_AM2_Binder_McAAP_Diesel.pdf
PDF 6 MB Posted
- Attached to
- McAAP Bulk Diesel Facility Federal contract opportunity
- Solicitation number
- w912bv19r0040
About this file
Amendment 0002 Binder McAAP Diesel
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912BV19R0040_0005.pdf | ||
| _AM4_Binder_McAAP_Bulk_Diesel.pdf | ||
| W912BV19R0040_0004.pdf | ||
| _AM3_Binder_MCAAP_Diesel.pdf | ||
| W912BV19R0040_0003.pdf | ||
| W912BV19R0040_0002.pdf | ||
| W912BV19R0040_P1.pdf | ||
| AM1_Binder_McAAP_Diesel_Storage.pdf | ||
| W912BV19R0040_VOL_2_Plans.pdf | ||
| Visit_Request_MF190-20.pdf | ||
| W912BV19R0040_VOL_1_Specifications_(1).pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT 0002 W912BV19R0040 REPLACE BULK DIESEL SYSTEM MCALESTER AAP,
OKLAHOMA
1. The revised/new sections/appendices/pages listed below are hereby added to or revised and made a part of the solicitation. Revised or added/deleted information can be located in the specifications by searching for an asterisk and amendment number (i.e., *AM2).
REVISED/NEW SECTIONS/APPENDICES
01 01 00 TABLE OF CONTENTS (Updated) 01 11 00 SUMMARY OF WORK (Added Section) REGISTER SUBMITTAL REGISTER (Updated) 02 41 00 DEMOLITION (Revised Section) 22 00 00 PLUMBING (Added Section) 23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS (Added Section)
2. Delete the following sections in their entirety:
DELETED SECTIONS
N/A
3. The revised drawings listed below are hereby added to or revised and made a part of the solicitation.
REVISED DRAWINGS
SITE/CIVIL
CS101 CIVIL SITE PLAN - AREA 1
CS401 ENLARGED AREA - FILLSTAND / OFFLOAD
MECHANICAL
M-505 MECHANICAL DETAILS - SHEET 3 OF 3
ELECTRICAL
EP102 TANK AREA POWER PLAN
EP602 ELECTRICAL PANEL SCHEDULE
EP605 CONDUIT AND CONDUCTOR SCHEDULES
-- END CONTINUATION SHEET --
i
00 73 46 WAGE DETERMINATION (Updated/Revised)
00 01 10 (TABLE OF CONTENTS) - 1
SPECIFICATIONS FOR CONSTRUCTION OF
REPLACE BULK DIESEL SYSTEM
DESC18S2
MCALESTER AAP, OKLAHOMA
PROJECT TABLE OF CONTENTS
TECHNICAL VOLUME 1 OF 2 – DIVISIONS 00 -22
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
01 01 10 PROJECT TABLE OF CONTENTS
00 01 15 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 30 01 OTHER ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
REGISTER SUBMITTAL REGISTER
01 33 29 SUSTAINABILITY REPORTING
01 33 29-A HPSB – GUIDING PRINCIPLES COMPLIANCE WORKSHEET CHECKLIST
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 35 29.13 HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES FOR
CONTAMINATED SITES
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS 3.0
CM)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL
01 58 00 PROJECT IDENTIFICATION
01 58 00AT PROJECT SAFETY SIGN
01 60 00.00 50 MATERIAL AND EQUIPMENT
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 00ATA INITIAL RED ZONE MEETING CHECKLIST
01 78 00ATB DD1354 CHECKLIST FOR PROJECT CLOSEOUT
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 23.33 OPERATION AND MAINTENANCE MANUALS FOR AVIATION FUEL
SYSTEMS
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS
Revised in Accordance with Am #0002
00 01 10 (TABLE OF CONTENTS) - 2
02 82 00 ASBESTOS REMEDIATION
02 83 00 LEAD REMEDIATION
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 05 - METALS
05 05 23.16 STRUCTURAL WELDING
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
DIVISION 09 - FINISHES
09 90 00 PAINTS AND COATINGS
09 97 13.27 EXTERIOR COATING OF STEEL STRUCTURES
DIVISION 10 - SPECIALTIES
10 44 16 FIRE EXTINGUISHERS
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 METAL BUILDING SYSTEMS AND CANOPY
00 01 10 (TABLE OF CONTENTS) - 3
TECHNICAL VOLUME 2 OF 2 – DIVISIONS 23 -33
DIVISION 22 – PLUMBING
22 00 00 PLUMBING
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 32 14.00 10 DIESEL-GENERATOR SET, STATIONARY 15-300 KW, STANDBY
APPLICATIONS
26 41 00 LIGHTNING PROTECTION SYSTEM
26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 21 GEOGRID SOIL REINFORCEMENT
31 05 22 GEOTEXTILES USED AS FILTERS
31 63 29 DRILLED CONCRETE PIERS AND SHAFTS
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID
PAVEMENTS
32 11 20 BASE COURSE FOR RIGID PAVING
00 01 10 (TABLE OF CONTENTS) - 4
32 13 13.03 CONCRETE PAVEMENT
32 15 00 AGGREGATE SURFACING
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 31 13.53 CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
DIVISION 33 - UTILITIES
33 01 50.60 CLEANING OF PETROLEUM STORAGE TANKS
33 05 23 TRENCHLESS UTILITY INSTALLATION
33 08 55 COMMISSIONING OF FUEL FACILITY SYSTEMS
33 09 52 FUEL PUMP CONTROL AND ANNUNCIATION SYSTEM (NON-
HYDRANT)
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 40 00 STORM DRAINAGE UTILITIES
33 46 16 SUBDRAINAGE PIPING
33 52 43.13 AVIATION FUEL PIPING
33 52 43.14 AVIATION FUEL CONTROL VALVES
33 56 10 FACTORY-FABRICATED FUEL STORAGE TANKS
33 57 55 FUEL SYSTEM COMPONENTS (NON-HYDRANT)
33 58 00 LEAK DETECTION FOR FUELING SYSTEMS
33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
"General Decision Number: OK20190071 03/22/2019
Superseded General Decision Number: OK20180071
State: Oklahoma
Construction Type: Building
Building Construction -does not include residential construction consisting of single family homes and apartments up to and including 4 stories. (Including building projects on treatment plants)
Counties: Coal, Garvin, Haskell, Hughes, Latimer, Marshall, McCurtain, Pittsburg, Pontotoc, Pottawatomie, Pushmataha and
Seminole Counties in Oklahoma.
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January
1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year
2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is
Page 1 of 13beta.SAM.gov
7/25/2019https://beta.sam.gov/wage-determination/OK20190071/1/document
*AM2 General Decision Updated for additional Job categories AM2*
00 73 46 - Page 1 higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the
Davis-Bacon Related Acts, including those set forth at 29 CFR
5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/04/2019
1 03/22/2019
BOIL0592-001 01/01/2017
Rates Fringes
BOILERMAKER......................$ 28.47 21.88
ELEC0301-006 06/01/2017
MCCURTAIN COUNTY ONLY
Rates Fringes
ELECTRICIAN......................$ 23.80 10.85
ELEC0301-007 06/01/2017
MCCURTAIN COUNTY ONLY
Rates Fringes
ELECTRICIAN (Low Voltage
Wiring, Alarm Installation, Page 2 of 13beta.SAM.gov
7/25/2019https://beta.sam.gov/wage-determination/OK20190071/1/document
00 73 46 - Page 2 and Sound and Communications
Systems Installation Only).......$ 23.80 10.85
ELEC0584-013 05/28/2018
COAL, HASKELL, HUGHES, LATIMER, PITTSBURG AND PUSHMATAHA
COUNTIES ONLY
Rates Fringes
ELECTRICIAN (Low Voltage
Wiring, Alarm Installation, and Sound and Communications
Systems Installation Only).......$ 30.43 7%+9.70
ELEC0584-016 05/28/2018
COAL, HASKELL, HUGHES, LATIMER, PITTSBURG AND PUSHMATAHA
COUNTIES ONLY
Rates Fringes
ELECTRICIAN......................$ 30.43 7%+9.70
ELEC1141-015 05/28/2018
GARVIN, MARSHALL, PONTOTOC, POTTAWATOMIE AND SEMINOLE COUNTIES
Rates Fringes
ELECTRICIAN......................$ 32.60 17.25%+5.60
ELEC1141-019 06/01/2018
GARVIN, MARSHALL, PONTOTOC, POTTAWATOMIE AND SEMINOLE COUNTIES
Page 3 of 13beta.SAM.gov
00 73 46 - Page 3
Rates Fringes
ELECTRICIAN (Low Voltage
Wiring, Alarm Installation, and Sound and Communication
Systems Installation Only).......$ 19.86 15.5%+5.60
ENGI0627-018 06/01/2018
Rates Fringes
POWER EQUIPMENT OPERATOR:
Group 1.....................$ 29.70 13.58
Group 2.....................$ 28.00 13.58
Group 3.....................$ 27.45 13.58
Group 4.....................$ 26.65 13.58
Group 5.....................$ 26.15 13.58
Group10.....................$ 21.70 13.58
POWER EQUIPMENT OPERATOR
GROUP 1: All Crane Type Equipment 200 ton and larger and including 400 ton capacity cranes. All Tower Cranes.
GROUP 2: All Crane Type Equipment 100 ton capacity and larger cranes, and less than 200 ton capacity.
GROUP 3: All Crane Type Equipment 50 ton capacity and larger, and less than 100 ton capacity. Crane Equipment (as rated by mfg.) 3 cu. yd. and over Guy derrick Whirley Power
Driven Hole Digger (with 30' and longer mast).
GROUP 4: CRANES with Boom Incl. Jib less than 100 ft and less than 3 cu. Yd.; Overhead Monorail Crane.
GROUP 5: BULLDOZER
GROUP 10: OILER
Page 4 of 13beta.SAM.gov
00 73 46 - Page 4
IRON0048-013 06/01/2018
GARVIN, MARSHALL, PONTOTOC, POTTAWATOMIE AND SEMINOLE COUNTIES
ONLY
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 25.00 15.25
IRON0584-024 06/01/2018
COAL, HASKELL, HUGHES, LATIMER, MCCURTAIN, PITTSBURG AND
PUSHMATAHA COUNTIES ONLY
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 25.00 15.25
* PLUM0344-015 07/01/2018
COAL, GARVIN, HUGHES, MARSHALL, PONTOTOC, POTTAWATOMIE,
PUSHMATAHA AND SEMINOLE COUNTIES
Rates Fringes
PIPEFITTER (Including
Installation of HVAC
Electrical/Temperature
Controls and HVAC Pipe
Installation)....................$ 32.23 15.37
* PLUM0344-018 07/01/2018
Page 5 of 13beta.SAM.gov
00 73 46 - Page 5
COAL, GARVIN, HUGHES, MARSHALL, PONTOTOC, POTTAWATOMIE,
PUSHMATAHA AND SEMINOLE COUNTIES
Rates Fringes
PLUMBER (Excludes HVAC Pipe
Installation)....................$ 32.23 15.37
PLUM0430-015 07/01/2018
HASKELL, LATIMER, MCCURTAIN AND PITTSBURG COUNTIES
Rates Fringes
PIPEFITTER (Including
Installation of HVAC
Electrical/Temperature
Controls and HVAC Pipe
Installation)....................$ 31.50 13.88
PLUM0430-018 07/01/2018
HASKELL, LATIMER, MCCURTAIN AND PITTSBURG COUNTIES
Rates Fringes
PLUMBER (Excludes HVAC Pipe
Installation)....................$ 31.50 13.88
SHEE0124-013 07/01/2017
COAL, GARVIN, HUGHES, MARSHALL, PONTOTOC, POTTAWATOMIE AND
SEMINOLE COUNTIES ONLY
Page 6 of 13beta.SAM.gov
00 73 46 - Page 6
Rates Fringes
SHEET METAL WORKER (Including
HVAC Duct Installation)..........$ 31.00 15.32
SHEE0270-007 06/01/2017
HASKELL, LATIMER, MCCURTAIN, PITTSBURG AND PUSHMATAHA COUNTIES
ONLY
Rates Fringes
SHEET METAL WORKER (Including
HVAC Duct Installation)..........$ 31.89 14.31
SUOK2012-051 06/18/2012
Rates Fringes
BRICKLAYER.......................$ 20.00 0.00
CARPENTER (Acoustical Ceiling
Installation Only)...............$ 16.24 0.00
CARPENTER (Drywall Hanging
Only)............................$ 14.96 0.00
CARPENTER, Excludes
Acoustical Ceiling
Installation, Drywall
Hanging, and Form Work...........$ 16.82 2.82
CEMENT MASON/CONCRETE FINISHER...$ 14.50 0.00
FLOOR LAYER (Hardwood and
Carpet)..........................$ 18.74 1.10
Page 7 of 13beta.SAM.gov
00 73 46 - Page 7
FORM WORKER......................$ 16.79 3.12
GLAZIER..........................$ 15.27 1.46
LABORER: Common or General......$ 11.43 0.00
LABORER: Mason Tender - Brick...$ 12.00 0.00
LABORER: Mason Tender -
Cement/Concrete..................$ 13.04 0.00
LABORER: Pipelayer..............$ 11.65 0.00
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 16.83 0.00
OPERATOR: Forklift..............$ 18.02 0.00
PAINTER: Brush, Roller and
Spray............................$ 12.32 0.00
ROOFER...........................$ 15.00 0.29
SPRINKLER FITTER (Fire
Sprinklers)......................$ 21.52 6.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this
Page 8 of 13beta.SAM.gov
00 73 46 - Page 8 contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or
""UAVG"" denotes that the union classification and rate were
Page 9 of 13beta.SAM.gov
00 73 46 - Page 9 prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Page 10 of 13beta.SAM.gov
00 73 46 - Page 10
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
Page 11 of 13beta.SAM.gov
00 73 46 - Page 11
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
Page 12 of 13beta.SAM.gov
00 73 46 - Page 12
END OF GENERAL DECISION"
Page 13 of 13beta.SAM.gov
00 73 46 - Page 13
Replace Bulk Diesel System, DESC18S2, McAlester AAP, Oklahoma OK21
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1.1 SUBMITTALS
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
1.2.2 Location
1.3 EXISTING WORK
1.4 LOCATION OF UNDERGROUND UTILITIES
1.4.1 Notification Prior to Excavation
1.5 SALVAGE MATERIAL AND EQUIPMENT
1.6 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
1.7 ANTITERRORISM (AT)/OPERATIONS SECURITY (OPSEC) PROVISIONS
1.8 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
1.9 BASE HOURS
1.10 FEDERAL HOLIDAYS
1.11 SECURITY REQUIREMENTS
1.11.1 Contractor's Employee Identification
1.11.2 Entry/Security Requirements
1.12 PERMITS AND REPSONSIBILTIES
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 11 00 Page 1 New Section Added Am #0002
SECTION 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals Salvage Plan; G, RO
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The work includes demolition and replacement of the existing bulk Diesel facility. The removal portion of this project will include removal of 1 bulk API fuel storage tank; removal of 4 STI fuel storage tanks; removal of 1 truck offload facility; removal of 1 truck fillstand facility; removal of 2 pumphouses; removal of a POL operations building; removal of all aboveground associated piping and appurtenances; and removal of underground issue piping. The replacement portion of this project will include 3 new 50,000 gallon UL 2085 factory fabricated fuel tanks; new truck offload facility; new truck fillstand facility; and a new POL building. Support facilities will include storm water management and spill containment systems. .
1.2.2 Location
The work is located at the McAlester Army Ammunition Plant (MCAAP), Oklahoma.
1.3 EXISTING WORK
In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
1.4 LOCATION OF UNDERGROUND UTILITIES
Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.
See paragraph PERMITS AND RESPONSIBILITES below. Verify existing utility
SECTION 01 11 00 Page 2 locations indicated on contract drawings, within area of work.
1.4.1 Notification Prior to Excavation
Notify the Contracting Officer at least 15 days prior to starting excavation work.
[][]1.5 SALVAGE MATERIAL AND EQUIPMENT
Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Use a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.
1.6 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
Note: Copies of each regional schedule may be obtained through the following Internet site:
http://www.publications.usace.army.mil/USACEPublications/EngineerPamphlets.aspx.
Currently the "Construction Equipment Ownership and Operating Expense Schedule" can be accessed on page 11 of 14 of the afore indicated URL.
Standard Form 1411 is no longer a current form. The Contracting Officer may require submission of cost or pricing data in the format indicated in Table 15-2 of FAR 15.408, specify an alternative format, or permit submission in the contractor’s format. Information other than cost or pricing data may be submitted in the contractor’s own format unless the use of a specific format is prescribed elsewhere in this contract.
(a) This clause does not apply to terminations. See paragraph: Basis for Settlement of Proposals below and FAR Part 49.
(b) Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a Contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the Contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series of equipment from the Contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of EP 1110-1-8, "Construction Equipment Ownership and Operating Expense Schedule," Region VI. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the Contracting Officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be developed using the formula provided in the schedule. For forward pricing, the Schedule in effect at the time of negotiations shall apply. For retrospective pricing, the Schedule in effect at the time the work was performed shall apply.
(c) Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements will be determined using the schedule, except that actual rates will be used for equipment leased from an organization
SECTION 01 11 00 Page 3 under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.
(d) When actual equipment costs are proposed and the total amount of the pricing action exceeds the small acquisition threshold (SAT), the contracting officer shall request the contractor to submit either certified cost or pricing data, or partial/limited data as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.
1.7 ANTITERRORISM (AT)/OPERATIONS SECURITY (OPSEC) PROVISIONS
1. AT Level I Training
All Contractor employees, to include subcontractor employees, requiring access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website:
http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the RA ATO in presentation form which will be documented via memorandum.
2. Access and General Protection/Security Policy and Procedures
All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
2b. for Contractors Who Do Not Require CAC, But Require Access To A Dod Facility Or Installation
Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
3. Not Used
SECTION 01 11 00 Page 4
4. Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something)
The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
5. Contractor Employees Who Require Access to Government Information Systems.
Not Applicable
6. OPSEC Standing Operating Procedure/Plan
OPSEC Plan can be as simple as a document that spells out how the contractor will protect the sensitive information given to him to accomplish the contract or any sensitive information gathered in the course of accomplishing the contract. This should include how documents/data will be stored when not in use and who will control them. We need some deliverable assurances that either what we give to the contractor or what they gather as work product that is of a sensitive nature is protected.
7. OPSEC Training
All new contractor employees will complete Level I OPSEC Training within 30 calendar days of their reporting for duty. Additionally, all contractor employees must complete annual OPSEC awareness training. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training.
OPSEC awareness training is available at the following websites:
https://www.iad.gov/ioss/ or http://www.cdse.edu/catalog/operations-security.html; or it can be provided by the RA OPSEC Officer in presentation form which will be documented via memorandum.
8. Information Assurance (IA)/Information Technology (IT) Training
Not Applicable
9. Information Assurance (IA)/Information Technology (IT) Certification
Not Applicable
10. Not Used
11. Not Used
12. Handling or Access to Classified Information.
Not Applicable
13. Will be Escorted in Areas Where They May be Exposed to Classified and/or Sensitive Materials and/or Sensitive or Restricted Areas
SECTION 01 11 00 Page 5
All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
14. Contractor Company to Obtain a Facility Clearance and Individual Clearances at the Appropriate Level
Not Applicable.
15. Pre-Screen Candidates using E-Verify Program
The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.
16. Required Armed Security Guards
Not Applicable
17. Threat Awareness Reporting Program (TARP) Training
Not Applcable.
1.8 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
a. This clause specifies the procedure for the determination of time extensions for unusually severe weather in accordance with the GENERAL CONDITIONS (CONTRACT CLAUSES) clause entitled "Default: (Fixed-Price Construction)." In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:
(1) The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.
(2) The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the contractor.
b. The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY
WORK DAYS BASED ON (5) DAY WORK WEEK
Jan - 7 Feb - 7
SECTION 01 11 00 Page 6
Mar - 6 Apr - 8 May - 9 Jun - 7 Jul - 6 Aug - 6 Sep - 6 Oct - 6 Nov - 5 Dec - 7
c. Upon acknowledgment of the Notice to Proceed (NTP) and continuing throughout the contract, the contractor will record on the RMS daily CQC report, any occurrence of adverse weather and resultant impact to normally scheduled work, within 24 hours of the event. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the contractor's scheduled work day. Describe in the RMS daily CQC reports the critical path item that is being affected and provide the critical path activity number(s) from the current schedule. The COR must acknowledge and accept the agreed upon occurrence of each adverse weather delay in RMS for the delays to be considered as adverse weather delays.
At the end of each month, identify the number of actual adverse weather delay days that includes days impacted by actual adverse weather (even if adverse weather occurred in previous month), calculated chronologically from the first to the last day of each month, and recorded as full days.
If the number of actual adverse weather delay days exceeds the number of days anticipated in paragraph b. above, the Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work days, and issue a modification in accordance with the GENERAL CONDITIONS (CONTRACT CLAUSES) clause entitled "Default (Fixed Price Construction)". (ER 415-1-15)
1.9 BASE HOURS
Normal installation hours are 6:00 a.m. to 4:30 p.m. (local time), Monday through Thursday, excluding federal holidays. Schedule work hours around installation working hours. Access to the base during other times must be requested in writing from the Contracting Officer and will be granted only for extenuating circumstances. Federal Holidays and weekends are considered as scheduled non-workdays.
1.10 FEDERAL HOLIDAYS
The following Federal legal holidays are observed by this installation:
New Year's Day 1 January Martin Luther King's Birthday Third Monday in January President's Day Third Monday in February Memorial Day Last Monday in May Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December
If a wage determination applies the number of holidays specified on it, it
SECTION 01 11 00 Page 7 has priority over this requirement.
1.11 SECURITY REQUIREMENTS
1.11.1 Contractor's Employee Identification
The Contractor shall be responsible for furnishing to each employee and for requiring each employee engaged on the work to display such identification as may be approved and directed by the Contracting Officer. All prescribed identification shall immediately be delivered to the Contracting Officer, for cancellation upon release of any employees. When the contract involves work in restricted security areas, only employees who are U.S. citizens will be permitted to enter. Proof of U.S. citizenship is required prior to entry. When required by the Contracting Officer, the Contractor shall obtain and submit fingerprints of all persons employed or to be employed on the project. (Based on FAR 52.204-2)
1.11.2 Entry/Security Requirements
McCalester Amy Ammunition Plant (MCAAP) is a closed post and positive ID is required for access to the installation. Positive ID's include but are not limited to the following, permanent MCAAP badges, MCAAP visitor badges, Common Access Cards (CAC), military dependent ID's, and Disabled American Veterans (DAV) cards. A current valid driver's license* is required to drive on to installation. *Contractor is responsible to adhere to the Real ID Act, or any other DOD security requirement(s), when applying for access to the installation, for all prime and subcontracted employees. See https://www.dhs.gov/real-id-enforcement-brief for states with Real ID Act compliant driver's license and other identification.
1.12 PERMITS AND REPSONSIBILTIES
In addtion to the requirements of Contact Clause "Permits and Responsibilities" for line locate notifications, notify Installation primary POC (Nathan Osborne) 72 Hours in advance. Notice must be given 3 working days ahead of scheduled work. Hot work permits will be issued by fire department POC James Breedlove 918-420-6543.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 8
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 60 PAGES
Replace Bulk Diesel System, DESC18S2, McAlester AAP, Oklahoma
01 11 00 SD-01 Preconstruction Submittals
1.5 G ROSalvage Plan
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 G ROProject Scheduler Qualifications
3.4.1 G ROPreliminary Project Schedule
3.4.2 G ROInitial Project Schedule
3.6.2 G ROPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.8 G ROSubmittal Register
01 33 29 SD-01 Preconstruction Submittals
1.4.1 G DOSustainability Action Plan
SD-11 Closeout Submittals
1.5.2.1 G ROFinal High Performance and
Sustainable Building Checklist
1.5.2.1 G ROFinal Sustainability eNotebook
1.5.2.1 G ROAmended Final Sustainability
eNotebook
1.5.2.1 G ROAmended Final High
Performance and Sustainable Building Checklist
01 35 26 SD-01 Preconstruction Submittals
1.7 G ROAccident Prevention Plan (APP)
SD-06 Test Reports 1.4Monthly Exposure Reports 1.12Notifications and Reports
1.12.2 G ROAccident Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 60 PAGES
01 35 26 1.12.3LHE Inspection Reports SD-07 Certificates
1.6.1.4Crane Operators/Riggers
1.7.2.2 G ROStandard Lift Plan
1.7.2.3 G ROCritical Lift Plan
1.8Activity Hazard Analysis (AHA) 1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit 1.12.4Certificate of Compliance 1.14License Certificates
1.14.1 G RORadiography Operation Planning
Work Sheet
1.14.1 G ROPortable Gauge Operations
Planning Worksheet 01 35 29.13 SD-02 Shop Drawings
3.8.1 G ROWork Zones
3.9.1 G RODecontamination Facilities
SD-03 Product Data 1.4Amendments to the APP/SSHP 3.4Exposure Monitoring/Air
Sampling Program 3.8.2Site Control Log 1.8SSHO's Daily Inspection Logs
SD-07 Certificates 1.7Certificate Of Worker/Visitor
Acknowledgement
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 60 PAGES
01 35 29.13 SD-11 Closeout Submittals 1.9Safety And Health Phase-Out
Report 01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 G ROContractor Quality Control (CQC)
Plan
SD-06 Test Reports 3.10.2Verification Statement
01 50 00 SD-01 Preconstruction Submittals
1.3 G ROConstruction Site Plan
3.4.1 G ROTraffic Control Plan
2.2.1 G ROHaul Road Plan
SD-07 Certificates 1.4.1Backflow Tester 1.4Backflow Preventers
01 57 19 SD-01 Preconstruction Submittals 1.5.1Preconstruction Survey
1.9 G ROSolid Waste Management Permit
1.5.2 G RORegulatory Notifications
1.6 G ROEnvironmental Protection Plan
3.2.1.2 G ROStormwater Notice of Intent
1.6.9.1 G RODirt and Dust Control Plan
1.5.5 G ROEmployee Training Records
1.5.4 G ROEnvironmental Manager
Qualifications SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 60 PAGES
01 57 19 3.7.1.1.2Laboratory Analysis 3.2.1.3Inspection Reports
3.7.2.1 G ROSolid Waste Management Report
SD-07 Certificates
1.5.5 G ROEmployee Training Records
SD-11 Closeout Submittals
3.2.1.4 G ROStormwater Pollution Prevention
Plan Compliance Notebook
3.2.1.5 G ROStormwater Notice of Termination
3.7.1 G ROWaste Determination
Documentation
3.7.3.6 G RODisposal Documentation for
Hazardous and Regulated Waste
1.5.5 G ROAssembled Employee Training
Records
1.9 G ROSolid Waste Management Permit
3.7.2.1 G ROSolid Waste Management Report
3.7.3.1 G ROHazardous Waste/Debris
Management
1.5.2 G RORegulatory Notifications
3.7.2.1 G ROSales Documentation
01 57 23 SD-07 Certificates 2.1.3Mill Certificate or Affidavit
01 74 19 SD-01 Preconstruction Submittals
1.7 G ROConstruction Waste Management
Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 60 PAGES
01 74 19 SD-06 Test Reports 1.9.2Quarterly Reports 1.9.3Annual Report
SD-11 Closeout Submittals
1.10 G ROFinal Construction Waste
Diversion Report 01 78 00 SD-03 Product Data
1.7.1Warranty Management Plan 1.7.5Warranty Tags 1.5Spare Parts Data
SD-08 Manufacturer’s Instructions 1.7.1Instructions
SD-10 Operation and Maintenance Data
3.6 G ROOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 G ROAs-Built Drawings
3.3 G RORecord Drawings
1.7.1As-Built Record of Equipment and Materials 3.5As-Built Record of Equipment and Materials 3.4Construction Contract
Specifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 60 PAGES
01 78 00 2.3 G ROCertification of EPA Designated Items
3.8.1 G ROInterim DD FORM 1354
3.8.2 G ROInterim DD FORM 1354
3.8.2 G ROInterim DD FORM 1354
3.8.1 G ROChecklist for DD FORM 1354
01 78 23 SD-10 Operation and Maintenance Data
1.4 G ROO&M Database
3.1.1 G ROTraining Plan
3.1.3 G ROTraining Outline
3.1.2 G ROTraining Content
SD-11 Closeout Submittals
3.1.4 G ROTraining Video Recording
3.1.6 G ROValidation of Training Completion
01 78 23.33 SD-10 Operation and Maintenance Data
2.1.1 G ROSystem Instructions
02 41 00 SD-01 Preconstruction Submittals
1.2.1 G RODemolition Plan
1.9Existing Conditions
SD-07 Certificates
1.6 G RONotification
SD-11 Closeout Submittals 3.3.4Receipts
02 81 00 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 60 PAGES
02 81 00 2.1.1Packaging Notifications
3.1 G ROHazardous Waste Management
Plan
3.2 G ROOnsite Hazardous Waste
Management 3.3Notices of Non-Compliance and
Notices of Violation SD-06 Test Reports
3.7 G RORecordkeeping
3.7 G ROException Report
3.8Spill Response
SD-07 Certificates
1.4.1 G ROTransportation and Disposal
Coordinator
1.4.2 G ROTraining
1.4.3Certification
3.3.3 G ROShipping Documents and
Packagings Certification 3.3.4Security Plan 3.3.5Certificates of Disposal 3.6Waste Minimization
02 82 00 SD-03 Product Data
1.2.2 G ROAmended Water
1.3.9 G ROSafety Data Sheets (SDS) for All
Materials
2.1 G ROEncapsulants
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 60 PAGES
02 82 00 3.1.2.1 G RORespirators
3.1.7 G ROLocal Exhaust Equipment
3.1.7 G ROPressure Differential Automatic
Recording Instrument
3.1.8 G ROVacuums
SD-06 Test Reports
1.5.5 G ROAir Sampling Results
1.5.6 G ROPressure Differential Recordings
for Local Exhaust System
3.2.5.5 G ROClearance Sampling
3.3.3.2 G ROAsbestos Disposal Quantity
Report SD-07 Certificates
1.3.4 G ROEmployee Training
1.3.5 G RONotifications
1.3.7 G RORespiratory Protection Program
1.3.10 G ROAsbestos Hazard Abatement
Plan
1.3.11 G ROTesting Laboratory
1.3.12 G ROLandfill Approval
1.3.12 G RODelivery Tickets
1.3.12 G ROWaste Shipment Records
1.3.13 G ROTransporter Certification
1.3.14 G ROMedical Certification
1.5.1 G ROPrivate Qualified Person
Documentation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 60 PAGES
02 82 00 1.5.2 G ROCompetent Person
1.5.3 G ROWorker's License
1.5.4 G ROContractor's License
1.5.7 G ROFederal, State or Local Citations
on Previous Projects
2.1 G ROEncapsulants
3.1 G ROEquipment Used to Contain
Airborne Asbestos Fibers
3.1.3.3 G ROWater Filtration Equipment
3.1.8 G ROVacuums
3.1.8 G ROVentilation Systems
SD-11 Closeout Submittals
1.3.5 G ROPermits and Licenses
1.3.5 G RONotifications
1.3.7.1 G RORespirator Program Records
1.7.1 G RORental Equipment
02 83 00 SD-01 Preconstruction Submittals
1.5.1.1 G ROCompetent Person
1.5.1.2 G ROTraining Certification
1.5.2.3 G ROOccupational and Environmental
Assessment Data Report
1.5.2.4 G ROMedical Examinations
1.5.2.8 G ROLead, Cadmium, Chromium
Waste Management Plan
1.5.3 G ROLicenses, Permits and
Notifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 60 PAGES
02 83 00 1.5.4 G ROOccupant Protection Plan
1.5.2.2 G ROLead, Cadmium, Chromium
Compliance Plan
3.4.1.1 G ROInitial Sample Results
3.5.2.1 G ROWritten Evidence of TSD
Approval SD-03 Product Data
1.6.1 G RORespirators
1.6.4 G ROVacuum Filters
1.6.7 G RONegative Air Pressure System
2.1 G ROMaterials and Equipment
2.1.1 G ROExpendable Supplies
SD-06 Test Reports
1.5.2.3 G ROOccupational and Environmental
Assessment Data Report
1.5.2.3 G ROSampling Results
SD-07 Certificates
1.5.1.3 G ROTesting Laboratory
1.5.1.4 G ROThird Party Consultant
Qualifications
3.5.1.1 G ROClearance Certification
SD-11 Closeout Submittals
3.5.2.1 G ROHazardous Waste Manifest
3.5.2.1 G ROTurn-In Documents or…