DGN EG103 TANK AREA GROUNDING AND LIGHTNING PROTECTION PLAN
(BASE BID)
OK21EG501.DGN EG501 ELECTRICAL LIGHTNING PROTECTION AND GROUNDING
DETAILS SHEET 1 OF 2
OK21EG502.DGN EG502 ELECTRICAL LIGHTNING PROTECTION AND GROUNDING
DETAILS SHEET 2 OF 2
OK21EI501.DGN EI501 TERMINAL BLOCK CONNECTIONS SHEET 1 OF 2
OK21EI502.DGN EI502 TERMINAL BLOCK CONNECTIONS SHEET 2 OF 2
OK21EI601.DGN EI601 CONTROL SYSTEMS DIAGRAM SHEET 1 OF 3
OK21EI602.DGN EI602 CONTROL SYSTEMS DIAGRAM SHEET 2 OF 3
OK21EI603.DGN EI603 CONTROL SYSTEMS DIAGRAM SHEET 3 OF 3
OK21EL101.DGN EL101 POL BLDG LIGHTING PLAN
OK21EL102.DGN EL102 TANK AREA LIGHTING PLAN (EQUIPMENT CANOPY OPTION)
OK21EL103.DGN EL103 TANK AREA LIGHTING PLAN (BASE BID)
OK21EL501.DGN EL501 LIGHTING DETAILS SHEET 1 OF 3
OK21EL502.DGN EL502 LIGHTING DETAILS SHEET 2 OF 3
OK21EL503.DGN EL503 LIGHTING DETAILS SHEET 3 OF 3
OK21EL701.DGN EL701 POL BLDG LIGHTING CALCULATIONS FOR INFORMATION
ONLY
OK21EL702.DGN EL702 SITE LIGHTING CALCULATIONS (EQUIPMENT CANOPY
OPTION) FOR INFORMATION ONLY
OK21EL703.DGN EL703 SITE LIGHTING CALCULATIONS (BASE BID) FOR
INFORMATION ONLY
OK21EP101.DGN EP101 POL BLDG POWER PLAN
OK21EP102.DGN EP102 TANK AREA POWER PLAN
OK21EP501.DGN EP501 FUEL PUMP DETAILS
OK21EP601.DGN EP601 ELECTRICAL ONE LINE DIAGRAM
OK21EP602.DGN EP602 ELECTRICAL PANEL SCHEDULE
OK21EP603.DGN EP603 EPDS CONTROL DIAGRAM
OK21EP604.DGN EP604 WIRING DIAGRAM
OK21EP605.DGN EP605 CONDUIT AND CONDUCTOR SCHEDULES
OK21ET101.DGN ET101 POL BLDG TELECOMMUNICATIONS PLAN
OK21ET501.DGN ET501 TELECOMMUNICATIONS DETAILS SHEET 1 OF 2
OK21ET502.DGN ET502 TELECOMMUNICATIONS DETAILS SHEET 2 OF 2
OK21FA-001.DGN FA-001 FIRE ALARM LEGEND
OK21FA101.DGN FA101 FIRE ALARM PLAN
OK21FA501.DGN FA501 FIRE ALARM MATRIX
OK21FA502.DGN FA502 FIRE ALARM RISER DIAGRAM
1.3 SUPPLEMENTARY DRAWINGS
These supplementary drawings may not be a part of the contract but are included with the drawings for information.
1.3.1 Boring Logs
The Government does not guarantee that borings indicate actual conditions, except for the exact locations and the time that they were made.
Subsurface data, not specified or indicated, have been obtained by the Government at this station.
1.3.2 Subsurface Data
DOCUMENT 00 01 15 Page 5 Revised in Accordance with Am #0004
*AM-3
Subsurface data, not specified or indicated, have been obtained by the Government at the station. The data are available for examination by prospective bidders.
