_AM4_Binder_McAAP_Bulk_Diesel.pdf

PDF 8 MB Posted

Attached to
McAAP Bulk Diesel Facility Federal contract opportunity
Solicitation number
w912bv19r0040
Issued by
Department of the Army Corps of Engineers Engineering District Tulsa

About this file

Amendment 04

View the file

Other files for this federal contract opportunity

Other files attached to McAAP Bulk Diesel Facility, newest first.
File Type Posted
W912BV19R0040_0005.pdf PDF
W912BV19R0040_0004.pdf PDF
_AM3_Binder_MCAAP_Diesel.pdf PDF
W912BV19R0040_0003.pdf PDF
W912BV19R0040_0002.pdf PDF
_AM2_Binder_McAAP_Diesel.pdf PDF
W912BV19R0040_P1.pdf PDF
AM1_Binder_McAAP_Diesel_Storage.pdf PDF
W912BV19R0040_VOL_2_Plans.pdf PDF
Visit_Request_MF190-20.pdf PDF
W912BV19R0040_VOL_1_Specifications_(1).pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT 0004

W912BV19R0040

REPLACE BULK DIESEL SYSTEM

MCALESTER AAP, OKLAHOMA

1. The revised/new sections/appendices/pages listed below are hereby added to or revised and made a part of the solicitation. Revised or added/deleted information can be located in the specifications by searching for an asterisk and amendment number (i.e., *AM4).

REVISED/NEW SECTIONS/APPENDICES

00 01 10 PROJECT TABLE OF CONTENTS

00 01 15 LIST OF DRAWINGS

REGISTER SUBMITTAL REGISTER (Includes added Section 09 97 13.17)

00 41 00 DEMOLITION

02 83 00 LEAD REMEDIATION

09 97 13.17 THREE COAT EPOXY INTERIOR COATING OF WELDED STEEL

PETROLEUM FUEL TANKS (New Section Added)

33 56 10 FACTORY-FABRICATED FUEL STORAGE TANKS

2. Delete the following sections in their entirety:

DELETED SECTIONS

N/A

3. The revised drawings listed below are hereby added to or revised and made a part of the solicitation.

REVISED AND NEW DRAWINGS

GENERAL

G-002 INDEX

SITE/CIVIL

CD101 DEMOLITION PLAN - AREA 1

MECHANCICAL SITE

MS102 TEMPORARY FUELING SYSTEM

ELECTRICAL SITE

ES101 ELECTRICAL SITE PLAN SHEET 1 OF 2

STRUCTURAL

S-111 (OPTION) CANOPY FOUNDATION PLAN & DETAIL

SS501 TEMPORARY FUELING SYSTEM PLATFORM (New Drawing Added)

ELECTRICAL

EL501 LIGHTING DETAILS SHEET 1 OF 3

EL503 LIGHTING DETAILS SHEET 3 OF 3

-- END CONTINUATION SHEET -

00 01 10 (TABLE OF CONTENTS) - 1

SPECIFICATIONS FOR CONSTRUCTION OF

REPLACE BULK DIESEL SYSTEM

DESC18S2

MCALESTER AAP, OKLAHOMA

PROJECT TABLE OF CONTENTS

TECHNICAL VOLUME 1 OF 2 – DIVISIONS 00 -22

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

01 01 10 PROJECT TABLE OF CONTENTS

00 01 15 LIST OF DRAWINGS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 30 01 OTHER ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

REGISTER SUBMITTAL REGISTER

01 33 29 SUSTAINABILITY REPORTING

01 33 29-A HPSB – GUIDING PRINCIPLES COMPLIANCE WORKSHEET CHECKLIST

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 35 29.13 HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES FOR

CONTAMINATED SITES

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS 3.0

CM)

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL

01 58 00 PROJECT IDENTIFICATION

01 58 00AT PROJECT SAFETY SIGN

01 60 00.00 50 MATERIAL AND EQUIPMENT

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

01 78 00ATA INITIAL RED ZONE MEETING CHECKLIST

01 78 00ATB DD1354 CHECKLIST FOR PROJECT CLOSEOUT

01 78 23 OPERATION AND MAINTENANCE DATA

01 78 23.33 OPERATION AND MAINTENANCE MANUALS FOR AVIATION FUEL

SYSTEMS

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS

*AM4

Revised in Accordance with Am #0004

00 01 10 (TABLE OF CONTENTS) - 2

02 82 00 ASBESTOS REMEDIATION

02 83 00 LEAD REMEDIATION

DIVISION 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DIVISION 05 - METALS

05 05 23.16 STRUCTURAL WELDING

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 00 METAL STAIRS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 60 00 FLASHING AND SHEET METAL

07 61 14.00 20 STEEL STANDING SEAM ROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

DIVISION 09 - FINISHES

09 90 00 PAINTS AND COATINGS

09 97 13.17 THREE COAT EPOXY INTERIOR COATING OF WELDED STEEL

PETROLEUM FUEL TANKS

09 97 13.27 EXTERIOR COATING OF STEEL STRUCTURES

DIVISION 10 - SPECIALTIES

10 44 16 FIRE EXTINGUISHERS

DIVISION 13 - SPECIAL CONSTRUCTION

*AM4

Revised in Accordance with Am #0004

ADDED BY AM4*

00 01 10 (TABLE OF CONTENTS) - 3

13 34 19 METAL BUILDING SYSTEMS AND CANOPY

TECHNICAL VOLUME 2 OF 2 – DIVISIONS 23 -33

DIVISION 22 – PLUMBING

00 22 00 PLUMBING

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 08 00 APPARATUS INSPECTION AND TESTING

26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 32 14.00 10 DIESEL-GENERATOR SET, STATIONARY 15-300 KW, STANDBY

APPLICATIONS

26 41 00 LIGHTNING PROTECTION SYSTEM

26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 05 21 GEOGRID SOIL REINFORCEMENT

31 05 22 GEOTEXTILES USED AS FILTERS

31 63 29 DRILLED CONCRETE PIERS AND SHAFTS

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID

PAVEMENTS

32 11 20 BASE COURSE FOR RIGID PAVING

32 13 13.03 CONCRETE PAVEMENT

00 01 10 (TABLE OF CONTENTS) - 4

32 15 00 AGGREGATE SURFACING

32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 31 13.53 CHAIN LINK FENCES AND GATES

