W912BV18Q0034P00002.pdf

PDF 26 KB Posted

Attached to
Tailrace Crane for RS Kerr Dam Federal contract opportunity
Solicitation number
W912BV18R0034
Issued by
Department of the Army Corps of Engineers Engineering District Tulsa

About this file

Modification to fix CLINs and extend the RFP date.

View the file

Other files for this federal contract opportunity

Other files attached to Tailrace Crane for RS Kerr Dam, newest first.
File Type Posted
Spec_Amendment.pdf PDF
W912BV18R0034_P00003.pdf PDF
Reference_Drawings.pdf PDF
W912BV18R0034P00001.pdf PDF
Attachment_3,_Drawings,_Tailrace_Crane.pdf PDF
AMRDEC_Instructions.pdf PDF
RSKerr_Tailrace_Crane_Specs_7-2-18.pdf PDF
AMRDEC_Instructions.pdf PDF
Drawings.pdf PDF
Attachment_4,_Additional_Drawings,_Tailrace_Crane.pdf PDF
CSS_Tailrace_Crane.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose for this modif ication is to correct CLINS 0001, 0007, 0008, 0009 and correct a typo on the RFP date. THE RFP DATE HAS BEEN

EXTENDED TO 17 OCT 2018 2:00 PM CST.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-Sep-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BV18R0034

X 9B. DATED (SEE ITEM 11)

24-Jul-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-Sep-2018

CODE

CONTRACTING DIV

US ARMY CORPS OF ENGINEERS, TULSA DISTRICT

2488 E. 81ST STREET

TULSA OK 74137-4290

W912BV 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912BV18R0034

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 13-Sep-2020 12:00 PM to 07-Oct-2018 02:00 PM.

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN type priced has been added.

The pricing detail quantity 1.00 has been added.

The unit of issue Job has been added.

The FOB Destination has been added.

The FSC code 3810 has been added.

The WSC Equipment code 000 has been added.

The NAICS code 333923 has been added.

The MDAP/MAIS Code 000 has been added.

CLIN 0003

The CLIN extended description has changed from:

Deliver and Offload costs shall consist of thetransport and deliver of gantry crane and lifting beam from the manufacturer to the project site.

To:

Deliver and Offload costs shall consist of thetransport and deliver of gantry crane and lifting beam from the manufacturer to the project site.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent..

CLIN 0004

Assembly costs shall consist of all material,equipment, and laborer costs for assembling the gantry crane and lifting beam. Costs shall also include mobilization of all equipment, material, field offices set up and field offices expenses, personnel oversight labor costs, personnel travel and per diem allowances for all personnel if applicable the project for the period of assembly work being performed.

Assembly costs shall consist of all material,equipment, and laborer costs for assembling the gantry crane and lifting beam. Costs shall also include mobilization of all equipment, material, field offices set up and field offices expenses, personnel oversight labor costs, personnel travel and per diem allowances for all personnel if applicable the project

W912BV18R0034

for the period of assembly work being performed.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent..

CLIN 0006

The pricing detail quantity has increased by 1.00 from 0.00 to 1.00.

The unit of issue Job has been added.

CLIN 0007

This CLIN has been renumbered to CLIN 0009.

Spare Parts costs shall consist of all material, deliverand offload, and laborer costs for purchasing spare parts.

Spare Parts costs shall consist of all material, deliverand offload, and laborer costs for purchasing spare parts.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent..

CLIN 0008

This CLIN has been renumbered to CLIN 0007.

CLIN 0009

This CLIN has been renumbered to CLIN 0008.

SECTION E - INSPECTION AND ACCEPTANCE

The Acceptance/Inspection Schedule for CLIN 0001 has been changed from:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A N/A

To:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

Destination Government Destination Government

(End of Summary of Changes)

File details come from the government source that posted it.