-- End of Document --
DOCUMENT 00 01 15 Page 6
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 62 PAGES
Replace Bulk Diesel System, DESC18S2, McAlester AAP, Oklahoma
01 11 00 SD-01 Preconstruction Submittals
1.5 G ROSalvage Plan
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 G ROProject Scheduler Qualifications
3.4.1 G ROPreliminary Project Schedule
3.4.2 G ROInitial Project Schedule
3.6.2 G ROPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.8 G ROSubmittal Register
01 33 29 SD-01 Preconstruction Submittals
1.4.1 G DOSustainability Action Plan
SD-11 Closeout Submittals
1.5.2.1 G ROFinal High Performance and
Sustainable Building Checklist
1.5.2.1 G ROFinal Sustainability eNotebook
1.5.2.1 G ROAmended Final Sustainability
eNotebook
1.5.2.1 G ROAmended Final High
Performance and Sustainable Building Checklist
01 35 26 SD-01 Preconstruction Submittals
1.7 G ROAccident Prevention Plan (APP)
SD-06 Test Reports 1.4Monthly Exposure Reports 1.12Notifications and Reports
1.12.2 G ROAccident Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 62 PAGES
01 35 26 1.12.3LHE Inspection Reports SD-07 Certificates
1.6.1.4Crane Operators/Riggers
1.7.2.2 G ROStandard Lift Plan
1.7.2.3 G ROCritical Lift Plan
1.8Activity Hazard Analysis (AHA) 1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit 1.12.4Certificate of Compliance 1.14License Certificates
1.14.1 G RORadiography Operation Planning
Work Sheet
1.14.1 G ROPortable Gauge Operations
Planning Worksheet 01 35 29.13 SD-02 Shop Drawings
3.8.1 G ROWork Zones
3.9.1 G RODecontamination Facilities
SD-03 Product Data 1.4Amendments to the APP/SSHP 3.4Exposure Monitoring/Air
Sampling Program 3.8.2Site Control Log 1.8SSHO's Daily Inspection Logs
SD-07 Certificates 1.7Certificate Of Worker/Visitor
Acknowledgement
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 62 PAGES
01 35 29.13 SD-11 Closeout Submittals 1.9Safety And Health Phase-Out
Report 01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 G ROContractor Quality Control (CQC)
Plan
SD-06 Test Reports 3.10.2Verification Statement
01 50 00 SD-01 Preconstruction Submittals
1.3 G ROConstruction Site Plan
3.4.1 G ROTraffic Control Plan
2.2.1 G ROHaul Road Plan
SD-07 Certificates 1.4.1Backflow Tester 1.4Backflow Preventers
01 57 19 SD-01 Preconstruction Submittals 1.5.1Preconstruction Survey
1.9 G ROSolid Waste Management Permit
1.5.2 G RORegulatory Notifications
1.6 G ROEnvironmental Protection Plan
3.2.1.2 G ROStormwater Notice of Intent
1.6.9.1 G RODirt and Dust Control Plan
1.5.5 G ROEmployee Training Records
1.5.4 G ROEnvironmental Manager
Qualifications SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 62 PAGES
01 57 19 3.7.1.1.2Laboratory Analysis 3.2.1.3Inspection Reports
3.7.2.1 G ROSolid Waste Management Report
SD-07 Certificates
1.5.5 G ROEmployee Training Records
SD-11 Closeout Submittals
3.2.1.4 G ROStormwater Pollution Prevention
Plan Compliance Notebook
3.2.1.5 G ROStormwater Notice of Termination
3.7.1 G ROWaste Determination
Documentation
3.7.3.6 G RODisposal Documentation for
Hazardous and Regulated Waste
1.5.5 G ROAssembled Employee Training
Records
1.9 G ROSolid Waste Management Permit
3.7.2.1 G ROSolid Waste Management Report
3.7.3.1 G ROHazardous Waste/Debris
Management
1.5.2 G RORegulatory Notifications
3.7.2.1 G ROSales Documentation
01 57 23 SD-07 Certificates 2.1.3Mill Certificate or Affidavit
01 74 19 SD-01 Preconstruction Submittals
1.7 G ROConstruction Waste Management
Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 62 PAGES
01 74 19 SD-06 Test Reports 1.9.2Quarterly Reports 1.9.3Annual Report
SD-11 Closeout Submittals
1.10 G ROFinal Construction Waste
Diversion Report 01 78 00 SD-03 Product Data
1.7.1Warranty Management Plan 1.7.5Warranty Tags 1.5Spare Parts Data
SD-08 Manufacturer’s Instructions 1.7.1Instructions
SD-10 Operation and Maintenance Data
3.6 G ROOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 G ROAs-Built Drawings
3.3 G RORecord Drawings
1.7.1As-Built Record of Equipment and Materials 3.5As-Built Record of Equipment and Materials 3.4Construction Contract
Specifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 62 PAGES
01 78 00 2.3 G ROCertification of EPA Designated Items
3.8.1 G ROInterim DD FORM 1354
3.8.2 G ROInterim DD FORM 1354
3.8.2 G ROInterim DD FORM 1354
3.8.1 G ROChecklist for DD FORM 1354
01 78 23 SD-10 Operation and Maintenance Data
1.4 G ROO&M Database
3.1.1 G ROTraining Plan
3.1.3 G ROTraining Outline
3.1.2 G ROTraining Content
SD-11 Closeout Submittals
3.1.4 G ROTraining Video Recording
3.1.6 G ROValidation of Training Completion
01 78 23.33 SD-10 Operation and Maintenance Data
2.1.1 G ROSystem Instructions
02 41 00 SD-01 Preconstruction Submittals
1.2.1 G RODemolition Plan
1.9Existing Conditions
SD-07 Certificates
1.6 G RONotification
SD-11 Closeout Submittals 3.3.4Receipts
02 81 00 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 62 PAGES
02 81 00 2.1.1Packaging Notifications
3.1 G ROHazardous Waste Management
Plan
3.2 G ROOnsite Hazardous Waste
Management 3.3Notices of Non-Compliance and
Notices of Violation SD-06 Test Reports
3.7 G RORecordkeeping
3.7 G ROException Report
3.8Spill Response
SD-07 Certificates
1.4.1 G ROTransportation and Disposal
Coordinator
1.4.2 G ROTraining
1.4.3Certification
3.3.3 G ROShipping Documents and
Packagings Certification 3.3.4Security Plan 3.3.5Certificates of Disposal 3.6Waste Minimization
02 82 00 SD-03 Product Data
1.2.2 G ROAmended Water
1.3.9 G ROSafety Data Sheets (SDS) for All
Materials
2.1 G ROEncapsulants
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 62 PAGES
02 82 00 3.1.2.1 G RORespirators
3.1.7 G ROLocal Exhaust Equipment
3.1.7 G ROPressure Differential Automatic
Recording Instrument
3.1.8 G ROVacuums
SD-06 Test Reports
1.5.5 G ROAir Sampling Results
1.5.6 G ROPressure Differential Recordings
for Local Exhaust System
3.2.5.5 G ROClearance Sampling
3.3.3.2 G ROAsbestos Disposal Quantity
Report SD-07 Certificates
1.3.4 G ROEmployee Training
1.3.5 G RONotifications
1.3.7 G RORespiratory Protection Program
1.3.10 G ROAsbestos Hazard Abatement
Plan
1.3.11 G ROTesting Laboratory
1.3.12 G ROLandfill Approval
1.3.12 G RODelivery Tickets
1.3.12 G ROWaste Shipment Records
1.3.13 G ROTransporter Certification
1.3.14 G ROMedical Certification
1.5.1 G ROPrivate Qualified Person
Documentation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 62 PAGES
02 82 00 1.5.2 G ROCompetent Person
1.5.3 G ROWorker's License
1.5.4 G ROContractor's License
1.5.7 G ROFederal, State or Local Citations
on Previous Projects
2.1 G ROEncapsulants
3.1 G ROEquipment Used to Contain
Airborne Asbestos Fibers
3.1.3.3 G ROWater Filtration Equipment
3.1.8 G ROVacuums
3.1.8 G ROVentilation Systems
SD-11 Closeout Submittals
1.3.5 G ROPermits and Licenses
1.3.5 G RONotifications
1.3.7.1 G RORespirator Program Records
1.7.1 G RORental Equipment
02 83 00 SD-01 Preconstruction Submittals
1.5.1.1 G ROCompetent Person