32 92 19 SEEDING

DIVISION 33 - UTILITIES

33 01 50.60 CLEANING OF PETROLEUM STORAGE TANKS

33 05 23 TRENCHLESS UTILITY INSTALLATION

33 08 55 COMMISSIONING OF FUEL FACILITY SYSTEMS

33 09 52 FUEL PUMP CONTROL AND ANNUNCIATION SYSTEM (NON-

HYDRANT)

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 40 00 STORM DRAINAGE UTILITIES

33 46 16 SUBDRAINAGE PIPING

33 52 43.13 AVIATION FUEL PIPING

33 52 43.14 AVIATION FUEL CONTROL VALVES

33 56 10 FACTORY-FABRICATED FUEL STORAGE TANKS

33 57 55 FUEL SYSTEM COMPONENTS (NON-HYDRANT)

33 58 00 LEAK DETECTION FOR FUELING SYSTEMS

33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

-- End of Project Table of Contents --

Replace Bulk Diesel System, DESC18S2, McAlester AAP, Oklahoma OK21

SECTION TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

DOCUMENT 00 01 15

LIST OF DRAWINGS

02/11

PART 1 GENERAL

1.1 SUMMARY

1.2 CONTRACT DRAWINGS

1.3 SUPPLEMENTARY DRAWINGS

1.3.1 Boring Logs

1.3.2 Subsurface Data

-- End of Section Table of Contents --

DOCUMENT 00 01 15 Page 1

DOCUMENT 00 01 15

LIST OF DRAWINGS

02/11

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."

1.2 CONTRACT DRAWINGS

Contract drawings are as follows:

Drawings

GENERAL

OK21G-001.DGN G-001 COVER

OK21G-002.DGN G-002 INDEX

OK21G-003.DGN G-003 ABBREVIATIONS

OK21G-004.DGN G-004 LEGEND

OK21G-005.DGN G-005 ELECTRICAL LEGEND

OK21GC101.DGN GC101 VICINITY MAPS & LOCATION PLAN

OK21GC102.DGN GC102 TEMPORARY FUELING & STAGING AREA PLAN

OK21GI101.DGN GI101 GENERAL INFORMATION - SHEET 1 OF 2

OK21GI102.DGN GI102 GENERAL INFORMATION - SHEET 2 OF 2

SITE/CIVIL

OK21B-101.DGN B-101 SOIL BORING LOCATION PLAN

OK21B-301.DGN B-301 SOIL BORING LOGS, LEGEND AND NOTES - MA18-01 &

MA18-02

OK21B-302.DGN B-302 MILCON SOIL BORING LOGS - MA18-03 THROUGH

MA18-05, MA18-07

OK21B-303.DGN B-303 MILCON SOIL BORING LOGS - MA18-08 & MA18-09,

MA18-11 & MA18-12

OK21VF100.DGN VF100 OVERALL EXISTING SURVEY

OK21VF101.DGN VF101 EXISTING SURVEY - AREA 1

OK21VF102.DGN VF102 EXISTING SURVEY - AREA 2

OK21VF103.DGN VF103 EXISTING SURVEY - AREA 3

OK21CD101.DGN CD101 DEMOLITION PLAN - AREA 1

OK21CD102.DGN CD102 DEMOLITION PLAN - AREA 2

OK21CS101.DGN CS101 CIVIL SITE PLAN - AREA 1

OK21CS401.DGN CS401 ENLARGED AREA - FILLSTAND / OFFLOAD

OK21CS402.DGN CS402 ENLARGED AREA - ABOVEGROUND STORAGE TANK PAD

OK21CS403.DGN CS403 ENLARGED AREA - POL BUILDING

OK21CS501.DGN CS501 REMOTE CONTAINMENT BASIN DETAILS

OK21CS502.DGN CS502 BASIN GUARDRAIL DETAILS

OK21CS503.DGN CS503 FE6 CHAINLINK SECURITY FENCING DETAILS

OK21CS504.DGN CS504 FE6 DOUBLE SWING GATE DETAILS

OK21CS505.DGN CS505 SIGNAGE DETAILS

OK21CP101.DGN CP101 CIVIL PAVING PLAN - AREA 1

OK21CP201.DGN CP201 ACCESS ROAD PROFILE

OK21CP301.DGN CP301 ROADWAY TYPICAL SECTIONS

OK21CP501.DGN CP501 CONCRETE PAVEMENT DETAILS

DOCUMENT 00 01 15 Page 2 Revised in Accordance with Am #0004

*AM4 Updated by AM4*

*AM4 Changed by AM4*

Drawings

OK21CP502.DGN CP502 MISCELLANEOUS PAVEMENT DETAILS

OK21CG101.DGN CG101 GRADING & DRAINAGE PLAN - AREA 1

OK21CG201.DGN CG201 STORM DRAINAGE PROFILES

OK21CG202.DGN CG202 SUBDRAIN OUTFALL PIPING PROFILES

OK21CG501.DGN CG501 BIORETENTION BASIN DETAILS

OK21CG502.DGN CG502 PIPE BEDDING DETAILS

OK21CG503.DGN CG503 CATCH BASIN STRUCTURE DETAILS

OK21CG504.DGN CG504 AREA INLET STRUCTURE DETAILS

OK21CG505.DGN CG505 MISCELLANEOUS DRAINAGE DETAILS

OK21CG506.DGN CG506 HEADWALL DETAILS

OK21CE001.DGN CE001 EROSION CONTROL PLAN - GENERAL INFORMATION -

SHEET 1 OF 2

OK21CE002.DGN CE002 EROSION CONTROL PLAN - GENERAL INFORMATION -

SHEET 2 OF 2

OK21CE101.DGN CE101 EROSION CONTROL PLAN - AREA 1 - PHASE 1

OK21CE102.DGN CE102 EROSION CONTROL PLAN - AREA 1 - PHASE 2

OK21CE501.DGN CE501 EROSION CONTROL DETAILS

OK21CE502.DGN CE502 INLET PROTECTION DETAILS

OK21CU101A.DGN CU101A CIVIL UTILITY PLAN (BASE BID) - SHEET 1 OF 1

OK21CU101B.DGN CU101B CIVIL UTILITY PLAN (BID OPTION) - SHEET 1 OF 2

OK21CU102B.DGN CU102B CIVIL UTILITY PLAN (BID OPTION) - SHEET 2 OF 2

OK21CU201.DGN CU201 WATER LINE PROFILES (BID OPTION)

