W912BV-15-R-0093_DWGS_8.pdf

PDF 6 MB Posted

Attached to
Plating Shop Renovation, Building 3001, Tinker Air Force Base, Oklahoma.
Solicitation number
W912BV-15-R-0093
Issued by

About this file

Drawings 8

View the file

Other files

File Type Posted
W912BV-15-R-0093-0006.pdf PDF
W912BV-15-R-0093-0005.pdf PDF
W912BV-15-R-0093-0004.pdf PDF
W912BV-15-R-0093-0003a.pdf PDF
W912BV-15-D-0093-0002.pdf PDF
Site_Visit_Attendee_Sheet.pdf PDF
W912BV-15-D-0093-0001.pdf PDF
W912BV-15-R-0093_DWGS_2.pdf PDF
W912BV-15-R-0093_DWGS_6.pdf PDF
W912BV-15-R-0093_DWGS_4.pdf PDF
W912BV-15-R-0093_DWGS_3.pdf PDF
W912BV-15-R-0093_DWGS_5.pdf PDF
W912BV-15-R-0093_DWGS_7.pdf PDF
W912BV-15-R-0093_DWGS_1.pdf PDF
W912BV-15-R-0093_SPECSa.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5 4 3 2 1

12345

D

C

B

A A

B

C

D

C O

PY

R

IG

H

T

BU

RN

S

AN

D

M

CD

O N

N

EL

L

EN

G

IN

EE

RI

N G

C O

M

PA

N Y, I N

C.

Tulsa District

TINKER AIR FORCE BASE, OKLAHOMA

US Army Corps Of Engineers

Tulsa, OKLAHOMA

MECHANICAL PHASE 6

SOLICITATION NO.: W912BV-15-R-0093

CONTRACT NO.: SET 8 OF 8

8/21/2015

WWYK150110 - REPLACE ROOF OVER PLATING SHOP AREA

78794-A-1000

0 LEGENDS

1 PLANS

2 P&IDS

3 SECTIONS

4 ENLARGED PLANS

5 DETAILS

6 SCHEDULES/DIAGRAMS

7 USED DEFINED

8 USER DEFINED

9 USER DEFINED

PROJECT NUMBER

SHEET FILE NAMING CONVENTION

SHEET DESIGNATOR

A - ARCHITECTURAL

AD - ARCHITECTURAL DEMOLITION

C - CIVIL

E - ELECTRICAL

ED - ELECTRICAL DEMOLITION

EP - ELECTRICAL POWER

EL - ELECTRICAL LIGHTING

EI - ELECTRICAL INSTRUMENTAION

FA - FIRE ALARM

FX - FIRE PROTECTION

G - GENERAL

LS - LIFE SAFETY

SD - STRUCTURAL DEMOLITION

M - MECHANICAL

MD - MECHANICAL DEMOLITION

MH - MECHANICAL HVAC

MP - MECHANICAL PIPING

MQ - MECHANICAL EQUIPMENT

S - STRUCTURAL

SD - STRUCTURAL DEMOLITION

AREA NUMBER*

0 OVERALL PLAN*

1 AREA A

2 AREA B

3 AREA C

4 AREA D

5 AREA E

6 AREA F

7 AREA G

8 AREA H

LEVEL*

0 BASEMENT

1 OPERATING FLOOR

2 MEZZANINE

3 BOTTOM CHORD FRAMING

4 ROOF

5 ROOF PLATFORM

PHASE NUMBER

0 MASTER SET

1 PHASE 1

2 PHASE 2

3 PHASE 3

4 PHASE 4

5 PHASE 5

6 PHASE 6

* LEVEL - PLAN SHEETS ONLY

* AREA - PLAN SHEETS ONLY

* OVERALL - ELECTRICAL OVERALL SHEETS THIS EQUALS SEQUENCE NUMBER

SHEET SERIES

5 4 3 2 1

12345

D

C

B

A A

B

C

D

C O

PY

R

IG

H

T

BU

RN

S

AN

D

M

CD

O N

N

EL

L

EN

G

IN

EE

RI

N G

C O

M

PA

N Y, I N

C.

MECHANICAL PHASE 6 SHEET INDEX

SHEET NUMBER SHEET TITLE

G-6100 PH 6 MECH PHASING PLAN BASEMENT

G-6110 PH 6 MECH PHASING PLAN OPERATING FLOOR

G-6140 PH 6 MECH PHASING PLAN ROOF

MD6111 PH 6 MECH DEMO WORK PLAN OPERATING FLOOR AREA A

MD6113 PH 6 MECH DEMO WORK PLAN OPERATING FLOOR AREA C

MD6119 PH 6 MECH DEMO WORK PLAN EQUIPMENT OPERATING FLR WAX DEWAX AREA

MD6141 PH 6 MECH DEMO WORK PLAN ROOF AREA A

MQ6112 PH 6 MECH NEW WORK PLAN EQUIPMENT OPERATING FLOOR AREA B

MQ6119 PH 6 MECH NEW WORK PLAN EQUIPMENT OPERATING FLR DEWAX AREA

MQ6142 PH 6 MECH NEW WORK PLAN EQUIPMENT ROOF AREA B

MH6112 PH 6 MECH NEW WORK PLAN HVAC OPERATING FLOOR AREA B

MH6122 PH 6 MECH NEW WORK PLAN HVAC MEZZANINE AREA B

MH6142 PH 6 MECH NEW WORK PLAN HVAC ROOF AREA B

MH6301 PH 6 MECH NEW WORK SECTIONS HVAC AREA B

MP6102 PH 6 MECH NEW WORK PLAN PIPING BASEMENT AREA B

MP6112 PH 6 MECH NEW WORK PLAN PIPING OPERATING FLOOR AREA B

MP6119 PH 6 MECH NEW WORK PLAN PIPING OPERATING FLOOR DEWAX AREA

MP6122 PH 6 MECH NEW WORK PLAN PIPING MEZZANINE AREA B

MP6350 PH 6 MECH NEW WORK SECTIONS BASEMENT AREA B

SET 8 OF 8

SEE PHASE 0 DRAWINGS FOR

COMPLETE SHEET INDEX LIST,

GENERAL & REFERENCE

INFORMATION

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

W912BV-15-R0093

AREA A AREA B AREA C AREA D AREA E AREA F AREA G AREA H

KEYED NOTES:

UPON COMPLETION OF RENOVATION OF AREA B IN PHASE

FIVE, EXTEND NEW PIPING SYSTEMS AS REQUIRED TO NEW

AREA B TANKS LOCATED ON THE OPERATING FLOOR. SEE

NEW WORK SHEETS FOR ADDITIONAL INFORMATION.

8'0 4' 16'

MECHANICAL PHASING BASEMENT

A5

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

BASEMENT

PH 6 MECH PHASING PLAN

G-6100

78794-MG6100.DWG

2/06/15

W912BV-15-R0093

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

W912BV-15-R0093

AREA A AREA B AREA C AREA D AREA E AREA F AREA G AREA H

KEYED NOTES:

UPON COMPLETION OF AREA B RENOVATION IN PHASE 5,

INSTALL TANKS 101 AND 103, AS WELL AS CHEMICAL MIXING,

BARREL WASHING, BLACK LIGHT INSPECTION, BRUSH PLATING,

AND MASK CLEANING IN AREA B.

MECHANICAL PHASING OPERATING FLOOR

A5

BUCKET WASH

WEIGH HOOD

SF-1004

RELOCATED

EXISTING

SALT FOG

CHAMBER

RELOCATED

EXISTING

MASKING

HOODS

RELOCATED

EXISTING

OVEN

SK-2

SK-2

T-103

T-101

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

OPERATING FLOOR

PH 6 MECH PHASING PLAN

G-6110

78794-MG6110.DWG

2/06/15

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

W912BV-15-R0093

AREA A AREA B AREA C AREA D AREA E AREA F AREA G AREA H

KEYED NOTES:

UPON COMPLETION OF RENOVATION OF AREA B IN PHASE 5,

INSTALL EXHAUST FAN EF-1001 SERVING ORGANISOL TANK

101 LOCATED ON OPERATING FLOOR.

UPON RELOCATION OF EXISTING MASKING HOODS FROM

AREA A TO AREA B, RELOCATE EXHAUST FAN EF-1002 IN

APPROXIMATE LOCATION.

UPON INSTALLATION OF NEW WEIGH HOOD IN AREA B,

INSTALL EXHAUST FAN EF-1003 IN APPROXIMATE LOCATION.

MECHANICAL PHASING PLAN ROOF

A5

EF-1002

EF-1002

2EF-1003

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

ROOF

PH 6 MECH PHASING PLAN

G-6140

78794-MG6140.DWG

2/06/15

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

KEYPLAN

NTS

N

AREA B

AREA C

AREA D

AREA E

AREA F

AREA G

AREA H

AREA - B

AREA - C

AREA - D

AREA - E

AREA - F

AREA - G

AREA - H

AREA - A

W912BV-15-R0093

N

OPERATING FLOOR AREA A

A5

4' 8'0 2'

KEYED NOTES:

DEMOLISH RO WATER PIPING, FITTINGS, VALVES, AND SUPPORTS AS INDICATED

ON THIS SHEET.

DEMOLISH TEMPORARY COMPRESSED AIR PIPING SERVING SALT FOG

CHAMBERS BACK TO MAIN AND CAP.

DISCONNECT AND RELOCATE EXISTING LAB MASKING HOODS, SALT FOG

CHAMBER, AND ASSOCIATED DUCTWORK, PIPING, AND SUPPORTS TO AREA B.

SEE SHEET MQ6112 FOR NEW LOCATIONS.

3/4" CA

EXISTING

SALT FOG

CHAMBER

EXISTING

MASKING HOOD EXISTING

MASKING HOOD

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

OPERATING FLOOR AREA A

PH 6 MECH DEMO WORK PLAN

MD6111

78794-MD6111.DWG

2/06/15

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

AREA B

AREA C

AREA D

AREA E

AREA F

AREA G

AREA H

N

KEYPLAN

NTS

AREA - B

AREA - C

AREA - D

AREA - E

AREA - F

AREA - G

AREA - H

AREA - A

W912BV-15-R0093

OPERATING FLOOR AREA C

A5

N

DISCONNECT AND RELOCATE OVEN TO AREA B. DEMOLISH VENT UP THROUGH

ROOF AND PATCH ROOF PENETRATION. SEE SHEET MQ6112 FOR ADDITIONAL

INFORMATION. SEE ARCHITECTURAL SHEET A-0500 FOR ROOF PATCH DETAIL.

EXISTING

OVEN OC12803

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

OPERATING FLOOR AREA C

PH 6 MECH DEMO WORK PLAN

MD6113

78794-MD6113.DWG

2/06/15

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

AREA B

AREA C

AREA D

AREA E

AREA F

AREA G

AREA H

N

KEYPLAN

NTS

AREA - B

AREA - C

AREA - D

AREA - E

AREA - F

AREA - G

AREA - H

AREA - A

W912BV-15-R0093

N

OPERATING FLOOR WAX DEWAX AREA

A5

4' 8'0 2'

WAXKEYED NOTES:

EXISTING BLAST CABINET 0C3792, TANK 0C13574, BLAST CABINET 0C15574 AND

VAPOR DEGREASER TO BE REMOVED.

EXISTING DISCONNECTS TO BE DEMOLISHED. SEE ELECTRICAL DEMOLITION

DRAWINGS FOR ADDITIONAL INFORMATION.

BLAST CABINET

OC3792

TANK OCI3574

BLAST CABINET

OCI5574

VAPOR/DEGREASER

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

EQUIPMENT OPERATING WAX DEWAX AREA

PH 6 MECH NEW WORK PLAN

MD6119

78794-MD6119.DWG

7/7/15

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

AREA B

AREA C

AREA D

AREA E

AREA F

AREA G

AREA H

N

KEYPLAN

NTS

AREA - B

AREA - C

AREA - D

AREA - E

AREA - F

AREA - G

AREA - H

AREA - A

W912BV-15-R0093

N

MECHANICAL DEMO PLAN - AREA A

DISCONNECT EF-1002, EQUIPMENT CURB, DUCTWORK AND RELOCATE TO

AREA B. SEE SHEET MQ6142 FOR NEW LOCATION. REPAIR AND SEAL ALL

ROOF PENETRATIONS FROM EXISTING INSTALLATION.

EXISTING ROOF FAN

TO REMAIN

EXISTING ROOF FAN

TO REMAIN

EXISTING ROOF FAN

TO REMAIN

EXISTING EF-1002

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

ROOF AREA A

PH 6 MECH DEMO WORK PLAN

MD6141

78794-MD6141.DWG

2/06/15

RELOCATED

EXISTING

MASKING

TABLES

5 4 3 2 1

12345

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

AREA B

AREA C

AREA D

AREA E

AREA F

AREA G

AREA H

N

KEYPLAN

NTS

AREA - B

AREA - C

AREA - D

AREA - E

AREA - F

AREA - G

AREA - H

AREA - A

W912BV-15-R0093

N

OPERATING FLOOR AREA B

NEW LOCATION AND ORIENTATION OF EXISTING OVEN RELOCATED FROM AREA

C (SEE SHEET MD6113). PROVIDE NEW VENT AS SHOWN ON MH6112. SEE SHEET

MH6112 FOR DUCTWORK.

NEW LOCATION AND ORIENTATION OF EXISTING LAB MASKING HOODS

RELOCATED FROM AREA A, SEE SHEET MD6111. SEE SHEET MH6112 FOR

DUCTWORK.

NEW LOCATION AND ORIENTATION OF EXISTING SALT FOG CHAMBER

RELOCATED FROM AREA A, SEE SHEET MD6111..

SUPPLY FAN SF-1004 MOUNTED ABOVE WEIGH HOOD AND DUCTED IN TO SERVE

HOOD. SEE DETAIL ON SHEET M-0508 FOR ADDITIONAL INFORMATION.

UPON COMPLETION OF RENOVATION OF AREA B, INSTALL TANKS T-101 AND

T-103. TANK T-103 IS A RELOCATED EXISTING TANK THAT WAS RETAINED IN

PHASE 3 (SEE SHEET MD3111) AND T-101 IS RETAINED FROM STORAGE.

43'-3" 14'-7"

9'-7"

T-103 T-101

NEW SK-2

NEW SK-2

CAX

ORGANISOL

OVEN

BUCKET

WASH

WEIGH HOOD

RELOCATED

SALT FOG

CHAMBER

SF-1004

1'-11"

9'-2"

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

EQUIPMENT OPERATING FLOOR AREA B

PH 6 MECH NEW WORK PLAN

MQ6112

78794-MQ6112.DWG

2/06/15

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

AREA B

AREA C

AREA D

AREA E

AREA F

AREA G

AREA H

N

KEYPLAN

NTS

AREA - B

AREA - C

AREA - D

AREA - E

AREA - F

AREA - G

AREA - H

AREA - A

W912BV-15-R0093

N

EQUIPMENT OPERATING FLOOR DEWAX AREA

WAX

T-1021 T-1019 T-1017

T-1015 T-1013

T-1011 T-1009 T-1007

T-1005 T-1003 T-1001

2 2

2 2 2

BC-1

BC-3

BC-4BC-2

KEYED NOTES:

OVEN OC4750 AND OC4749 SHALL BE RENOVATED PER SPECIFICATION 42 15 19.

RENUMBER TANKS PER SPECIFICATION 43 41 23, PAGE 4 SECTION 2.5.6.

PROVIDE PHENOLIC-PLASTIC IDENTIFICATION PLATE STATING TANK NUMBER,

PROCESS NAME AND TEMPERATURE WITH LETTERS AT LEAST 2 INCHES HIGH.

SEE DETAIL ON SHEET M-0503 FOR ADDITIONAL INFORMATION.

INSTALL NEW BLAST CABINETS BC-1, BC-2, BC-3, AND BC-4. INSTALL

ASSOCIATED DUCT COLLECTORS DC-1, DC-2, DC-3, AND DC-4 AND

INTERCONNECTING DUCTWORK.

REPLACE MONORAIL HOIST IN QUANTITY AND KIND. NEW HOIST SHALL HAVE

THE SAME CAPACITY AND METHOD OF ELECTRIFICATION AS THE EXISTING

HOIST. NEW HOIST SHALL UTILIZE THE EXISTING MONORAILS.

OVEN OC20608 SHALL BE RENOVATED PER SPECIFICATION 42 15 19.

PARTIAL EXISTING

CRANE RAIL (TYP.)

PARTIAL EXISTING

CRANE RAIL (TYP.)

NEW MOTORIZED

1/2 TON CHAIN

HOIST (2 PER LINE)

NEW MOTORIZED

1/2 TON CHAIN

HOIST (2 PER LINE)

NEW CONTROLLER WITH PLC

NEW CONTROLLER WITH PLC

NEW CONTROLLER WITH PLC

EXISTING OVEN

OC4750

EXISTING OVEN

OC20608

EXISTING OVEN

OC4749

DC-1 DC-3

DC-4DC-2

3 3

9'-0"

9'-0"

7'-10"

7'-10"

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

EQUIPMENT OPERATING FLR DEWAX AREA

PH 6 MECH NEW WORK PLAN

MQ6119

78794-MQ6119.DWG

8/26/14

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

AREA B

AREA C

AREA D

AREA E

AREA F

AREA G

AREA H

N

KEYPLAN

NTS

AREA - B

AREA - C

AREA - D

AREA - E

AREA - F

AREA - G

AREA - H

AREA - A

W912BV-15-R0093

N

EQUIPMENT ROOF AREA B

A5

4' 8'0 2'

KEYED NOTES:

NEW LOCATION OF EXISTING EXHAUST FAN EF-1002

SERVING EXISTING LAB MASKING HOODS RELOCATED

FROM AREA A, SEE SHEET MD6141. FURNISH NEW ROOF

PENETRATION AND MOUNT EXHAUST FAN.

EF-10011 EF-1002

EF-1003

RELOCATED EQUIPMENT

RAIL

NEW EQUIPMENT

RAIL

NEW EQUIPMENT

RAIL

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

EQUIPMENT ROOF AREA B

PH 6 MECH NEW WORK PLAN

MQ6142

78794-MQ6142.DWG

2/06/15

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

AREA B

AREA C

AREA D

AREA E

AREA F

AREA G

AREA H

N

KEYPLAN

NTS

AREA - B

AREA - C

AREA - D

AREA - E

AREA - F

AREA - G

AREA - H

AREA - A

W912BV-15-R0093

N

HVAC OPERATING FLOOR AREA B

RETAIN EXISTING EXHAUST HOOD DUCT AND

RECONNECT TO LAB HOODS. EXTEND NEW 14"Ø DUCT

UP THROUGH ROOF TO EXHAUST FAN EF-1002. SEE

SHEET MH6142 FOR ADDITIONAL INFORMATION.

CONNECT NEW TANK EXHAUST DUCT DIRECTLY TO NEW

TANK EXHAUST HOODS.

SEE WEIGH HOOD DETAIL ON SHEET M-0508 FOR

ADDITIONAL INFORMATION.

12"Ø UP TO MEZZANINE LEVEL8"Ø (TYP.)

T-103 T-101

14"Ø UP TO EF-1002

10"Ø (TYP 2)

6"Ø EXHAUST UP

304 STAINLESS HOOD

AND DUCT WORK

16"Ø EXHAUST UP TO

MEZZANINE LEVEL

10"Ø SUPPLY FROM

SF-1004 SERVING

WEIGH HOOD

EXISTING LAB

MASKING HOOD

RELOCATED OVEN

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

HVAC OPERATING FLOOR AREA B

PH 6 MECH NEW WORK PLAN

MH6112

78794-MH6112.DWG

2/06/15

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

AREA B

AREA C

AREA D

AREA E

AREA F

AREA G

AREA H

N

KEYPLAN

NTS

AREA - B

AREA - C

AREA - D

AREA - E

AREA - F

AREA - G

AREA - H

AREA - A

W912BV-15-R0093

N

HVAC MEZZANINE AREA B

12"Ø DN TO T-101

& UP TO EF-1001

ON ROOF

14"Ø UP TO

EF-1002 ON ROOF

14"Ø DN TO

MASKING HOODS

6"Ø EXHAUST

UP TO ROOF

6" EXHAUST

UP FROM

OVEN

PROVIDE DUCT FITTINGS AS REQUIRED TO ROUTE DUCT TO AVOID ADJACENT

LARGER DUCT.

16"Ø UP FROM OPERATING

FLOOR, UP TO EF-1003 ON ROOF

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

HVAC MEZZANINE AREA B

PH 6 MECH NEW WORK PLAN

MH6122

78794-MH6122.DWG

2/06/15

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

AREA B

AREA C

AREA D

AREA E

AREA F

AREA G

AREA H

N

KEYPLAN

NTS

AREA - B

AREA - C

AREA - D

AREA - E

AREA - F

AREA - G

AREA - H

AREA - A

W912BV-15-R0093

N

HVAC ROOF AREA B

12"Ø

EF-1001

12"Ø UP FROM

MEZZANINE

REFER TO STRUCTURAL AND ARCHITECTURAL DETAILS FOR

ADDITIONAL INFORMATION ON DUCT PENETRATIONS THROUGH THE

ROOF.

DUCT TRANSITION FROM EXHAUST FAN TO EXHAUST STACK SHALL BE

NO MORE THAN 15 DEGREE ANGLE. EXHAUST STACK SHALL BE 16"

DIAMETER AND 72" TALL.

KEYED NOTES:

EF-1002

14"Ø

14"Ø UP FROM

MEZZANINE

6"Ø EXHAUST

GOOSENECK

10"Ø EXHAUST

STACK

10"Ø EXHAUST

STACK

EF-1003

16"Ø

16"Ø UP FROM

MEZZANINE

16"Ø EXHAUST

STACK

UP FROM

OVEN

PROVIDE BIRD

SCREEN ON OUTLET

NEW ROOF CURB

NEW ROOF CURB

NEW ROOF CURB

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

HVAC ROOF AREA B

PH 6 NEW WORK PLAN

MH6142

78794-MH6142.DWG

2/06/15

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

CONNECT EXHAUST DUCT TO EXHAUST HOOD.

DUCT TRANSITION FROM EXHAUST FAN TO EXHAUST

STACK SHALL BE NO MORE THAN 15 DEGREE ANGLE.

(TYP.)

SECTION LOOKING NORTH AREA B

2 2

MANUAL VOLUME

DAMPER (MVD)

MVD MVD

MVD

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

HVAC AREA B

PH 6 MECH NEW WORK SECTIONS

MH6301

78794-MH6301.DWG

2/06/15

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

AREA B

AREA C

AREA D

AREA E

AREA F

AREA G

AREA H

N

KEYPLAN

NTS

AREA - B

AREA - C

AREA - D

AREA - E

AREA - F

AREA - G

AREA - H

AREA - A

W912BV-15-R0093

N

PIPING BASEMENT AREA B

TERMINATE PIPE 3/4" BELOW TOP OF TRENCH.

CONNECT NEW RWE BRANCH PIPING TO EXISTING MAIN

AND ROUTE AS INDICATED. ROUTE RWE BRANCH PIPING

TO EEWS ON OPERATING FLOOR.

CONNECT NEW COMPRESSED AIR (CA) MAIN PIPE TO

EXISTING BRANCH PIPING AND ROUTE AS INDICATED ON

THIS SHEET.

CONNECT NEW REVERSE OSMOSIS SUPPLY (RO-S)

BRANCH PIPING TO EXISTING MAIN AND ROUTE AS

INDICATED ON THIS SHEET.

CONNECT NEW POTABLE WATER (PW) BRANCH PIPING

TO EXISTING MAIN AND ROUTE AS INDICATED ON THIS

SHEET.

3/4" RO UP

TO T-103

1 1/2" RO-S

BOP EL -1'-7"

3/4" RO UP TO SALT

FOG CHAMBER

3/4" CA UP TO SALT

FOG CHAMBER

3/4" CA

BOP EL -2'-3"

3" WD DN

TO TRENCH

3" WD

BOP EL -2'-0"

2" WD DN

FROM SK-1

1/2" RO UP

TO SK-1

2" WD DN FROM SK-1

1/2" RO UP TO SK-1

2" WD

BOP EL -2'-0"

3" WD UP TO FD

3" WD

BOP EL -2'-0"

3" WD

2" WD DN

TO TRENCH

1 1/4" RWE

BOP EL -2'-0"

1 1/4" RWE

BOP EL -2'-0"

CONNECT RWE

TO EXISTING RWE

CONNECT RWE TO

EXISTING RWE

3" WD DN

TO TRENCH

1" RO-S

BOP EL. -1'-6"

3/4" CA UP

1" RO UP TO HB-1

1" PW

BOP EL -2'-0"

1" WD DN

TO TRENCH

1" PW UP TO BUCKET

WASH

1" WD DN FROM

BUCKET WASH

EXIST. 2" RWE

EXIST. 1 1/2" PW

EXIST. 1" CA

EXIST. 2" RWE

EXIST. 2 1/2" RO-S

EXIST. 1 1/2" RO-R

EXIST. 1" CA

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

PIPING BASEMENT AREA B

PH 6 MECH NEW WORK PLAN

MP6102

78794-MP6102.DWG

2/06/15

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

AREA B

AREA C

AREA D

AREA E

AREA F

AREA G

AREA H

N

KEYPLAN

NTS

AREA - B

AREA - C

AREA - D

AREA - E

AREA - F

AREA - G

AREA - H

AREA - A

W912BV-15-R0093

N

PIPING OPERATING FLOOR AREA B

SK-2 SK-2

2" WD DN TO BASEMENT

1/2" RO UP FROM BASEMENT

2" WD DN TO BASEMENT

1/2" RO UP FROM BASEMENT 1

FD

1 1/4" RWE UP

FROM BASEMENT

EEWS

FD

1 1/4" RWE UP FROM

BASEMENT

EEWS

3/4" RO DN TO BASEMENT

3/4" CA DN TO BASEMENT

3/4" RO

1 1/2" V UP TO MEZZANINE

1 1/2" V UP TO MEZZANINE

COMPRESSED AIR

QUICK DISCONNECT

1" RO-S UP FROM

BASEMENT TO HB-1

1" PW UP FROM BASEMENT

1" WD DN TO BASEMENT

SALT FOG CHAMBER

3/4" CA UP FROM

BASEMENT

BUCKET WASH

KEYED NOTES:

CONNECT 1/2" RO SUPPLY PIPE TO FAUCET SERVING SK-2.

CONNECT 2" WD TO SK-2 DRAIN. CONNECT 1 1/2" V TO SK-2.

SEE FIXTURE SCHEDULE IN PHASE 0 FOR ADDITIONAL

INFORMATION.

HOSE BIBB LOCATION. 1" RO PIPE FED FROM BASEMENT.

SEE DETAIL ON SHEET M-0502 FOR ADDITIONAL

INFORMATION.

NEW FLOOR DRAIN INSTALLED TO SERVE NEW EEWS.

ROUTE 3" WASTEWATER DRAIN (WD) DOWN TO BASEMENT.

CONNECT PIPING TO BUCKET WASH PER

MANUFACTURER'S RECOMMENDATIONS.

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

PIPING OPERATING FLOOR AREA B

PH 6 MECH NEW WORK PLAN

MP6112

78794-MP6112.DWG

2/06/15

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

AREA B

AREA C

AREA D

AREA E

AREA F

AREA G

AREA H

N

KEYPLAN

NTS

AREA - B

AREA - C

AREA - D

AREA - E

AREA - F

AREA - G

AREA - H

AREA - A

W912BV-15-R0093

N

PIPING OPERATING FLOOR DEWAX AREA

A5

4' 8'0 2'

WAX

T-1021 T-1019 T-1017

T-1015 T-1013

T-1011 T-1009 T-1007

T-1005 T-1003 T-1001

NEW 2" CA

1 1/2" CA

EXISTING CA

CONNECT TO

EXISTING CA MAIN

1" CA DN

TO BC-3

1" CA

1" CA

1" CA DN

TO BC-4

1" CA DN

TO BC-1

1" CA DN

TO BC-2

1" CA

KEYED NOTES:

CONNECT NEW 2" COMPRESSED AIR (CA) BRANCH PIPING TO EXISTING MAIN AS

INDICATED ON THIS SHEET. ELEVATION OF NEW BRANCH PIPING SHALL MATCH

THAT OF EXISTING MAIN. FIELD VERIFY APPROXIMATE PIPE ELEVATION.

BC-1

BC-3

BC-4

BC-2

DC-1

DC-3

DC-4

DC-2

EXISTING OVEN

OC4750

EXISTING OVEN

OC20608

EXISTING OVEN

OC4749

1" CA DN

TO DC-4

1" CA DN

TO DC-3

1" CA DN

TO DC-2

1" CA DN

TO DC-1

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

PIPING OPERATING FLOOR DEWAX AREA

PH 6 MECH NEW WORK PLAN

MP6119

78794-MP6119.DWG

8/12/15

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

AREA B

AREA C

AREA D

AREA E

AREA F

AREA G

AREA H

N

KEYPLAN

NTS

AREA - B

AREA - C

AREA - D

AREA - E

AREA - F

AREA - G

AREA - H

AREA - A

W912BV-15-R0093

N

PIPING MEZZANINE AREA B

A5

4' 8'0 2'

KEYED NOTES:

2" VENT PIPE UP, INCREASE TO 3" VTR.

1 1/2" VENT UP FROM

OPERATING FLOOR

1 1/2" VENT UP FROM

OPERATING FLOOR

2" V

BOP EL 16'-0"

2" VTR

1 1/2" PW

2" SWM

2" CA

1/2" NaOH

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

PIPING MEZZANINE AREA B

PH 6 MECH NEW WORK PLAN

MP6122

78794-MP6122.DWG

8/26/14

D

C

B

A ofSheet

TULSA, OKLAHOMA

U.S. ARMY ENGINEER DISTRICT

CORPS OF ENGINEERS

A

B

C

D

US Army Corps of Engineers

BURNS & MCDONNELL

9400 WARD PARKWAY

KANSAS CITY, MO 64114

SYMBOL REVISIONS DATE APPROVED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

REVIEWED BY:

SUBMITTED BY:

PLOT SCALE:

DATE:

FILE NUMBER:

SHEET

IDENTIFICATION

SOLICITATION NO.:

CONTRACT NO.:

SIZE:

42x30

BLDG 3001 PLATING SHOP RENOVATIONS

TINKER AIR FORCE BASE

OKLAHOMA CITY, OKLAHOMA

FY:15

C O P Y R I G H T

2' 4'0 1'

2' 4'0 1'

ROUTE AND CONNECT NEW REVERSE OSMOSIS SUPPLY (RO-S)

BRANCH PIPE TO EXISTING MAIN.

CONNECT NEW RWE BRANCH PIPING TO EXISTING MAIN AND

ROUTE AS INDICATED. ROUTE RWE BRANCH PIPING TO EEWS ON

OPERATING FLOOR.

CONNECT NEW CR BRANCH PIPING TO EXISTING MAIN AND ROUTE

AS INDICATED.

CONNECT NEW PW BRANCH PIPING TO EXISTING MAIN AND ROUTE

AS INDICATED.

KEYED NOTES:

M SCHLUENDER

C. MCAFEE

M. SCHLUENDER

G. REWALD

J. KLING

1:1

SECTIONS BASEMENT AREA B

PH 6 MECH NEW WORK

MP6350

78794-MP6350.DWG

2/06/15

1 - Sheet - SET 8 COVER - SHEET
1 - Sheet - SET 8 INDEX - SHEET
Phase 6_Final
78794-MG6100-PHASE 6
78794-MG6110-MG6101 PHASE 6
78794-MG6140-PHASE 6
78794-MD6111-DEMO WORK PLAN AREA A
78794-MD6113-DEMO WORK PLAN AREA C
78794-MD6119-EQUIPMENT PLAN OPERATING WAX DEWAX AREA
78794-MD6141-DEMO WORK PLAN ROOF AREA A
78794-MQ6112-EQUIPMENT PLAN OPERATING AREA B
78794-MQ6119-EQUIPMENT PLAN OPERATING DEWAX AREA
78794-MQ6142-EQUIPMENT ROOF AREA B
78794-MH6112-HVAC PLAN OPERATING AREA B
78794-MH6122-HVAC PLAN MEZZANINE LEVEL AREA B
78794-MH6142-HVAC PLAN ROOF AREA B
78794-MH6301-MECHANICAL SECTIONS
78794-MP6102-PIPING PLAN BASEMENT AREA B
78794-MP6112-PIPING PLAN OPERATING AREA B
78794-MP6119-EQUIPMENT PLAN OPERATING DEWAX AREA
78794-MP6122-PIPING PLAN MEZZANINE AREA B
78794-MP6350-PH 6 MECH NEW WORK SECTIONS BASEMENT AREA B

File details come from the government source that posted it. Updated .