1.5.1.2 G ROTraining Certification
1.5.2.3 G ROOccupational and Environmental
Assessment Data Report
1.5.2.4 G ROMedical Examinations
1.5.2.8 G ROLead, Cadmium, Chromium
Waste Management Plan
1.5.3 G ROLicenses, Permits and
Notifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 62 PAGES
02 83 00 1.5.4 G ROOccupant Protection Plan
1.5.2.2 G ROLead, Cadmium, Chromium
Compliance Plan
3.4.1.1 G ROInitial Sample Results
3.5.2.1 G ROWritten Evidence of TSD
Approval SD-03 Product Data
1.6.1 G RORespirators
1.6.4 G ROVacuum Filters
1.6.7 G RONegative Air Pressure System
2.1 G ROMaterials and Equipment
2.1.1 G ROExpendable Supplies
SD-06 Test Reports
1.5.2.3 G ROOccupational and Environmental
Assessment Data Report
1.5.2.3 G ROSampling Results
SD-07 Certificates
1.5.1.3 G ROTesting Laboratory
1.5.1.4 G ROThird Party Consultant
Qualifications
3.5.1.1 G ROClearance Certification
SD-11 Closeout Submittals
3.5.2.1 G ROHazardous Waste Manifest
3.5.2.1 G ROTurn-In Documents or Weight
Tickets 03 30 00 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 62 PAGES
03 30 00 1.6.3.1Concrete Curing Plan
1.6.5 G OMAQuality Control Plan
1.6.6 G ROQuality Control Personnel
Certifications 1.6.6Quality Control Organizational
Chart
1.6.8 G ROLaboratory Accreditation
3.3.10Maturity Method Data
1.6.2.1 G ROForm Removal Schedule
SD-02 Shop Drawings
1.6.2.2 G OMAReinforcing Steel
SD-03 Product Data 2.4.4Joint Sealants 2.4.3Joint Filler 2.1Formwork Materials 2.3.3.2Recycled Aggregate Materials 2.3.1Cementitious Materials 2.4.5Vapor Retarder and Vapor
Barrier 2.4.1Concrete Curing Materials 2.6Reinforcement 2.3.4Admixtures 2.6.2Mechanical Reinforcing Bar
Connectors 2.2.2Waterstops 1.8.1Local/Regional Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 62 PAGES
03 30 00 2.2.3Biodegradable Form Release Agent
1.6.3.2Pumping Concrete 2.4.2Nonshrink Grout
SD-05 Design Data
1.6.1.1 G OMAConcrete Mix Design
SD-06 Test Reports
1.6.1.1 G OMAConcrete Mix Design
1.6.4.1Fly Ash 1.6.4.1Pozzolan 1.6.4.2Slag Cement 1.6.4.3Aggregates
3.13.2.3 G OMACompressive Strength Tests
3.13.2.4Air Content 3.13.2.1Slump Tests 2.3.2Water
SD-07 Certificates 2.6.1Reinforcing Bars 1.9Welder Qualifications 1.6.3.3VOC Content for Form Release
Agents and Curing Compounds 1.6.3.4Safety Data Sheets 1.8.2Forest Stewardship Council
(FSC) Certification 1.6.6.2Field Testing Technician and
Testing Agency
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 62 PAGES
03 30 00 SD-08 Manufacturer’s Instructions 2.4.4Joint Sealants 2.4.1Curing Compound
05 05 23.16 SD-01 Preconstruction Submittals 3.2Welding Quality Assurance Plan
SD-03 Product Data
1.3 G ROWelding Procedure Qualifications
1.3.4Welder, Welding Operator, and
Tacker Qualification 1.3.2Previous Qualifications 1.3.3Pre-Qualified Procedures 2.2Welding Electrodes and Rods
SD-06 Test Reports 3.3Nondestructive Testing 3.2Weld Inspection Log
SD-07 Certificates 1.3.1Certified Welding Procedure
Specifications (WPS) 1.3.1Certified Brazing Procedure
Specifications (BPS) 1.3.1Certified Procedure Qualification
Records (PQR) 1.3.1Certified Welder Performance
Qualifications (WPQ) 1.3.1Certified Brazer Performance
Qualifications (BPQ)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 62 PAGES
05 05 23.16 1.3.5Certified Welding Inspector 1.3.5Nondestructive Testing
Personnel 05 40 00 SD-02 Shop Drawings
1.6.1 G OMAFraming Components
SD-03 Product Data
2.1Studs, Joists SD-05 Design Data
1.6.2 G OMAMetal Framing Calculations
SD-07 Certificates
1.4Load-Bearing Cold-Formed Metal Framing
3.2.1Welds SD-11 Closeout Submittals
2.1 G RORecycled Content of Steel
Products
05 50 13 SD-02 Shop Drawings
2.7 G OMAStructural Steel Framing (Tank
Platform and Stairs)
2.7 G OMAStructural Steel Framing (Tank
Platform and Stairs)
2.4 G OMAFloor Gratings
2.5 G OMABollards/Pipe Guards
SD-03 Product Data
2.4 G ROFloor Gratings
2.9 G OMAPipe Supports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 62 PAGES
05 50 13 2.1 G RORecycled Content 05 51 00 SD-02 Shop Drawings
2.1 G OMAIron and Steel Hardware
2.1 G OMASteel Shapes, Plates, Bars, and
Strips
2.2.1 G OMAMetal Stair System
SD-03 Product Data
2.4.1 G OMAStructural-Steel Plates, Shapes, and Bars
2.4.2 G OMAStructural-Steel Tubing
2.4.5 G OMAHot-Rolled Carbon Steel Sheets
and Strips
2.4.4 G OMACold-Finished Steel Bars
2.4.3 G OMAHot-Rolled Carbon Steel Bars
2.4.6 G OMACold-Rolled Carbon Steel Sheets
2.4.7 G OMAGalvanized Carbon Steel Sheets
2.2.3 G OMAProtective Coating
2.3.1 G OMASteel Stairs
SD-07 Certificates
1.3.1 G OMAWelding Procedures
1.3.1 G OMAWelder Qualification
SD-08 Manufacturer’s Instructions
2.4.1 G OMAStructural-Steel Plates, Shapes, and Bars
2.4.2 G OMAStructural-Steel Tubing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 62 PAGES
05 51 00 2.4.5 G OMAHot-Rolled Carbon Steel Sheets and Strips
2.4.4 G OMACold-Finished Steel Bars
2.4.3 G OMAHot-Rolled Carbon Steel Bars
2.4.6 G OMACold-Rolled Carbon Steel Sheets
2.4.7 G OMAGalvanized Carbon Steel Sheets
2.2.3 G OMAProtective Coating
05 51 33 SD-02 Shop Drawings 2.3Ladders 2.3.3Ship's Ladder
SD-03 Product Data 2.3Ladders 2.3.3Ship's Ladder 2.3.2Ladder Safety Devices
SD-07 Certificates 1.3Fabricator Certification for Ladder
Assembly 1.3Fabricator Certification for Ships
Ladder Assembly 05 52 00 SD-02 Shop Drawings
1.2.1 G ROFabrication Drawings
3.2 G ROIron and Steel Hardware
3.2 G ROSteel Shapes, Plates, Bars and
Strips SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 62 PAGES
05 52 00 2.2.1 G ROStructural-Steel Plates, Shapes, and Bars
2.2.2 G ROStructural-Steel Tubing
2.2.3 G ROCold-Finished Steel Bars
2.1.2 G ROProtective Coating
2.2.5 G ROSteel Railings and Handrails
1.2.1 G ROAnchorage and Fastening
Systems SD-07 Certificates
1.4.1 G ROWelding Procedures
1.4.2 G ROWelder Qualification
SD-08 Manufacturer’s Instructions 3.2Installation Instructions
06 10 00 SD-02 Shop Drawings
3.2.1 G RONailers
SD-06 Test Reports 1.4.3Preservative-treated
SD-07 Certificates 1.8.1Certificates of Grade 1.7Preservative Treatment
07 60 00 SD-02 Shop Drawings
2.2.1 G ROExposed Sheet Metal
3.1.12 G ROGutters
3.1.13 G RODownspouts
3.1.16 G ROFlashing at Roof Penetrations
and Equipment Supports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 62 PAGES
07 60 00 3.1.11 G RODrip Edges
3.1.14 G ROEave Flashing
3.1.15 G ROExpansion Joints
SD-04 Samples
1.4.2 G ROFinish Samples
SD-07 Certificates
2.1 G ROCertificates of Compliance
2.1 G RORecycled Content
SD-08 Manufacturer’s Instructions
1.4.3 G ROInstructions for Installation
3.5 G ROQuality Control Plan
SD-10 Operation and Maintenance Data
1.4.3 G ROCleaning and Maintenance
07 61 14.00 20 SD-02 Shop Drawings
1.2.4 G OMARoofing
SD-03 Product Data
2.1 G OMARoofing panels
2.3Attachment clips 2.4.1Closures 2.4Accessories 2.4.2Fasteners 2.4.3Sealants
2.6 G OMASnow Guards
1.7 G OMAwarranty
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 62 PAGES
07 61 14.00 20 2.1 G OMApanel
2.1 G OMApanel