OK21CU501.DGN CU501 WATER SYSTEM DETAILS

OK21CU502.DGN CU502 CASING PIPE DETAILS (BID OPTION)

MECHANCICAL SITE

OK21MD101.DGN MD101 MECHANICAL REMOVAL PLAN

OK21MS101.DGN MS101 FUELING SYSTEM SITE LAYOUT

OK21MS102.DGN MS102 TEMPORARY FUELING SYSTEM

OK21MS201.DGN MS201 PIPING PROFILES - SHEET 1 OF 3

OK21MS202.DGN MS202 PIPING PROFILES - SHEET 2 OF 3

OK21MS203.DGN MS203 PIPING PROFILES - SHEET 3 OF 3

OK21MS401.DGN MS401 ENLARGED FUELING SYSTEM SITE LAYOUT - SHEET 1 OF 3

OK21MS402.DGN MS402 ENLARGED FUELING SYSTEM SITE LAYOUT - SHEET 2 OF 3

OK21MS403.DGN MS403 ENLARGED FUELING SYSTEM SITE LAYOUT - SHEET 3 OF 3

OK21MS501.DGN MS501 TRUCK FILLSTAND DETAILS - SHEET 1 OF 2

OK21MS502.DGN MS502 TRUCK FILLSTAND DETAILS - SHEET 2 OF 2

OK21MS503.DGN MS503 TRUCK OFFLOAD DETAILS

ELECTRICAL SITE

OK21ED101.DGN ED101 ELECTRICAL SITE DEMOLITION PLAN

OK21ED501.DGN ED501 ELECTRICAL SITE DEMOLITION DETAILS SHEET 1 OF 4

OK21ED502.DGN ED502 ELECTRICAL SITE DEMOLITION DETAILS SHEET 2 OF 4

OK21ED503.DGN ED503 ELECTRICAL SITE DEMOLITION DETAILS SHEET 3 OF 4

OK21ED504.DGN ED504 ELECTRICAL SITE DEMOLITION DETAILS SHEET 4 OF 4

OK21EC101A.DGN EC101A CATHODIC PROTECTION PLAN (BASE BID)

