W912BV-15-R-0093_DWGS_1.pdf
PDF 41 MB Posted
- Solicitation number
- W912BV-15-R-0093
About this file
Drawings 1
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5 4 3 2 1
12345
D
C
B
A A
B
C
D
C O
PY
R
IG
H
T
BU
RN
S
AN
D
M
CD
O N
N
EL
L
EN
G
IN
EE
RI
N G
C O
M
PA
N Y, I N
C.
Tulsa District
TINKER AIR FORCE BASE, OKLAHOMA
US Army Corps Of Engineers
Tulsa, OKLAHOMA
CIVIL, ARCHITECTURAL, STRUCTURAL, ELECTRICAL, FIRE ALARM & FIRE PROTECTION
SOLICITATION NO.: W912BV-15-R-0093
CONTRACT NO.:
WWYK150110 - REPLACE ROOF OVER PLATING SHOP AREA
SET 1 OF 8
8/21/2015
78794-A-1000
0 LEGENDS
1 PLANS
2 P&IDS
3 SECTIONS
4 ENLARGED PLANS
5 DETAILS
6 SCHEDULES/DIAGRAMS
7 USED DEFINED
8 USER DEFINED
9 USER DEFINED
PROJECT NUMBER
SHEET FILE NAMING CONVENTION
SHEET DESIGNATOR
A - ARCHITECTURAL
AD - ARCHITECTURAL DEMOLITION
C - CIVIL
E - ELECTRICAL
ED - ELECTRICAL DEMOLITION
EP - ELECTRICAL POWER
EL - ELECTRICAL LIGHTING
EI - ELECTRICAL INSTRUMENTAION
FA - FIRE ALARM
FX - FIRE PROTECTION
G - GENERAL
LS - LIFE SAFETY
SD - STRUCTURAL DEMOLITION
M - MECHANICAL
MD - MECHANICAL DEMOLITION
MH - MECHANICAL HVAC
MP - MECHANICAL PIPING
MQ - MECHANICAL EQUIPMENT
S - STRUCTURAL
SD - STRUCTURAL DEMOLITION
AREA NUMBER*
0 OVERALL PLAN*
1 AREA A
2 AREA B
3 AREA C
4 AREA D
5 AREA E
6 AREA F
7 AREA G
8 AREA H
LEVEL*
0 BASEMENT
1 OPERATING FLOOR
2 MEZZANINE
3 BOTTOM CHORD FRAMING
4 ROOF
5 ROOF PLATFORM
PHASE NUMBER
0 MASTER SET
1 PHASE 1
2 PHASE 2
3 PHASE 3
4 PHASE 4
5 PHASE 5
6 PHASE 6
* LEVEL - PLAN SHEETS ONLY
* AREA - PLAN SHEETS ONLY
* OVERALL - ELECTRICAL OVERALL SHEETS THIS EQUALS SEQUENCE NUMBER
SHEET SERIES
5 4 3 2 1
12345
D
C
B
A A
B
C
D
C O
PY
R
IG
H
T
BU
RN
S
AN
D
M
CD
O N
N
EL
L
EN
G
IN
EE
RI
N G
C O
M
PA
N Y, I N
C.
GENERAL SHEET INDEX
SHEET NUMBER SHEET TITLE
G-0005 GENERAL PHASING NOTES
CIVIL SHEET INDEX
SHEET NUMBER SHEET TITLE
C-0001 ACCESS AND SAFETY PLAN
C-0002 STAGING AND LAYDOWN AREA PLAN
ARCHITECTURAL SHEET INDEX
SHEET NUMBER SHEET TITLE
AD0100 OVERALL DEMOLITION PLAN - BASEMENT
AD0110 OVERALL DEMOLITION PLAN - OPERATING FLOOR
AD0140 OVERALL DEMOLITION PLAN - ROOF
LS-011 LIFE SAFETY PLAN - BASEMENT
LS-012 LIFE SAFETY PLAN - OPERATING FLOOR
LS-013 LIFE SAFETY PLAN - MEZZANINE
A-0100 OVERALL PLAN - BASEMENT
A-0110 OVERALL PLAN - OPERATING FLOOR
A-0112 AREA PLAN - OPERATING FLOOR - AREA B
A-0114 AREA PLAN - OPERATING FLOOR - AREA F
A-0120 OVERALL PLAN - MEZZANINE
A-0140 OVERALL PLAN - ROOF
A-0400 STAIR PLANS AND SECTIONS
A-0500 ROOF & PENETRATION DETAILS
A-0600 SCHEDULES
STRUCTURAL SHEET INDEX
SHEET NUMBER SHEET TITLE
S-0001 GENERAL NOTES, LEGEND & ABBREVIATIONS
S-0002 STATEMENT OF SPECIAL INSPECTIONS
S-0003 TYPICAL DETAILS
SD0100 DEMOLITION PLAN BASEMENT OVERALL
SD0110 DEMOLITION PLAN OPERATING FLOOR OVERALL
SD0120 DEMOLITION PLAN MEZZANINE OVERALL
SD0130 DEMOLITION PLAN BOTTOM CHORD OVERALL
SD0140 DEMOLITION PLAN ROOF OVERALL
SD0150 DEMOLITION PLAN ROOF PLATFORM OVERALL
SD1106 PHASE 1 DEMOLITION PLAN BASEMENT AREA F
SD1111 PHASE 1 DEMOLITION PLAN OPERATING FLOOR AREA A
SD1116 PHASE 1 DEMOLITION PLAN OPERATING FLOOR AREA F
SD1126 PHASE 1 DEMOLITION PLAN MEZZANINE AREA F
SD2103 PHASE 2 DEMOLITION PLAN BASEMENT AREA C/D
SD2113 PHASE 2 DEMOLITION PLAN OPERATING FLOOR AREA C/D
SD2153 PHASE 2 DEMOLITION PLAN ROOF PLATFORM AREA C/D
SD3107 PHASE 3 DEMOLITION PLAN BASEMENT AREA G/H
SD3117 PHASE 3 DEMOLITION PLAN OPERATING FLOOR AREA G/H
SD3127 PHASE 3 DEMOLITION PLAN MEZZANINE AREA G/H
SD3137 PHASE 3 DEMOLITION PLAN BOTTOM CHORD AREA G/H
SD3157 PHASE 3 DEMOLITION PLAN ROOF PLATFORM AREA G/H
SD4105 PHASE 4 DEMOLITION PLAN BASEMENT AREA E
SD4115 PHASE 4 DEMOLITION PLAN OPERATING FLOOR AREA E
SD4155 PHASE 4 DEMOLITION PLAN ROOF PLATFORM AREA E
SD5102 PHASE 5 DEMOLITION PLAN BASEMENT AREA B
SD5112 PHASE 5 DEMOLITION PLAN OPERATING FLOOR AREA B
SD5122 PHASE 5 DEMOLITION PLAN MEZZANINE AREA B
SD5142 PHASE 5 DEMOLITION PLAN ROOF AREA B
SD5152 PHASE 5 DEMOLITION PLAN ROOF PLATFORM AREA B
S-0100 FOUNDATION PLAN BASEMENT OVERALL
S-0102 FOUNDATION PLAN BASEMENT AREA B
S-0103 FOUNDATION PLAN BASEMENT AREA C/D
S-0105 FOUNDATION PLAN BASEMENT AREA E
S-0106 FOUNDATION PLAN BASEMENT AREA F