2.4Accessories 2.4.3Sealants 2.2Intermediate Support
SD-05 Design Data 1.5Design calculations
SD-06 Test Reports
3.6 G ROField Inspection
1.3.3Structural performance 1.6.6Finish
SD-07 Certificates 1.6.3Manufacturer's Technical
Representative 1.6.4Installer's Qualifications
2.1 G ROCoil stock
SD-08 Manufacturer’s Instructions
3.3 G ROInstallation
07 84 00 SD-02 Shop Drawings 2.1Firestopping Materials
SD-07 Certificates 2.1Firestopping Materials 1.4Installer Qualifications 3.3Inspection
07 92 00 SD-03 Product Data
2.2 G ROSealants
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 62 PAGES
07 92 00 2.3 G ROPrimers
2.4 G ROBond Breakers
2.5 G ROBackstops
SD-07 Certificates
1.4.1 G ROIndoor Air Quality
SD-11 Closeout Submittals 2.2.1Indoor Air Quality For Interior
Sealants 2.2.3Indoor Air Quality For Interior
Floor Joint Sealants 08 11 13 SD-02 Shop Drawings
2.1 G RODoors
2.1 G RODoors
2.5 G ROFrames
2.5 G ROFrames
2.3Accessories 2.6Weatherstripping
SD-03 Product Data
2.1 G RODoors
2.5 G ROFrames
2.3Accessories 2.6Weatherstripping
08 51 13 SD-02 Shop Drawings
2.1 G OMAWindows
1.10Fabrication Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 62 PAGES
08 51 13 2.1 G DOWindows
2.2.5.1 G DOHardware
2.2.3 G DOFasteners
1.11 G DOWindow performance
2.3 G DOThermal-Barrier Windows
2.2.7 G DOScreens
2.2.2 G DOWeatherstripping
2.2.5 G DOAccessories
1.11.4Thermal performance
SD-04 Samples 1.4.2.1Finish Sample 1.4.2.2Window Sample
SD-05 Design Data
2.1 G OMAStructural calculations for
deflection SD-10 Operation and Maintenance Data
2.1 G ROWindows
1.7.1Plastic Identification
08 71 00 SD-02 Shop Drawings
1.3 G ROHardware schedule
2.3.5Keying system
SD-03 Product Data
2.3 G OMAHardware items
SD-08 Manufacturer’s Instructions 3.1Installation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 62 PAGES
08 71 00 SD-10 Operation and Maintenance Data
1.3 G ROHardware Schedule
SD-11 Closeout Submittals
1.4Key Bitting 08 81 00 SD-02 Shop Drawings
3.2.2Installation SD-03 Product Data
1.6.1Insulating Glass 1.3Glazing Accessories
SD-04 Samples 1.6.1Insulating Glass 2.3.5Tape 2.3.2.1Sealant
SD-07 Certificates 1.6.1Insulating Glass 1.3Glazing Accessories
SD-08 Manufacturer’s Instructions 2.3Setting and Sealing Materials 3.2Glass Setting
09 90 00 SD-02 Shop Drawings
3.8 G ROPiping identification
3.8stencil
SD-03 Product Data 2.1Materials 1.4.2Certification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 62 PAGES
09 90 00 2.1 G ROCoating 2.1Manufacturer's Technical Data
Sheets SD-04 Samples
1.9 G OMAColor
1.9 G OMAColor
SD-07 Certificates 1.3Applicator's qualifications
1.4.1.2 G ROQualification Testing
SD-08 Manufacturer’s Instructions 3.5.1Application instructions 3.5.2Mixing 1.7.2Manufacturer's Material Safety
Data Sheets SD-10 Operation and Maintenance Data
2.1 G ROCoatings
09 97 13.17 SD-05 Design Data
1.4.4.1Environmental Control System SD-06 Test Reports
1.4.5.1Metallic Abrasive Qualification Test Reports
3.2.3Coating Sample Test Reports 3.2.4Abrasive Sample Test Reports 3.10.2.2Inspection Report Forms 3.10.2.3Daily Inspection Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 62 PAGES
09 97 13.17 1.4.5.2Recycled Metallic Abrasive Field Test Reports (Daily and Weekly)
SD-07 Certificates 1.4.1Contract Errors, Omissions, and
Other Discrepancies 1.4.2.1Corrective Action Procedures 1.4.3Coating Work Plan 1.4.6.1Qualifications of Certified
Industrial Hygienist (CIH) 1.4.6.5Qualifications Of Individuals