OK21EC101B.DGN EC101B CATHODIC PROTECTION PLAN (BID OPTION) SHEET 1 OF

OK21EC102B.DGN EC102B CATHODIC PROTECTION PLAN (BID OPTION) SHEET 2 OF

OK21EC501.DGN EC501 CATHODIC PROTECTION DETAILS SHEET 1 OF 2

OK21EC502.DGN EC502 CATHODIC PROTECTION DETAILS SHEET 2 OF 2

OK21ES101.DGN ES101 ELECTRICAL SITE PLAN SHEET 1 OF 2

OK21ES103.DGN ES103 ELECTRICAL SITE PLAN SHEET 2 OF 2

OK21ES501.DGN ES501 ELECTRICAL SITE DETAILS SHEET 1 OF 8

OK21ES502.DGN ES502 ELECTRICAL SITE DETAILS SHEET 2 OF 8

OK21ES503.DGN ES503 ELECTRICAL SITE DETAILS SHEET 3 OF 8

OK21ES504.DGN ES504 ELECTRICAL SITE DETAILS SHEET 4 OF 8

DOCUMENT 00 01 15 Page 3 Revised in Accordance with Am #0004

OK21ES505.DGN ES505 ELECTRICAL SITE DETAILS SHEET 5 OF 8

OK21ES506.DGN ES506 ELECTRICAL SITE DETAILS SHEET 6 OF 8

OK21ES507.DGN ES507 ELECTRICAL SITE DETAILS SHEET 7 OF 8

OK21ES508.DGN ES508 ELECTRICAL SITE DETAILS SHEET 8 OF 8

OK21ES509.DGN ES509 ELECTRICAL HAZARDOUS AREA DETAILS SHEET 1 OF 4

OK21ES510.DGN ES510 ELECTRICAL HAZARDOUS AREA DETAILS SHEET 2 OF 4

OK21ES511.DGN ES511 ELECTRICAL HAZARDOUS AREA DETAILS SHEET 3 OF 4

OK21ES512.DGN ES512 ELECTRICAL HAZARDOUS AREA DETAILS SHEET 4 OF 4

*AM4

STRUCTURAL

OK21S-001.DGN S-001 STRUCTURAL NOTES

OK21S-002.DGN S-002 POL BUILDING COMPONENTS AND CLADDING / WIND

PRESSURE LOADS

OK21S-101.DGN S-101 POL BUILDING PLAN

OK21S-111.DGN S-111 (OPTION) CANOPY FOUNDATION PLAN & DETAIL

OK21S-501.DGN S-501 TYPICAL CONCRETE DETAILS

OK21S-502.DGN S-502 VERTICAL PIPE BRACE

OK21SB301.DGN SB301 POL BUILDING FOUNDATION DETAILS

OK21SS201.DGN SS201 TANK SUPPORT PIERS

OK21SS202.DGN SS202 MISCELLANEOUS SITE FOUNDATIONS

OK21SS301.DGN SS301 TANK PIER SECTIONS / TANK SLAB DETAIL

OK21SS401.DGN SS401 TANK PLATFORM PLAN

OK21SS402.DGN SS402 TANK FOUNDATION AND SLAB LAYOUT

OK21SS501.DGN SS501 TEMPORARY FUELING SYSTEM PLATFORM

ARCHITECTURAL

OK21A-101.DGN A-101 OPERATIONS BUILDING - FLOOR PLAN, ROOF PLAN, AND

BUILDING ELEVATIONS

OK21A-101CP1.DGN A-101CP1 OFFLOAD CANOPY 1 - FLOOR PLAN AND BUILDING

ELEVATIONS

OK21A-112CP1.DGN A-112CP1 OFFLOAD CANOPY 1 - REFLECTED CEILING PLAN

OK21A-113CP1.DGN A-113CP1 OFFLOAD CANOPY 1 - ROOF PLAN

OK21A-301.DGN A-301 OPERATIONS BUILDING - WALL SECTIONS AND DETAILS

OK21A-501.DGN A-501 OPERATIONS BUILDING - ROOF, DOOR, AND WINDOW

DETAILS

OK21A-601.DGN A-601 OPERATIONS BUILDING - ROOM FINISH SCHEDULE -

DOOR SCHEDULE - DOOR AND FRAME TYPES

MECHANICAL

OK21M-001.DGN M-001 FUELING SYSTEM LEGEND AND NOTES

OK21M-201.DGN M-201 FLOW DIAGRAM - SHEET 1 OF 2

OK21M-202.DGN M-202 FLOW DIAGRAM - SHEET 2 OF 2

OK21M-501.DGN M-501 ABOVEGROUND STORAGE TANK DETAILS

OK21M-502.DGN M-502 TOP LOADING FILLSTAND PLATFORM DETAIL

OK21M-503.DGN M-503 MECHANICAL DETAILS - SHEET 1 OF 3

OK21M-504.DGN M-504 MECHANICAL DETAILS - SHEET 2 OF 3

OK21M-505.DGN M-505 MECHANICAL DETAILS - SHEET 3 OF 3

OK21M-506.DGN M-506 SEQUENCE OF OPERATION

OK21M-601.DGN M-601 FUEL PUMP SCHEDULE

OK21MH101.DGN MH101 POL BLDG FOUNDATION MECHANICAL PLAN

OK21MH501.DGN MH501 MECHANICAL DETAILS

OK21MH601.DGN MH601 MECHANICAL SCHEDULES

ELECTRICAL

OK21E-001.DGN E-001 ELECTRICAL LEGEND

OK21EG101.DGN EG101 ELECTRICAL POL BLDG GROUNDING/LIGHTNING

PROTECTION PLAN

OK21EG102.DGN EG102 TANK AREA GROUNDING AND LIGHTNING PROTECTION PLAN

DOCUMENT 00 01 15 Page 4 Revised in Accordance with Am #0004

*AM4 Changed AM4*

*AM4 Added by AM4*

(EQUIPMENT CANOPY OPTION)

OK21EG103.DGN EG103 TANK AREA GROUNDING AND LIGHTNING PROTECTION PLAN

(BASE BID)

OK21EG501.DGN EG501 ELECTRICAL LIGHTNING PROTECTION AND GROUNDING

DETAILS SHEET 1 OF 2

OK21EG502.DGN EG502 ELECTRICAL LIGHTNING PROTECTION AND GROUNDING

DETAILS SHEET 2 OF 2

OK21EI501.DGN EI501 TERMINAL BLOCK CONNECTIONS SHEET 1 OF 2

OK21EI502.DGN EI502 TERMINAL BLOCK CONNECTIONS SHEET 2 OF 2

OK21EI601.DGN EI601 CONTROL SYSTEMS DIAGRAM SHEET 1 OF 3

OK21EI602.DGN EI602 CONTROL SYSTEMS DIAGRAM SHEET 2 OF 3

OK21EI603.DGN EI603 CONTROL SYSTEMS DIAGRAM SHEET 3 OF 3

OK21EL101.DGN EL101 POL BLDG LIGHTING PLAN

OK21EL102.DGN EL102 TANK AREA LIGHTING PLAN (EQUIPMENT CANOPY OPTION)

OK21EL103.DGN EL103 TANK AREA LIGHTING PLAN (BASE BID)

OK21EL501.DGN EL501 LIGHTING DETAILS SHEET 1 OF 3

OK21EL502.DGN EL502 LIGHTING DETAILS SHEET 2 OF 3

OK21EL503.DGN EL503 LIGHTING DETAILS SHEET 3 OF 3

OK21EL701.DGN EL701 POL BLDG LIGHTING CALCULATIONS FOR INFORMATION

ONLY

OK21EL702.DGN EL702 SITE LIGHTING CALCULATIONS (EQUIPMENT CANOPY

OPTION) FOR INFORMATION ONLY

OK21EL703.DGN EL703 SITE LIGHTING CALCULATIONS (BASE BID) FOR

INFORMATION ONLY

OK21EP101.DGN EP101 POL BLDG POWER PLAN

OK21EP102.DGN EP102 TANK AREA POWER PLAN

OK21EP501.DGN EP501 FUEL PUMP DETAILS

OK21EP601.DGN EP601 ELECTRICAL ONE LINE DIAGRAM

OK21EP602.DGN EP602 ELECTRICAL PANEL SCHEDULE

OK21EP603.DGN EP603 EPDS CONTROL DIAGRAM

OK21EP604.DGN EP604 WIRING DIAGRAM

OK21EP605.DGN EP605 CONDUIT AND CONDUCTOR SCHEDULES

OK21ET101.DGN ET101 POL BLDG TELECOMMUNICATIONS PLAN

OK21ET501.DGN ET501 TELECOMMUNICATIONS DETAILS SHEET 1 OF 2

OK21ET502.DGN ET502 TELECOMMUNICATIONS DETAILS SHEET 2 OF 2

OK21FA-001.DGN FA-001 FIRE ALARM LEGEND

OK21FA101.DGN FA101 FIRE ALARM PLAN

OK21FA501.DGN FA501 FIRE ALARM MATRIX

OK21FA502.DGN FA502 FIRE ALARM RISER DIAGRAM

1.3 SUPPLEMENTARY DRAWINGS

These supplementary drawings may not be a part of the contract but are included with the drawings for information.

1.3.1 Boring Logs

The Government does not guarantee that borings indicate actual conditions, except for the exact locations and the time that they were made.

Subsurface data, not specified or indicated, have been obtained by the Government at this station.

1.3.2 Subsurface Data

DOCUMENT 00 01 15 Page 5 Revised in Accordance with Am #0004

*AM-3

Subsurface data, not specified or indicated, have been obtained by the Government at the station. The data are available for examination by prospective bidders.

-- End of Document --

DOCUMENT 00 01 15 Page 6

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 62 PAGES

Replace Bulk Diesel System, DESC18S2, McAlester AAP, Oklahoma

01 11 00 SD-01 Preconstruction Submittals

1.5 G ROSalvage Plan

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 G ROProject Scheduler Qualifications

3.4.1 G ROPreliminary Project Schedule

3.4.2 G ROInitial Project Schedule

3.6.2 G ROPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.8 G ROSubmittal Register

01 33 29 SD-01 Preconstruction Submittals

1.4.1 G DOSustainability Action Plan

SD-11 Closeout Submittals

1.5.2.1 G ROFinal High Performance and

Sustainable Building Checklist

1.5.2.1 G ROFinal Sustainability eNotebook

1.5.2.1 G ROAmended Final Sustainability

eNotebook

1.5.2.1 G ROAmended Final High

Performance and Sustainable Building Checklist

01 35 26 SD-01 Preconstruction Submittals

1.7 G ROAccident Prevention Plan (APP)

SD-06 Test Reports 1.4Monthly Exposure Reports 1.12Notifications and Reports

1.12.2 G ROAccident Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 62 PAGES

01 35 26 1.12.3LHE Inspection Reports SD-07 Certificates

1.6.1.4Crane Operators/Riggers

1.7.2.2 G ROStandard Lift Plan

1.7.2.3 G ROCritical Lift Plan

1.8Activity Hazard Analysis (AHA) 1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit 1.12.4Certificate of Compliance 1.14License Certificates

1.14.1 G RORadiography Operation Planning

Work Sheet

1.14.1 G ROPortable Gauge Operations

Planning Worksheet 01 35 29.13 SD-02 Shop Drawings

3.8.1 G ROWork Zones

3.9.1 G RODecontamination Facilities

SD-03 Product Data 1.4Amendments to the APP/SSHP 3.4Exposure Monitoring/Air

Sampling Program 3.8.2Site Control Log 1.8SSHO's Daily Inspection Logs

SD-07 Certificates 1.7Certificate Of Worker/Visitor

Acknowledgement

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 62 PAGES

01 35 29.13 SD-11 Closeout Submittals 1.9Safety And Health Phase-Out

Report 01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 G ROContractor Quality Control (CQC)

Plan

SD-06 Test Reports 3.10.2Verification Statement

01 50 00 SD-01 Preconstruction Submittals

1.3 G ROConstruction Site Plan

3.4.1 G ROTraffic Control Plan

2.2.1 G ROHaul Road Plan

SD-07 Certificates 1.4.1Backflow Tester 1.4Backflow Preventers

01 57 19 SD-01 Preconstruction Submittals 1.5.1Preconstruction Survey

1.9 G ROSolid Waste Management Permit

1.5.2 G RORegulatory Notifications

1.6 G ROEnvironmental Protection Plan

3.2.1.2 G ROStormwater Notice of Intent

1.6.9.1 G RODirt and Dust Control Plan

1.5.5 G ROEmployee Training Records

1.5.4 G ROEnvironmental Manager

Qualifications SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 62 PAGES

01 57 19 3.7.1.1.2Laboratory Analysis 3.2.1.3Inspection Reports

3.7.2.1 G ROSolid Waste Management Report

SD-07 Certificates

1.5.5 G ROEmployee Training Records

SD-11 Closeout Submittals

3.2.1.4 G ROStormwater Pollution Prevention

Plan Compliance Notebook

3.2.1.5 G ROStormwater Notice of Termination

3.7.1 G ROWaste Determination

Documentation

3.7.3.6 G RODisposal Documentation for

Hazardous and Regulated Waste

1.5.5 G ROAssembled Employee Training

Records

1.9 G ROSolid Waste Management Permit

3.7.2.1 G ROSolid Waste Management Report

3.7.3.1 G ROHazardous Waste/Debris

Management

1.5.2 G RORegulatory Notifications

3.7.2.1 G ROSales Documentation

01 57 23 SD-07 Certificates 2.1.3Mill Certificate or Affidavit

01 74 19 SD-01 Preconstruction Submittals

1.7 G ROConstruction Waste Management

Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 62 PAGES

01 74 19 SD-06 Test Reports 1.9.2Quarterly Reports 1.9.3Annual Report

SD-11 Closeout Submittals

1.10 G ROFinal Construction Waste

Diversion Report 01 78 00 SD-03 Product Data

1.7.1Warranty Management Plan 1.7.5Warranty Tags 1.5Spare Parts Data

SD-08 Manufacturer’s Instructions 1.7.1Instructions

SD-10 Operation and Maintenance Data

3.6 G ROOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 G ROAs-Built Drawings

3.3 G RORecord Drawings

1.7.1As-Built Record of Equipment and Materials 3.5As-Built Record of Equipment and Materials 3.4Construction Contract

Specifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 62 PAGES

01 78 00 2.3 G ROCertification of EPA Designated Items

3.8.1 G ROInterim DD FORM 1354

3.8.2 G ROInterim DD FORM 1354

3.8.2 G ROInterim DD FORM 1354

3.8.1 G ROChecklist for DD FORM 1354

01 78 23 SD-10 Operation and Maintenance Data

1.4 G ROO&M Database

3.1.1 G ROTraining Plan

3.1.3 G ROTraining Outline

3.1.2 G ROTraining Content

SD-11 Closeout Submittals

3.1.4 G ROTraining Video Recording

3.1.6 G ROValidation of Training Completion

01 78 23.33 SD-10 Operation and Maintenance Data

2.1.1 G ROSystem Instructions

02 41 00 SD-01 Preconstruction Submittals

1.2.1 G RODemolition Plan

1.9Existing Conditions

SD-07 Certificates

1.6 G RONotification

SD-11 Closeout Submittals 3.3.4Receipts

02 81 00 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 62 PAGES

02 81 00 2.1.1Packaging Notifications

3.1 G ROHazardous Waste Management

Plan

3.2 G ROOnsite Hazardous Waste

Management 3.3Notices of Non-Compliance and

Notices of Violation SD-06 Test Reports

3.7 G RORecordkeeping

3.7 G ROException Report

3.8Spill Response

SD-07 Certificates

1.4.1 G ROTransportation and Disposal

Coordinator

1.4.2 G ROTraining

1.4.3Certification

3.3.3 G ROShipping Documents and

Packagings Certification 3.3.4Security Plan 3.3.5Certificates of Disposal 3.6Waste Minimization

02 82 00 SD-03 Product Data

1.2.2 G ROAmended Water

1.3.9 G ROSafety Data Sheets (SDS) for All

Materials

2.1 G ROEncapsulants

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 62 PAGES

02 82 00 3.1.2.1 G RORespirators

3.1.7 G ROLocal Exhaust Equipment

3.1.7 G ROPressure Differential Automatic

Recording Instrument

3.1.8 G ROVacuums

SD-06 Test Reports

1.5.5 G ROAir Sampling Results

1.5.6 G ROPressure Differential Recordings

for Local Exhaust System

3.2.5.5 G ROClearance Sampling

3.3.3.2 G ROAsbestos Disposal Quantity

Report SD-07 Certificates

1.3.4 G ROEmployee Training

1.3.5 G RONotifications

1.3.7 G RORespiratory Protection Program

1.3.10 G ROAsbestos Hazard Abatement

Plan

1.3.11 G ROTesting Laboratory

1.3.12 G ROLandfill Approval

1.3.12 G RODelivery Tickets

1.3.12 G ROWaste Shipment Records

1.3.13 G ROTransporter Certification

1.3.14 G ROMedical Certification

1.5.1 G ROPrivate Qualified Person

Documentation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 62 PAGES

02 82 00 1.5.2 G ROCompetent Person

1.5.3 G ROWorker's License

1.5.4 G ROContractor's License

1.5.7 G ROFederal, State or Local Citations

on Previous Projects

2.1 G ROEncapsulants

3.1 G ROEquipment Used to Contain

Airborne Asbestos Fibers

3.1.3.3 G ROWater Filtration Equipment

3.1.8 G ROVacuums

3.1.8 G ROVentilation Systems

SD-11 Closeout Submittals

1.3.5 G ROPermits and Licenses

1.3.5 G RONotifications

1.3.7.1 G RORespirator Program Records

1.7.1 G RORental Equipment

02 83 00 SD-01 Preconstruction Submittals

1.5.1.1 G ROCompetent Person

1.5.1.2 G ROTraining Certification

1.5.2.3 G ROOccupational and Environmental

Assessment Data Report

1.5.2.4 G ROMedical Examinations

1.5.2.8 G ROLead, Cadmium, Chromium

Waste Management Plan

1.5.3 G ROLicenses, Permits and

Notifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 62 PAGES

02 83 00 1.5.4 G ROOccupant Protection Plan

1.5.2.2 G ROLead, Cadmium, Chromium

Compliance Plan

3.4.1.1 G ROInitial Sample Results

3.5.2.1 G ROWritten Evidence of TSD

Approval SD-03 Product Data

1.6.1 G RORespirators

1.6.4 G ROVacuum Filters

1.6.7 G RONegative Air Pressure System

2.1 G ROMaterials and Equipment

2.1.1 G ROExpendable Supplies

SD-06 Test Reports

1.5.2.3 G ROOccupational and Environmental

Assessment Data Report

1.5.2.3 G ROSampling Results

SD-07 Certificates

1.5.1.3 G ROTesting Laboratory

1.5.1.4 G ROThird Party Consultant

Qualifications

3.5.1.1 G ROClearance Certification

SD-11 Closeout Submittals

3.5.2.1 G ROHazardous Waste Manifest

3.5.2.1 G ROTurn-In Documents or Weight

Tickets 03 30 00 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 62 PAGES

03 30 00 1.6.3.1Concrete Curing Plan

1.6.5 G OMAQuality Control Plan

1.6.6 G ROQuality Control Personnel

Certifications 1.6.6Quality Control Organizational

Chart

1.6.8 G ROLaboratory Accreditation

3.3.10Maturity Method Data

1.6.2.1 G ROForm Removal Schedule

SD-02 Shop Drawings

1.6.2.2 G OMAReinforcing Steel

SD-03 Product Data 2.4.4Joint Sealants 2.4.3Joint Filler 2.1Formwork Materials 2.3.3.2Recycled Aggregate Materials 2.3.1Cementitious Materials 2.4.5Vapor Retarder and Vapor

Barrier 2.4.1Concrete Curing Materials 2.6Reinforcement 2.3.4Admixtures 2.6.2Mechanical Reinforcing Bar

Connectors 2.2.2Waterstops 1.8.1Local/Regional Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 62 PAGES

03 30 00 2.2.3Biodegradable Form Release Agent

1.6.3.2Pumping Concrete 2.4.2Nonshrink Grout

SD-05 Design Data

1.6.1.1 G OMAConcrete Mix Design

SD-06 Test Reports

1.6.1.1 G OMAConcrete Mix Design

1.6.4.1Fly Ash 1.6.4.1Pozzolan 1.6.4.2Slag Cement 1.6.4.3Aggregates

3.13.2.3 G OMACompressive Strength Tests

3.13.2.4Air Content 3.13.2.1Slump Tests 2.3.2Water

SD-07 Certificates 2.6.1Reinforcing Bars 1.9Welder Qualifications 1.6.3.3VOC Content for Form Release

Agents and Curing Compounds 1.6.3.4Safety Data Sheets 1.8.2Forest Stewardship Council

(FSC) Certification 1.6.6.2Field Testing Technician and

Testing Agency

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 62 PAGES

03 30 00 SD-08 Manufacturer’s Instructions 2.4.4Joint Sealants 2.4.1Curing Compound

05 05 23.16 SD-01 Preconstruction Submittals 3.2Welding Quality Assurance Plan

SD-03 Product Data

1.3 G ROWelding Procedure Qualifications

1.3.4Welder, Welding Operator, and

Tacker Qualification 1.3.2Previous Qualifications 1.3.3Pre-Qualified Procedures 2.2Welding Electrodes and Rods

SD-06 Test Reports 3.3Nondestructive Testing 3.2Weld Inspection Log

SD-07 Certificates 1.3.1Certified Welding Procedure

Specifications (WPS) 1.3.1Certified Brazing Procedure

Specifications (BPS) 1.3.1Certified Procedure Qualification

Records (PQR) 1.3.1Certified Welder Performance

Qualifications (WPQ) 1.3.1Certified Brazer Performance

Qualifications (BPQ)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 62 PAGES

05 05 23.16 1.3.5Certified Welding Inspector 1.3.5Nondestructive Testing

Personnel 05 40 00 SD-02 Shop Drawings

1.6.1 G OMAFraming Components

SD-03 Product Data

2.1Studs, Joists SD-05 Design Data

1.6.2 G OMAMetal Framing Calculations

SD-07 Certificates

1.4Load-Bearing Cold-Formed Metal Framing

3.2.1Welds SD-11 Closeout Submittals

2.1 G RORecycled Content of Steel

Products

05 50 13 SD-02 Shop Drawings

2.7 G OMAStructural Steel Framing (Tank

Platform and Stairs)

2.7 G OMAStructural Steel Framing (Tank

Platform and Stairs)

2.4 G OMAFloor Gratings

2.5 G OMABollards/Pipe Guards

SD-03 Product Data

2.4 G ROFloor Gratings

2.9 G OMAPipe Supports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 62 PAGES

05 50 13 2.1 G RORecycled Content 05 51 00 SD-02 Shop Drawings

2.1 G OMAIron and Steel Hardware

2.1 G OMASteel Shapes, Plates, Bars, and

Strips

2.2.1 G OMAMetal Stair System

SD-03 Product Data

2.4.1 G OMAStructural-Steel Plates, Shapes, and Bars

2.4.2 G OMAStructural-Steel Tubing

2.4.5 G OMAHot-Rolled Carbon Steel Sheets

and Strips

2.4.4 G OMACold-Finished Steel Bars

2.4.3 G OMAHot-Rolled Carbon Steel Bars

2.4.6 G OMACold-Rolled Carbon Steel Sheets

2.4.7 G OMAGalvanized Carbon Steel Sheets

2.2.3 G OMAProtective Coating

2.3.1 G OMASteel Stairs

SD-07 Certificates

1.3.1 G OMAWelding Procedures

1.3.1 G OMAWelder Qualification

SD-08 Manufacturer’s Instructions

2.4.1 G OMAStructural-Steel Plates, Shapes, and Bars

2.4.2 G OMAStructural-Steel Tubing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 62 PAGES

05 51 00 2.4.5 G OMAHot-Rolled Carbon Steel Sheets and Strips

2.4.4 G OMACold-Finished Steel Bars

2.4.3 G OMAHot-Rolled Carbon Steel Bars

2.4.6 G OMACold-Rolled Carbon Steel Sheets

2.4.7 G OMAGalvanized Carbon Steel Sheets

2.2.3 G OMAProtective Coating

05 51 33 SD-02 Shop Drawings 2.3Ladders 2.3.3Ship's Ladder

SD-03 Product Data 2.3Ladders 2.3.3Ship's Ladder 2.3.2Ladder Safety Devices

SD-07 Certificates 1.3Fabricator Certification for Ladder

Assembly 1.3Fabricator Certification for Ships

Ladder Assembly 05 52 00 SD-02 Shop Drawings

1.2.1 G ROFabrication Drawings

3.2 G ROIron and Steel Hardware

3.2 G ROSteel Shapes, Plates, Bars and

Strips SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 62 PAGES

05 52 00 2.2.1 G ROStructural-Steel Plates, Shapes, and Bars

2.2.2 G ROStructural-Steel Tubing

2.2.3 G ROCold-Finished Steel Bars

2.1.2 G ROProtective Coating

2.2.5 G ROSteel Railings and Handrails

1.2.1 G ROAnchorage and Fastening

Systems SD-07 Certificates

1.4.1 G ROWelding Procedures

1.4.2 G ROWelder Qualification

SD-08 Manufacturer’s Instructions 3.2Installation Instructions

06 10 00 SD-02 Shop Drawings

3.2.1 G RONailers

SD-06 Test Reports 1.4.3Preservative-treated

SD-07 Certificates 1.8.1Certificates of Grade 1.7Preservative Treatment

07 60 00 SD-02 Shop Drawings

2.2.1 G ROExposed Sheet Metal

3.1.12 G ROGutters

3.1.13 G RODownspouts

3.1.16 G ROFlashing at Roof Penetrations

and Equipment Supports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 62 PAGES

07 60 00 3.1.11 G RODrip Edges

3.1.14 G ROEave Flashing

3.1.15 G ROExpansion Joints

SD-04 Samples

1.4.2 G ROFinish Samples

SD-07 Certificates

2.1 G ROCertificates of Compliance

2.1 G RORecycled Content

SD-08 Manufacturer’s Instructions

1.4.3 G ROInstructions for Installation

3.5 G ROQuality Control Plan

SD-10 Operation and Maintenance Data

1.4.3 G ROCleaning and Maintenance

07 61 14.00 20 SD-02 Shop Drawings

1.2.4 G OMARoofing

SD-03 Product Data

2.1 G OMARoofing panels

2.3Attachment clips 2.4.1Closures 2.4Accessories 2.4.2Fasteners 2.4.3Sealants

2.6 G OMASnow Guards

1.7 G OMAwarranty

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 62 PAGES

07 61 14.00 20 2.1 G OMApanel

2.1 G OMApanel

2.4Accessories 2.4.3Sealants 2.2Intermediate Support

SD-05 Design Data 1.5Design calculations

SD-06 Test Reports

3.6 G ROField Inspection

1.3.3Structural performance 1.6.6Finish

SD-07 Certificates 1.6.3Manufacturer's Technical

Representative 1.6.4Installer's Qualifications

2.1 G ROCoil stock

SD-08 Manufacturer’s Instructions

3.3 G ROInstallation

07 84 00 SD-02 Shop Drawings 2.1Firestopping Materials

SD-07 Certificates 2.1Firestopping Materials 1.4Installer Qualifications 3.3Inspection

07 92 00 SD-03 Product Data

2.2 G ROSealants

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 62 PAGES

07 92 00 2.3 G ROPrimers

2.4 G ROBond Breakers

2.5 G ROBackstops

SD-07 Certificates

1.4.1 G ROIndoor Air Quality

SD-11 Closeout Submittals 2.2.1Indoor Air Quality For Interior

Sealants 2.2.3Indoor Air Quality For Interior

Floor Joint Sealants 08 11 13 SD-02 Shop Drawings

2.1 G RODoors

2.1 G RODoors

2.5 G ROFrames

2.5 G ROFrames

2.3Accessories 2.6Weatherstripping

SD-03 Product Data

2.1 G RODoors

2.5 G ROFrames

2.3Accessories 2.6Weatherstripping

08 51 13 SD-02 Shop Drawings

2.1 G OMAWindows

1.10Fabrication Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 62 PAGES

08 51 13 2.1 G DOWindows

2.2.5.1 G DOHardware

2.2.3 G DOFasteners

1.11 G DOWindow performance

2.3 G DOThermal-Barrier Windows

2.2.7 G DOScreens

2.2.2 G DOWeatherstripping

2.2.5 G DOAccessories

1.11.4Thermal performance

SD-04 Samples 1.4.2.1Finish Sample 1.4.2.2Window Sample

SD-05 Design Data

2.1 G OMAStructural calculations for

deflection SD-10 Operation and Maintenance Data

2.1 G ROWindows

1.7.1Plastic Identification

08 71 00 SD-02 Shop Drawings

1.3 G ROHardware schedule

2.3.5Keying system

SD-03 Product Data

2.3 G OMAHardware items

SD-08 Manufacturer’s Instructions 3.1Installation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 62 PAGES

08 71 00 SD-10 Operation and Maintenance Data

1.3 G ROHardware Schedule

SD-11 Closeout Submittals

1.4Key Bitting 08 81 00 SD-02 Shop Drawings

3.2.2Installation SD-03 Product Data

1.6.1Insulating Glass 1.3Glazing Accessories

SD-04 Samples 1.6.1Insulating Glass 2.3.5Tape 2.3.2.1Sealant

SD-07 Certificates 1.6.1Insulating Glass 1.3Glazing Accessories

SD-08 Manufacturer’s Instructions 2.3Setting and Sealing Materials 3.2Glass Setting

09 90 00 SD-02 Shop Drawings

3.8 G ROPiping identification

3.8stencil

SD-03 Product Data 2.1Materials 1.4.2Certification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 62 PAGES

09 90 00 2.1 G ROCoating 2.1Manufacturer's Technical Data

Sheets SD-04 Samples

1.9 G OMAColor

1.9 G OMAColor

SD-07 Certificates 1.3Applicator's qualifications

1.4.1.2 G ROQualification Testing

SD-08 Manufacturer’s Instructions 3.5.1Application instructions 3.5.2Mixing 1.7.2Manufacturer's Material Safety

Data Sheets SD-10 Operation and Maintenance Data

2.1 G ROCoatings

09 97 13.17 SD-05 Design Data

1.4.4.1Environmental Control System SD-06 Test Reports

1.4.5.1Metallic Abrasive Qualification Test Reports

3.2.3Coating Sample Test Reports 3.2.4Abrasive Sample Test Reports 3.10.2.2Inspection Report Forms 3.10.2.3Daily Inspection Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 62 PAGES

09 97 13.17 1.4.5.2Recycled Metallic Abrasive Field Test Reports (Daily and Weekly)

SD-07 Certificates 1.4.1Contract Errors, Omissions, and

Other Discrepancies 1.4.2.1Corrective Action Procedures 1.4.3Coating Work Plan 1.4.6.1Qualifications of Certified

Industrial Hygienist (CIH) 1.4.6.5Qualifications Of Individuals

Performing Abrasive Blasting 1.4.6.2Qualifications of Certified

Protective Coatings Specialist

(PCS)

1.4.6.3Qualifications of Coating Inspection Company

1.4.6.4Qualifications of QC Specialist Coating Inspector

1.4.6.6Qualifications of Testing Laboratory for Coatings

1.4.6.7Qualifications of Testing Laboratory for Abrasive

1.4.6.8Qualifications of Coating Contractors

1.4.6.9Roof Joint Sealant Materials 1.4.6.10Roof Joint Sealant Compatibility

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 62 PAGES

09 97 13.17 1.4.6.11Epoxy Coating Materials 1.4.6.12Non-metallic Abrasive 1.4.6.13Metallic Abrasive

SD-08 Manufacturer’s Instructions 1.5.1Roof Joint Sealant Instructions 1.5.2Coating System Instructions

SD-11 Closeout Submittals

3.7.6 G RODisposal of Used Abrasive

3.10.2.4 G ROInspection Logbook

09 97 13.27 SD-05 Design Data 1.4.4.1Containment System

SD-06 Test Reports 1.4.5.1Joint Sealant Qualification Test

Reports 1.4.5.2Coatings Qualification Test

Reports 1.4.5.3Metallic Abrasive Qualification

Test Reports 3.1.3Coating Sample Test Reports 3.1.4Abrasive Sample Test Reports 3.8.2.2Inspection Report Forms 3.8.2.3Daily Inspection Reports 1.4.5.4Recycled Metallic Abrasive Field

Test Reports (Daily and Weekly) SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 62 PAGES

09 97 13.27 1.4.1Contract Errors, Omissions, and Other Discrepancies

1.4.2.1Corrective Action Procedures 1.4.3Coating Work Plan 1.4.6.1Qualifications of Certified

Industrial Hygienist (CIH) 1.4.6.5Qualifications Of Individuals

Performing Abrasive Blasting 1.4.6.2Qualifications of Certified

Protective Coatings Specialist

(PCS)

1.4.6.3Qualifications of Coating Inspection Company

1.4.6.4Qualifications of QC Specialist Coating Inspector

1.4.6.6Qualifications of Testing Laboratory for Coatings

1.4.6.7Qualifications of Testing Laboratory for Abrasive

1.4.6.8Qualifications of Coating Contractors

1.4.6.9Joint Sealant Materials 1.4.6.10Coating Materials 1.4.6.11Coating System Component

Compatibility 1.4.6.12Non-metallic Abrasive

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 62 PAGES

09 97 13.27 1.4.6.13Metallic Abrasive SD-08 Manufacturer’s Instructions

1.5.1Joint Sealant Instructions 1.5.2Coating System Instructions

SD-11 Closeout Submittals 3.5.6Disposal of Used Abrasive

3.8.2.4 G ROInspection Logbook

10 44 16 SD-01 Preconstruction Submittals

2.1 G ROManufacturer's Data

SD-02 Shop Drawings

2.1 G ROFire Extinguishers

1.3.1Accessories Part 2 G ROCabinets

SD-03 Product Data 2.1Fire Extinguishers 1.3.1Accessories Part 2Cabinets 3.2.1Replacement Parts

SD-04 Samples 1.3.1Fire Extinguisher 1.3.1Cabinet 1.3.1Accessories

SD-07 Certificates 2.1Fire Extinguishers 2.1Manufacturer's Warranty with

Inspection Tag

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 62 PAGES

13 34 19 SD-01 Preconstruction Submittals

1.6.3 G OMAManufacturer's Qualifications

SD-02 Shop Drawings

1.2.1.7 G OMADetail Drawings

1.6.1 G OMADetail Drawings

SD-03 Product Data

1.6.1 G OMAManufacturer's Catalog Data

1.2.1.9 G ROWall Panels

2.4.2Insulation

SD-04 Samples

1.6.1 G ROCoil Stock

2.1.8 G ROCoil Stock

1.2.1.9 G RORoof Panels

1.6.5 G ROFascia Panels

2.5.2 G ROFasteners

2.8.1 G ROMetal Closure Strips

2.4.3 G OMAManufacturer's Color Charts and

Chips SD-05 Design Data

1.6.1 G OMAManufacturer's Descriptive and

Technical Literature

1.6.1 G OMAManufacturer's Building Design

Analysis

1.6.3Calculations SD-06 Test Reports

1.6.1 G OMATest Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRAC…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.