W912BV-15-R-0093_DWGS_8.pdf
PDF 6 MB Posted
- Solicitation number
- W912BV-15-R-0093
About this file
Drawings 8
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5 4 3 2 1
12345
D
C
B
A A
B
C
D
C O
PY
R
IG
H
T
BU
RN
S
AN
D
M
CD
O N
N
EL
L
EN
G
IN
EE
RI
N G
C O
M
PA
N Y, I N
C.
Tulsa District
TINKER AIR FORCE BASE, OKLAHOMA
US Army Corps Of Engineers
Tulsa, OKLAHOMA
MECHANICAL PHASE 6
SOLICITATION NO.: W912BV-15-R-0093
CONTRACT NO.: SET 8 OF 8
8/21/2015
WWYK150110 - REPLACE ROOF OVER PLATING SHOP AREA
78794-A-1000
0 LEGENDS
1 PLANS
2 P&IDS
3 SECTIONS
4 ENLARGED PLANS
5 DETAILS
6 SCHEDULES/DIAGRAMS
7 USED DEFINED
8 USER DEFINED
9 USER DEFINED
PROJECT NUMBER
SHEET FILE NAMING CONVENTION
SHEET DESIGNATOR
A - ARCHITECTURAL
AD - ARCHITECTURAL DEMOLITION
C - CIVIL
E - ELECTRICAL
ED - ELECTRICAL DEMOLITION
EP - ELECTRICAL POWER
EL - ELECTRICAL LIGHTING
EI - ELECTRICAL INSTRUMENTAION
FA - FIRE ALARM
FX - FIRE PROTECTION
G - GENERAL
LS - LIFE SAFETY
SD - STRUCTURAL DEMOLITION
M - MECHANICAL
MD - MECHANICAL DEMOLITION
MH - MECHANICAL HVAC
MP - MECHANICAL PIPING
MQ - MECHANICAL EQUIPMENT
S - STRUCTURAL
SD - STRUCTURAL DEMOLITION
AREA NUMBER*
0 OVERALL PLAN*
1 AREA A
2 AREA B
3 AREA C
4 AREA D
5 AREA E
6 AREA F
7 AREA G
8 AREA H
LEVEL*
0 BASEMENT
1 OPERATING FLOOR
2 MEZZANINE
3 BOTTOM CHORD FRAMING
4 ROOF
5 ROOF PLATFORM
PHASE NUMBER
0 MASTER SET
1 PHASE 1
2 PHASE 2
3 PHASE 3
4 PHASE 4
5 PHASE 5
6 PHASE 6
* LEVEL - PLAN SHEETS ONLY
* AREA - PLAN SHEETS ONLY
* OVERALL - ELECTRICAL OVERALL SHEETS THIS EQUALS SEQUENCE NUMBER
SHEET SERIES
5 4 3 2 1
12345
D
C
B
A A
B
C
D
C O
PY
R
IG
H
T
BU
RN
S
AN
D
M
CD
O N
N
EL
L
EN
G
IN
EE
RI
N G
C O
M
PA
N Y, I N
C.
MECHANICAL PHASE 6 SHEET INDEX
SHEET NUMBER SHEET TITLE
G-6100 PH 6 MECH PHASING PLAN BASEMENT
G-6110 PH 6 MECH PHASING PLAN OPERATING FLOOR
G-6140 PH 6 MECH PHASING PLAN ROOF
MD6111 PH 6 MECH DEMO WORK PLAN OPERATING FLOOR AREA A
MD6113 PH 6 MECH DEMO WORK PLAN OPERATING FLOOR AREA C
MD6119 PH 6 MECH DEMO WORK PLAN EQUIPMENT OPERATING FLR WAX DEWAX AREA
MD6141 PH 6 MECH DEMO WORK PLAN ROOF AREA A
MQ6112 PH 6 MECH NEW WORK PLAN EQUIPMENT OPERATING FLOOR AREA B
MQ6119 PH 6 MECH NEW WORK PLAN EQUIPMENT OPERATING FLR DEWAX AREA
MQ6142 PH 6 MECH NEW WORK PLAN EQUIPMENT ROOF AREA B
MH6112 PH 6 MECH NEW WORK PLAN HVAC OPERATING FLOOR AREA B
MH6122 PH 6 MECH NEW WORK PLAN HVAC MEZZANINE AREA B
MH6142 PH 6 MECH NEW WORK PLAN HVAC ROOF AREA B
MH6301 PH 6 MECH NEW WORK SECTIONS HVAC AREA B
MP6102 PH 6 MECH NEW WORK PLAN PIPING BASEMENT AREA B
MP6112 PH 6 MECH NEW WORK PLAN PIPING OPERATING FLOOR AREA B
MP6119 PH 6 MECH NEW WORK PLAN PIPING OPERATING FLOOR DEWAX AREA
MP6122 PH 6 MECH NEW WORK PLAN PIPING MEZZANINE AREA B
MP6350 PH 6 MECH NEW WORK SECTIONS BASEMENT AREA B
SET 8 OF 8
SEE PHASE 0 DRAWINGS FOR
COMPLETE SHEET INDEX LIST,
GENERAL & REFERENCE
INFORMATION
D
C
B
A ofSheet
TULSA, OKLAHOMA
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
A
B
C
D
US Army Corps of Engineers
BURNS & MCDONNELL
9400 WARD PARKWAY
KANSAS CITY, MO 64114
SYMBOL REVISIONS DATE APPROVED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY:
SUBMITTED BY:
PLOT SCALE:
DATE:
FILE NUMBER:
SHEET
IDENTIFICATION
SOLICITATION NO.:
CONTRACT NO.:
SIZE:
42x30
BLDG 3001 PLATING SHOP RENOVATIONS
TINKER AIR FORCE BASE
OKLAHOMA CITY, OKLAHOMA
FY:15
C O P Y R I G H T
W912BV-15-R0093
AREA A AREA B AREA C AREA D AREA E AREA F AREA G AREA H
KEYED NOTES:
UPON COMPLETION OF RENOVATION OF AREA B IN PHASE
FIVE, EXTEND NEW PIPING SYSTEMS AS REQUIRED TO NEW
AREA B TANKS LOCATED ON THE OPERATING FLOOR. SEE
NEW WORK SHEETS FOR ADDITIONAL INFORMATION.
8'0 4' 16'
MECHANICAL PHASING BASEMENT
A5
M SCHLUENDER
C. MCAFEE
M. SCHLUENDER
G. REWALD
J. KLING
1:1
BASEMENT
PH 6 MECH PHASING PLAN
G-6100
78794-MG6100.DWG
2/06/15
W912BV-15-R0093
D
C
B
A ofSheet
TULSA, OKLAHOMA
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
A
B
C
D
US Army Corps of Engineers
BURNS & MCDONNELL
9400 WARD PARKWAY
KANSAS CITY, MO 64114
SYMBOL REVISIONS DATE APPROVED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY:
SUBMITTED BY:
PLOT SCALE:
DATE:
FILE NUMBER:
SHEET
IDENTIFICATION
SOLICITATION NO.:
CONTRACT NO.:
SIZE:
42x30
BLDG 3001 PLATING SHOP RENOVATIONS
TINKER AIR FORCE BASE
OKLAHOMA CITY, OKLAHOMA
FY:15
C O P Y R I G H T
W912BV-15-R0093
AREA A AREA B AREA C AREA D AREA E AREA F AREA G AREA H
KEYED NOTES:
UPON COMPLETION OF AREA B RENOVATION IN PHASE 5,
INSTALL TANKS 101 AND 103, AS WELL AS CHEMICAL MIXING,
BARREL WASHING, BLACK LIGHT INSPECTION, BRUSH PLATING,
AND MASK CLEANING IN AREA B.
MECHANICAL PHASING OPERATING FLOOR
A5
BUCKET WASH
WEIGH HOOD
SF-1004
RELOCATED
EXISTING
SALT FOG
CHAMBER
RELOCATED
EXISTING
MASKING
HOODS
RELOCATED
EXISTING
OVEN
SK-2
SK-2
T-103
T-101
M SCHLUENDER
C. MCAFEE
M. SCHLUENDER
G. REWALD
J. KLING
1:1
OPERATING FLOOR
PH 6 MECH PHASING PLAN
G-6110
78794-MG6110.DWG
2/06/15
D
C
B
A ofSheet
TULSA, OKLAHOMA
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
A
B
C
D
US Army Corps of Engineers
BURNS & MCDONNELL
9400 WARD PARKWAY
KANSAS CITY, MO 64114
SYMBOL REVISIONS DATE APPROVED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY:
SUBMITTED BY:
PLOT SCALE:
DATE:
FILE NUMBER:
SHEET
IDENTIFICATION
SOLICITATION NO.:
CONTRACT NO.:
SIZE:
42x30
BLDG 3001 PLATING SHOP RENOVATIONS
TINKER AIR FORCE BASE
OKLAHOMA CITY, OKLAHOMA
FY:15
C O P Y R I G H T
W912BV-15-R0093
AREA A AREA B AREA C AREA D AREA E AREA F AREA G AREA H
KEYED NOTES:
UPON COMPLETION OF RENOVATION OF AREA B IN PHASE 5,
INSTALL EXHAUST FAN EF-1001 SERVING ORGANISOL TANK
101 LOCATED ON OPERATING FLOOR.
UPON RELOCATION OF EXISTING MASKING HOODS FROM
AREA A TO AREA B, RELOCATE EXHAUST FAN EF-1002 IN
APPROXIMATE LOCATION.
UPON INSTALLATION OF NEW WEIGH HOOD IN AREA B,
INSTALL EXHAUST FAN EF-1003 IN APPROXIMATE LOCATION.
MECHANICAL PHASING PLAN ROOF
A5
EF-1002
EF-1002
2EF-1003
M SCHLUENDER
C. MCAFEE
M. SCHLUENDER
G. REWALD
J. KLING
1:1
ROOF
PH 6 MECH PHASING PLAN
G-6140
78794-MG6140.DWG
2/06/15
D
C
B
A ofSheet
TULSA, OKLAHOMA
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
A
B
C
D
US Army Corps of Engineers
BURNS & MCDONNELL
9400 WARD PARKWAY
KANSAS CITY, MO 64114
SYMBOL REVISIONS DATE APPROVED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY:
SUBMITTED BY:
PLOT SCALE:
DATE:
FILE NUMBER:
SHEET
IDENTIFICATION
SOLICITATION NO.:
CONTRACT NO.:
SIZE:
42x30
BLDG 3001 PLATING SHOP RENOVATIONS
TINKER AIR FORCE BASE
OKLAHOMA CITY, OKLAHOMA
FY:15
C O P Y R I G H T
KEYPLAN
NTS
N
AREA B
AREA C
AREA D
AREA E
AREA F
AREA G
AREA H
AREA - B
AREA - C
AREA - D
AREA - E
AREA - F
AREA - G
AREA - H
AREA - A
W912BV-15-R0093
N
OPERATING FLOOR AREA A
A5
4' 8'0 2'
KEYED NOTES:
DEMOLISH RO WATER PIPING, FITTINGS, VALVES, AND SUPPORTS AS INDICATED
ON THIS SHEET.
DEMOLISH TEMPORARY COMPRESSED AIR PIPING SERVING SALT FOG
CHAMBERS BACK TO MAIN AND CAP.
DISCONNECT AND RELOCATE EXISTING LAB MASKING HOODS, SALT FOG
CHAMBER, AND ASSOCIATED DUCTWORK, PIPING, AND SUPPORTS TO AREA B.
SEE SHEET MQ6112 FOR NEW LOCATIONS.
3/4" CA
EXISTING
SALT FOG
CHAMBER
EXISTING
MASKING HOOD EXISTING
MASKING HOOD
M SCHLUENDER
C. MCAFEE
M. SCHLUENDER
G. REWALD
J. KLING
1:1
OPERATING FLOOR AREA A
PH 6 MECH DEMO WORK PLAN
MD6111
78794-MD6111.DWG
2/06/15
D
C
B
A ofSheet
TULSA, OKLAHOMA
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
A
B
C
D
US Army Corps of Engineers
BURNS & MCDONNELL
9400 WARD PARKWAY
KANSAS CITY, MO 64114
SYMBOL REVISIONS DATE APPROVED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY:
SUBMITTED BY:
PLOT SCALE:
DATE:
FILE NUMBER:
SHEET
IDENTIFICATION
SOLICITATION NO.:
CONTRACT NO.:
SIZE:
42x30
BLDG 3001 PLATING SHOP RENOVATIONS
TINKER AIR FORCE BASE
OKLAHOMA CITY, OKLAHOMA
FY:15
C O P Y R I G H T
AREA B
AREA C
AREA D
AREA E
AREA F
AREA G
AREA H
N
KEYPLAN
NTS
AREA - B
AREA - C
AREA - D
AREA - E
AREA - F
AREA - G
AREA - H
AREA - A
W912BV-15-R0093
OPERATING FLOOR AREA C
A5
N
DISCONNECT AND RELOCATE OVEN TO AREA B. DEMOLISH VENT UP THROUGH
ROOF AND PATCH ROOF PENETRATION. SEE SHEET MQ6112 FOR ADDITIONAL
INFORMATION. SEE ARCHITECTURAL SHEET A-0500 FOR ROOF PATCH DETAIL.
EXISTING
OVEN OC12803
M SCHLUENDER
C. MCAFEE
M. SCHLUENDER
G. REWALD
J. KLING
1:1
OPERATING FLOOR AREA C
PH 6 MECH DEMO WORK PLAN
MD6113
78794-MD6113.DWG
2/06/15
D
C
B
A ofSheet
TULSA, OKLAHOMA
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
A
B
C
D
US Army Corps of Engineers
BURNS & MCDONNELL
9400 WARD PARKWAY
KANSAS CITY, MO 64114
SYMBOL REVISIONS DATE APPROVED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY:
SUBMITTED BY:
PLOT SCALE:
DATE:
FILE NUMBER:
SHEET
IDENTIFICATION
SOLICITATION NO.:
CONTRACT NO.:
SIZE:
42x30
BLDG 3001 PLATING SHOP RENOVATIONS
TINKER AIR FORCE BASE
OKLAHOMA CITY, OKLAHOMA
FY:15
C O P Y R I G H T
AREA B
AREA C
AREA D
AREA E
AREA F
AREA G
AREA H
N
KEYPLAN
NTS
AREA - B
AREA - C
AREA - D
AREA - E
AREA - F
AREA - G
AREA - H
AREA - A
W912BV-15-R0093
N
OPERATING FLOOR WAX DEWAX AREA
A5
4' 8'0 2'
WAXKEYED NOTES:
EXISTING BLAST CABINET 0C3792, TANK 0C13574, BLAST CABINET 0C15574 AND
VAPOR DEGREASER TO BE REMOVED.
EXISTING DISCONNECTS TO BE DEMOLISHED. SEE ELECTRICAL DEMOLITION
DRAWINGS FOR ADDITIONAL INFORMATION.
BLAST CABINET
OC3792
TANK OCI3574
BLAST CABINET
OCI5574
VAPOR/DEGREASER
M SCHLUENDER
C. MCAFEE
M. SCHLUENDER
G. REWALD
J. KLING
1:1
EQUIPMENT OPERATING WAX DEWAX AREA
PH 6 MECH NEW WORK PLAN
MD6119
78794-MD6119.DWG
7/7/15
D
C
B
A ofSheet
TULSA, OKLAHOMA
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
A
B
C
D
US Army Corps of Engineers
BURNS & MCDONNELL
9400 WARD PARKWAY
KANSAS CITY, MO 64114
SYMBOL REVISIONS DATE APPROVED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY:
SUBMITTED BY:
PLOT SCALE:
DATE:
FILE NUMBER:
SHEET
IDENTIFICATION
SOLICITATION NO.:
CONTRACT NO.:
SIZE:
42x30
BLDG 3001 PLATING SHOP RENOVATIONS
TINKER AIR FORCE BASE
OKLAHOMA CITY, OKLAHOMA
FY:15
C O P Y R I G H T
AREA B
AREA C
AREA D
AREA E
AREA F
AREA G
AREA H
N
KEYPLAN
NTS
AREA - B
AREA - C
AREA - D
AREA - E
AREA - F
AREA - G
AREA - H
AREA - A
W912BV-15-R0093
N
MECHANICAL DEMO PLAN - AREA A
DISCONNECT EF-1002, EQUIPMENT CURB, DUCTWORK AND RELOCATE TO
AREA B. SEE SHEET MQ6142 FOR NEW LOCATION. REPAIR AND SEAL ALL
ROOF PENETRATIONS FROM EXISTING INSTALLATION.
EXISTING ROOF FAN
TO REMAIN
EXISTING ROOF FAN
TO REMAIN
EXISTING ROOF FAN
TO REMAIN
EXISTING EF-1002
M SCHLUENDER
C. MCAFEE
M. SCHLUENDER
G. REWALD
J. KLING
1:1
ROOF AREA A
PH 6 MECH DEMO WORK PLAN
MD6141
78794-MD6141.DWG
2/06/15
RELOCATED
EXISTING
MASKING
TABLES
5 4 3 2 1
12345
D
C
B
A ofSheet
TULSA, OKLAHOMA
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
A
B
C
D
US Army Corps of Engineers
BURNS & MCDONNELL
9400 WARD PARKWAY
KANSAS CITY, MO 64114
SYMBOL REVISIONS DATE APPROVED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY:
SUBMITTED BY:
PLOT SCALE:
DATE:
FILE NUMBER:
SHEET
IDENTIFICATION
SOLICITATION NO.:
CONTRACT NO.:
SIZE:
42x30
BLDG 3001 PLATING SHOP RENOVATIONS
TINKER AIR FORCE BASE
OKLAHOMA CITY, OKLAHOMA
FY:15
C O P Y R I G H T
AREA B
AREA C
AREA D
AREA E
AREA F
AREA G
AREA H
N
KEYPLAN
NTS
AREA - B
AREA - C
AREA - D
AREA - E
AREA - F
AREA - G
AREA - H
AREA - A
W912BV-15-R0093
N
OPERATING FLOOR AREA B
NEW LOCATION AND ORIENTATION OF EXISTING OVEN RELOCATED FROM AREA
C (SEE SHEET MD6113). PROVIDE NEW VENT AS SHOWN ON MH6112. SEE SHEET
MH6112 FOR DUCTWORK.
NEW LOCATION AND ORIENTATION OF EXISTING LAB MASKING HOODS
RELOCATED FROM AREA A, SEE SHEET MD6111. SEE SHEET MH6112 FOR
DUCTWORK.
NEW LOCATION AND ORIENTATION OF EXISTING SALT FOG CHAMBER
RELOCATED FROM AREA A, SEE SHEET MD6111..
SUPPLY FAN SF-1004 MOUNTED ABOVE WEIGH HOOD AND DUCTED IN TO SERVE
HOOD. SEE DETAIL ON SHEET M-0508 FOR ADDITIONAL INFORMATION.
UPON COMPLETION OF RENOVATION OF AREA B, INSTALL TANKS T-101 AND
T-103. TANK T-103 IS A RELOCATED EXISTING TANK THAT WAS RETAINED IN
PHASE 3 (SEE SHEET MD3111) AND T-101 IS RETAINED FROM STORAGE.
43'-3" 14'-7"
9'-7"
T-103 T-101
NEW SK-2
NEW SK-2
CAX
ORGANISOL
OVEN
BUCKET
WASH
WEIGH HOOD
RELOCATED
SALT FOG
CHAMBER
SF-1004
1'-11"
9'-2"
M SCHLUENDER
C. MCAFEE
M. SCHLUENDER
G. REWALD
J. KLING
1:1
EQUIPMENT OPERATING FLOOR AREA B
PH 6 MECH NEW WORK PLAN
MQ6112
78794-MQ6112.DWG
2/06/15
D
C
B
A ofSheet
TULSA, OKLAHOMA
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
A
B
C
D
US Army Corps of Engineers
BURNS & MCDONNELL
9400 WARD PARKWAY
KANSAS CITY, MO 64114
SYMBOL REVISIONS DATE APPROVED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY:
SUBMITTED BY:
PLOT SCALE:
DATE:
FILE NUMBER:
SHEET
IDENTIFICATION
SOLICITATION NO.:
CONTRACT NO.:
SIZE:
42x30
BLDG 3001 PLATING SHOP RENOVATIONS
TINKER AIR FORCE BASE
OKLAHOMA CITY, OKLAHOMA
FY:15
C O P Y R I G H T
AREA B
AREA C
AREA D
AREA E
AREA F
AREA G
AREA H
N
KEYPLAN
NTS
AREA - B
AREA - C
AREA - D
AREA - E
AREA - F
AREA - G
AREA - H
AREA - A
W912BV-15-R0093
N
EQUIPMENT OPERATING FLOOR DEWAX AREA
WAX
T-1021 T-1019 T-1017
T-1015 T-1013
T-1011 T-1009 T-1007
T-1005 T-1003 T-1001
2 2
2 2 2
BC-1
BC-3
BC-4BC-2
KEYED NOTES:
OVEN OC4750 AND OC4749 SHALL BE RENOVATED PER SPECIFICATION 42 15 19.
RENUMBER TANKS PER SPECIFICATION 43 41 23, PAGE 4 SECTION 2.5.6.
PROVIDE PHENOLIC-PLASTIC IDENTIFICATION PLATE STATING TANK NUMBER,
PROCESS NAME AND TEMPERATURE WITH LETTERS AT LEAST 2 INCHES HIGH.
SEE DETAIL ON SHEET M-0503 FOR ADDITIONAL INFORMATION.
INSTALL NEW BLAST CABINETS BC-1, BC-2, BC-3, AND BC-4. INSTALL
ASSOCIATED DUCT COLLECTORS DC-1, DC-2, DC-3, AND DC-4 AND
INTERCONNECTING DUCTWORK.
REPLACE MONORAIL HOIST IN QUANTITY AND KIND. NEW HOIST SHALL HAVE
THE SAME CAPACITY AND METHOD OF ELECTRIFICATION AS THE EXISTING
HOIST. NEW HOIST SHALL UTILIZE THE EXISTING MONORAILS.
OVEN OC20608 SHALL BE RENOVATED PER SPECIFICATION 42 15 19.
PARTIAL EXISTING
CRANE RAIL (TYP.)
PARTIAL EXISTING
CRANE RAIL (TYP.)
NEW MOTORIZED
1/2 TON CHAIN
HOIST (2 PER LINE)
NEW MOTORIZED
1/2 TON CHAIN
HOIST (2 PER LINE)
NEW CONTROLLER WITH PLC
NEW CONTROLLER WITH PLC
NEW CONTROLLER WITH PLC
EXISTING OVEN
OC4750
EXISTING OVEN
OC20608
EXISTING OVEN
OC4749
DC-1 DC-3
DC-4DC-2
3 3
9'-0"
9'-0"
7'-10"
7'-10"
M SCHLUENDER
C. MCAFEE
M. SCHLUENDER
G. REWALD
J. KLING
1:1
EQUIPMENT OPERATING FLR DEWAX AREA
PH 6 MECH NEW WORK PLAN
MQ6119
78794-MQ6119.DWG
8/26/14
D
C
B
A ofSheet
TULSA, OKLAHOMA
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
A
B
C
D
US Army Corps of Engineers
BURNS & MCDONNELL
9400 WARD PARKWAY
KANSAS CITY, MO 64114
SYMBOL REVISIONS DATE APPROVED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY:
SUBMITTED BY:
PLOT SCALE:
DATE:
FILE NUMBER:
SHEET
IDENTIFICATION
SOLICITATION NO.:
CONTRACT NO.:
SIZE:
42x30
BLDG 3001 PLATING SHOP RENOVATIONS
TINKER AIR FORCE BASE
OKLAHOMA CITY, OKLAHOMA
FY:15
C O P Y R I G H T
AREA B
AREA C
AREA D
AREA E
AREA F
AREA G
AREA H
N
KEYPLAN
NTS
AREA - B
AREA - C
AREA - D
AREA - E
AREA - F
AREA - G
AREA - H
AREA - A
W912BV-15-R0093
N
EQUIPMENT ROOF AREA B
A5
4' 8'0 2'
KEYED NOTES:
NEW LOCATION OF EXISTING EXHAUST FAN EF-1002
SERVING EXISTING LAB MASKING HOODS RELOCATED
FROM AREA A, SEE SHEET MD6141. FURNISH NEW ROOF
PENETRATION AND MOUNT EXHAUST FAN.
EF-10011 EF-1002
EF-1003
RELOCATED EQUIPMENT
RAIL
NEW EQUIPMENT
RAIL
NEW EQUIPMENT
RAIL
M SCHLUENDER
C. MCAFEE
M. SCHLUENDER
G. REWALD
J. KLING
1:1
EQUIPMENT ROOF AREA B
PH 6 MECH NEW WORK PLAN
MQ6142
78794-MQ6142.DWG
2/06/15
D
C
B
A ofSheet
TULSA, OKLAHOMA
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
A
B
C
D
US Army Corps of Engineers
BURNS & MCDONNELL
9400 WARD PARKWAY
KANSAS CITY, MO 64114
SYMBOL REVISIONS DATE APPROVED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY:
SUBMITTED BY:
PLOT SCALE:
DATE:
FILE NUMBER:
SHEET
IDENTIFICATION
SOLICITATION NO.:
CONTRACT NO.:
SIZE:
42x30
BLDG 3001 PLATING SHOP RENOVATIONS
TINKER AIR FORCE BASE
OKLAHOMA CITY, OKLAHOMA
FY:15
C O P Y R I G H T
AREA B
AREA C
AREA D
AREA E
AREA F
AREA G
AREA H
N
KEYPLAN
NTS
AREA - B
AREA - C
AREA - D
AREA - E
AREA - F
AREA - G
AREA - H
AREA - A
W912BV-15-R0093
N
HVAC OPERATING FLOOR AREA B
RETAIN EXISTING EXHAUST HOOD DUCT AND
RECONNECT TO LAB HOODS. EXTEND NEW 14"Ø DUCT
UP THROUGH ROOF TO EXHAUST FAN EF-1002. SEE
SHEET MH6142 FOR ADDITIONAL INFORMATION.
CONNECT NEW TANK EXHAUST DUCT DIRECTLY TO NEW
TANK EXHAUST HOODS.
SEE WEIGH HOOD DETAIL ON SHEET M-0508 FOR
ADDITIONAL INFORMATION.
12"Ø UP TO MEZZANINE LEVEL8"Ø (TYP.)
T-103 T-101
14"Ø UP TO EF-1002
10"Ø (TYP 2)
6"Ø EXHAUST UP
304 STAINLESS HOOD
AND DUCT WORK
16"Ø EXHAUST UP TO
MEZZANINE LEVEL
10"Ø SUPPLY FROM
SF-1004 SERVING
WEIGH HOOD
EXISTING LAB
MASKING HOOD
RELOCATED OVEN
M SCHLUENDER
C. MCAFEE
M. SCHLUENDER
G. REWALD
J. KLING
1:1
HVAC OPERATING FLOOR AREA B
PH 6 MECH NEW WORK PLAN
MH6112
78794-MH6112.DWG
2/06/15
D
C
B
A ofSheet
TULSA, OKLAHOMA
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
A
B
C
D
US Army Corps of Engineers
BURNS & MCDONNELL
9400 WARD PARKWAY
KANSAS CITY, MO 64114
SYMBOL REVISIONS DATE APPROVED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY:
SUBMITTED BY:
PLOT SCALE:
DATE:
FILE NUMBER:
SHEET
IDENTIFICATION
SOLICITATION NO.:
CONTRACT NO.:
SIZE:
42x30
BLDG 3001 PLATING SHOP RENOVATIONS
TINKER AIR FORCE BASE
OKLAHOMA CITY, OKLAHOMA
FY:15
C O P Y R I G H T
AREA B
AREA C
AREA D
AREA E
AREA F
AREA G
AREA H
N
KEYPLAN
NTS
AREA - B
AREA - C
AREA - D
AREA - E
AREA - F
AREA - G
AREA - H
AREA - A
W912BV-15-R0093
N
HVAC MEZZANINE AREA B
12"Ø DN TO T-101
& UP TO EF-1001
ON ROOF
14"Ø UP TO
EF-1002 ON ROOF
14"Ø DN TO
MASKING HOODS
6"Ø EXHAUST
UP TO ROOF
6" EXHAUST
UP FROM
OVEN
PROVIDE DUCT FITTINGS AS REQUIRED TO ROUTE DUCT TO AVOID ADJACENT
LARGER DUCT.
16"Ø UP FROM OPERATING
FLOOR, UP TO EF-1003 ON ROOF
M SCHLUENDER
C. MCAFEE
M. SCHLUENDER
G. REWALD
J. KLING
1:1
HVAC MEZZANINE AREA B
PH 6 MECH NEW WORK PLAN
MH6122
78794-MH6122.DWG
2/06/15
D
C
B
A ofSheet
TULSA, OKLAHOMA
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
A
B
C
D
US Army Corps of Engineers
BURNS & MCDONNELL
9400 WARD PARKWAY
KANSAS CITY, MO 64114
SYMBOL REVISIONS DATE APPROVED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY:
SUBMITTED BY:
PLOT SCALE:
DATE:
FILE NUMBER:
SHEET
IDENTIFICATION
SOLICITATION NO.:
CONTRACT NO.:
SIZE:
42x30
BLDG 3001 PLATING SHOP RENOVATIONS
TINKER AIR FORCE BASE
OKLAHOMA CITY, OKLAHOMA
FY:15
C O P Y R I G H T
AREA B
AREA C
AREA D
AREA E
AREA F
AREA G
AREA H
N
KEYPLAN
NTS
AREA - B
AREA - C
AREA - D
AREA - E
AREA - F
AREA - G
AREA - H
AREA - A
W912BV-15-R0093
N
HVAC ROOF AREA B
12"Ø
EF-1001
12"Ø UP FROM
MEZZANINE
REFER TO STRUCTURAL AND ARCHITECTURAL DETAILS FOR
ADDITIONAL INFORMATION ON DUCT PENETRATIONS THROUGH THE
ROOF.
DUCT TRANSITION FROM EXHAUST FAN TO EXHAUST STACK SHALL BE
NO MORE THAN 15 DEGREE ANGLE. EXHAUST STACK SHALL BE 16"
DIAMETER AND 72" TALL.
KEYED NOTES:
EF-1002
14"Ø
14"Ø UP FROM
MEZZANINE
6"Ø EXHAUST
GOOSENECK
10"Ø EXHAUST
STACK
10"Ø EXHAUST
STACK
EF-1003
16"Ø
16"Ø UP FROM
MEZZANINE
16"Ø EXHAUST
STACK
UP FROM
OVEN
PROVIDE BIRD
SCREEN ON OUTLET
NEW ROOF CURB
NEW ROOF CURB
NEW ROOF CURB
M SCHLUENDER
C. MCAFEE
M. SCHLUENDER
G. REWALD
J. KLING
1:1
HVAC ROOF AREA B
PH 6 NEW WORK PLAN
MH6142
78794-MH6142.DWG
2/06/15
D
C
B
A ofSheet
TULSA, OKLAHOMA
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
A
B
C
D
US Army Corps of Engineers
BURNS & MCDONNELL
9400 WARD PARKWAY
KANSAS CITY, MO 64114
SYMBOL REVISIONS DATE APPROVED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY:
SUBMITTED BY:
PLOT SCALE:
DATE:
FILE NUMBER:
SHEET
IDENTIFICATION
SOLICITATION NO.:
CONTRACT NO.:
SIZE:
42x30
BLDG 3001 PLATING SHOP RENOVATIONS
TINKER AIR FORCE BASE
OKLAHOMA CITY, OKLAHOMA
FY:15
C O P Y R I G H T
CONNECT EXHAUST DUCT TO EXHAUST HOOD.
DUCT TRANSITION FROM EXHAUST FAN TO EXHAUST
STACK SHALL BE NO MORE THAN 15 DEGREE ANGLE.
(TYP.)
SECTION LOOKING NORTH AREA B
2 2
MANUAL VOLUME
DAMPER (MVD)
MVD MVD
MVD
M SCHLUENDER
C. MCAFEE
M. SCHLUENDER
G. REWALD
J. KLING
1:1
HVAC AREA B
PH 6 MECH NEW WORK SECTIONS
MH6301
78794-MH6301.DWG
2/06/15
D
C
B
A ofSheet
TULSA, OKLAHOMA
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
A
B
C
D
US Army Corps of Engineers
BURNS & MCDONNELL
9400 WARD PARKWAY
KANSAS CITY, MO 64114
SYMBOL REVISIONS DATE APPROVED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY:
SUBMITTED BY:
PLOT SCALE:
DATE:
FILE NUMBER:
SHEET
IDENTIFICATION
SOLICITATION NO.:
CONTRACT NO.:
SIZE:
42x30
BLDG 3001 PLATING SHOP RENOVATIONS
TINKER AIR FORCE BASE
OKLAHOMA CITY, OKLAHOMA
FY:15
C O P Y R I G H T
AREA B
AREA C
AREA D
AREA E
AREA F
AREA G
AREA H
N
KEYPLAN
NTS
AREA - B
AREA - C
AREA - D
AREA - E
AREA - F
AREA - G
AREA - H
AREA - A
W912BV-15-R0093
N
PIPING BASEMENT AREA B
TERMINATE PIPE 3/4" BELOW TOP OF TRENCH.
CONNECT NEW RWE BRANCH PIPING TO EXISTING MAIN
AND ROUTE AS INDICATED. ROUTE RWE BRANCH PIPING
TO EEWS ON OPERATING FLOOR.
CONNECT NEW COMPRESSED AIR (CA) MAIN PIPE TO
EXISTING BRANCH PIPING AND ROUTE AS INDICATED ON
THIS SHEET.
CONNECT NEW REVERSE OSMOSIS SUPPLY (RO-S)
BRANCH PIPING TO EXISTING MAIN AND ROUTE AS
INDICATED ON THIS SHEET.
CONNECT NEW POTABLE WATER (PW) BRANCH PIPING
TO EXISTING MAIN AND ROUTE AS INDICATED ON THIS
SHEET.
3/4" RO UP
TO T-103
1 1/2" RO-S
BOP EL -1'-7"
3/4" RO UP TO SALT
FOG CHAMBER
3/4" CA UP TO SALT
FOG CHAMBER
3/4" CA
BOP EL -2'-3"
3" WD DN
TO TRENCH
3" WD
BOP EL -2'-0"
2" WD DN
FROM SK-1
1/2" RO UP
TO SK-1
2" WD DN FROM SK-1
1/2" RO UP TO SK-1
2" WD
BOP EL -2'-0"
3" WD UP TO FD
3" WD
BOP EL -2'-0"
3" WD
2" WD DN
TO TRENCH
1 1/4" RWE
BOP EL -2'-0"
1 1/4" RWE
BOP EL -2'-0"
CONNECT RWE
TO EXISTING RWE
CONNECT RWE TO
EXISTING RWE
3" WD DN
TO TRENCH
1" RO-S
BOP EL. -1'-6"
3/4" CA UP
1" RO UP TO HB-1
1" PW
BOP EL -2'-0"
1" WD DN
TO TRENCH
1" PW UP TO BUCKET
WASH
1" WD DN FROM
BUCKET WASH
EXIST. 2" RWE
EXIST. 1 1/2" PW
EXIST. 1" CA
EXIST. 2" RWE
EXIST. 2 1/2" RO-S
EXIST. 1 1/2" RO-R
EXIST. 1" CA
M SCHLUENDER
C. MCAFEE
M. SCHLUENDER
G. REWALD
J. KLING
1:1
PIPING BASEMENT AREA B
PH 6 MECH NEW WORK PLAN
MP6102
78794-MP6102.DWG
2/06/15
D
C
B
A ofSheet
TULSA, OKLAHOMA
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
A
B
C
D
US Army Corps of Engineers
BURNS & MCDONNELL
9400 WARD PARKWAY
KANSAS CITY, MO 64114
SYMBOL REVISIONS DATE APPROVED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY:
SUBMITTED BY:
PLOT SCALE:
DATE:
FILE NUMBER:
SHEET
IDENTIFICATION
SOLICITATION NO.:
CONTRACT NO.:
SIZE:
42x30
BLDG 3001 PLATING SHOP RENOVATIONS
TINKER AIR FORCE BASE
OKLAHOMA CITY, OKLAHOMA
FY:15
C O P Y R I G H T
AREA B
AREA C
AREA D
AREA E
AREA F
AREA G
AREA H
N
KEYPLAN
NTS
AREA - B
AREA - C
AREA - D
AREA - E
AREA - F
AREA - G
AREA - H
AREA - A
W912BV-15-R0093
N
PIPING OPERATING FLOOR AREA B
SK-2 SK-2
2" WD DN TO BASEMENT
1/2" RO UP FROM BASEMENT
2" WD DN TO BASEMENT
1/2" RO UP FROM BASEMENT 1
FD
1 1/4" RWE UP
FROM BASEMENT
EEWS
FD
1 1/4" RWE UP FROM
BASEMENT
EEWS
3/4" RO DN TO BASEMENT
3/4" CA DN TO BASEMENT
3/4" RO
1 1/2" V UP TO MEZZANINE
1 1/2" V UP TO MEZZANINE
COMPRESSED AIR
QUICK DISCONNECT
1" RO-S UP FROM
BASEMENT TO HB-1
1" PW UP FROM BASEMENT
1" WD DN TO BASEMENT
SALT FOG CHAMBER
3/4" CA UP FROM
BASEMENT
BUCKET WASH
KEYED NOTES:
CONNECT 1/2" RO SUPPLY PIPE TO FAUCET SERVING SK-2.
CONNECT 2" WD TO SK-2 DRAIN. CONNECT 1 1/2" V TO SK-2.
SEE FIXTURE SCHEDULE IN PHASE 0 FOR ADDITIONAL
INFORMATION.
HOSE BIBB LOCATION. 1" RO PIPE FED FROM BASEMENT.
SEE DETAIL ON SHEET M-0502 FOR ADDITIONAL
INFORMATION.
NEW FLOOR DRAIN INSTALLED TO SERVE NEW EEWS.
ROUTE 3" WASTEWATER DRAIN (WD) DOWN TO BASEMENT.
CONNECT PIPING TO BUCKET WASH PER
MANUFACTURER'S RECOMMENDATIONS.
M SCHLUENDER
C. MCAFEE
M. SCHLUENDER
G. REWALD
J. KLING
1:1
PIPING OPERATING FLOOR AREA B
PH 6 MECH NEW WORK PLAN
MP6112
78794-MP6112.DWG
2/06/15
D
C
B
A ofSheet
TULSA, OKLAHOMA
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
A
B
C
D
US Army Corps of Engineers
BURNS & MCDONNELL
9400 WARD PARKWAY
KANSAS CITY, MO 64114
SYMBOL REVISIONS DATE APPROVED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY:
SUBMITTED BY:
PLOT SCALE:
DATE:
FILE NUMBER:
SHEET
IDENTIFICATION
SOLICITATION NO.:
CONTRACT NO.:
SIZE:
42x30
BLDG 3001 PLATING SHOP RENOVATIONS
TINKER AIR FORCE BASE
OKLAHOMA CITY, OKLAHOMA
FY:15
C O P Y R I G H T
AREA B
AREA C
AREA D
AREA E
AREA F
AREA G
AREA H
N
KEYPLAN
NTS
AREA - B
AREA - C
AREA - D
AREA - E
AREA - F
AREA - G
AREA - H
AREA - A
W912BV-15-R0093
N
PIPING OPERATING FLOOR DEWAX AREA
A5
4' 8'0 2'
WAX
T-1021 T-1019 T-1017
T-1015 T-1013
T-1011 T-1009 T-1007
T-1005 T-1003 T-1001
NEW 2" CA
1 1/2" CA
EXISTING CA
CONNECT TO
EXISTING CA MAIN
1" CA DN
TO BC-3
1" CA
1" CA
1" CA DN
TO BC-4
1" CA DN
TO BC-1
1" CA DN
TO BC-2
1" CA
KEYED NOTES:
CONNECT NEW 2" COMPRESSED AIR (CA) BRANCH PIPING TO EXISTING MAIN AS
INDICATED ON THIS SHEET. ELEVATION OF NEW BRANCH PIPING SHALL MATCH
THAT OF EXISTING MAIN. FIELD VERIFY APPROXIMATE PIPE ELEVATION.
BC-1
BC-3
BC-4
BC-2
DC-1
DC-3
DC-4
DC-2
EXISTING OVEN
OC4750
EXISTING OVEN
OC20608
EXISTING OVEN
OC4749
1" CA DN
TO DC-4
1" CA DN
TO DC-3
1" CA DN
TO DC-2
1" CA DN
TO DC-1
M SCHLUENDER
C. MCAFEE
M. SCHLUENDER
G. REWALD
J. KLING
1:1
PIPING OPERATING FLOOR DEWAX AREA
PH 6 MECH NEW WORK PLAN
MP6119
78794-MP6119.DWG
8/12/15
D
C
B
A ofSheet
TULSA, OKLAHOMA
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
A
B
C
D
US Army Corps of Engineers
BURNS & MCDONNELL
9400 WARD PARKWAY
KANSAS CITY, MO 64114
SYMBOL REVISIONS DATE APPROVED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY:
SUBMITTED BY:
PLOT SCALE:
DATE:
FILE NUMBER:
SHEET
IDENTIFICATION
SOLICITATION NO.:
CONTRACT NO.:
SIZE:
42x30
BLDG 3001 PLATING SHOP RENOVATIONS
TINKER AIR FORCE BASE
OKLAHOMA CITY, OKLAHOMA
FY:15
C O P Y R I G H T
AREA B
AREA C
AREA D
AREA E
AREA F
AREA G
AREA H
N
KEYPLAN
NTS
AREA - B
AREA - C
AREA - D
AREA - E
AREA - F
AREA - G
AREA - H
AREA - A
W912BV-15-R0093
N
PIPING MEZZANINE AREA B
A5
4' 8'0 2'
KEYED NOTES:
2" VENT PIPE UP, INCREASE TO 3" VTR.
1 1/2" VENT UP FROM
OPERATING FLOOR
1 1/2" VENT UP FROM
OPERATING FLOOR
2" V
BOP EL 16'-0"
2" VTR
1 1/2" PW
2" SWM
2" CA
1/2" NaOH
M SCHLUENDER
C. MCAFEE
M. SCHLUENDER
G. REWALD
J. KLING
1:1
PIPING MEZZANINE AREA B
PH 6 MECH NEW WORK PLAN
MP6122
78794-MP6122.DWG
8/26/14
D
C
B
A ofSheet
TULSA, OKLAHOMA
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
A
B
C
D
US Army Corps of Engineers
BURNS & MCDONNELL
9400 WARD PARKWAY
KANSAS CITY, MO 64114
SYMBOL REVISIONS DATE APPROVED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY:
SUBMITTED BY:
PLOT SCALE:
DATE:
FILE NUMBER:
SHEET
IDENTIFICATION
SOLICITATION NO.:
CONTRACT NO.:
SIZE:
42x30
BLDG 3001 PLATING SHOP RENOVATIONS
TINKER AIR FORCE BASE
OKLAHOMA CITY, OKLAHOMA
FY:15
C O P Y R I G H T
2' 4'0 1'
2' 4'0 1'
ROUTE AND CONNECT NEW REVERSE OSMOSIS SUPPLY (RO-S)
BRANCH PIPE TO EXISTING MAIN.
CONNECT NEW RWE BRANCH PIPING TO EXISTING MAIN AND
ROUTE AS INDICATED. ROUTE RWE BRANCH PIPING TO EEWS ON
OPERATING FLOOR.
CONNECT NEW CR BRANCH PIPING TO EXISTING MAIN AND ROUTE
AS INDICATED.
CONNECT NEW PW BRANCH PIPING TO EXISTING MAIN AND ROUTE
AS INDICATED.
KEYED NOTES:
M SCHLUENDER
C. MCAFEE
M. SCHLUENDER
G. REWALD
J. KLING
1:1
SECTIONS BASEMENT AREA B
PH 6 MECH NEW WORK
MP6350
78794-MP6350.DWG
2/06/15
| 1 - Sheet - SET 8 COVER - SHEET |
| 1 - Sheet - SET 8 INDEX - SHEET |
| Phase 6_Final |
| 78794-MG6100-PHASE 6 |
| 78794-MG6110-MG6101 PHASE 6 |
| 78794-MG6140-PHASE 6 |
| 78794-MD6111-DEMO WORK PLAN AREA A |
| 78794-MD6113-DEMO WORK PLAN AREA C |
| 78794-MD6119-EQUIPMENT PLAN OPERATING WAX DEWAX AREA |
| 78794-MD6141-DEMO WORK PLAN ROOF AREA A |
| 78794-MQ6112-EQUIPMENT PLAN OPERATING AREA B |
| 78794-MQ6119-EQUIPMENT PLAN OPERATING DEWAX AREA |
| 78794-MQ6142-EQUIPMENT ROOF AREA B |
| 78794-MH6112-HVAC PLAN OPERATING AREA B |
| 78794-MH6122-HVAC PLAN MEZZANINE LEVEL AREA B |
| 78794-MH6142-HVAC PLAN ROOF AREA B |
| 78794-MH6301-MECHANICAL SECTIONS |
| 78794-MP6102-PIPING PLAN BASEMENT AREA B |
| 78794-MP6112-PIPING PLAN OPERATING AREA B |
| 78794-MP6119-EQUIPMENT PLAN OPERATING DEWAX AREA |
| 78794-MP6122-PIPING PLAN MEZZANINE AREA B |
| 78794-MP6350-PH 6 MECH NEW WORK SECTIONS BASEMENT AREA B |
File details come from the government source that posted it. Updated .