Performing Abrasive Blasting 1.4.6.2Qualifications of Certified
Protective Coatings Specialist
(PCS)
1.4.6.3Qualifications of Coating Inspection Company
1.4.6.4Qualifications of QC Specialist Coating Inspector
1.4.6.6Qualifications of Testing Laboratory for Coatings
1.4.6.7Qualifications of Testing Laboratory for Abrasive
1.4.6.8Qualifications of Coating Contractors
1.4.6.9Roof Joint Sealant Materials 1.4.6.10Roof Joint Sealant Compatibility
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 62 PAGES
09 97 13.17 1.4.6.11Epoxy Coating Materials 1.4.6.12Non-metallic Abrasive 1.4.6.13Metallic Abrasive
SD-08 Manufacturer’s Instructions 1.5.1Roof Joint Sealant Instructions 1.5.2Coating System Instructions
SD-11 Closeout Submittals
3.7.6 G RODisposal of Used Abrasive
3.10.2.4 G ROInspection Logbook
09 97 13.27 SD-05 Design Data 1.4.4.1Containment System
SD-06 Test Reports 1.4.5.1Joint Sealant Qualification Test
Reports 1.4.5.2Coatings Qualification Test
Reports 1.4.5.3Metallic Abrasive Qualification
Test Reports 3.1.3Coating Sample Test Reports 3.1.4Abrasive Sample Test Reports 3.8.2.2Inspection Report Forms 3.8.2.3Daily Inspection Reports 1.4.5.4Recycled Metallic Abrasive Field
Test Reports (Daily and Weekly) SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 62 PAGES
09 97 13.27 1.4.1Contract Errors, Omissions, and Other Discrepancies
1.4.2.1Corrective Action Procedures 1.4.3Coating Work Plan 1.4.6.1Qualifications of Certified
Industrial Hygienist (CIH) 1.4.6.5Qualifications Of Individuals
Performing Abrasive Blasting 1.4.6.2Qualifications of Certified
Protective Coatings Specialist
(PCS)
1.4.6.3Qualifications of Coating Inspection Company
1.4.6.4Qualifications of QC Specialist Coating Inspector
1.4.6.6Qualifications of Testing Laboratory for Coatings
1.4.6.7Qualifications of Testing Laboratory for Abrasive
1.4.6.8Qualifications of Coating Contractors
1.4.6.9Joint Sealant Materials 1.4.6.10Coating Materials 1.4.6.11Coating System Component
Compatibility 1.4.6.12Non-metallic Abrasive
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 62 PAGES
09 97 13.27 1.4.6.13Metallic Abrasive SD-08 Manufacturer’s Instructions
1.5.1Joint Sealant Instructions 1.5.2Coating System Instructions
SD-11 Closeout Submittals 3.5.6Disposal of Used Abrasive
3.8.2.4 G ROInspection Logbook
10 44 16 SD-01 Preconstruction Submittals
2.1 G ROManufacturer's Data
SD-02 Shop Drawings
2.1 G ROFire Extinguishers
1.3.1Accessories Part 2 G ROCabinets
SD-03 Product Data 2.1Fire Extinguishers 1.3.1Accessories Part 2Cabinets 3.2.1Replacement Parts
SD-04 Samples 1.3.1Fire Extinguisher 1.3.1Cabinet 1.3.1Accessories
SD-07 Certificates 2.1Fire Extinguishers 2.1Manufacturer's Warranty with
Inspection Tag
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 62 PAGES
13 34 19 SD-01 Preconstruction Submittals
1.6.3 G OMAManufacturer's Qualifications
SD-02 Shop Drawings
1.2.1.7 G OMADetail Drawings
1.6.1 G OMADetail Drawings
SD-03 Product Data
1.6.1 G OMAManufacturer's Catalog Data
1.2.1.9 G ROWall Panels
2.4.2Insulation
SD-04 Samples
1.6.1 G ROCoil Stock
2.1.8 G ROCoil Stock
1.2.1.9 G RORoof Panels
1.6.5 G ROFascia Panels
2.5.2 G ROFasteners
2.8.1 G ROMetal Closure Strips
2.4.3 G OMAManufacturer's Color Charts and
Chips SD-05 Design Data
1.6.1 G OMAManufacturer's Descriptive and
Technical Literature
1.6.1 G OMAManufacturer's Building Design
Analysis
1.6.3Calculations SD-06 Test Reports
1.6.1 G OMATest Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRAC…