W912BV-15-R-0093_DWGS_5.pdf

PDF 20 MB Posted

Attached to
Plating Shop Renovation, Building 3001, Tinker Air Force Base, Oklahoma.
Solicitation number
W912BV-15-R-0093
Issued by

About this file

Drawings 5

View the file

Other files

File Type Posted
W912BV-15-R-0093-0006.pdf PDF
W912BV-15-R-0093-0005.pdf PDF
W912BV-15-R-0093-0004.pdf PDF
W912BV-15-R-0093-0003a.pdf PDF
W912BV-15-D-0093-0002.pdf PDF
Site_Visit_Attendee_Sheet.pdf PDF
W912BV-15-D-0093-0001.pdf PDF
W912BV-15-R-0093_DWGS_8.pdf PDF
W912BV-15-R-0093_DWGS_2.pdf PDF
W912BV-15-R-0093_DWGS_6.pdf PDF
W912BV-15-R-0093_DWGS_4.pdf PDF
W912BV-15-R-0093_DWGS_3.pdf PDF
W912BV-15-R-0093_DWGS_7.pdf PDF
W912BV-15-R-0093_DWGS_1.pdf PDF
W912BV-15-R-0093_SPECSa.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5 4 3 2 1

12345

D

C

B

A A

B

C

D

C O

PY

R

IG

H

T

BU

RN

S

AN

D

M

CD

O N

N

EL

L

EN

G

IN

EE

RI

N G

C O

M

PA

N Y, I N

C.

Tulsa District

TINKER AIR FORCE BASE, OKLAHOMA

US Army Corps Of Engineers

Tulsa, OKLAHOMA

MECHANICAL PHASE 3

SOLICITATION NO.: W912BV-15-R-0093

CONTRACT NO.: SET 5 OF 8

8/21/2015

WWYK150110 - REPLACE ROOF OVER PLATING SHOP AREA

78794-A-1000

0 LEGENDS

1 PLANS

2 P&IDS

3 SECTIONS

4 ENLARGED PLANS

5 DETAILS

6 SCHEDULES/DIAGRAMS

7 USED DEFINED

8 USER DEFINED

9 USER DEFINED

PROJECT NUMBER

SHEET FILE NAMING CONVENTION

SHEET DESIGNATOR

A - ARCHITECTURAL

AD - ARCHITECTURAL DEMOLITION

C - CIVIL

E - ELECTRICAL

ED - ELECTRICAL DEMOLITION

EP - ELECTRICAL POWER

EL - ELECTRICAL LIGHTING

EI - ELECTRICAL INSTRUMENTAION

FA - FIRE ALARM

FX - FIRE PROTECTION

G - GENERAL

LS - LIFE SAFETY

SD - STRUCTURAL DEMOLITION

M - MECHANICAL

MD - MECHANICAL DEMOLITION

MH - MECHANICAL HVAC

MP - MECHANICAL PIPING

MQ - MECHANICAL EQUIPMENT

S - STRUCTURAL

SD - STRUCTURAL DEMOLITION

AREA NUMBER*

0 OVERALL PLAN*

1 AREA A

2 AREA B

3 AREA C

4 AREA D

5 AREA E

6 AREA F

7 AREA G

8 AREA H

LEVEL*

0 BASEMENT

1 OPERATING FLOOR

2 MEZZANINE

3 BOTTOM CHORD FRAMING

4 ROOF

5 ROOF PLATFORM

PHASE NUMBER

0 MASTER SET

1 PHASE 1

2 PHASE 2

3 PHASE 3

4 PHASE 4

5 PHASE 5

6 PHASE 6

* LEVEL - PLAN SHEETS ONLY

* AREA - PLAN SHEETS ONLY

* OVERALL - ELECTRICAL OVERALL SHEETS THIS EQUALS SEQUENCE NUMBER

SHEET SERIES

5 4 3 2 1

12345

D

C

B

A A

B

C

D

C O

PY

R

IG

H

T

BU

RN

S

AN

D

M

CD

O N

N

EL

L

EN

G

IN

EE

RI

N G

C O

M

PA

N Y, I N

C.

MECHANICAL PHASE 3 SHEET INDEX

SHEET NUMBER SHEET TITLE

G-3100 PH 3 MECH PHASING PLAN BASEMENT

G-3110 PH 3 MECH PHASING PLAN OPERATING FLOOR

G-3120 PH 3 MECH PHASING PLAN MEZZANINE

G-3140 PH 3 MECH PHASING PLAN ROOF

MD3106 PH 3 MECH DEMO PLAN BASEMENT AREA F

MD3107 PH 3 MECH DEMO PLAN BASEMENT AREA G

MD3108 PH 3 MECH DEMO PLAN BASEMENT AREA H

MD3111 PH 3 MECH DEMO PLAN OPERATING FLOOR AREA A

MD3117 PH 3 MECH DEMO PLAN OPERATING FLOOR AREA G

MD3118 PH 3 MECH DEMO PLAN OPERATING FLOOR AREA H

MD3126 PH 3 MECH DEMO PLAN MEZZANINE AREA F

MD3127 PH 3 MECH DEMO PLAN MEZZANINE AREA G

MD3128 PH 3 MECH DEMO PLAN MEZZANINE AREA H

MD3147 PH 3 MECH DEMO PLAN ROOF AREA G

MD3148 PH 3 MECH DEMO PLAN ROOF AREA H

MD3344 PH 3 MECH DEMO SECTIONS BASEMENT AREA F

MD3345 PH 3 MECH DEMO SECTIONS AREA G

MD3346 PH 3 MECH DEMO SECTIONS AREA G

MD3347 PH 3 MECH DEMO SECTIONS AREA G

MD3348 PH 3 MECH DEMO SECTIONS AREA G

MD3349 PH 3 MECH DEMO SECTIONS AREA G

MD3350 PH 3 MECH DEMO SECTIONS AREA G

MD3351 PH 3 MECH DEMO SECTIONS BASEMENT AREA G

MD3352 PH 3 MECH DEMO SECTIONS AREA H

MD3353 PH 3 MECH DEMO SECTIONS AREA H

MD3354 PH 3 MECH DEMO SECTIONS AREA H

MD3355 PH 3 MECH DEMO SECTIONS BASEMENT AREA H

MD3430 PH 3 MECH DEMO ENLARGED PLANS AREA G

MD3431 PH 3 MECH DEMO ENLARGED PLANS AREA G

MD3432 PH 3 MECH DEMO ENLARGED PLANS AREA G

MD3433 PH 3 MECH DEMO ENLARGED PLANS AREA G

MD3434 PH 3 MECH DEMO ENLARGED PLANS AREA G

MD3435 PH 3 MECH DEMO ENLARGED PLANS AREA G

MD3436 PH 3 MECH DEMO ENLARGED PLANS AREA H

MD3437 PH 3 MECH DEMO ENLARGED PLANS AREA H

MD3438 PH 3 MECH DEMO ENLARGED PLANS AREA H

MQ3104 PH 3 MECH NEW WORK PLAN EQUIPMENT BASEMENT AREA D

MQ3111 PH 3 MECH NEW WORK PLAN EQUIPMENT OPERATING FLOOR AREA A

MQ3113 PH 3 MECH NEW WORK PLAN EQUIPMENT OPERATING FLOOR AREA C

MQ3114 PH 3 MECH NEW WORK PLAN EQUIPMENT OPERATING FLOOR AREA D

MQ3123 PH 3 MECH NEW WORK PLAN EQUIPMENT MEZZANINE AREA C

MQ3124 PH 3 MECH NEW WORK PLAN EQUIPMENT MEZZANINE AREA D

MQ3141 PH 3 MECH NEW WORK PLAN EQUIPMENT ROOF AREA A

MQ3143 PH 3 MECH NEW WORK PLAN EQUIPMENT ROOF AREA C

MQ3144 PH 3 MECH NEW WORK PLAN EQUIPMENT ROOF AREA D

MQ3310 PH 3 MECH NEW WORK SECTIONS EQUIPMENT AREA C & D

MQ3311 PH 3 MECH NEW WORK SECTIONS EQUIPMENT AREA C & D

MH3111 PH 3 MECH NEW WORK PLAN HVAC OPERATING FLOOR AREA A

MH3113 PH 3 MECH NEW WORK PLAN HVAC OPERATING FLOOR AREA C

MH3114 PH 3 MECH NEW WORK PLAN HVAC OPERATING FLOOR AREA D

MH3123 PH 3 MECH NEW WORK PLAN HVAC MEZZANINE AREA C

MH3124 PH 3 MECH NEW WORK PLAN HVAC MEZZANINE AREA D

MH3143 PH 3 MECH NEW WORK PLAN HVAC ROOF AREA C

MH3144 PH 3 MECH NEW WORK PLAN HVAC ROOF AREA D

MH3303 PH 3 MECH NEW WORK SECTIONS HVAC AREA C

MH3304 PH 3 MECH NEW WORK SECTIONS HVAC AREA C

MH3305 PH 3 MECH NEW WORK SECTIONS HVAC AREA D

MH3306 PH 3 MECH NEW WORK SECTIONS HVAC AREA D

MP3102 PH 3 MECH NEW WORK PLAN PIPING BASEMENT AREA B

MP3103 PH 3 MECH NEW WORK PLAN PIPING BASEMENT AREA C

MP3104 PH 3 MECH NEW WORK PLAN PIPING BASEMENT AREA D

MP3105 PH 3 MECH NEW WORK PLAN PIPING BASEMENT AREA E

MP3106 PH 3 MECH NEW WORK PLAN PIPING BASEMENT AREA F

MP3107 PH 3 MECH NEW WORK PLAN PIPING BASEMENT AREA G

MP3108 PH 3 MECH NEW WORK PLAN PIPING BASEMENT AREA H

MP3111 PH 3 MECH NEW WORK PLAN PIPING OPERATING FLOOR AREA A

MP3113 PH 3 MECH NEW WORK PLAN PIPING OPERATING FLOOR AREA C

MP3114 PH 3 MECH NEW WORK PLAN PIPING OPERATING FLOOR AREA D

MP3116 PH 3 MECH NEW WORK PLAN PIPING OPERATING FLOOR AREA F

MP3123 PH 3 MECH NEW WORK PLAN PIPING MEZZANINE AREA C

MP3124 PH 3 MECH NEW WORK PLAN PIPING MEZZANINE AREA D

MP3125 PH 3 MECH NEW WORK PLAN PIPING MEZZANINE AREA E

MP3126 PH 3 MECH NEW WORK PLAN PIPING MEZZANINE AREA F

MP3143 PH 3 MECH NEW WORK PLAN PIPING ROOF AREA C

MP3144 PH 3 MECH NEW WORK PLAN PIPING ROOF AREA D

MP3301 PH 3 MECH NEW WORK SECTIONS PIPING AREA A

MP3302 PH 3 MECH NEW WORK SECTIONS PIPING AREA A

MP3303 PH 3 MECH NEW WORK SECTIONS PIPING AREA C

MP3304 PH 3 MECH NEW WORK SECTIONS PIPING AREA C

MP3305 PH 3 MECH NEW WORK SECTIONS PIPING AREA D

MP3306 PH 3 MECH NEW WORK SECTIONS PIPING AREA D

MP3350 PH 3 MECH NEW WORK SECTIONS BASEMENT AREA C

MP3351 PH 3 MECH NEW WORK SECTIONS BASEMENT AREA D

MP3352 PH 3 MECH NEW WORK SECTIONS BASEMENT AREA F

MP3353 PH 3 MECH NEW WORK SECTIONS BASEMENT AREA G

MP3354 PH 3 MECH NEW WORK SECTIONS BASEMENT AREA H

SET 5 OF 8

SEE PHASE 0 DRAWINGS FOR

COMPLETE SHEET INDEX LIST,

GENERAL & REFERENCE

INFORMATION

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

W912BV-15-R0093

AREA A AREA B AREA C AREA D AREA E AREA F AREA G AREA H

KEYED NOTES:

RENOVATE AREA H. RENOVATION INCLUDES REMOVAL OF

PIPING ASSOCIATED WITH EXISTING 800 LINE, AND SCRUBBER

RECIRCULATION TANK T782, AND PUMPS P-782A AND P-782B.

RENOVATE AREA G. RENOVATION INCLUDES REMOVAL OF

PIPING ASSOCIATED WITH EXISTING 700 LINE, AND FILTRATE

TRANSFER TANK T682 AND ASSOCIATED PUMPS P682A AND

P682B.

UPON COMPLETION OF AREA D RENOVATION IN PHASE 2,

INSTALL NITRIC/HCL STRIP, AND NITRIC STRIP LINES IN NORTH

AREA OF AREA D.

INSTALL NEW NICKEL STRIP, CAD STRIP, AND PLASMA STRIP

TANKS IN SOUTH AREA OF AREA D. SEE PHASE 3 NEW WORK

SHEETS FOR ADDITIONAL INFORMATION.

8'0 4' 16'

MECHANICAL PHASING PLAN BASEMENT

A5

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

BASEMENT

PH 3 MECH PHASING PLAN

G-3100

78794-MG3100.DWG

2/06/15

W912BV-15-R0093

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

W912BV-15-R0093

AREA A AREA B AREA C AREA D AREA E AREA F AREA G AREA H

KEYED NOTES:

UPON COMPLETION OF AREA C RENOVATION IN PHASE 2, INSTALL

SILVER PLATE, BORAZON PLATE, PASSIVATE, SILVER STRIP, AND

B-9 STRIP LINES IN AREA C.

UPON COMPLETION OF AREA D RENOVATION IN PHASE 2, INSTALL

NITRIC /HCL STRIP, AND NITRIC STRIP LINES IN AREA OF AREA D.

INSTALL NEW NICKEL STRIP, CAD STRIP, AND PLASMA STRIP

TANKS IN SOUTH AREA OF AREA D. SEE PHASE 3 NEW WORK

SHEETS FOR ADDITIONAL INFORMATION.

RENOVATE AREA G. RENOVATION INCLUDES REMOVAL OF ALL

TANKS, EQUIPMENT, PIPING, AND DUCTWORK ASSOCIATED WITH

THE EXISTING 700A, 700B, AND 700C LINES. SEE LIST ON THIS

SHEET FOR TANK NUMBERS AND PROCESS.

RENOVATE AREA H. RENOVATION INCLUDES THE REMOVAL OF ALL

TANKS, EQUIPMENT, PIPING AND DUCTWORK ASSOCIATED WITH

THE EXISTING 800 LINE. SEE LIST ON THIS SHEET FOR TANK

NUMBERS AND PROCESS.

TANK LIST AREA G:

TANKS TO BE DEMOLISHED IN AREA G DURING PHASE 3 ARE AS

FOLLOWS:

704 - NITRIC STRIP 740 - ALKALINE CLEANER

706 - 15% ACID STRIP 742 - COLD WATER RINSE

708 - COLD WATER RINSE 744 - ACID ETCH

710 - CAD STRIP 746 - COLD WATER RINSE

712 - NITRIC STRIP 748 - ACID ETCH

714 - NITRIC STRIP 750 - NICKEL STRIKE

716 - NITRIC STRIP 752 - COLD WATER RINSE

718 - COLD WATER RINSE 754 - COPPER STRIKE

720 - CREST NICKEL STRIPPER 756 - COLD WATER RINSE

722 - CREST NICKEL STRIPPER 758 - SILVER PLATE

724 - COLD WATER RINSE 760 - COLD WATER RINSE

726 - B-9 NICKEL STRIPPER 762 - PASSIVATE TYPE VIII

728 - HOT WATER RINSE 764 - COLD WATER RINSE

766 - ZINC NICKEL PLATE

768 - COLD WATER RINSE

770 - PASSIVATE TYPE VI

772 - COLD WATER RINSE

774 - SILVER DESMUT

776 - SILVER STRIP

778 - COLD WATER RINSE

780 - HOT WATER RINSE

TANK LIST AREA H:

TANKS TO BE DEMOLISHED IN AREA H DURING PHASE 3 ARE AS

FOLLOWS:

800 - ACID ETCH

802 - COLD WATER RINSE

804 - NICKEL STRIKE

806 - COLD WATER RINSE

808 - NICKEL TACK

810 - NICKEL PLATE

812 - COLD WATER RINSE

814 - NICKEL TACK

816 - NICKEL PLATE

818 - COLD WATER RINSE

820 - PLASMA STRIP

822 - NITRIC STRIP

824 - COLD WATER RINSE

826 - COLD WATER RINSE

828 - ROCHELLE STRIP SOLUTION

830 - NICKEL PLATE

832 - COLD WATER RINSE

834 - NICKEL STRIKE

836 - COLD WATER RINSE

838 - ACID ETCH

8'0 4' 16'

MECHANICAL PHASING PLAN OPERATING FLOOR

A5

TEMPORARY ALKALINE WASTE

COLLECTION TANK TT-501, CRWS &

CRWR PIPING, AND RELOCATED PUMP

P582

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

OPERATING FLOOR

PH 3 MECH PHASING PLAN

G-3110

78794-MG3110.DWG

2/06/15

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

W912BV-15-R0093

MECHANICAL PHASING PLAN MEZZANINE

A5

I:\USCOE_TULSA\78794\CAD\MECH\PHASE 03\78794-MG3120.DWG 8/20/2015 3:26 PM CHARLES.MCAFEE

32'8'0 16'

AREA A AREA B AREA C AREA D AREA E AREA F AREA G AREA H

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

MEZZANINE

PH 3 MECH PHASING PLAN

G-3120

78794-MG3120.DWG

2/06/15

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

W912BV-15-R0093

AREA A AREA B AREA C AREA D AREA E AREA F AREA G AREA H

KEYED NOTES:

UPON COMPLETION OF AREA C RENOVATION IN PHASE 2,

INSTALL SCRUBBERS S-2001 AND S-2002. SCRUBBER S-2001

AND S-2002 SHALL SERVE THE NEW 200 LINE TANKS IN AREA C.

SEE PHASE 3 NEW WORK DRAWINGS FOR ADDITIONAL

INFORMATION.

UPON COMPLETION OF AREA D RENOVATION, INSTALL

SCRUBBER S-3002 TO SERVE NEW NORTH TANKS IN AREA D

AND S-3001 TO SERVE NEW SOUTH TANK LINE IN AREA D.

RENOVATE AREA G. RENOVATION INCLUDES REMOVAL OF

SCRUBBERS S-701 THROUGH S-706.

RENOVATE AREA H. RENOVATION INCLUDES REMOVAL OF

EXISTING SCRUBBERS S-801, S-802, EXHAUST FANS EF-803,

EF-811, BLOWERS B-801A AND B-801B.

8'0 4' 16'

MECHANICAL PHASING PLAN ROOF

A5

S-2002

EF-2002

S-2001

EF-2001

S-3001

EF-3001

S-3002

EF-3002

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

ROOF

PH 3 MECH PHASING PLAN

G-3140

78794-MG3140.DWG

2/06/15

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

AREA B

AREA C

AREA D

AREA E

AREA F

AREA G

AREA H

N

KEYPLAN

NTS

AREA - B

AREA - C

AREA - D

AREA - E

AREA - F

AREA - G

AREA - H

AREA - A

W912BV-15-R0093

DEMOLISH FOLLOWING MAINS AND CAP AT LOCATION SHOWN.

CHROMIC ACID DRAIN (CRAD)

ALKALINE RINSE WATER DRAIN (ARWD)

DEMOLISH FOLLOWING MAINS AND CAP AT LOCATION SHOWN.

ALKALINE RINSE WATER DRAIN (ARWD)

RAW WATER MAINTENANCE (RWM)

SCRUBBER WATER MAKE-UP (SWM)

INSTRUMENT AIR (IA)

DEMOLISH ALL FILTRATE TRANSFER (FT) PIPING AND ASSOCIATED EQUIPMENT

INCLUDING PUMPS AND FILTRATE TRANSFER TANK.

N

BASEMENT AREA F

A5

SEE SHEET MD3107 SEE SHEET MD3107

4' 8'0 2'

KEYED NOTES:

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

BASEMENT AREA F

PH 3 MECH DEMO PLAN

MD3106

78794-MD3106.DWG

8/26/14

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

AREA B

AREA C

AREA D

AREA E

AREA F

AREA G

AREA H

N

KEYPLAN

NTS

W912BV-15-R0093

N

BASEMENT AREA G

A5

SEE SHEET MD3108 SEE SHEET MD3108

MD3107 MD3430

MD3107 MD3431

MD3107 MD3432

SEE SHEET MD3106 SEE SHEET MD3106

DEMOLISH STEAM PROCESS (SP) PIPING, FITTINGS, VALVES AND SUPPORTS.

FIELD VERIFY EXACT ROUTING

DEMOLISH ALL ACID/ALKALI SCRUBBER WATER RETURN (AAWR) PIPING,

FITTINGS, VALVES, TANKS, PUMPS AND SUPPORTS.

DEMOLISH ALL ACID/ALKALI SCRUBBER WATER SUPPLY (AAWS) PIPING, FITTINGS,

VALVES, TANKS, PUMPS AND SUPPORTS.

DEMOLISH EMERGENCY EYEWASH AND ALL RAW WATER EYE WASH (RWE) PIPING

TO MAIN. INSTALL VALVE, CAP AND PREPARE LINE FOR FUTURE CONNECTION.

DEMOLISH ALL ALKALINE RINSE WATER DRAIN (ARWD) PIPING, FITTINGS, VALVES,

TANKS, PUMPS AND SUPPORTS.

DEMOLISH ALL DEIONIZED WATER DRAIN (DID) PIPING, FITTINGS, VALVES, TANKS,

PUMPS AND SUPPORTS.

DEMOLISH ALL AGITATION AIR (AA) PIPING, FITTINGS, VALVES, TANKS, PUMPS

AND SUPPORTS

DEMOLISH ALL ALKALINE SOLUTION DRAIN (ASD) PIPING, FITTINGS, VALVES,

TANKS, PUMPS AND SUPPORTS.

DEMOLISH ALL DEIONIZED WATER (DI) PIPING TO NEW REVERSE OSMOSIS (RO)

MAIN. INSTALL VALVE, CAP AND PREPARE LINE FOR FUTURE CONNECTION.

DEMOLISH ALL DEMINERALIZED WATER (DM) PIPING, FITTINGS, VALVES, TANKS,

PUMPS, AND SUPPORTS.

DEMOLISH ALL COMPRESSED AIR (A) PIPING TO MAIN. INSTALL VALVE AND CAP

LINE AT MAIN.

DEMOLISH ALL MIXED ACID DRAIN (MAD) PIPING, FITTINGS, VALVES, TANKS,

PUMPS, AND SUPPORTS.

DEMOLISH ALL RAW WATER MAINTENANCE (RWM) PIPING, FITTINGS, VALVES,

TANKS, PUMPS, AND SUPPORTS.

DEMOLISH ALL FILTRATE TRANSFER (FT) PIPING AND ASSOCIATED EQUIPMENT

INCLUDING PUMPS AND FILTRATE TRANSFER TANK.

KEYED NOTES:

3 2

MD3433MD3107

MD3107

MD3435MD3107

MD3434

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

BASEMENT AREA G

PH 3 MECH DEMO PLAN

MD3107

78794-MD3107.DWG

8/26/14

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

AREA B

AREA C

AREA D

AREA E

AREA F

AREA G

AREA H

N

KEYPLAN

NTS

W912BV-15-R0093

N

BASEMENT AREA H

A5

SEE SHEET MD3107 SEE SHEET MD3107

DEMOLISH ALL SODIUM HYDROXIDE (NAOH) PIPING, FITTINGS, VALVES,

SUPPORTS AND EQUIPMENT.

DEMOLISH EMERGENCY EYEWASH AND ALL RAW WATER EYE WASH (RWE) PIPING

TO MAIN. INSTALL VALVE, CAP AND PREPARE LINE FOR FUTURE CONNECTION.

DEMOLISH ALL DEIONIZED WATER DRAIN (DID) PIPING, FITTINGS, VALVES,

SUPPORTS AND EQUIPMENT.

DEMOLISH ALL AGITATION AIR (AA) PIPING, FITTINGS, VALVES, SUPPORTS AND

EQUIPMENT.

DEMOLISH ALL DEIONIZED WATER (DI) PIPING TO NEW REVERSE OSMOSIS (RO)

MAIN. INSTALL VALVE, CAP AND PREPARE LINE FOR FUTURE CONNECTION.

DEMOLISH ALL DEMINERALIZED WATER (DM) PIPING, FITTINGS, VALVES,

SUPPORTS AND EQUIPMENT.

DEMOLISH ALL COMPRESSED AIR (A) PIPING TO MAIN. INSTALL VALVE AND CAP

LINE AT MAIN.

DEMOLISH ALL MIXED ACID DRAIN (MAD) PIPING, FITTINGS, VALVES, SUPPORTS

AND EQUIPMENT.

DEMOLISH ALL RAW WATER MAINTENANCE (RWM) PIPING, FITTINGS, VALVES,

SUPPORTS AND EQUIPMENT.

DEMOLISH ALL WASTEWATER PROCESS (WP) PIPING, FITTINGS, VALVES,

SUPPORTS AND EQUIPMENT.

DEMOLISH ALL CONDENSATE DRAIN PROCESS (CDP) PIPING, FITTINGS, VALVES,

SUPPORTS AND EQUIPMENT.

DEMOLISH ALL SCRUBBER WATER MAKE-UP (SWM) PIPING, FITTINGS, VALVES,

SUPPORTS AND EQUIPMENT.

DEMOLISH EXISTING TANK INCLUDING ALL SUPPORTS, FITTINGS, CONNECTIONS

AND EQUIPMENT.

DEMOLISH ALL ACID/ALKALI SCRUBBER WATER RETURN (AAWR) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL ALKALINE RINSE WATER DRAIN (AWRD) PIPING, FITTINGS, VALVES,

SUPPORTS AND EQUIPMENT.

KEYED NOTES:

MD3436MD3437MD3438 MD3108MD3108 MD3108

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

BASEMENT AREA H

PH 3 MECH DEMO PLAN

MD3108

78794-MD3108.DWG

8/26/14

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

AREA B

AREA C

AREA D

AREA E

AREA F

AREA G

AREA H

N

KEYPLAN

NTS

AREA - B

AREA - C

AREA - D

AREA - E

AREA - F

AREA - G

AREA - H

AREA - A

W912BV-15-R0093

N

PIPING OPERATING FLOOR AREA A

A5

DEMOLISH RO PIPING AS INDICATED ON THIS SHEET.

DISCONNECT RO STORAGE TANK AND RO DISTRIBUTION PUMPS P-101

AND P-102 AND RETAIN FOR RELOCATION SHOWN ON SHEET MQ3111.

1" PW UP TO MEZZANINE

2" SWM UP TO MEZZANINE

1 1/2" PW DN

TO BASEMENT

2" PW

BOP EL 12'-11"

2" SWM

BOP EL 12'-11"

2 1/2" RO-S DN1 1/2" RO-R DN

CARBON

FILTER SKID

ANTI-

SCALANT

2 1/2" RO-S

BOP EL 16'-11"

1 1/2" RO-R

BOP EL 16'-11"

ANTI-

SCALANT

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

OPERATING FLOOR AREA A

PH 3 MECH DEMO PLAN

MD3111

78794-MD3111.DWG

8/26/14

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

AREA B

AREA C

AREA D

AREA E

AREA F

AREA G

AREA H

N

KEYPLAN

NTS

W912BV-15-R0093

N

OPERATING FLOOR AREA G

A5

SEE SHEET MD3118 SEE SHEET MD3118

MD3430MD3117

MD3431MD3117

MD3432MD3117

MD3434MD3117

MD3434

MD3117

DEMOLISH ALL ACID/ALKALI SCRUBBER WATER RETURN (AAWR) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL ACID/ALKALI SCRUBBER WATER SUPPLY (AAWS) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH EMERGENCY EYEWASH AND ALL RAW WATER EYE WASH (RWE) PIPING

TO MAIN. INSTALL VALVE, CAP AND PREPARE LINE FOR FUTURE CONNECTION.

DEMOLISH ALL AGITATION AIR (AA) PIPING, FITTINGS, VALVES, SUPPORTS AND

EQUIPMENT.

DEMOLISH ALL CONDENSATE RETURN (CR) PIPING, FITTINGS, VALVES, SUPPORTS

AND EQUIPMENT.

KEYED NOTES:

1 2

MD3117

MD3435

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

OPERATING FLOOR AREA G

PH 3 MECH DEMO PLAN

MD3117

78794-MD3117.DWG

8/26/14

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

AREA B

AREA C

AREA D

AREA E

AREA F

AREA G

AREA H

N

KEYPLAN

NTS

W912BV-15-R0093

N

EQUIPMENT PLAN OPERATING AREA H

A5

SEE SHEET MD3117 SEE SHEET MD3117

DEMOLISH EMERGENCY EYEWASH AND ALL RAW WATER EYE WASH (RWE) PIPING

TO MAIN. INSTALL VALVE, CAP AND PREPARE LINE FOR FUTURE CONNECTION.

DEMOLISH ALL AGITATION AIR (AA) PIPING, FITTINGS, VALVES, TANKS, PUMPS,

AND SUPPORTS.

DEMOLISH ALL CONDENSATE RETURN (CR) PIPING, FITTINGS, VALVES, TANKS,

PUMPS, AND SUPPORTS.

DISCONNECT EXISTING EXHAUST HOODS, SALT FOG CHAMBERS AND ALL

ASSOCIATED DUCTWORK, PIPING, AND SUPPORTS AND RETAIN FOR FUTURE USE.

REPAIR AND SEAL ROOF PENETRATIONS.

KEYED NOTES:

4 4 4 4 4 4 4

MD3438MD3118

MD3437MD3118

MD3436MD3118

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

OPERATING FLOOR AREA H

PH 3 MECH DEMO PLAN

MD3118

78794-MD3118.DWG

8/26/14

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

AREA B

AREA C

AREA D

AREA E

AREA F

AREA G

AREA H

N

KEYPLAN

NTS

AREA - B

AREA - C

AREA - D

AREA - E

AREA - F

AREA - G

AREA - H

AREA - A

W912BV-15-R0093

N

MEZZANINE AREA F

A5

SEE SHEET MD3127 SEE SHEET MD3127

DEMOLISH FOLLOWING MAINS AND CAP AT LOCATION SHOWN.

RECTIFIER COOLING WATER SUPPLY (RCWS)

RECTIFIER COOLING WATER RETURN (RCWR)

GLYCOL WATER (GW)

SCRUBBER BASIN DRAIN (SBD)

DEMOLISH FOLLOWING MAINS AND CAP AT LOCATION SHOWN.

CHILLED WATER SUPPLY (CHWS)

CHILLED WATER RETURN (CHWR)

DEMOLISH FOLLOWING MAINS AND CAP AT LOCATION SHOWN.

RAW WATER MAINTENANCE (RWM)

4" STEAM MAIN (S)

KEYED NOTES:

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

MEZZANINE AREA F

PH 3 MECH DEMO PLAN

MD3126

78794-MD3126.DWG

8/26/14

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

AREA B

AREA C

AREA D

AREA E

AREA F

AREA G

AREA H

N

KEYPLAN

NTS

AREA - B

AREA - C

AREA - D

AREA - E

AREA - F

AREA - G

AREA - H

AREA - A

W912BV-15-R0093

N

MEZZANINE AREA G

A5

SEE SHEET MD3128 SEE SHEET MD3128

SEE SHEET MD3126 SEE SHEET MD3126

DEMOLISH ALL ACID/ALKALI SCRUBBER WATER RETURN (AAWR) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL ACID/ALKALI SCRUBBER WATER SUPPLY (AAWS) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH EMERGENCY EYEWASH AND ALL RAW WATER EYE WASH (RWE) PIPING

TO MAIN. INSTALL VALVE, CAP AND PREPARE LINE FOR FUTURE CONNECTION.

DEMOLISH ALL AGITATION AIR (AA) PIPING, FITTINGS, VALVES, SUPPORTS AND

EQUIPMENT.

DEMOLISH ALL COMPRESSED AIR (A) PIPING TO MAIN. INSTALL VALVE AND CAP

LINE AT MAIN.

DEMOLISH ALL RAW WATER MAINTENANCE (RWM) PIPING, FITTINGS, VALVES,

SUPPORTS AND EQUIPMENT.

DEMOLISH ALL STEAM PROCESS (SP) PIPING, FITTINGS, VALVES, SUPPORTS AND

EQUIPMENT.

DEMOLISH ALL CONDENSATE RETURN (CR) PIPING, FITTINGS, VALVES, SUPPORTS

AND EQUIPMENT.

DEMOLISH ALL 4" STEAM (S) PIPING, FITTINGS, VALVES, SUPPORTS AND

EQUIPMENT.

DEMOLISH ALL RECTIFIER COOLING WATER SUPPLY (RCWS) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT AND CAP FOR FUTURE CONNECTION.

DEMOLISH ALL RECTIFIER COOLING WATER RETURN (RCWR) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT AND CAP FOR FUTURE CONNECTION.

DEMOLISH ALL SCRUBBER BASIN DRAIN (SBD) PIPING, FITTINGS, VALVES,

SUPPORTS AND EQUIPMENT.

DEMOLISH ALL GLYCOL WATER (GW) PIPING, FITTINGS, VALVES, SUPPORTS AND

EQUIPMENT.

DEMOLISH EXISTING DUCTWORK AND SUPPORTS, FITTINGS AND EQUIPMENT.

DEMOLISH ALL CHILLED WATER RETURN (CHWR) PIPING, FITTINGS, VALVES,

SUPPORTS AND EQUIPMENT.

DEMOLISH ALL CHILLED WATER SUPPLY (CHWS) PIPING, FITTINGS, VALVES,

SUPPORTS AND EQUIPMENT.

KEYED NOTES:

6 5

1 2

8 7

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

MEZZANINE AREA G

PH 3 MECH DEMO PLAN

MD3127

78794-MD3127.DWG

8/26/14

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

AREA B

AREA C

AREA D

AREA E

AREA F

AREA G

AREA H

N

KEYPLAN

NTS

AREA - B

AREA - C

AREA - D

AREA - E

AREA - F

AREA - G

AREA - H

AREA - A

W912BV-15-R0093

N

MEZZANINE AREA H

A5

SEE SHEET MD3127 SEE SHEET MD3127

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL ACID/ALKALI SCRUBBER WATER SUPPLY (AAWS) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH EMERGENCY EYEWASH AND ALL RAW WATER EYE WASH (RWE) PIPING

TO MAIN. INSTALL VALVE, CAP AND PREPARE LINE FOR FUTURE CONNECTION.

DEMOLISH ALL AGITATION AIR (AA) PIPING, FITTINGS, VALVES, SUPPORTS AND

EQUIPMENT.

DEMOLISH ALL DEMINERALIZED WATER (DM) PIPING, FITTINGS, VALVES,

SUPPORTS AND EQUIPMENT.

DEMOLISH ALL COMPRESSED AIR (A) PIPING TO MAIN. INSTALL VALVE AND CAP

LINE AT MAIN.

DEMOLISH ALL RAW WATER MAINTENANCE (RWM) PIPING, FITTINGS, VALVES,

SUPPORTS AND EQUIPMENT.

DEMOLISH ALL STEAM PROCESS (SP) PIPING, FITTINGS, VALVES, SUPPORTS AND

EQUIPMENT.

DEMOLISH ALL CONDENSATE RETURN (CR) PIPING, FITTINGS, VALVES, SUPPORTS

AND EQUIPMENT.

DEMOLISH ALL RECTIFIER COOLING WATER SUPPLY (RCWS) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL RECTIFIER COOLING WATER RETURN (RCWR) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL SCRUBBER BASIN DRAIN (SBD) PIPING, FITTINGS, VALVES,

SUPPORTS AND EQUIPMENT.

DEMOLISH ALL 4" STEAM (S) PIPING, FITTINGS, VALVES, SUPPORTS AND

EQUIPMENT.

DEMOLISH EXISTING EXHAUST HOODS AND ALL DUCTWORK, PIPING, SUPPORTS,

FITTINGS AND CONNECTIONS.

DEMOLISH EXISTING DUCTWORK AND SUPPORTS, FITTINGS AND EQUIPMENT.

DEMOLISH STEAM (S) PIPING TO MAIN. INSTALL VALVE AND CAP LINE AT MAIN.

KEYED NOTES:

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

MEZZANINE AREA H

PH 3 MECH DEMO PLAN

MD3128

78794-MD3128.DWG

8/26/14

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

AREA B

AREA C

AREA D

AREA E

AREA F

AREA G

AREA H

N

KEYPLAN

NTS

AREA - B

AREA - C

AREA - D

AREA - E

AREA - F

AREA - G

AREA - H

AREA - A

W912BV-15-R0093

N

ROOF AREA G

SEE SHEET MD3148 SEE SHEET MD3148

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL ACID/ALKALI SCRUBBER WATER SUPPLY (AAWS) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH EMERGENCY EYEWASH AND ALL RAW WATER EYE WASH (RWE) PIPING

TO MAIN. INSTALL VALVE, CAP AND PREPARE LINE FOR FUTURE CONNECTION.

DEMOLISH ALL SCRUBBER BASIN DRAIN (SBD) PIPING, FITTINGS, VALVES,

SUPPORTS AND EQUIPMENT.

DEMOLISH EXISTING FUME SCRUBBER AND CONNECTED EXHAUST FAN.

DEMOLISH ALL DUCTWORK, PIPING, SUPPORT, FITTINGS AND CONNECTIONS.

KEYED NOTES:

5 5 5

1. REMOVE EXISTING ROOF CURBS, REPAIR AND SEAL ROOF TO NEW CONDITION.

SEE ARCHITECTURAL SHEET A-0104.

GENERAL NOTES:

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

ROOF AREA G

PH 3 MECH DEMO PLAN

MD3147

78794-MD3147.DWG

8/26/14

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

AREA B

AREA C

AREA D

AREA E

AREA F

AREA G

AREA H

N

KEYPLAN

NTS

AREA - B

AREA - C

AREA - D

AREA - E

AREA - F

AREA - G

AREA - H

AREA - A

W912BV-15-R0093

N

ROOF AREA H

SEE SHEET MD3147 SEE SHEET MD3147

FITTINGS, VALVES, SUPPORT AND EQUIPMENT.

DEMOLISH ALL ACID/ALKALI SCRUBBER WATER SUPPLY (AAWS) PIPING, FITTINGS,

VALVES, SUPPORT, AND EQUIPMENT.

DEMOLISH EMERGENCY EYEWASH AND ALL RAW WATER EYE WASH (RWE) PIPING

TO MAIN. INSTALL VALVE, CAP AND PREPARE LINE FOR FUTURE CONNECTION.

DEMOLISH ALL AGITATION AIR (AA) PIPING, FITTINGS, VALVES, SUPPORT AND

EQUIPMENT.

DEMOLISH ALL COMPRESSED AIR (A) PIPING TO MAIN. INSTALL VALVE AND CAP

LINE AT MAIN.

DEMOLISH ALL RAW WATER MAINTENANCE (RWM) PIPING, FITTINGS, VALVES,

SUPPORTS, AND EQUIPMENT.

DEMOLISH ALL SCRUBBER BASIN DRAIN (SBD) PIPING, FITTINGS, VALVES,

SUPPORTS, AND EQUIPMENT.

DEMOLISH EXISTING FUME SCRUBBER AND CONNECTED EXHAUST FAN.

DEMOLISH ALL DUCTWORK, PIPING, SUPPORT, FITTINGS AND CONNECTIONS.

DEMOLISH EXISTING EXHAUST FAN AND ALL ASSOCIATED DUCTWORK, PIPING,

SUPPORTS, CONNECTIONS AND EQUIPMENT.

DEMOLISH EXISTING DEGREASER SYSTEM COOLING TOWER AND ALL

DUCTWORK, PIPING, SUPPORTS, CONNECTIONS AND ASSOCIATED EQUIPMENT.

DEMOLISH EXISTING AGITATION AIR BLOWER AND ALL ASSOCIATED PIPING,

SUPPORTS, CONNECTIONS AND EQUIPMENT.

DEMOLISH EXITING CONDENSING UNIT AND ALL ASSOCIATED PIPING, SUPPORTS,

CONNECTIONS AND EQUIPMENT.

KEYED NOTES:

1. REMOVE EXISTING ROOF CURBS, REPAIR AND SEAL ROOF TO NEW CONDITION.

SEE ARCHITECTURAL SHEET A-0104.

NOTES:

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

ROOF AREA H

PH 3 MECH DEMO PLAN

MD3148

78794-MD3148.DWG

8/26/14

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

DEMOLISH ALKALINE RINSE WATER DRAIN (ARWD) PIPE, FITTINGS,

VALVES, AND SUPPORTS AS INDICATED.

DEMOLISH MIXED ACID DRAIN (MAD) PIPE, FITTINGS, VALVES, AND

SUPPORTS AS INDICATED.

DEMOLISH ALKALINE SOLUTION DRAIN (ASD) PIPE, FITTINGS,

VALVES, AND SUPPORTS AS INDICATED.

DEMOLISH RAW WATER MAINTENANCE (RWM) PIPE, FITTINGS,

VALVES, AND SUPPORTS AS INDICATED.

DEMOLISH SCRUBBER WATER MAKE-UP (SWM) PIPE, FITTINGS,

VALVES, AND SUPPORTS AS INDICATED.

KEYED NOTES:

S E

E

S

H E

E T

M

D

S E

E

S

H E

2' 4'0 1'

2' 4'0 1'

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

BASEMENT AREA F

PH 3 MECH DEMO SECTIONS

MD3344

78794-MD3344.DWG

8/26/14

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

W912BV-15-R0093

KEYED NOTES:

DEMOLISH EMERGENCY EYEWASH AND ALL RAW WATER EYE WASH (RWE)

PIPING TO MAIN. INSTALL VALVE, CAP AND PREPARE LINE FOR FUTURE

CONNECTION.

DEMOLISH ALL DEIONIZED WATER (DI) PIPING TO NEW REVERSE OSMOSIS

(RO) MAIN. INSTALL VALVE, CAP AND PREPARE LINE FOR FUTURE

CONNECTION.

DEMOLISH ALL DEMINERALIZED WATER (DM) PIPING, FITTINGS, VALVES,

SUPPORTS AND EQUIPMENT.

DEMOLISH ALL RIM VENT DRAIN (RVD) PIPING, FITTINGS, VALVES,

SUPPORTS AND EQUIPMENT.

DEMOLISH ALL CONDENSATE DRAIN PROCESS (CDP) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL AGITATION AIR (AA) PIPING, FITTINGS, VALVES, SUPPORTS

AND EQUIPMENT.

DEMOLISH ALL CONDENSATE RECOVERY PROCESS (CRP) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL DEIONIZED WATER DRAIN (DID) PIPING, FITTINGS, VALVES,

SUPPORTS AND EQUIPMENT.

DEMOLISH ALL STEAM PROCESS (SP) PIPING, FITTINGS, VALVES,

SUPPORTS AND EQUIPMENT.

DEMOLISH ALL TANK DRAIN (TD) PIPING, FITTINGS, VALVES, SUPPORTS

AND EQUIPMENT.

DEMOLISH EXISTING TANK INCLUDING ALL SUPPORTS, FITTINGS,

CONNECTIONS AND EQUIPMENT.

DEMOLISH ALL DUCTWORK ASSOCIATED WITH DEMOLISHED TANKS

INCLUDING ALL SUPPORTS, FITTINGS, CONNECTIONS AND EQUIPMENT.

DEMOLISH ALL ALKALINE RINSE WATER DRAIN (ARWD) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

0 1' 2' 3'

9 9

4 4

6 6

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

AREA G

PH 3 MECH DEMO SECTIONS

MD3345

78794-MD3345.DWG

8/26/14

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

W912BV-15-R0093

KEYED NOTES:

DEMOLISH ALL DEIONIZED WATER DRAIN (DID) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL DEMINERALIZED WATER (DM) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL DEIONIZED WATER (DI) PIPING TO NEW

REVERSE OSMOSIS (RO) MAIN. INSTALL VALVE, CAP AND

PREPARE LINE FOR FUTURE CONNECTION.

DEMOLISH ALL CONDENSATE RECOVERY PROCESS

(CRP) PIPING, FITTINGS, VALVES, SUPPORTS AND

EQUIPMENT.

DEMOLISH ALL AGITATION AIR (AA) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL STEAM PROCESS (SP) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL RIM VENT DRAIN (RVD) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL CONDENSATE DRAIN PROCESS (CDP)

PIPING, FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL TANK DRAIN (TD) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH EXISTING TANK INCLUDING ALL SUPPORTS,

FITTINGS, CONNECTIONS AND EQUIPMENT.

DEMOLISH ALL DUCTWORK ASSOCIATED WITH

DEMOLISHED TANKS INCLUDING ALL SUPPORTS,

FITTINGS, CONNECTIONS AND EQUIPMENT.

0 1' 2' 3'

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

AREA G

PH 3 MECH DEMO SECTIONS

MD3346

78794-MD3346.DWG

8/26/14

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

W912BV-15-R0093

KEYED NOTES:

DEMOLISH EMERGENCY EYEWASH AND ALL RAW

WATER EYE WASH (RWE) PIPING TO MAIN. INSTALL

VALVE, CAP AND PREPARE LINE FOR FUTURE

CONNECTION.

DEMOLISH ALL DEIONIZED WATER (DI) PIPING TO NEW

REVERSE OSMOSIS (RO) MAIN. INSTALL VALVE, CAP

AND PREPARE LINE FOR FUTURE CONNECTION.

DEMOLISH ALL DEMINERALIZED WATER (DM) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL RIM VENT DRAIN (RVD) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL CONDENSATE DRAIN PROCESS (CDP)

PIPING, FITTINGS, VALVES, SUPPORTS AND

EQUIPMENT.

DEMOLISH ALL AGITATION AIR (AA) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL CONDENSATE RECOVERY PROCESS

(CRP) PIPING, FITTINGS, VALVES, SUPPORTS AND

EQUIPMENT.

DEMOLISH ALL DEIONIZED WATER DRAIN (DID) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL STEAM PROCESS (SP) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL TANK DRAIN (TD) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH EXISTING TANK INCLUDING ALL SUPPORTS,

FITTINGS, CONNECTIONS AND EQUIPMENT.

DEMOLISH ALL DUCTWORK ASSOCIATED WITH

DEMOLISHED TANKS INCLUDING ALL SUPPORTS,

FITTINGS, CONNECTIONS AND EQUIPMENT.

DEMOLISH ALL MIXED ACID DRAIN (MAD) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

6 12

0 1' 2' 3'

5 5 5

12 12

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

AREA G

PH 3 MECH DEMO SECTIONS

MD3347

78794-MD3347.DWG

8/26/14

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

W912BV-15-R0093

KEYED NOTES:

DEMOLISH ALL COMPRESSED AIR (A) PIPING TO MAIN.

INSTALL VALVE AND CAP LINE AT MAIN.

DEMOLISH ALL DEIONIZED WATER (DI) PIPING TO NEW

REVERSE OSMOSIS (RO) MAIN. INSTALL VALVE, CAP AND

PREPARE LINE FOR FUTURE CONNECTION.

DEMOLISH ALL DEMINERALIZED WATER (DM) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL RAW WATER MAINTENANCE (RWM)

PIPING, FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL ALKALINE RINSE WATER DRAIN (ARWD)

PIPING, FITTINGS, VALVES, SUPPORTS AND EQUIPMENT

DEMOLISH ALL MIXED ACID DRAIN (MAD) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL DEIONIZED WATER DRAIN (DID) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH EMERGENCY EYEWASH AND ALL RAW WATER

EYE WASH (RWE) PIPING TO MAIN. INSTALL VALVE, CAP

AND PREPARE LINE FOR FUTURE CONNECTION.

DEMOLISH ALL CONDENSATE DRAIN PROCESS (CDP)

AND CONDENSATE RECOVERY PROCESS (CRP) PIPING

AND EQUIPMENT.

DEMOLISH ALL RIM VENT DRAIN (RVD) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL AGITATION AIR (AA) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL STEAM PROCESS (SP) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL TANK DRAIN (TD) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH EXISTING TANK INCLUDING ALL SUPPORTS,

FITTINGS, CONNECTIONS AND EQUIPMENT.

DEMOLISH ALL DUCTWORK ASSOCIATED WITH

DEMOLISHED TANKS INCLUDING ALL SUPPORTS,

FITTINGS, CONNECTIONS AND EQUIPMENT.

15 15

3 9

92 11

92 11

0 1' 2' 3'

11 11

9 9

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

AREA G

PH 3 MECH DEMO SECTIONS

MD3348

78794-MD3348.DWG

8/26/14

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

W912BV-15-R0093

KEYED NOTES:

DEMOLISH ALL COMPRESSED AIR (A) PIPING TO MAIN.

INSTALL VALVE AND CAP LINE AT MAIN.

DEMOLISH ALL DEIONIZED WATER (DI) PIPING TO NEW

REVERSE OSMOSIS (RO) MAIN. INSTALL VALVE, CAP AND

PREPARE LINE FOR FUTURE CONNECTION.

DEMOLISH ALL DEMINERALIZED WATER (DM) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL RAW WATER MAINTENANCE (RWM)

PIPING, FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL MIXED ACID DRAIN (MAD) PIPING,

FITTINGS, VALVES ,SUPPORTS AND EQUIPMENT.

DEMOLISH ALL DEIONIZED WATER DRAIN (DID) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH EXISTING TANK INCLUDING ALL SUPPORTS,

FITTINGS, CONNECTIONS AND EQUIPMENT.

DEMOLISH ALL CONDENSATE DRAIN PROCESS (CDP)

AND CONDENSATE RECOVERY PROCESS (CRP) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL RIM VENT DRAIN (RVD) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL AGITATION AIR (AA) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL STEAM PROCESS (SP) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL TANK DRAIN (TD) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL DUCTWORK ASSOCIATED WITH

DEMOLISHED TANKS INCLUDING ALL SUPPORTS,

FITTINGS, CONNECTIONS AND EQUIPMENT.

4 11

13 13 13

8 8

0 1' 2' 3'

9 9

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

AREA G

PH 3 MECH DEMO SECTIONS

MD3349

78794-MD3349.DWG

8/26/14

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

W912BV-15-R0093

KEYED NOTES:

DEMOLISH ALL COMPRESSED AIR (A) PIPING TO MAIN.

INSTALL VALVE AND CAP LINE AT MAIN.

DEMOLISH ALL DEIONIZED WATER (DI) PIPING TO NEW

REVERSE OSMOSIS (RO) MAIN. INSTALL VALVE, CAP AND

PREPARE LINE FOR FUTURE CONNECTION.

DEMOLISH ALL DEMINERALIZED WATER (DM) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL RAW WATER MAINTENANCE (RWM) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL ALKALINE RINSE WATER DRAIN (ARWD)

PIPING, FITTINGS, VALVES, SUPPORTS AND EQUIPMENT

DEMOLISH ALL MIXED ACID DRAIN (MAD) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL DEIONIZED WATER DRAIN (DID) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH EXISTING TANK INCLUDING ALL SUPPORTS,

FITTINGS, CONNECTIONS AND EQUIPMENT.

DEMOLISH ALL CONDENSATE DRAIN PROCESS (CDP) AND

CONDENSATE RECOVERY PROCESS (CRP) PIPING AND

EQUIPMENT.

DEMOLISH ALL RIM VENT DRAIN (RVD) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL AGITATION AIR (AA) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL STEAM PROCESS (SP) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL TANK DRAIN (TD) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL DUCTWORK ASSOCIATED WITH

DEMOLISHED TANKS INCLUDING ALL SUPPORTS,

FITTINGS, CONNECTIONS AND EQUIPMENT.

DEMOLISH RAW WATER EYEWASH (RWE) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

0 1' 2' 3'

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

AREA G

PH 3 MECH DEMO SECTIONS

MD3350

78794-MD3350.DWG

8/26/14

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

DEMOLISH ALL EXISTING ALKALINE RINSE WATER DRAIN

(ARWD) PIPING, FITTINGS, VALVE, SUPPORTS AND

EQUIPMENT.

DEMOLISH ALL EXISTING MIXED ACID DRAIN (MAD)

PIPING, FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL EXISTING ALKALINE SOLUTION DRAIN

(ASD) PIPING, FITTINGS, VALVES, SUPPORTS AND

EQUIPMENT.

DEMOLISH EMERGENCY EYEWASH AND ALL RAW WATER

EYE WASH (RWE) PIPING AND EQUIPMENT TO MAIN.

INSTALL VALVE AS REQUIRED, CAP AND PREPARE LINE

FOR FUTURE CONNECTION.

DEMOLISH ALL DEIONIZED WATER (DI) AND

DEMINERALIZED WATER (DM) PIPING AND EQUIPMENT TO

NEW REVERSE OSMOSIS (RO) MAIN. INSTALL VALVE, CAP

AND PREPARE LINE FOR FUTURE CONNECTION.

DEMOLISH COMPRESSED AIR (A) PIPING AND EQUIPMENT

TO MAIN. INSTALL VALVE AS REQUIRED AND CAP LINE AT

MAIN.

DEMOLISH ALL EXISTING AGITATION AIR (AA) AND RIM

VENT DRAIN (RVD) PIPING, FITTINGS, VALVES, SUPPORTS

AND EQUIPMENT.

DEMOLISH ALL EXISTING CONDENSATE DRAIN PROCESS

(CDP) PIPING, FITTINGS, VALVES, SUPPORTS AND

EQUIPMENT.

DEMOLISH ALL EXISTING RAW WATER MAINTENANCE

(RWM) PIPING, FITTINGS, VALVES, SUPPORTS AND

EQUIPMENT.

DEMOLISH ALL EXISTING SCRUBBER WATER MAKE-UP

(SWM) PIPING, FITTINGS, VALVES, SUPPORTS AND

EQUIPMENT.

KEYED NOTES:

1 6

2' 4'0 1'

2' 4'0 1'

S E

E

S

H E

S E

E

S

H E

S E

E

S

H E

S E

E

S

H E

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

BASEMENT AREA G

PH 3 MECH DEMO SECTIONS

MD3351

78794-MD3351.DWG

8/26/14

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

DEMOLISH ALL COMPRESSED AIR (A) PIPING TO MAIN.

INSTALL VALVE AND CAP LINE AT MAIN.

DEMOLISH ALL SCRUBBER WATER MAKEUP (SWM)

PIPING, FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL RAW WATER MAINTENANCE (RWM)

PIPING, FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL DEIONIZED WATER (DI) PIPING TO NEW

REVERSE OSMOSIS (RO) MAIN. INSTALL VALVE, CAP AND

PREPARE LINE FOR FUTURE CONNECTION.

DEMOLISH ALL DEMINERALIZED WATER (DM) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL DEIONIZED WATER DRAIN (DID) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL MIXED ACID DRAIN (MAD) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL CONDENSATE DRAIN PROCESS (CDP)

AND CONDENSATE RECOVERY PROCESS (CRP) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL RIM VENT DRAIN (RVD) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL AGITATION AIR (AA) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL TANK DRAIN (TD) PIPING ,FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL STEAM PROCESS (SP) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH EXISTING TANK INCLUDING ALL SUPPORTS,

FITTINGS, CONNECTIONS AND EQUIPMENT.

DEMOLISH EXISTING TRANSFER PUMPS INCLUDING ALL

SUPPORTS, FITTINGS, CONNECTIONS AND EQUIPMENT.

DEMOLISH ALL DUCTWORK ASSOCIATED WITH

DEMOLISHED TANKS INCLUDING ALL SUPPORTS,

FITTINGS, CONNECTIONS AND EQUIPMENT.

DEMOLISH EMERGENCY EYEWASH AND ALL RAW

WATER EYE WASH (RWE) PIPING TO MAIN. INSTALL

VALVE, CAP AND PREPARE LINE FOR FUTURE

CONNECTION.

KEYED NOTES:

15 15 15

0 1' 2' 3'

10 10

8 8

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

AREA H

PH 3 MECH DEMO SECTIONS

MD3352

78794-MD3352.DWG

8/26/14

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

DEMOLISH ALL SCRUBBER WATER MAKEUP (SWM)

PIPING, FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL RAW WATER MAINTENANCE (RWM)

PIPING, FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL DEIONIZED WATER (DI) PIPING TO NEW

REVERSE OSMOSIS (RO) MAIN. INSTALL VALVE, CAP AND

PREPARE LINE FOR FUTURE CONNECTION.

DEMOLISH ALL DEMINERALIZED WATER (DM) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL DEIONIZED WATER DRAIN (DID) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL MIXED ACID DRAIN (MAD) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL CONDENSATE DRAIN PROCESS (CDP)

AND CONDENSATE RECOVERY PROCESS (CRP) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL RIM VENT DRAIN (RVD) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL AGITATION AIR (AA) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL TANK DRAIN (TD) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL STEAM PROCESS (SP) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH EXISTING TANK INCLUDING ALL SUPPORTS,

FITTINGS, CONNECTIONS AND EQUIPMENT.

DEMOLISH EXISTING TRANSFER PUMPS INCLUDING ALL

SUPPORTS, FITTINGS, CONNECTIONS AND EQUIPMENT.

DEMOLISH ALL SODIUM HYDROXIDE (NAOH) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL WASTE PROCESS (WP) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL DUCTWORK ASSOCIATED WITH

DEMOLISHED TANKS INCLUDING ALL SUPPORTS,

FITTINGS, CONNECTIONS AND EQUIPMENT.

KEYED NOTES:

9 17

17 17

14 14

0 1' 2' 3'

16 16

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

AREA H

PH 3 MECH DEMO SECTIONS

MD3353

78794-MD3353.DWG

8/26/14

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

DEMOLISH ALL SODIUM HYDROXIDE (NAOH) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL RAW WATER MAINTENANCE (RWM)

PIPING, FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL DEIONIZED WATER (DI) PIPING TO NEW

REVERSE OSMOSIS (RO) MAIN. INSTALL VALVE, CAP AND

PREPARE LINE FOR FUTURE CONNECTION.

DEMOLISH ALL DEMINERALIZED WATER (DM) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL DEIONIZED WATER DRAIN (DID) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL MIXED ACID DRAIN (MAD) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL CONDENSATE DRAIN PROCESS (CDP)

AND CONDENSATE RECOVERY PROCESS (CRP) PIPING,

FITTINGS, VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL RIM VENT DRAIN (RVD) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL AGITATION AIR (AA) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL TANK DRAIN (TD) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH ALL STEAM PROCESS (SP) PIPING, FITTINGS,

VALVES, SUPPORTS AND EQUIPMENT.

DEMOLISH EXISTING TANK INCLUDING ALL SUPPORTS,

FITTINGS, CONNECTIONS AND EQUIPMENT.

DEMOLISH EMERGENCY EYEWASH AND ALL RAW WATER

EYE WASH (RWE) PIPING TO MAIN. INSTALL VALVE, CAP

AND PREPARE LINE FOR FUTURE CONNECTION.

DEMOLISH ALL DUCTWORK ASSOCIATED WITH

DEMOLISHED TANKS INCLUDING ALL SUPPORTS,

FITTINGS, CONNECTIONS AND EQUIPMENT.

DEMOLISH ALL EXISTING SCRUBBER WATER MAKE-UP

(SWM) PIPING, FITTINGS, VALVES, SUPPORTS AND

EQUIPMENT.

KEYED NOTES:

151515

0 1' 2' 3'

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

AREA H

PH 3 MECH DEMO SECTIONS

MD3354

78794-MD3354.DWG

8/26/14

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

DEMOLISH ALL EXISTING MIXED ACID DRAIN (MAD) PIPING

A…