Solicitation

View the file

Other files

File Type Posted
W912BV-15-R-0093-0006.pdf PDF
W912BV-15-R-0093-0005.pdf PDF
W912BV-15-R-0093-0004.pdf PDF
W912BV-15-R-0093-0003a.pdf PDF
W912BV-15-D-0093-0002.pdf PDF
Site_Visit_Attendee_Sheet.pdf PDF
W912BV-15-D-0093-0001.pdf PDF
W912BV-15-R-0093_DWGS_8.pdf PDF
W912BV-15-R-0093_DWGS_2.pdf PDF
W912BV-15-R-0093_DWGS_6.pdf PDF
W912BV-15-R-0093_DWGS_4.pdf PDF
W912BV-15-R-0093_DWGS_3.pdf PDF
W912BV-15-R-0093_DWGS_5.pdf PDF
W912BV-15-R-0093_DWGS_7.pdf PDF
W912BV-15-R-0093_DWGS_1.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP NO: W912BV-15-R-0093

US Army Corps of Engineers Tulsa District

PMXG PLATING SHOP RENOVATION,

BUILDING 3001

WWYK150110

TINKER AIR FORCE BASE, OKLAHOMA

REQUEST FOR PROPOSAL

Prepared by:

September 2015

PLATING SHOP RENOVATION BUILDING 3001

US Army Corps of Engineers Tulsa District

Tinker Air Force Base Midwest City, OK

Solicitation Number: W912BV-15-R-0093 Contract Number:

Project Number: WWYK150110

Specifications

August 2015 Burns & McDonnell 9400 Ward Parkway

Kansas City, MO 64114

CERTIFICATION PAGE

CERTIFICATIONS')

ŝSSS ̂ te>l&f 15

8-29644 , C>8/ZA/I£

CIVIL ARCHITECTURAL STRUCTURAL

CERT.DOC SIC-1

Tinker AFB, OK B3001 Plating Shop Renovation

PROJECT TABLE OF CONTENTS Page 1

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 11 00 SF1442 AND PRICING (CLIN) SCHEDULE

00 21 00 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

00 22 11 PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA AND

BASIS OF AWARD

00 45 00 REPRESENTATIONS AND CERTIFICATONS

00 72 00 CONTRACT CLAUSES

00 73 00 SPECIAL CONTRACT REQUIREMENTS

00 73 46 WAGE DETERMINATIONS

DIVISION 01 – GENERAL REQUIREMENTS

01 04 00 COORDINATION, FIELD ENGINEERING, AND MEETINGS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 10 10 DIGITAL SUBMITTAL PROCEDURES AND CORRESPONDENCE

01 35 26.00 10 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)

01 45 01.00 10 USACE QUALITY CONTROL

01 50 02.00 10 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

01 57 20.01 10 ENVIRONMENTAL PROTECTION

01 58 00.00 10 BULLETIN BOARD, PROJECT SIGN, AND SAFETY SIGN

01 60 00.00 50 MATERIAL AND EQUIPMENT

01 62 35 RECYCLED/RECOVERED BIOBASED MATERIALS

01 70 00.00 10 CONTRACT CLOSEOUT

01 74 19 CONSTRUCTION AND DEOLITION WASTE MANAGEMENT

01 78 23 OPERATION AND MAITENANCE DATA

01 91 00.00 40 COMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

DIVISION 03 - CONCRETE

03 01 30.71 CONCRETE REHABILITATION

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00.00 10 CONCRETE ACCESSORIES

03 20 00.00 10 CONCRETE REINFORCING

03 30 00.00 10 CAST-IN-PLACE CONCRETE

03 35 00.00 10 CONCRETE FINISHING

03 39 00.00 10 CONCRETE CURING

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL

05 30 00 STEEL DECKS

05 50 13 MISCELLANEOUS METAL FABRICATIONS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 73 01 FIBERGLASS REINFORCED PLASTIC (FRP) GRATING

PROJECT TABLE OF CONTENTS Page 2

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 51 13 BUILT-UP ASPHALT ROOFING

07 60 00 FLASHING AND SHEET METAL

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 90 00 PAINTS AND COATINGS

09 96 00 HIGH-PERFORMANCE COATINGS

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

22 31 00 WATER SOFTENERS, CATION-EXCHANGE (SODIUM CYCLE)

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 08 01.00 20 TESTING INDUSTRIAL VENTILATION SYSTEMS

23 35 19.00 20 INDUSTRIAL VENTILATION AND EXHAUST

23 64 23 SCROLL WATER CHILLERS

DIVISION 26 - ELECTRICAL

26 09 23.00 40 LIGHTING CONTROL DEVICES

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 35 43 SWITCHMODE RECTIFIER

26 51 00 INTERIOR AND EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 40 - PROCESS INTEGRATION

40 05 13.96 WELDING PROCESS PIPING

40 05 13 PROCESS PIPING

40 95 00 PROCESS CONTROL

DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT

41 22 13.15 BRIDGE CRANES, OVERHEAD ELECTRIC, UNDER RUNNING

41 22 23.19 MONORAIL HOISTS

41 34 65 BLAST CABINETS

PROJECT TABLE OF CONTENTS Page 3

DIVISION 42 - PROCESS HEATING, COOLING, AND DRYING EQUIPMENT

42 12 26 HEATING COILS, PROCESS IN TANK

42 13 16 HEAT EXCHANGERS, PROCESS

42 15 19 SPECIALTY OVENS

42 23 14 FLUID COOLERS

DIVISION 43 - PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE

EQUIPMENT

43 21 13 PUMPS: CENTRIFUGAL

43 21 14 PUMPS: PROCESS, NON-METALLIC

43 22 56 MIXERS

43 27 00 FILTERS: PROCESS

43 32 56 REVERSE-OSMOSIS WATER EQUIPMENT

43 41 16.16 40 VERTICAL ATMOSPHERIC TANKS AND VESSELS

43 41 19 TANK LINERS

43 41 23 STAINLESS STEEL TANKS

43 41 83 POLYPROPYLENE TANKS

DIVISION 44 - POLLUTION AND WASTE CONTROL EQUIPMENT

44 10 00 AIR POLLUTION CONTROL

-- End of Project Table of Contents --

Building 3001, PMXG Plating Shop Renovation at Tinker AFB, Oklahoma.

This is a design-bid-build (government furnished design), one phase, trade-off selection process, w ith full and open competition (no set-asides).

The product service code (FSC) is Z2EZ and the NAICS code is 236220, Industrial Building Construction.

A small business subcontracting plan may be required prior to aw ard.

Range of Magnitude is $20M - $40M.

PUNNIE CHITTCHANG 918.669.7544

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

28-Oct-2015

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________1309 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time _18 Dec 2015_____ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

CONTRACTING DIV

USACE, TULSA 1645 S 101 E AVE

TULSA OK 74128-4609

W912BV

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W912BV-15-R-0093 71

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

PMXG Plating Shop Renovation, Bldg 3001 Tinker AFB, OK

00 11 00 -1

Section 00 11 00 - SF 1442 and CLIN Schedule

00 11 00

PRICING SCHEDULE

CLIN Estimated Unit No. Description Quantity Unit Price Amount

BASE PROPOSAL

0001 All work unless listed Separately 1 Job XXX $_____________

0002 Site Work (Note 9a) 1 Job XXX $_____________

0003 As-Built Drawings 1 Job XXX $___55,000___ _

0004 O&M Manuals 1 Job XXX $___90,000___

0005 Drilled Piers 2’-0” Diameter

26 VLF _______ $__________________

0006 Drilled Piers 2’-6” Diameter

406 VLF _______ $__________________

0007 Drilled Piers 3’-0” Diameter

210 VLF _______ $__________________

TOTAL BASE PROPOSAL

(CLIN 0001 – 0007 INCLUSIVE) $___________________

OPTIONS

0008 Option 1 – Furnishings

(See note 8a) 1 Job XXX $_____________

0009 Option 2 – Break Area & Patio (See note 8b) 1 Job XXX $_____________

0010 Option 3 – Enhanced Landscaping (See note 8c) 1 Job XXX $_____________

0011 Option 4 – Landscape Feature (See note 8d) 1 Job XXX $_____________

0012 Option 5 – Bus Drop Off (See note 8e)

001201 Bus Drop Off - all work unless listed separately 1 Job xxx $__________

001202 Drilled Piers 2’-0” Diameter

17 VLF _______ $__________________

00 11 00 - 2

Subtotal Option 5 (CLIN 0012) $____________

Sub-Total Options 1 – 5 (CLINS 0010 – 0012 Inclusive) $______________

TOTAL BASE PROPOSAL & OPTIONS

(CLINS 0001 – 0012 INCLUSIVE) $______________

Contract Duration (See Note 6): ______________ (Calendar Days)

PRICING SCHEDULE NOTES

1. The Offeror shall submit pricing data on the latest Pricing Schedule as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.

2. Offerors must insert a price on all numbered items of the Pricing Schedule. Failure to do so will disqualify the Offer.

3. All quantities are estimated except where the unit is given as Job.

4. If a modification to a proposal is submitted and provides for a lump-sum adjustment to the total estimated cost, the application of the lump-sum adjustment to each unit price and/or Job, in the Pricing Schedule must be stated or, if it is not stated, the Offeror agrees that the lump-sum adjustment shall be applied on the prorated basis to every litem in the Bidding Schedule.

5. All the extensions of the unit prices shown (if applicable) will be subject to verification by the Government.

In case of variation between the unit price and the extension, the unit price will be considered to be the offer.

6. The Offeror shall propose total contract duration in number of calendar days after the notice to Proceed (NTP) is received by the Contractor, whether via electronic means or hard copy, whichever is the earliest method of delivery. The total number of proposed calendar days for construction through completion, ready for turnover shall not exceed the days shown at, SCR: 5.211-10 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK. The proposed duration shall become the required contract duration. The Government may issue the NTP via e-mail or Facsimile (FAX) or by other means. Day number 1 is the day after the date of the receipt of the NTP.

7. AWARD

Only one contract will be awarded under this solicitation.

8. OPTIONAL BID ITEM DESCRIPTIONS

a. Option 1: Furnishings: This option shall provide furnishing for the facility. This includes modular wall system, freestanding furniture, systems furniture, loose furniture and interior specialties. See drawings and specifications for further definition.

00 11 00-3

b. Option 2: Break Area & Patio: This option shall provide a break area and patio as indicated on the drawings. Option shall also include all associated landscape walls, utilities, lighting, and pavement as indicated on drawings.

c. Option 3: Enhanced Landscaping: This option shall provide enhanced landscaping as indicated on the drawings. Option shall also include all associated landscaping, plantings, landscape bedding, and pavement as indicated on drawings.

d. Option 4: Landscape Feature: This option shall provide a landscape feature as indicated on the drawings. Option shall also include all associated utilities, landscaping, and finishes as indicated on drawings.

e. Option 5: Bus Drop Off: This option shall provide a bus drop off area as indicated on the drawings.

Option shall also include all associated lighting, drilled piers for light poles, grading and pavement as indicated on drawings.

9. BASE PROPOSAL ITEM DESCRIPTION

a. CLIN 0002: Shall include all site work and any utilities complete to within 5-foot line of the building(s).

b. CLINS 0005, 0006, 0007 shall include costs to provide the drilled piers in accordance with contract drawings and section 31 63 29 DRILLED CONCRETE PIERS AND SHAFTS.

11. COST BREAKDOWN INFORMATION

The Contractor shall provide cost or pricing data with this proposal as required by FAR Part 15. This information shall be provided in the format specified by Table 15-2 of FAR 15.408 or in the Contractor’s own format provided that format includes the appropriate information.

12. AWARD OF OPTIONAL PROPOSAL ITEMS

CLINS 0008 (Option 1) may, at the option of the Government, be awarded at the time of contract award or may be exercised at any time from the date of contract award until 270 days after award.

CLINS 0009 – 0012 (Options 2 through 5) may, at the option of the Government, be awarded at the time of contract award or may be exercised at any time from the date of contract award until 90 days after award.

Any and all optional line items may be exercised solely at the discretion of the Government.

00 22 11 - 6

Section 00 21 00 - Instructions, Conditions & Notices to Offerors

00 21 00

INSTRUCTIONS TO OFFERORS

SECTION 00 21 00

INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

1.0 GENERAL INFORMATION

1.1 GENERAL DESCRIPTION OF WORK

1.2 GOVERNMENT SECURITY REQUIREMENTS

1.3 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

1.4 OFFEROR'S QUESTIONS AND COMMENTS

1.5 SMALL BUSINESS SIZE STANDARD/NAICS CODE

1.6 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

1.7 PRE-PROPOSAL CONFERENCE

1.8 ACCURACY IN PROPOSALS

1.9 PROPOSAL SUBMITTALS

1.10 JOINT VENTURE PROPOSAL REQUIREMENTS

1.0 GENERAL INFORMATION

1.1. GENERAL DESCRIPTION OF WORK

This project involves renovating the existing 40,000 square foot plating shop located within Building 3001, including: new chemical process tanks (approximately 180 tanks); replacing the operating floor; replacing roof-mounted scrubbers/exhaust fans; and recoating the entire shop.

As part of this effort, power, lighting, Reverse Osmosis (RO) water system, process controls and other utility systems supporting the process lines will require modifications and replacement.

00 22 11 - 7

1.2. GOVERNMENT SECURITY REQUIREMENTS

The Offeror(s) must ensure that ALL mail sent to the Tulsa District, U.S. Army Corps of Engineers, either pre-contract or post-contract award, has a return mailing address on the outside of the envelope, package, box, etc. ANY MAIL addressed to the U.S. Army Corps of Engineers, including but not limited to bids, modifications to bids, proposals, revised proposals, bonds, correspondence, etc., will be REJECTED by the US Army Corps of Engineers mail room facility located at 1645 S. 101 E. Ave, Tulsa, OK 74128, if it does not contain a return mailing address. There will be no exceptions.

USACE Tulsa District Point of Contact is Punnie Chittchang:

Phone: 918-669-7544 Email: punnie.chittchang@usace.army.mil

1.3. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation documents will be posted through the Army’s Single Face to Industry (AFSI) to the Federal Business Opportunities (FBO) website at:

http://www.fbo.gov

Solicitation number: W912BV-15-R-0093

It shall be the contractor’s responsibility to check the websites for any amendments. The offeror shall submit in the proposal all requested information specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation.

1.4. OFFEROR'S QUESTIONS AND COMMENTS

Questions and/or comments relative to the document should be submitted via Bidders Inquiry at:

https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=HomePagePublic.

Instructions for registering in the ProjNet Bidder Inquiry system are available on the above web site.

The Bidder Inquiry Key for this project is: XXXXXXXX

Any information given to an offeror which impacts the solicitation and/or offer will be given in the form of a written amendment to the solicitation.

Note: All questions and/or comments should be entered in Bidder’s Inquiry no later than 20 calendar days prior to the proposal deadline, so they may be given consideration or action taken prior to receipt of offers.

(Key will be issued in an amendment.)

00 22 11 - 8

1.5. SMALL BUSINESS SIZE STANDARD/NAICS CODE

The small business size standard for NAICS Code 236220 is $36.5 Million.

1.6. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

This Request for Proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.

1.7. PRE-PROPOSAL CONFERENCE

The Government intends to hold the pre-proposal conference. The date, location, and time will be announced by Amendment. The offeror must submit, via e-mail, the firm’s name, address, point of contact, telephone number, and number of personnel planning to attend to the following no later than two (2) working days prior to the conference:

U.S. Army Corps of Engineers, Tulsa District ATTN: Punnie Chittchang 1645 S. 101 E. Ave.

Tulsa, OK 74128 Phone: 918-669-7657 Fax: 918-669-7495 Email: punnie.chittchang@usace.army.mil

During this conference, the requirements set forth in the solicitation will be reviewed and discussed, with part of the conference to include a question and answer period.

1.8. ACCURACY IN PROPOSALS

Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments). The penalty for making false statements is prescribed in 18 U.S.C.

1001.

1.9. PROPOSAL SUBMITTALS

The submittal method for proposals is electronic via AMRDEC SAFE web site or email:

https://safe.amrdec.army.mil/safe/.

The following email addresses must be entered for notification of proposal receipt and download availability:

punnie.chittchang@usace.army.mil nathan.r.kloeckler@usace.army.mil

00 22 11 - 9

Proposals will be received until the time and date shown on Standard Form SF 1442 or as amended on SF30. Mail proposals to:

U.S. Army Corps of Engineers, Tulsa District ATTN: Punnie Chittchang, CESWT-CT 1645 S. 101 E. Ave.

Tulsa, OK 74128

The Packaging Proposals shall be marked:

”Proposal for Solicitation Number: W912BV-15-R-0093”

1.10. JOINT VENTURE PROPOSAL REQUIREMENTS

When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 and the bid bond unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration.

If this is an 8(a) or HubZone joint venture, the offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124 and 13 CFR Part 126, respectively

CLAUSES INCORPORATED BY REFERENCE

52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2004 252.215-7008 Only One Offer OCT 2013

CLAUSES INCORPORATED BY FULL TEXT

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

00 22 11 - 10

Goals for minority participation for each trade

Goals for female participation for each trade

14.8 6.9

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is [Contracting Officer shall insert description of the geographical areas where the contract is to be performed, giving the State, county, and city].

(End of provision)

CLAUSES INCORPORATED BY FULL TEXT

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from Charles Peterson, 1645 S. 101st E. Ave, Tulsa, OK 74128.

00 22 11 - 11

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of provision)

CLAUSES INCORPORATED BY FULL TEXT

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for-- 1300, November 16 2015

(c) Participants will meet at--

Specific meeting times and deadlines for submission of personnel attending will be issued by amendment.

Oklahoma Tourism Information Center

CITY OF MIDWEST CITY

7200 SE 29th Midwest City, OK 73110

Access to Tinker AFB:

Please provide to the Contracting Officer a list of all personnel that will be attending this Pre-Bid Conference for the Plating Shop Renovation Project. Information required: Full Name and Company Name. All personnel must be US Citizens and have a valid Driver’s License for access onto Tinker AFB. Request that each bidder limit the number of personnel to three individuals, if additional individuals are needed, please notify the Contracting Officer. The list is due to the Contracting Officer by 1000 hrs CST on 12 Nov 2015.

Irrespective if you have a Tinker Badge, you are required to provide a list of personnel attending the list walk.

Base Access, if you do NOT have a Tinker Badge (this is a closed Base): A Corps of Engineer’s representative will escort bidders onto Tinker AFB that do NOT have access. Please indentify who requires an escort onto Base. All individuals must have a valid driver’s license to present at the gate to enter onto Tinker AFB.

Pickup location for personnel without a badge:

Oklahoma Tourism Information Center

CITY OF MIDWEST CITY

7200 SE 29th Midwest City, OK 73110

The GSA Van will be at the pickup location by 1245 CST on 26 Oct 2015 and depart by 12:55 CST.

00 22 11 - 12

Meeting Location once on Tinker AFB:

If you have Base Access, go directly Building 412 to the main conference room.

This is the only site walk that the Government intends to hold. All bidders are encouraged to attend. Dr Checks will be used for RFIs. Deadline for RFIs will be set at noon on 25 Nov 2015. RFIs received after this date may not be answered.

Pre-Bid Conference Agenda 16 Nov 2015, Monday 1300 HRS 1245‐1255: Pick up Bidders without Base Access 1300: B414 Conference Room

・ Check In ・ In Brief with Contracting Officer ・ Project Overview ・ Questions/Answer Site Walk will commence after.

CLAUSES INCORPORATED BY FULL TEXT

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil/

00 22 11 - 13

Section 00 22 11 - Proposal Submission Requirements, Evaluation Criteria, Basis of Award One-Step-Best Value, Design-Build (Single Award)

00 22 10 EVALUATION CRITERIA

SSP ATTACHMENT #1

SECTION 00 22 11

PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA, AND BASIS OF AWARD

1. 0 OVERVIEW

This is a competitive best‐value solicitation utilizing the trade‐off method for a construction contract for the PMXG Plating Shop Renovation, Bldg 3001, located at Tinker Air Force Base, Oklahoma. The Government will evaluate proposals in accordance with the criteria described herein and award a firm fixed‐price contract to the responsible firm whose proposal conforms to all the terms and conditions of the solicitation and whose proposal is determined to represent the overall best value to the Government.

If awarded the contract, the Offeror shall construct the project in accordance with the plans and specifications.

1.1 WHO CAN SUBMIT

1.1.1 Firms formally organized as construction contractors that have associated specifically for this project, consortia of firms or any other interested parties may submit proposals. Associations may be as joint ventures or as key team subcontractors.

1.1.2 Organization Conflicts of Interest (OCI) Disclosure: The Offeror shall provide a disclosure statement with its proposal which concisely describes all the relevant facts concerning the past or present organizational conflicts of interest relating to work on this project. In the same statement, and if applicable, the Offeror shall provide information to assure the Government that the conflicts of interest have been mitigated and/or neutralized to the maximum extent possible. If a conflict of interest is discovered after award of this contract, the Contracting Office will make a decision whether to terminate the contract.

2.0 BASIS OF AWARD

The Contracting Officer intends to award a firm fixed‐price contract to the responsible Offeror whose proposal the Source Selection Authority determines conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government, considering all non‐price factors described herein, and price. All evaluation factors, other than price, when combined, are considered more important than the price. The intent of this solicitation is to obtain the best proposal for the work within the solicitation. The Government reserves the right to accept other than the lowest priced offer or to reject all offers. The Government will not award a contract to a Firm whose proposal contains a deficiency, as defined in FAR 15.001. The Government reserves the right to reject any offer if the offer is not in the best interest of the Government.

3. 0 PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS

All offerors shall be required to submit a proposal with the minimum content as specified herein. Proposals without the minimum content may be rejected. Proposals will be received until the date and time indicated on Standard Form 1442 at the following address:

U.S. Army Engineer District, Tulsa

CESWT-CT-E

ATTN: Punnie Chittchang

00 22 11 - 14

1645 E 101ST East Ave, Tulsa, OK 74128

3.1 REQUIREMENT FOR SEPARATE PRICE AND TECHNICAL PROPOSALS

3.1.1 Each Offeror must submit both a Price Proposal and a Technical Proposal. The Price Proposal and the Technical Proposal must be submitted as separate volumes. Ensure that the outside of each separate volume is clearly marked to indicate its contents; and the identity of the Offeror. Additionally, clearly identify the “original” price proposal and the “original” technical proposal on the outside cover.

3.1.2 Both the Price Proposal and the Technical Proposal must be received by the closing date and time set for receipt of proposals.

3.1.3 No dollar amounts from the Price Proposal are to be included in the Technical Proposal.

3.1.4 All information intended to be evaluated as part of the Technical Proposal must be submitted as part of the Technical Proposal (Volume 1). Do not merely cross‐reference similar material in the Price Proposal, or vice versa. Also, do not include links to websites in lieu of incorporating information into your proposal.

3.2 DISCUSSIONS

The Government does not intend to enter into discussions with offerors prior to making an award. Offerors are encouraged to present their best technical proposal and prices in their initial proposal submission. However, in accordance with FAR Part 15.306, should discussions become necessary, the Government reserves the right to hold them. If this occurs, a competitive range will be determined and offerors notified. The competitive range may be limited for purposes of efficiency in accordance with (IAW) FAR Part 15.306(c)(2).

3.3 GENERAL INSTRUCTIONS

3.3.1 Submit only the hard‐copy paper documents and the electronic files specifically authorized and/or required elsewhere in this section. Do not submit excess information, to include audio‐visual materials, electronic media, etc. Number all pages unless told otherwise.

3.3.2 Text font size shall not be less than 10 point. Do not use condensed font. Each page shall be identified with the appropriate page number centered at the bottom of the page, except for the cover sheet, which shall not be numbered. Page number format for the Table of Contents shall be “i, ii, iii….” Proposal page size shall be 8‐1/2 inches x 11 inches; however, if drawings, charts, or other graphics are submitted, sheets no larger than 11 x 17 inches and folded to 8‐1/2 inches x 11 inches (folio) shall be used. Eleven‐by‐seventeen (11 x 17) inch sheets will be counted as two (2) 8‐1/2 inch x 11 inch sheets. Each side of a double‐sided page (sheet) counts as one page.

Proposals shall not exceed the maximum page limits indicated, excluding the cover sheet and Table of Contents.

The Government will not review any information submitted in an appendix or attachment to the proposal. The Offeror shall not submit verbatim sections of this solicitation as part of their proposal. Offers that do not meet these requirements may be subject to rejection. All page margins must be at least 1 inch wide, but may include headers and footers.

3.3.3 Use three‐ring binders to assemble your proposal. Do not use spring clamps or exceed the recommended capacity of the fastener or binder.

3.3.4 “Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can be provided to the Government as part of the Offeror’s technical proposal.

Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, 00 22 11 - 15 or used by the Government except for evaluation purposes, must be clearly marked in accordance with the instructions at FAR 52.215‐1, “Instructions to Offerors—Competitive Acquisition”, paragraph (e), “Restriction on disclosure and use of data”.

3.3.5 Proposal revisions shall be submitted as page replacements with revised text readily identifiable, e.g., bold face print or underlining. The source of the revision, e.g., Error, Omission, or Clarification, or amendment shall be included and be annotated for each revision. Proposal replacement pages shall be numbered, shall be clearly marked “REVISED”, shall show the date of revision, shall be submitted in appropriate number of copies (e.g., if two

(2) copies of the original page was required, then two (2) copies of the revised page will also be required, and shall be a different color than the original pages they are to replace).

3.3.6 Cover Sheets and Table of Contents

a. Proposals shall contain a cover sheet containing the information shown below in accordance with FAR 52.215‐1 “Instructions to Offerors – Competitive Acquisitions”.

PROPOSAL COVER SHEET FORMAT:

Solicitation Number: W912BV‐15‐R‐0093

Title: PMXG PLATING SHOP RENOVATION, BUILDING 3001, TINKER AFB, OK

Name, address, email address(es),telephone and facsimile number(s) of Offeror.

Company CAGE code, DUNS number and Federal ID number.

Names, titles, telephone, email addresses and facsimile numbers of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this solicitation.

Name, title, and signature of person authorized to sign the proposal.

NOTE: Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.

b. Table of Contents. The second sheet shall be a detailed Table of Contents. If more than one binder is used, the complete Table of Contents shall be included in each.

3.4 SPECIFIC INSTRUCTIONS FOR THE TECHNICAL PROPOSAL

3.4.1 Number of Sets of the Technical Proposal. The Offeror shall submit one ORIGINAL copy of the written Technical Proposal in hard copy format and provide the complete proposal on 6 (six) CDs. The six (6) CDs shall contain the entire technical proposal in .pdf format using Adobe Acrobat software to print to a .pdf file (or “save as .pdf”); do NOT scan the document(s) into a .pdf file. The text portion of the complete proposal shall be contained as a single .pdf file. Sections of the proposal shall be bookmarked (linked to the index) in logical order.

3.4.2 Format and Contents of the Technical Proposal and List of Tabs. The original and all copies of the Technical Proposal will be appropriately labeled as such and shall be organized using the tabs specified in the chart below.

3.4.3 Page Limitations. The following page limitations are established for each Factor/Subfactor/Element:

Factor 1 – Performance Capability:

Subfactor 1, Specialized Experience – Limited to 20 pages (1 page per project; maximum 5 forms; see paragraph 5.1.1) per contactor/subcontractor

00 22 11 - 16

Subfactor 2, Key Subcontractors – Limited to 1 letter per subcontractor Subfactor 3, Key Personnel – Limited to 1 page for each resume provided

Factor 2 – Contract Duration, Schedule, Organization & Technical Approach Subfactor 1, Proposed Contract Duration and Summary Schedule ‐ No page limit Subfactor 2, Organization/Technical Approach – Limited to 10 pages

Factor 3‐ Past Performance – No page limitation Factor 4 ‐ Small and Small Disadvantaged Business Utilization – No page limitation

3.5 SPECIFIC INSTRUCTIONS FOR THE PRICE PROPOSAL (VOLUME 2)

3.5.1 Number of Sets of the Price Proposal. Submit an ORIGINAL set of the Price Proposal plus a CD containing the Price Proposal. The Price Proposal CD will be due 24 hours following the proposal due date. Mail or hand deliver the CD in accordance with the instructions in Section 00 21 00.

3.5.2 Size Restrictions and Page Limits. The following are established for each Factor/Subfactor:

Factor 5 – SF 1442, Pricing (CLIN) Schedule (no page limit) Subfactor 1 – Subcontracting Plan (no page limit)

Use only 8 ½” x 11” pages. There are no page limits set for the Price Proposal. However, limit your response to information required by this solicitation. Excess information will not be considered in the Government’s evaluation.

3.5.3 Format and Contents of the Price Proposal and List of Tabs. The Price Proposal shall be appropriately labeled as such and shall be organized as indicated in the following chart. Note: If the Offeror is not required to submit any information under a listed Tab in accordance with the instructions below, that tab can be omitted.

However, do not renumber the subsequent tabs.

4.0 PROPOSAL CONTENTS AND RELATED EVALUATION FACTORS

VOLUME 1 – TECHNICAL PROPOSAL

Factor/

Subfactor/

Element

LOCATION DESCRIPTION RELATIVE IMPORTANCE

N/A Vol 1 Tab A Assumptions Not rated but may affect other factors.

FACTOR 1 PERFORMANCE

CAPABILITY

1st Most Important Factor

Subfactor 1 Vol 1 Tab B Specialized Experience Most Important Subfactor

Subfactor 2 Vol 1 Tab C Key Subcontractors 2nd Most Important Subfactor

Subfactor 3 Vol 1 Tab D Key Personnel 3rd Most Important Subfactor

00 22 11 - 17

FACTOR 2 CONTRACT DURATION,

SCHEDULE, ORGANIZATION &

TECHNICAL APPROACH

2nd Most Important Factor

Subfactor 1 Vol 1 Tab E Proposed Contract Duration & Summary Schedule

Most Important Subfactor

Subfactor 2 Vol 1 Tab F Organization & Technical Approach

2nd Most Important Subfactor

FACTOR 3 Vol 1 Tab G PAST PERFORMANCE 3rd Most Important Factor

FACTOR 4 Vol 1 Tab H SMALL AND SMALL

DISADVANTAGED BUSINESS

UTILIZATION

4th Most Important Factor

00 22 11 - 18

VOLUME 2 – PRICE PROPOSAL

Factor/

Subfactor/

Element

LOCATION

DESCRIPTION

RELATIVE IMPORTANCE

FACTOR 5 Vol 2 Tab A SF 1442, PRICING (CLIN)

SCHEDULE

Not Rated

N/A Vol 2 Tab B Bid Guarantee (Bid Bond) Not Rated

N/A Vol 2 Tab C Self‐Performed Work Not Rated

N/A Vol 2 Tab D Required Pre‐Award Information Not Rated

Subfactor 1 Vol 2 Tab 7 Subcontracting Plan Go/No Go

5.0 VOLUME 1 – TECHNICAL PROPOSAL

5.1 VOLUME 1, TAB A: ASSUMPTIONS

Deviations and exceptions to the requirements contained in the RFP are not allowed. Any questions related to specific terms and conditions of the solicitation must be resolved prior to submission of the proposal. However, if assumptions are made, the Offeror shall list and describe in detail the assumption(s). If award is made without discussions, an exception or deviation to any portion of the RFP requirements may make the proposal ineligible for award. Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the proposal may be deemed “unacceptable” and thus ineligible for award. See Section 00 22 11, paragraphs 7.3, “Definitions”.

5.1.1 Submission Requirements

The list of assumptions shall be located under Tab A of Volume 1 – Technical Proposal Information. All assumptions shall be fully supported with the Offeror’s rationale and shall fully explain the impact, if any, on the performance and specific requirement of the RFP. The Offeror shall clearly describe on the Proposal Cover Sheet submitted with the Price Proposal any assumptions made concerning contractual and/or technical terms and include the monetary impact on the solicitation with the price proposal.

5.1.2 Evaluation Criteria

The list of assumptions will not be rated separately but will be used to determine if the Offeror understands the

Statement of Work and the intent and may affect the rating of the other factors. It will also be used to compare the impact on the performance of the project.

5.2 VOLUME 1 – FACTOR 1: PERFORMANCE CAPABILITY

5.2.1 Volume 1, Tab B: Subfactor 1 – Specialized Experience

5.2.1.1 Submission Requirements

Demonstrate the specialized experience of the Offeror and/or proposed team, including sub‐contractors, on projects same/similar in size and complexity to that described in the solicitation for same/similar construction services. Emphasis shall be placed on large renovation projects involving fully operational processing facilities, to include tank lines and associated equipment for chemical cleaning and/or plating processes or fully operational heavy industrial facilities, to include fuel processing facilities, paint/paint stripping facilities, food processing facilities or other specialized industrial processing facilities, during construction. If using subcontractors as part of

00 22 11 - 19 the proposed team to demonstrate experience, describe the role they will play in this project and the percentage of work they will perform. Demonstrate successful management of multiple subcontractors and multiple project phases within an occupied and operational facility for all projects submitted. Experience from a sub‐contractor or team member with heavy industrial experience will be acceptable as long as the Prime has experience with large renovation projects.

The Contractor shall complete a minimum of three (3), but no more than five (5), “Experience Information” forms, attached at the end of this section (Attachment 1), in response to this factor. All blocks must be filled in and all data should be accurate, current, and complete. All projects submitted must be at least 50% complete and completed within the last 7 years. At least two (2) of the projects provided must be valued at over $15,000,000.

5.2.1.2 Evaluation Criteria

a. The Government will evaluate the extent of recent, related experience of the Offeror in regard to their role on this project. The Government may place greater importance on projects performed as a prime contractor than as a subcontractor, depending upon overall role and relevancy considerations. Federal Government project experience will not be rated inherently more important than non‐Federal Government project experience.

Offerors demonstrating experience with projects of similar size and complexity and on processing facilities with tank lines and associated equipment for chemical cleaning and/or plating processes or fully operational heavy industrial facilities, to include fuel processing facilities, paint/paint stripping, food processing facilities or other specialized industrial processing facilities that remained fully operational during construction will be viewed more favorably by the Government. All projects must demonstrate successful management of multiple subcontractors and multiple project phases within an occupied and operational facility.

(1) The Offeror must submit the requested information to demonstrate a record of recent, related experience in construction, for the project (which may include similar state or local government or private counterparts) included in this solicitation. Recent experience includes projects well underway (see above criteria) or those completed and turned over within 7 years of the proposal issue date for this RFP for construction experience. Joint Venture partners should each demonstrate experience commensurate with their role on this project or how their experience qualifies them for their role on this project. If any of the information required is not included in the form (Attachment 1), then the Contractor will be considered non‐responsive and evaluated as unacceptable.

(2) The Government reserves the right to verify the experience record of cited projects or other recent projects by reviewing the Corps of Engineers Construction Contractor (or Architect‐Engineer) Appraisal Support System (CCASS/ACASS), other DOD or Government appraisal systems or to interview owners or references. The Government may check any or all cited references to verify supplied information.

(3) To receive credit for extent (amount) of experience, the Offeror shall demonstrate a history of recent, relevant experience. A firm will not receive credit under this factor for the relevant experience of key personnel proposed for this project.

(4) The Government will consider extent of recent experience, degree of relationship of such experience to this project, demonstrated familiarity with applicable codes and local conditions. Some examples of relevancy to this project may include, but not be limited to:

(a) Number, size, type work, complexity, location

(b) Dates (well under way or completed no more than 7 years preceding date of Solicitation)

(c) Firm's role and extent of work self‐performed (brokering out all work and simply “placing the sidewalks” or similar minor work on a cited project are examples of less relevant experience).

00 22 11 - 20

5.2.2 Volume 1 – Tab C: Subfactor 2 ‐ Key Subcontractors

5.2.2.1 Submission Requirements

Identify the potential Key Subcontractors chosen for mechanical, electrical and process controls installation, describing the extent of their involvement in the project. Submit at least three (3) but no more than five (5) Specialized Experience forms (Attachment 1) for each Key Subcontractor, using the same requirements as described in the Phase 1 Specialized Experience submission requirements. Subcontractors shall be selected from the list of potential subcontractors. Any substitutions shall be approved by the Contracting Officer. All subcontractor personnel working on this project must be U.S. citizens or documented U.S. workers and must be able to provide proof of U.S. citizenship or other authorized documentation (See Contract Clause 52.0000‐4515 Security Contract Language for All Corps of Engineers’ Unclassified Contracts).

Provide letters of commitment for each of the Key Subcontractors (Attachment 4).

5.2.2.2 Evaluation Criteria

This Factor is composed of two equal elements: Specialized Experience and Past Performance. The Government will evaluate the specialized experience and past performance of the Key Subcontractors for mechanical, electrical, and process controls installation using the same criteria as in the Phase 1 evaluation. After award, the Section 00 73 00 SCR entitled “Key Personnel, Subcontractors and Outside Consultants” will apply to the selection, which establishes the minimum quality standard. No substitution will be allowed without adequate reason and possible consideration to the Government.

5.2.3 Volume 1 ‐ Tab D: Subfactor 3 ‐ Key Personnel

5.2.3.1 Submission Requirements

The Offeror shall provide resume data for the following key personnel: Construction Project Manager, Quality Control Manager (CQC System Manager), Site Superintendent, and Site Safety and Health Oficer (SSHO) as applicable to this requirement. Project Managers with professional certification to include Project Manager Professional (PMP) or equivalent are preferred. Résumé information to be provided shall be limited to no more than one (1) page per person (Attachment 2) and shall include the following information as a minimum:

a. Name and title

b. Project assignment

c. Name of firm with which associated

d. Years experience in the role identified.

e. Years experience with this firm and with other firms

f. Education degree(s), year, specialization, if applicable

g. Active professional registration, year first registered, if…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .