_AM3_Binder_MCAAP_Diesel.pdf

PDF 5 MB Posted

Attached to
McAAP Bulk Diesel Facility Federal contract opportunity
Solicitation number
w912bv19r0040
Issued by
Department of the Army Corps of Engineers Engineering District Tulsa

About this file

Amendment 3 Binder

View the file

Other files for this federal contract opportunity

Other files attached to McAAP Bulk Diesel Facility, newest first.
File Type Posted
W912BV19R0040_0005.pdf PDF
_AM4_Binder_McAAP_Bulk_Diesel.pdf PDF
W912BV19R0040_0004.pdf PDF
W912BV19R0040_0003.pdf PDF
W912BV19R0040_0002.pdf PDF
_AM2_Binder_McAAP_Diesel.pdf PDF
W912BV19R0040_P1.pdf PDF
AM1_Binder_McAAP_Diesel_Storage.pdf PDF
W912BV19R0040_VOL_2_Plans.pdf PDF
Visit_Request_MF190-20.pdf PDF
W912BV19R0040_VOL_1_Specifications_(1).pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT 0003

W912BV19R0040

REPLACE BULK DIESEL SYSTEM

MCALESTER AAP, OKLAHOMA

1. The revised/new sections/appendices/pages listed below are hereby added to or revised and made a part of the solicitation. Revised or added/deleted information can be located in the specifications by searching for an asterisk and amendment number (i.e., *AM3).

REVISED/NEW SECTIONS/APPENDICES

00 01 15 00 22 11

LIST OF DRAWINGS

PROPOSAL SUBMISSION REQUIREMENTS

01 45 00.00 10 QUALITY CONTROL

26 32 14.00 10 DIESEL-GENERATOR SET, STATIONARY 15-300 KW, STANDBY

APPLICATIONS

33 52 43.13 AVIATION FUEL PIPING

2. Delete the following sections in their entirety:

DELETED SECTIONS

N/A

3. The revised drawings listed below are hereby added to or revised and made a part of the solicitation.

REVISED DRAWINGS

SITE/CIVIL

CS101 CIVIL SITE PLAN - AREA 1

CS403 ENLARGED AREA - POL BUILDING

MECHANCICAL SITE

MS102 TEMPORARY FUELING SYSTEM

ELECTRICAL

EP601 ELECTRICAL ONE LINE DIAGRAM

EP602 ELECTRICAL PANEL SCHEDULE

-- END CONTINUATION SHEET --

Replace Bulk Diesel System, DESC18S2, McAlester AAP, Oklahoma OK21

SECTION TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

DOCUMENT 00 01 15

LIST OF DRAWINGS

02/11

PART 1 GENERAL

1.1 SUMMARY

1.2 CONTRACT DRAWINGS

1.3 SUPPLEMENTARY DRAWINGS

1.3.1 Boring Logs

1.3.2 Subsurface Data

-- End of Section Table of Contents --

DOCUMENT 00 01 15 Page 1 Revised in Accordance with Am #0003

DOCUMENT 00 01 15

LIST OF DRAWINGS

02/11

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."

1.2 CONTRACT DRAWINGS

Contract drawings are as follows:

Drawings

GENERAL

OK21G-001.DGN G-001 COVER

OK21G-002.DGN G-002 INDEX

OK21G-003.DGN G-003 ABBREVIATIONS

OK21G-004.DGN G-004 LEGEND

OK21G-005.DGN G-005 ELECTRICAL LEGEND

OK21GC101.DGN GC101 VICINITY MAPS & LOCATION PLAN

OK21GC102.DGN GC102 TEMPORARY FUELING & STAGING AREA PLAN

OK21GI101.DGN GI101 GENERAL INFORMATION - SHEET 1 OF 2

OK21GI102.DGN GI102 GENERAL INFORMATION - SHEET 2 OF 2

SITE/CIVIL

OK21B-101.DGN B-101 SOIL BORING LOCATION PLAN

OK21B-301.DGN B-301 SOIL BORING LOGS, LEGEND AND NOTES - MA18-01 &

MA18-02

OK21B-302.DGN B-302 MILCON SOIL BORING LOGS - MA18-03 THROUGH

MA18-05, MA18-07

OK21B-303.DGN B-303 MILCON SOIL BORING LOGS - MA18-08 & MA18-09,

MA18-11 & MA18-12

OK21VF100.DGN VF100 OVERALL EXISTING SURVEY

OK21VF101.DGN VF101 EXISTING SURVEY - AREA 1

OK21VF102.DGN VF102 EXISTING SURVEY - AREA 2

OK21VF103.DGN VF103 EXISTING SURVEY - AREA 3

OK21CD101.DGN CD101 DEMOLITION PLAN - AREA 1

OK21CD102.DGN CD102 DEMOLITION PLAN - AREA 2

OK21CS101.DGN CS101 CIVIL SITE PLAN - AREA 1

OK21CS401.DGN CS401 ENLARGED AREA - FILLSTAND / OFFLOAD

OK21CS402.DGN CS402 ENLARGED AREA - ABOVEGROUND STORAGE TANK PAD

OK21CS403.DGN CS403 ENLARGED AREA - POL BUILDING

OK21CS501.DGN CS501 REMOTE CONTAINMENT BASIN DETAILS

OK21CS502.DGN CS502 BASIN GUARDRAIL DETAILS

OK21CS503.DGN CS503 FE6 CHAINLINK SECURITY FENCING DETAILS

OK21CS504.DGN CS504 FE6 DOUBLE SWING GATE DETAILS

OK21CS505.DGN CS505 SIGNAGE DETAILS

OK21CP101.DGN CP101 CIVIL PAVING PLAN - AREA 1

OK21CP201.DGN CP201 ACCESS ROAD PROFILE

OK21CP301.DGN CP301 ROADWAY TYPICAL SECTIONS

OK21CP501.DGN CP501 CONCRETE PAVEMENT DETAILS

DOCUMENT 00 01 15 Page 2 Revised in Accordance with Am #0003

*AM3 (Revised) AM3*

Drawings

OK21CP502.DGN CP502 MISCELLANEOUS PAVEMENT DETAILS

OK21CG101.DGN CG101 GRADING & DRAINAGE PLAN - AREA 1

OK21CG201.DGN CG201 STORM DRAINAGE PROFILES

OK21CG202.DGN CG202 SUBDRAIN OUTFALL PIPING PROFILES

OK21CG501.DGN CG501 BIORETENTION BASIN DETAILS

OK21CG502.DGN CG502 PIPE BEDDING DETAILS

OK21CG503.DGN CG503 CATCH BASIN STRUCTURE DETAILS

OK21CG504.DGN CG504 AREA INLET STRUCTURE DETAILS

OK21CG505.DGN CG505 MISCELLANEOUS DRAINAGE DETAILS

OK21CG506.DGN CG506 HEADWALL DETAILS

OK21CE001.DGN CE001 EROSION CONTROL PLAN - GENERAL INFORMATION -

SHEET 1 OF 2

OK21CE002.DGN CE002 EROSION CONTROL PLAN - GENERAL INFORMATION -

SHEET 2 OF 2

OK21CE101.DGN CE101 EROSION CONTROL PLAN - AREA 1 - PHASE 1

OK21CE102.DGN CE102 EROSION CONTROL PLAN - AREA 1 - PHASE 2

OK21CE501.DGN CE501 EROSION CONTROL DETAILS

OK21CE502.DGN CE502 INLET PROTECTION DETAILS

OK21CU101A.DGN CU101A CIVIL UTILITY PLAN (BASE BID) - SHEET 1 OF 1

OK21CU101B.DGN CU101B CIVIL UTILITY PLAN (BID OPTION) - SHEET 1 OF 2

OK21CU102B.DGN CU102B CIVIL UTILITY PLAN (BID OPTION) - SHEET 2 OF 2

OK21CU201.DGN CU201 WATER LINE PROFILES (BID OPTION)

OK21CU501.DGN CU501 WATER SYSTEM DETAILS

OK21CU502.DGN CU502 CASING PIPE DETAILS (BID OPTION)

MECHANCICAL SITE

OK21MD101.DGN MD101 MECHANICAL REMOVAL PLAN

OK21MS101.DGN MS101 FUELING SYSTEM SITE LAYOUT

OK21MS102.DGN MS102 TEMPORARY FUELING SYSTEM

OK21MS201.DGN MS201 PIPING PROFILES - SHEET 1 OF 3

OK21MS202.DGN MS202 PIPING PROFILES - SHEET 2 OF 3

OK21MS203.DGN MS203 PIPING PROFILES - SHEET 3 OF 3

OK21MS401.DGN MS401 ENLARGED FUELING SYSTEM SITE LAYOUT - SHEET 1 OF 3

OK21MS402.DGN MS402 ENLARGED FUELING SYSTEM SITE LAYOUT - SHEET 2 OF 3

OK21MS403.DGN MS403 ENLARGED FUELING SYSTEM SITE LAYOUT - SHEET 3 OF 3

OK21MS501.DGN MS501 TRUCK FILLSTAND DETAILS - SHEET 1 OF 2

OK21MS502.DGN MS502 TRUCK FILLSTAND DETAILS - SHEET 2 OF 2

OK21MS503.DGN MS503 TRUCK OFFLOAD DETAILS

ELECTRICAL SITE

OK21ED101.DGN ED101 ELECTRICAL SITE DEMOLITION PLAN

OK21ED501.DGN ED501 ELECTRICAL SITE DEMOLITION DETAILS SHEET 1 OF 4

OK21ED502.DGN ED502 ELECTRICAL SITE DEMOLITION DETAILS SHEET 2 OF 4

OK21ED503.DGN ED503 ELECTRICAL SITE DEMOLITION DETAILS SHEET 3 OF 4

OK21ED504.DGN ED504 ELECTRICAL SITE DEMOLITION DETAILS SHEET 4 OF 4

OK21EC101A.DGN EC101A CATHODIC PROTECTION PLAN (BASE BID)

OK21EC101B.DGN EC101B CATHODIC PROTECTION PLAN (BID OPTION) SHEET 1 OF

OK21EC102B.DGN EC102B CATHODIC PROTECTION PLAN (BID OPTION) SHEET 2 OF

OK21EC501.DGN EC501 CATHODIC PROTECTION DETAILS SHEET 1 OF 2

OK21EC502.DGN EC502 CATHODIC PROTECTION DETAILS SHEET 2 OF 2

OK21ES101.DGN ES101 ELECTRICAL SITE PLAN SHEET 1 OF 2

OK21ES103.DGN ES103 ELECTRICAL SITE PLAN SHEET 2 OF 2

OK21ES501.DGN ES501 ELECTRICAL SITE DETAILS SHEET 1 OF 8

OK21ES502.DGN ES502 ELECTRICAL SITE DETAILS SHEET 2 OF 8

OK21ES503.DGN ES503 ELECTRICAL SITE DETAILS SHEET 3 OF 8

OK21ES504.DGN ES504 ELECTRICAL SITE DETAILS SHEET 4 OF 8

DOCUMENT 00 01 15 Page 3

OK21ES505.DGN ES505 ELECTRICAL SITE DETAILS SHEET 5 OF 8

OK21ES506.DGN ES506 ELECTRICAL SITE DETAILS SHEET 6 OF 8

OK21ES507.DGN ES507 ELECTRICAL SITE DETAILS SHEET 7 OF 8

OK21ES508.DGN ES508 ELECTRICAL SITE DETAILS SHEET 8 OF 8

OK21ES509.DGN ES509 ELECTRICAL HAZARDOUS AREA DETAILS SHEET 1 OF 4

OK21ES510.DGN ES510 ELECTRICAL HAZARDOUS AREA DETAILS SHEET 2 OF 4

OK21ES511.DGN ES511 ELECTRICAL HAZARDOUS AREA DETAILS SHEET 3 OF 4

OK21ES512.DGN ES512 ELECTRICAL HAZARDOUS AREA DETAILS SHEET 4 OF 4

STRUCTURAL

OK21S-001.DGN S-001 STRUCTURAL NOTES

OK21S-002.DGN S-002 POL BUILDING COMPONENTS AND CLADDING / WIND

PRESSURE LOADS

OK21S-101.DGN S-101 POL BUILDING PLAN

OK21S-111.DGN S-111 (OPTION) CANOPY FOUNDATION PLAN & DETAIL

OK21S-501.DGN S-501 TYPICAL CONCRETE DETAILS

OK21S-502.DGN S-502 VERTICAL PIPE BRACE

OK21SB301.DGN SB301 POL BUILDING FOUNDATION DETAILS

OK21SS201.DGN SS201 TANK SUPPORT PIERS

OK21SS202.DGN SS202 MISCELLANEOUS SITE FOUNDATIONS

OK21SS301.DGN SS301 TANK PIER SECTIONS / TANK SLAB DETAIL

OK21SS401.DGN SS401 TANK PLATFORM PLAN

OK21SS402.DGN SS402 TANK FOUNDATION AND SLAB LAYOUT

ARCHITECTURAL

OK21A-101.DGN A-101 OPERATIONS BUILDING - FLOOR PLAN, ROOF PLAN, AND

BUILDING ELEVATIONS

OK21A-101CP1.DGN A-101CP1 OFFLOAD CANOPY 1 - FLOOR PLAN AND BUILDING

ELEVATIONS

OK21A-112CP1.DGN A-112CP1 OFFLOAD CANOPY 1 - REFLECTED CEILING PLAN

OK21A-113CP1.DGN A-113CP1 OFFLOAD CANOPY 1 - ROOF PLAN

OK21A-301.DGN A-301 OPERATIONS BUILDING - WALL SECTIONS AND DETAILS

OK21A-501.DGN A-501 OPERATIONS BUILDING - ROOF, DOOR, AND WINDOW

DETAILS

OK21A-601.DGN A-601 OPERATIONS BUILDING - ROOM FINISH SCHEDULE -

DOOR SCHEDULE - DOOR AND FRAME TYPES

MECHANICAL

OK21M-001.DGN M-001 FUELING SYSTEM LEGEND AND NOTES

OK21M-201.DGN M-201 FLOW DIAGRAM - SHEET 1 OF 2

OK21M-202.DGN M-202 FLOW DIAGRAM - SHEET 2 OF 2

OK21M-501.DGN M-501 ABOVEGROUND STORAGE TANK DETAILS

OK21M-502.DGN M-502 TOP LOADING FILLSTAND PLATFORM DETAIL

OK21M-503.DGN M-503 MECHANICAL DETAILS - SHEET 1 OF 3

OK21M-504.DGN M-504 MECHANICAL DETAILS - SHEET 2 OF 3

OK21M-505.DGN M-505 MECHANICAL DETAILS - SHEET 3 OF 3

OK21M-506.DGN M-506 SEQUENCE OF OPERATION

OK21M-601.DGN M-601 FUEL PUMP SCHEDULE

OK21MH101.DGN MH101 POL BLDG FOUNDATION MECHANICAL PLAN

OK21MH501.DGN MH501 MECHANICAL DETAILS

OK21MH601.DGN MH601 MECHANICAL SCHEDULES

ELECTRICAL

OK21E-001.DGN E-001 ELECTRICAL LEGEND

OK21EG101.DGN EG101 ELECTRICAL POL BLDG GROUNDING/LIGHTNING

PROTECTION PLAN

OK21EG102.DGN EG102 TANK AREA GROUNDING AND LIGHTNING PROTECTION PLAN

(EQUIPMENT CANOPY OPTION)

DOCUMENT 00 01 15 Page 4

OK21EG103.DGN EG103 TANK AREA GROUNDING AND LIGHTNING PROTECTION PLAN

(BASE BID)

OK21EG501.DGN EG501 ELECTRICAL LIGHTNING PROTECTION AND GROUNDING

DETAILS SHEET 1 OF 2

OK21EG502.DGN EG502 ELECTRICAL LIGHTNING PROTECTION AND GROUNDING

DETAILS SHEET 2 OF 2

OK21EI501.DGN EI501 TERMINAL BLOCK CONNECTIONS SHEET 1 OF 2

OK21EI502.DGN EI502 TERMINAL BLOCK CONNECTIONS SHEET 2 OF 2

OK21EI601.DGN EI601 CONTROL SYSTEMS DIAGRAM SHEET 1 OF 3

OK21EI602.DGN EI602 CONTROL SYSTEMS DIAGRAM SHEET 2 OF 3

OK21EI603.DGN EI603 CONTROL SYSTEMS DIAGRAM SHEET 3 OF 3

OK21EL101.DGN EL101 POL BLDG LIGHTING PLAN

OK21EL102.DGN EL102 TANK AREA LIGHTING PLAN (EQUIPMENT CANOPY OPTION)

OK21EL103.DGN EL103 TANK AREA LIGHTING PLAN (BASE BID)

OK21EL501.DGN EL501 LIGHTING DETAILS SHEET 1 OF 3

OK21EL502.DGN EL502 LIGHTING DETAILS SHEET 2 OF 3

OK21EL503.DGN EL503 LIGHTING DETAILS SHEET 3 OF 3

OK21EL701.DGN EL701 POL BLDG LIGHTING CALCULATIONS FOR INFORMATION

ONLY

OK21EL702.DGN EL702 SITE LIGHTING CALCULATIONS (EQUIPMENT CANOPY

OPTION) FOR INFORMATION ONLY

OK21EL703.DGN EL703 SITE LIGHTING CALCULATIONS (BASE BID) FOR

INFORMATION ONLY

OK21EP101.DGN EP101 POL BLDG POWER PLAN

OK21EP102.DGN EP102 TANK AREA POWER PLAN

OK21EP501.DGN EP501 FUEL PUMP DETAILS

OK21EP601.DGN EP601 ELECTRICAL ONE LINE DIAGRAM

OK21EP602.DGN EP602 ELECTRICAL PANEL SCHEDULE

OK21EP603.DGN EP603 EPDS CONTROL DIAGRAM

OK21EP604.DGN EP604 WIRING DIAGRAM

OK21EP605.DGN EP605 CONDUIT AND CONDUCTOR SCHEDULES

OK21ET101.DGN ET101 POL BLDG TELECOMMUNICATIONS PLAN

OK21ET501.DGN ET501 TELECOMMUNICATIONS DETAILS SHEET 1 OF 2

OK21ET502.DGN ET502 TELECOMMUNICATIONS DETAILS SHEET 2 OF 2

OK21FA-001.DGN FA-001 FIRE ALARM LEGEND

OK21FA101.DGN FA101 FIRE ALARM PLAN

OK21FA501.DGN FA501 FIRE ALARM MATRIX

OK21FA502.DGN FA502 FIRE ALARM RISER DIAGRAM

1.3 SUPPLEMENTARY DRAWINGS

These supplementary drawings may not be a part of the contract but are included with the drawings for information.

1.3.1 Boring Logs

The Government does not guarantee that borings indicate actual conditions, except for the exact locations and the time that they were made.

Subsurface data, not specified or indicated, have been obtained by the Government at this station.

1.3.2 Subsurface Data

DOCUMENT 00 01 15 Page 5 Revised in Accordance with Am #0003

*AM3 (REVISED) AM3*

*AM3 (REVISED) AM3*

*AM-3

Subsurface data, not specified or indicated, have been obtained by the Government at the station. The data are available for examination by prospective bidders. The soils report is included as part of the solicitation.

-- End of Document --

DOCUMENT 00 01 15 Page 6

21 11 - 1

Section 00 22 11 - Proposal Submission Requirements, Evaluation Criteria, Basis of Award One-Step-Best Value, Design-Build (Single Award)

PROPOSAL SUB REQUIREMENTS

SECTION 00 22 11

PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA, AND BASIS OF AWARD

1.0 OVERVIEW

This is a competitive best value solicitation for a construction contract for the FY19 Construct Bulk Diesel Facility project located at McAlester Army Ammunition Plant, McAlester, Pittsburg County, Oklahoma. The Government will evaluate proposals in accordance with the criteria described herein and award a firm fixed-price contract to the responsible firm whose proposal conforms to all the terms and conditions of the solicitation and whose proposal is determined to represent the overall best value to the Government.

1.1 WHO CAN SUBMIT.

Only firms Small Business firms are authorized to submit proposals.

b. Organization Conflicts of Interest (OCI) Disclosure: The Offeror shall provide a disclosure statement with its proposal which concisely describes all the relevant facts concerning the past or present organizational conflicts of interest relating to work on this project. In the same statement, and if applicable, the Offeror shall provide information to assure the Government that the conflicts of interest have been mitigated and/or neutralized to the maximum extent possible. If a conflict of interest is discovered after award of this contract, the Contracting Office will make a decision whether to terminate the contract.

2.0 BASIS OF AWARD

Award will be made to the acceptable proposal meeting or exceeding the technical acceptability standards for non-cost factors and is the lowest price of all acceptable proposals and is found fair and reasonable by the Contracting Officer. Tradeoffs are not permitted. Proposals are evaluated for acceptability but not ranked using non-cost/price factors. The Government will not award a contract to a Firm whose proposal contains a deficiency, as defined in FAR

15.001. The Government reserves the right to reject any offer if the offer is not in the best interest of the Government.

3.0 PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS

3.1 REQUIREMENT FOR SEPARATE PRICE AND TECHNICAL PROPOSALS.

3.1.1 Each offeror must submit both a price proposal and a technical proposal. The price proposal and the technical proposal must be submitted as separate volumes. Ensure that the outside of each separate volume is clearly marked to indicate its contents; and the identity of the offeror.

Additionally, clearly identify the “original” price proposal and the “original” technical proposal on the outside cover.

3.1.2 Both the price proposal and the technical proposal must be received by the closing date and time set for receipt of proposals.

3.1.3 No dollar amounts from the price proposal are to be included in the technical proposal.

a.

00 22 11 - 2

3.1.4 All information intended to be evaluated as part of the Technical Proposal must be submitted as part of the Technical Proposal (Volume 1). Do not merely cross-reference similar material in the Price Proposal, or vice versa. Also, do not include links to websites in lieu of incorporating information into your proposal.

3.1.5 Deviations, Exception and Assumptions

Deviations and exceptions to the terms and conditions of the solicitation are not allowed.

Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be deemed “unacceptable” and thus ineligible for award. Should the Offeror have any questions related to specific terms and conditions, these must be resolved prior to submission of the offer. If the Offeror must make any assumptions prior to submitting the proposal, the Offeror shall list and describe in detail the assumptions on the first page of each Tab. All assumptions shall be fully supported with the Offeror’s rationale and shall fully explain the impact, if any, on the performance and/or specific requirement of the RFP. The Offeror shall clearly describe on the Proposal Cover Sheet submitted with the Price Proposal any assumption to the contractual and/or technical terms and include the monetary impact on the solicitation with the price proposal. This information will not be evaluated separately but may impact the evaluation of other factors.

3.2 DISCUSSIONS.

The Government does not intend to enter into discussions with offerors prior to making an award. Offerors are encouraged to present their best technical proposal and prices in their initial proposal submission. However, in accordance with FAR Part 15.306, should discussions become necessary, the Government reserves the right to hold them. If this occurs, a competitive range will be determined and offerors notified. The competitive range may be limited for purposes of efficiency in accordance with (IAW) FAR Part 15.306(c)(2).

3.3 GENERALINSTRUCTIONS.

3.3.1 Submit only the hard-copy paper documents and the electronic files specifically authorized and/or required elsewhere in this section. Do not submit excess information, to include audio-visual materials, electronic media, etc. All pages should be numbered.

3.3.2 Use only 8 ½ by 11 inch paper for hard copy submissions, unless another paper size is specifically authorized elsewhere in this section for a particular submission. Do not use fold-outs (e.g., 11” x 14” or 11” x 17” sheets) unless specifically authorized in this section for a particular submission. Do not use a font size smaller than 10, an unusual font style such as script, or condensed print for any submission. All page margins must be at least 1 inch wide, but may include headers and footers.

3.3.3 Use three-ring binders to assemble your proposal. Do not use spring clamps or exceed the recommended capacity of the fastener or binder.

3.3.4 “Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can be provided to the Government as part of the Offeror’s technical proposal. Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must be clearly marked in accordance with the instructions at FAR 52.215-1, “Instructions to Offerors—Competitive Acquisition”, paragraph (e), “Restriction on disclosure and use of data.”

3.3.5 For submissions with page limitations, the pages will be counted as follows: One

00 22 11 - 3 side of the paper is one page; information on both the back and front of one sheet of paper will be counted as two pages. Where authorized, fold-out pages (11" x 14" or 11" x 17") will count as one page. Tables of content, proposal cover letters, and tabs between proposal information do not count toward any page limitations in the proposal.

3.3.6 Proposal revisions shall be submitted as page replacements with revised text readily identifiable, e.g., bold face print or underlining. The source of the revision, e.g., Error, Omission, or Clarification, or amendment shall be included and be annotated for each revision.

Proposal replacement pages shall be numbered, shall be clearly marked “REVISED”, shall show the date of revision, shall be submitted in appropriate number of copies (e.g., if two (2) copies of the original page was required, then two (2) copies of the revised page will also be required, and shall be a different color than the original pages they are to replace).

3.4 SPECIFIC INSTRUCTIONS FOR THE TECHNICAL PROPOSAL (VOLUME 1).

3.4.1 Number of Sets of the Technical Proposal. Submit one (1) electronic copy of the Technical Proposal. Submission shall contain the entire proposal in .pdf format using Adobe Acrobat software to print to a .pdf file; do NOT scan the document(s) into a .pdf file. The text portion of the complete proposal shall be contained as a single .pdf file. Sections of the proposal shall be bookmarked (linked to the index) in logical order.

3.4.2 Format and Contents of the Technical Proposal and List of Tabs

The proposal shall be organized using the tabs specified in the chart below.

3.4.3 Page Limitations. The following page limitations are established for each Factor:

Factor 1, Specialized Experience – Limited to 20 pages (1 page per project;

maximum 5 forms per contactor/subcontractor, see paragraph 5.1) Factor 2, Proposed Contract Duration and Summary Schedule – No page limitation Factor 3, Past Performance – No page limitation

3.5 SPECIFIC INSTRUCTIONS FOR THE PRICE PROPOSAL – FACTOR 4

(VOLUME 2).

3.5.1. Number of Sets of the Price Proposal.

Submit an ORIGINAL set of the price proposal electronically.

3.5.2. Size Restrictions and Page Limits.

Use only 8 ½” x 11” pages. There are no page limits set for the price proposal. However, limit your response to information required by this solicitation. Excess information will not be considered in the Government’s evaluation.

3.5.3 Format and Contents of the Price Proposal and List of Tabs. The price proposal shall be appropriately labeled as such and shall be organized as indicated in the following chart.

Note: If the Offeror is not required to submit any information under a listed Tab in accordance with the instructions below, that tab can be omitted. However, do not renumber the subsequent tabs.

4.0 PROPOSAL CONTENTS AND RELATED EVALUATION FACTORS

VOLUME 1 – TECHNICAL PROPOSAL

00 22 11 - 4

Factor LOCATION DESCRIPTION

FACTOR 1 Vol 1 Tab A Specialized Experience FACTOR 2 Vol 1 Tab B Proposed Contract Duration and Summary Schedule FACTOR 3 Vol 1 Tab C PAST PERFORMANCE

VOLUME 2 – PRICE PROPOSAL

Factor

LOCATION DESCRIPTION

N/A Vol 2 Tab 1 Proposal Cover Sheet N/A Vol 2 Tab 2 SF1442 and Acknowledgement of

Amendments FACTOR 4 Vol 2 Tab 3 SECTION 00 11 00, PRICING

SCHEDULE

N/A Vol 2 Tab 4 Bid Guarantee (Bid Bond) N/A Vol 2 Tab 5 Representations & Certifications N/A Vol 2 Tab 6 JV Agreement (if applicable)

5.0 VOLUME 1

5.1 VOLUME 1 – TAB A: FACTOR 1 - SPECIALIZED EXPERIENCE.

5.1.1 Submission Requirements:

Demonstrate the specialized experience of the Offeror and/or proposed team on projects same/similar in size and complexity to that described in the solicitation for same/similar construction services.

The Contractor shall complete a minimum of three (3), but no more than five (5) “Experience Information” forms, attached at the end of this section (Attachment 1), in response to this factor, of which a minimum of three (3) of those “Experience Information” forms must have included the prime Contractor. All blocks must be filled in and all data should be accurate, current, and complete. All projects submitted must be at least 50% complete and completed within the last five (5) years. If the Offeror’s firm has multiple locations, projects should have been completed by the regional office that will be performing the work. The Government preference is that project examples submitted be of completed projects (i.e., construction complete). At least two (2) of the projects provided must be valued at over $3,000,000.

5.1.2 Evaluation Criteria:

a. The Government will evaluate the extent of recent, relevant experience of the Offeror (including subcontractors) in regard to their role on this project. Federal Government project experience will not be rated inherently more important than non-Federal Government project experience. The Government will evaluate the experience submitted to see that it demonstrates capability to execute projects that are similar in size, scope, and complexity to this requirement. Projects still under construction will be evaluated only if they are at least 50% complete.

(1) The Offeror must submit the requested information to demonstrate a record of recent, related experience in construction, for the project (which may include similar state or local government or private counterparts) included in this solicitation. Recent experience

*AM3

AM3*

00 22 11 - 5 includes projects well underway (see above criteria) or those completed and turned over within five (5) years of the proposal issue date for this RFP for construction experience. Joint Venture partners should each demonstrate experience commensurate with their role on this project or how their experience qualifies them for their role on this project. If any of the information required is not included in the form (Attachment 1), then the Contractor will be considered non-responsive and evaluated as unacceptable.

(2) The Government reserves the right to verify the experience record of cited projects or other recent projects by reviewing the Contractor Performance Assessment Reporting System (CPARS), other DOD or Government appraisal systems or to interview owners or references. The Government may check any or all cited references to verify supplied information.

(3) The Government will consider extent of recent experience, degree of relationship of such experience to this project, demonstrated familiarity with applicable codes and local conditions. Some examples of relevancy to this project may include, but not be limited to:

(a) Number, size, type work, complexity, location

(b) Dates (well under way or completed no more than 5 years preceding date of Solicitation)

(c) Firm's role and extent of work self-performed.

(d) Experience with tank foundations in corrosive environments.

5.2 VOLUME 1 - TAB B: FACTOR 2 – PROPOSED CONTRACT DURATION AND

SUMMARY SCHEDULE.

5.2.1 Submission Requirements:

a. The Offeror shall propose a contract duration in the appropriate location on the Pricing Schedule not to exceed the maximum contract duration specified in the SCR entitled COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK. The proposed duration shall become the required contract duration.

b. Submit a summary level schedule for construction including any construction phasing. Schedules or diagrams may be provided separately in a size that is easily read, but shall be bound and clearly labeled as Tab 2. Summary schedule may be presented as an 11”x17” foldout sheet, counted as one (1) page. This summary schedule will, after contract award, be replaced with a project schedule as required by Section 01 32 01.00 10 PROJECT SCHEDULE. The summary schedule shall be task oriented, indicating the number of calendar days, after notice to proceed, by which milestones are to be achieved. Offeror may use a critical path or other method of his choice; however, schedules shall be graphically represented. The proposed summary schedule shall reflect the proposed contract duration.

Give attention to the following features:

(1) Show the overall construction phase for major item(s).

(2) Show turnover of the project. Identify any proposed phased turnovers (if applicable). The time to complete the project and turnover to the Government must consider the requirement for the Contractor’s CQC completion inspection and the subsequent joint Contractor-Government turnover inspection.

(3) Show as-builtsubmissions.

(4) Constraints: Offeror must demonstrate the capability and flexibility to plan and schedule the complete project to meet the proposed contract completion period. Clearly identify any constraints on the schedules presented (e.g., labor or material availability, 00 22 11 - 6 permits, weather, etc.). Indicate the anticipated overall critical path on the schedule.

c. The Offerors shall provide a narrative explanation to include the following:

(1) Proposed Phasing Plan

(2) Crew Assembly and Work Schedule(s). Crew assembly shall include how the Contractor will obtain and assemble work crews to cover the various trade requirements of the solicitation.

Work schedule shall include working days and working hours.

(3) Safety Plan

The intent is to provide enough detail to demonstrate the Offeror’s understanding of the project; however, it is not the intent for the Offeror to provide the amount of detail that will be required in the pre-work submittals contained in Division 01 of this RFP.

5.2.2 Evaluation Criteria:

5.2.2.1 Proposed Contract Duration: This duration will become the contractually binding completion period. The Government will evaluate the contract duration, as proposed by the Offeror in the Pricing Schedule, not to exceed the maximum allowed duration shown in the SCR entitled COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK. In assessing the reasonableness of the proposed contract duration, the Government may take into account how well the proposed summary schedule supports the proposed duration, as well as use other information, such as but not limited to independent judgment concerning logic, constraints and typical construction durations. The Government will consider an unreasonably condensed contract duration, which places additional cost or schedule risk on the Government or which may create a risk of contract or performance failure, as a deficiency, depending upon the evaluators' judgment.

5.2.2.2 Summary Schedule: The Government will evaluate the summary schedule for construction. The length of the schedule must match the proposed contract duration. If it is shorter than the proposed contract duration, it offers no advantage to the Government because it is non-binding, only representing a preliminary planned schedule. A schedule shorter than the proposed contract duration may indicate the Offeror is placing additional risk on the Government for any delays between the scheduled completion date and the required contract completion period. Both parties shall assume field overhead costs are included in the contract price for the full proposed contract duration. Therefore, the Government believes that there is no valid need to shorten the schedule less than the full proposed contract duration. The Government will evaluate the schedule to assess the strength of understanding of the project scope, restrictions which must be considered in the schedule e.g., permitting, long lead items, phasing, etc. The Government will evaluate the strength of understanding of events associated with coordinating submittals, the firm's capability to schedule the complete project within the proposed contract duration and the realism of the schedule.

5.2.2.3 Narrative: The Government will evaluate the narrative for realism and logic in regard to the proposed phasing plan, work crew assembly and work schedule, and safety plan.

5.3 VOLUME 1 -TAB C: FACTOR 3 - PAST PERFORMANCE.

5.3.1 Submission Requirements

a. For the projects listed under Factor 1 – Experience, the Government will query the Contractor Performance Assessment Reporting System (to include ACASS and CCASS) to validate past performance ratings on Department of Defense contracts and any other past performance information the Government deems necessary to evaluate a contractor’s past performance.

b. For each project that does not have an ACASS, CCASS, or CPARS evaluation, Offerors shall forward a copy of the Past Performance Questionnaire (PPQ) included at Attachment 2 to the points of contact responsible for monitoring performance

*AM3

AM3*

00 22 11 - 7 under such contracts. The Past Performance Questionnaire included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 2. Ensure correct phone numbers and email addresses are provided for the client point of contact. Completed Past Performance Questionnaires should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Attachment 2) which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Contract Specialist identified via email prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

c. The information contained in the questionnaires will be used to evaluate the offeror’s past performance. If any negative past performance information is received, the contractor will be given an opportunity to provide rebuttal. Each contractor shall provide at least three (3) past performance ratings. Any rating an offeror has in CCASS for the projects listed under Factor 1 will count toward this requirement. The offeror is responsible for ensuring that the KO has received a minimum of three (3) questionnaires prior to that date/time or has provided written notification to the KO that they have current ratings in CCASS.

Entities that have no past customers shall notify the KO in writing, prior to the date and time established for the RFP closing, that they have had no previous clients and that the minimum number of questionnaires cannot be provided. It is the contractor’s responsibility to ensure that the reference documentation is provided, as the Government may not make additional requests for past performance information from the references. The evaluation form shall be provided to the Contract Specialist directly from the reference. Do not request past performance questionnaires on projects that have final CCASS evaluations. If a past performance questionnaire is received on a project where a final CCASS evaluation exists, the CCASS evaluation will serve as the official rating of record for evaluation purposes.

d. The Government may contact references provided as part of Factor 1 – Specialized Experience, for information regarding the Offeror’s past performance on the project and for the purposes of assessing and verifying the scope of the work performed.

Offerors should provide accurate, current, and complete contact information for references provided in the project descriptions.

e. The Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other sources not provided by the offeror.

f. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

5.3.2 Joint Venture Submission Requirements. Offerors submitting proposals as a Joint Venture (JV) shall obtain a DUNS number and be registered in the CCR as the offering Joint Venture. The Offeror must provide three (3) to five

(5) "recent", "relevant" projects performed by the JV that reflect the JV's ability to perform the

00 22 11 - 8 work required in this solicitation as required by paragraph 5.1 “Specialized Experience”.

a. If the Offeror cannot provide a sufficient number of projects as the JV to meet the minimum requirement, the Offeror must provide those "recent", "relevant" projects that it has performed as the JV, and then supplement the record with additional "recent", "relevant" projects performed by each JV member in their individual capacities. In such instance, each JV member must satisfy the minimum requirement of three (3) projects, to include any performed as the JV.

b. If the JV has no "recent", "relevant" projects performed by the JV, then each member of the JV must provide three (3) to five (5) "recent", "relevant" projects performed by the JV member that reflect the JV member's ability to perform the work required in this solicitation as required by paragraph 5.1 “Specialized Experience”.

c. In addition to the examples of "Company Specialized Experience" and "Past Performance Surveys", the Joint Venture shall provide a brief narrative (not to exceed 1 page) stating the roles that each partner of the Joint Venture will perform on this project. The attached "Specialized Experience" and "Past Performance Survey" forms shall be used by the Joint Venture or the JV partners. Explain how the JV is structured.

d. Verification: The Government reserves the right to verify the experience record of cited projects or other recent projects not submitted by reviewing the Past Performance Information Retrieval System (PPIRS, or other Government appraisal systems or to interview owner or references. The Government may check any or all cited references to verify supplied information. An Offeror will be afforded the opportunity to reply to or explain adverse performance information to which the Offeror has not previously had an opportunity to address.

5.3.3 Evaluation Criteria:

The Government will review all CPARS, ACASS, CCASS evaluations regardless of project and past performance questionnaires for projects submitted under Factor 1. The Government may contact points of contacts listed on the “Experience Information” forms submitted under Factor 1. Offerors must demonstrate the following minimum acceptability standards:

All past or current references must have overall ratings of satisfactory or above.

FAR 15.101-2(b)(1) requires if the KO determines that a small business' past performance is not acceptable, the matter is referred to the SBA for a COC determination.

Failure to demonstrate the minimally acceptable criteria under this factor will result in an “Unacceptable” rating and elimination from further consideration for contract award. In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305(a)(2)(iv)). Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability “unknown” shall be considered “acceptable”.

6.0 VOLUME 2 – PRICEPROPOSAL

6.1 GENERAL.

Submit the Price Proposal (Volume 2) in a separate envelope labeled “Volume 2 – Price Proposal”.

00 22 11 - 9

6.2 SUBMISSION REQUIREMENTS.

a. Volume 2, TAB 1: Proposal Cover Sheet. The proposal cover sheet is required by FAR 52.215-1(2) (c)(i)-(v) and must be submitted by all Offerors. This provision, titled “Instructions to Offerors—Competitive Acquisition,” and the format for the proposal cover sheet as shown here:

b. Volume 2, TAB 2: SF1442. The SF1442 is to be completed by all Offerors and duly executed with an original signature by an official authorized to bind the company in accordance with FAR 4.102. Provide Signed SF1442 with all amendments acknowledged by all Offerors in accordance with the instructions on the Standard Form 30, Amendment of Solicitation.

c. Volume 2, TAB 3: FACTOR 4 – PRICING SCHEDULE. Section 00 11 00, Pricing Schedule, is to be completed in its entirety by all Offerors. See Section 00 11 00 with attached notes, for further instructions. Include price breakdown information behind the Pricing Schedule.

d. Volume 2, TAB 4: Bid Guarantee. Provide a fully executed Bid Bond as required by FAR Clause 52.228-1, Bid Guarantee.

e. Volume 2, TAB 5: Representations and Certifications: All Offerors must have electronically completed the annual representations and certifications on the “Online Representations and Certifications Application” (ORCA) website or respond with the completed representations/certifications found in the solicitation. The Offerors are responsible for ensuring that these on-line Representations and Certifications are updated as necessary to reflect changes, but at least annually to ensure that they are kept current, accurate and complete. Additionally, the Offeror must also complete and return the “Representations, Certifications, and Other Statements of Offerors” included in the solicitation. If the Offeror is a Joint Venture, all participants must separately complete both the ORCA Representations and Certifications.

f. Volume 2, TAB 6: Joint Venture Agreement (if applicable): If the Offeror is a Joint Venture (JV), include a copy of the JV Agreement. If a JV Agreement has not yet been finalized/approve, indicate its status. JV Agreements must clearly indicate the percentage of the JV participants, in particular the percent of the controlling party, and a clear delineation of responsibilities and authorities between the JV parties.

Solicitation Number:

The name, address, and telephone and facsimile numbers of the Offeror (and electronic address ifavailable):

Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this solicitation:

Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previouslyfurnished to the issuing office.

Tax Identification number ofOfferor.

00 22 11 - 10

6.3 EVALUATION CRITERIA.

a. The Price Proposal will not be rated or scored but will be evaluated for completeness, fairness, and reasonableness through the use of a price analysis. The price evaluators will also check for appearance of unbalanced line item prices. Firms are cautioned to distribute direct costs, such as material, labor, equipment, subcontracts, etc. and to evenly distribute indirect costs, such as job overhead, home office overhead, bond, etc., to the appropriate contract line items. Both parties shall presume that field overhead costs through the proposed contract duration are inclusive in the offered price for the contract.

b. If deemed necessary, the supplemental price breakdown information will be used to assist the Government in performing the price evaluations described above.

c. Award cannot be made for project cost for construction exceeding the cost amount authorized by

Congress.

7.0 EVALUATIONPROCEDURES

7.1 SOURCE SELECTION EVALUATION BOARD (SSEB).

The SSEB will be established to conduct the evaluation of proposals received in response to this solicitation. The evaluation will be based on the content of the proposal and any subsequent discussions required, as well as information obtained from other sources, e.g. past performance information. The SSEB will not consider any information incorporated by reference, except as expressly allowed by this solicitation.

7.2 EVALUATION.

a. The SSEB will evaluate the proposals and assign a consensus rating for each evaluation factor), except that performance risk ratings are assigned to past performance (see below).

*AM3 DELETED ITEM c. AM3*

00 22 11 - 11

b. The Government intends to award without discussions. Firms are cautioned to put forth their best efforts, and to furnish all information clearly to allow the Government to evaluate proposals. Firms should not assume that they will have an opportunity to clarify or correct anything in their proposal after submitting it.

c. A “Competitive Range” is a subjective determination of the most highly rated proposals in the event that the Government decides that discussions with competing firms are required or are considered to be in the Government’s best interests. In such an event, the Contracting Officer will establish a competitive range of all the most highly rated proposals.

d. If discussions are held, the Government may engage in a broad give and take with those firms in the competitive range, in accordance with FAR 15.306 (d). The Government will provide the Firm an advance agenda for the discussions. During discussions, the Government may ask the Firm to further explain its proposal and to answer questions about it.

e. Upon conclusion of discussions, those firms still in the competitive range, will be afforded an opportunity to submit their proposal revisions for final evaluation and selection.

7.3 GENERAL TECHNICALCRITERIA.

a. Material omission(s) may cause the technical proposal to be rejected as unacceptable.

b. Proposals which are generic, vague, or lacking in detail may be considered unacceptable. The offeror’s failure to include information that the Government has indicated should be included may result in the proposal being found deficient if inadequate detail is provided.

c. The Government cannot make award based on a deficient offer. Therefore, receipt of an “UNACCEPTABLE” determination of acceptability for any factor will make the offer ineligible for award, unless the Government elects to enter into discussions with that Offeror and all deficiencies are remedied in a revised proposal. Note: It is the Government’s intent to award withoutdiscussions.

00 22 11 - 12

Replace Bulk Diesel System McAlester AAP, OK

ATTACHMENT 1

EXPERIENCE INFORMATION

(To be completed by Contractor)

1. Contractor:

Name:

Address:

2. Contract /Task Order(TO) /Purchase Order (PO) Number:

3. Contract/TO/PO Dollar Value:

4. Contract/TO/PO Status: Active Complete Completion Date (w/ extensions):

5. Project Title:

Location:

6. Project Description-- to include the role of the contractor on the project and specific responsibilities of the contractor in performance of the effort:

7. How is the project (above) relevant to the project contained in the RFP?

8. Project Owner or Project Manager for the Client – provide:

Name:

Address:

Telephone Number and E-mail:

00 22 11 - 13

ATTACHMENT 2

NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)

CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information Firm Name: CAGE Code:

Address: DUNs Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other(Explain) Percent of project workperformed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Pleasespecify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS.

CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS

FORM.

00 22 11 - 14

McAlester AAP, OK

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming whichimpacted the Government/Owner.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactoryrating.

(N) Not Applicable

No information or did not apply to your contract

Rating will be neither positive nor negative.

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

00 22 11 - 15

TO BE COMPLETED BYCLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHI CH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY:

a) Quality of technical data/report preparation efforts E VG S M U N

b) Ability to meet quality standards specified for technical performance E VG S M U N

c) Timeliness/effectiveness of contract problemresolution without extensive customer guidance E VG S M U N

d)…