S-0107 FOUNDATION PLAN BASEMENT AREA G/H
S-0110 FRAMING AND SLAB PLAN OPERATING FLOOR OVERALL
S-0111 FLOOR SLAB PLAN OPERATING FLOOR AREA A
S-0112 FRAMING AND SLAB PLAN OPERATING FLOOR AREA B
S-0113 FRAMING AND SLAB PLAN OPERATING FLOOR AREA C/D
S-0115 FRAMING AND SLAB PLAN OPERATING FLOOR AREA E
S-0116 FRAMING AND SLAB PLAN OPERATING FLOOR AREA F
S-0117 FRAMING AND SLAB PLAN OPERATING FLOOR AREA G/H
S-0120 FRAMING PLAN MEZZANINE OVERALL
S-0122 FRAMING PLAN MEZZANINE AREA B
S-0123 FRAMING PLAN MEZZANINE AREA C/D
S-0125 FRAMING PLAN MEZZANINE AREA E
S-0127 FRAMING PLAN MEZZANINE AREA G/H
S-0130 FRAMING PLAN BOTTOM CHORD OVERALL
S-0132 FRAMING PLAN BOTTOM CHORD AREA B
S-0133 FRAMING PLAN BOTTOM CHORD AREA C/D
S-0135 FRAMING PLAN BOTTOM CHORD AREA E
S-0136 FRAMING PLAN BOTTOM CHORD AREA F
S-0137 FRAMING PLAN BOTTOM CHORD AREA G/H
S-0140 FRAMING PLAN ROOF OVERALL
S-0141 FRAMING PLAN ROOF AREA A
S-0142 FRAMING PLAN ROOF AREA B
S-0143 FRAMING PLAN ROOF AREA C/D
S-0145 FRAMING PLAN ROOF AREA E
S-0146 FRAMING PLAN ROOF AREA F
S-0147 FRAMING PLAN ROOF AREA G/H
S-0150 FRAMING PLAN ROOF PLATFORM OVERALL
S-0153 FRAMING PLAN ROOF PLATFORM AREA C/D
S-0155 FRAMING PLAN ROOF PLATFORM AREA E
S-0156 FRAMING PLAN ROOF PLATFORM AREA F
S-0157 FRAMING PLAN ROOF PLATFORM AREA G/H
S-0301 FOUNDATION & FRAMING SECTIONS 1 OF 3
S-0302 FOUNDATION & FRAMING SECTIONS 2 OF 3
S-0303 FOUNDATION & FRAMING SECTIONS 3 OF 3
S-0501 FRAMING SECTIONS & DETAILS 1 OF 2
S-0502 FRAMING SECTIONS & DETAILS 2 OF 2
ELECTRICAL SHEET INDEX
SHEET NUMBER SHEET TITLE
E-0001 ELECTRICAL LEGEND
E-0100 ELECTRICAL DEMOLITION BASEMENT PHASING PLAN
E-0101 ELECTRICAL BASEMENT NEW WORK PHASING PLAN
E-0110 ELECTRICAL DEMOLITION OPERATING FLOOR PHASING PLAN
E-0111 ELECTRICAL OPERATING FLOOR NEW WORK PHASING PLAN
E-0120 ELECTRICAL DEMOLITION MEZZANINE PHASING PLAN
E-0121 ELECTRICAL MEZZANINE NEW WORK PHASING PLAN
E-0140 ELECTRICAL DEMOLITION ROOF PHASING PLAN
E-0141 ELECTRICAL ROOF NEW WORK PHASING PLAN
ED0001 ELECTRICAL DEMOLITION NOTES
ED0100 ELECTRICAL DEMO PLAN - BASEMENT AREA B
ED0103 ELECTRICAL DEMO PLAN - BASEMENT AREA C&D
ED0105 ELECTRICAL DEMO PLAN - BASEMENT AREA E&F
ED0107 ELECTRICAL DEMO PLAN - BASEMENT AREA G&H
ED0110 ELECTRICAL DEMO PLAN - OPERATING FLOOR AREA A&B
ED0113 ELECTRICAL DEMO PLAN - OPERATING FLOOR AREA C&D
ED0115 ELECTRICAL DEMO PLAN - OPERATING FLOOR AREA E&F
ED0117 ELECTRICAL DEMO PLAN - OPERATING FLOOR AREA G&H
ED0118 ELECTRICAL LIGHTING DEMO PLAN - WAX AREA
ED0119 ELECTRICAL POWER DEMO PLAN - WAX AREA
ED0120 ELECTRICAL DEMO PLAN - MEZZANINE AREA A&B
ED0123 ELECTRICAL DEMO PLAN - MEZZANINE AREA C&D
ED0125 ELECTRICAL DEMO PLAN - MEZZANINE AREA E&F
ED0127 ELECTRICAL DEMO PLAN - MEZZANINE AREA G&H
ED0140 ELECTRICAL DEMO PLAN - ROOF AREA A&B
ED0143 ELECTRICAL DEMO PLAN - ROOF AREA C&D
ED0145 ELECTRICAL DEMO PLAN - ROOF AREA E&F
ED0147 ELECTRICAL DEMO PLAN - ROOF AREA G&H
ED0400 ENLARGED ELECTRICAL DEMO PLANS
ED0600 DEMOLITION POWER ONE-LINE DIAGRAM 480Y/277V
ED0601 DEMOLITION POWER ONE-LINE DIAGRAM - 208Y/120V (1 OF 2)
ED0602 DEMOLITION POWER ONE-LINE DIAGRAM - 208Y/120V (2 OF 2)
ED0603 DEMOLITION POWER ONE-LINE DIAGRAM MOTOR CONTROL PANELS
EP0100 ELECTRICAL POWER PLAN - OVERALL BASEMENT
EP0110 ELECTRICAL POWER PLAN - OVERALL OPERATING FLOOR
EP0111 ELECTRICAL POWER PLAN - OVERALL OPERATING FLOOR DC
CONNECTIONS
EP0112 ELECTRICAL POWER PLAN - OVERALL WAX AREA
EP0113 ELECTRICAL POWER PLAN - OVERALL PREP AREA
EP0120 ELECTRICAL POWER PLAN - OVERALL MEZZANINE
EP0121 ELECTRICAL POWER PLAN - OVERALL BUSWAY
EP0140 ELECTRICAL POWER PLAN - OVERALL ROOF
EP0500 CONTROL SCHEMATICS
EP0501 TYPICAL BACK OF TANK POWER & CONTROL CONNECTIONS
EP0503 FRONT OF TANK AC POWER & CONTROL DETAILS
EP0504 FRONT OF TANK AC POWER & CONTROL DETAILS
EP0505 FRONT OF TANK AC POWER & CONTROL DETAILS
EP0506 FRONT OF TANK AC POWER & CONTROL DETAILS
EP0507 FRONT OF TANK AC POWER & CONTROL DETAILS
EP0510 BUSBAR DETAILS
EP0511 BUSBAR DETAILS
EP0512 RECTIFIER CABINET DETAILS
EP0513 TANK DC CONNECTION DETAILS
EP0514 DC CONNECTION DIAGRAMS
EP0515 DC CONNECTION DIAGRAMS
EP0530 EQUIPMENT MOUNTING DETAILS
EP0531 EQUIPMENT MOUNTING DETAILS
EP0540 SECTIONS
EP0600 208Y/120V PANELBOARD SCHEDULES
EP0601 208Y/120V PANELBOARD SCHEDULES
EP0602 208Y/120V PANELBOARD SCHEDULES
EP0603 480Y/277V PANELBOARD SCHEDULES
EP0604 480Y/277V PANELBOARD SCHEDULES
EP0605 480Y/277V PANELBOARD SCHEDULES
EP0606 480Y/277V EMERGENCY PANEL SCHEDULES
EP0607 208Y/120V EMERGENCY PANEL SCHEDULES
EP0608 208Y/120V EMERGENCY PANEL SCHEDULES
EP0609 BUSWAY SCHEDULES
EP0610 BUSWAY SCHEDULES
EP0611 MOTOR CONTROL PANEL SCHEDULES
EP0612 RECTIFIER SCHEDULE
EP0613 MECHANICAL EQUIPMENT SCHEDULE
EP0614 TANK CONTROL SCHEDULE
EP0700 POWER DIAGRAM - BUSWAYS
EP0701 POWER DIAGRAM - EMERGENCY & 208Y/120V SYSTEMS
EI0100 ELECTRICAL INSTRUMENTATION PLAN - OVERALL BASEMENT
EI0110 ELECTRICAL INSTRUMENTATION PLAN - OVERALL OPERATING FLOOR
EI0111 ELECTRICAL INSTRUMENTATION PLAN - OVERALL WAX AREA
EI0113 ELECTRICAL INSTRUMENTATION PLAN - OVERALL PREP AREA
EI0120 ELECTRICAL INSTRUMENTATION PLAN - OVERALL MEZZANINE
EI0140 ELECTRICAL INSTRUMENTATION PLAN - OVERALL ROOF
EI0500 ELECTRICAL INSTRUMENTATION DETAILS
EI0501 ELECTRICAL INSTRUMENTATION DETAILS
EI0502 ELECTRICAL INSTRUMENTATION DETAILS
EI0503 ELECTRICAL INSTRUMENTATION DETAILS
EI0504 ELECTRICAL INSTRUMENTATION DETAILS
EI0505 MAU CONTROL
EI0600 I/O POINTS SCHEDULES
EI0601 I/O POINTS SCHEDULES
EI0602 I/O POINTS SCHEDULES
EI0603 I/O POINTS SCHEDULES
EI0604 I/O POINTS SCHEDULES
EI0605 I/O POINTS SCHEDULES
EI0610 INSTRUMENT SCHEDULE
EI0611 INSTRUMENT SCHEDULE II
EI0700 OVERALL INSTRUMENTATION DIAGRAM
EL0100 ELECTRICAL LIGHTING PLAN - OVERALL BASEMENT
EL0110 ELECTRICAL LIGHTING PLAN - OVERALL OPERATING FLOOR
EL0112 ELECTRICAL LIGHTING PLAN - OVERALL WAX AREA
EL0120 ELECTRICAL LIGHTING PLAN - OVERALL MEZZANINE
EL0500 ELECTRICAL LIGHTING DETAILS
EL0600 LIGHT FIXTURE AND CONTROLS SCHEDULES
FIRE PROTECTION SHEET INDEX
SHEET NUMBER SHEET TITLE
FX0001 FIRE PROTECTION LEGEND AND ABBREVIATIONS
FX0100 FIRE PROTECTION PLAN BASEMENT
FX0110 FIRE PROTECTION PLAN OPERATING FLOOR
FX0120 FIRE PROTECTION PLAN MEZZANINE
FA0001 FIRE ALARM AND MASS NOTIFICATION LEGEND
FA0100 FIRE ALARM AND MASS NOTIFICATION PLAN BASEMENT
FA0110 FIRE ALARM AND MASS NOTIFICATION PLAN OPERATING FLOOR
FA0140 FIRE ALARM AND MASS NOTIFICATION PLAN ROOF
FA0601 FIRE ALARM RISER
FA0602 FIRE ALARM MATRIX
SET 1 OF 8
5 4 3 2 1
12345
D
C
B
A ofSheet
TULSA, OKLAHOMA
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
A
B
C
D
US Army Corps of Engineers
BURNS & MCDONNELL
9400 WARD PARKWAY
KANSAS CITY, MO 64114
SYMBOL REVISIONS DATE APPROVED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY:
SUBMITTED BY:
PLOT SCALE:
DATE:
FILE NUMBER:
SHEET
IDENTIFICATION
SOLICITATION NO.:
CONTRACT NO.:
SIZE:
42x30
BLDG 3001 PLATING SHOP RENOVATIONS
TINKER AIR FORCE BASE
OKLAHOMA CITY, OKLAHOMA
FY:15
C O P Y R I G H T
W912BV-15-R0093
ELECTRICAL GENERAL NOTES
PHASE 1:
1. INSTALL NEW PROCESS CONTROLS SYSTEM IN THE NEW
CONTROL ROOM. INSTALL PLC'S, SERVERS, SWITCHES, PATCH
PANELS, CENTRAL WORKSTATION, CONNECTIONS TO PMXG
OFFICE COMPUTERS, CONNECTION TO FISHER SCIENTIFIC LIMS
SERVER AND ALL ASSOCIATED CABLING AND RACEWAYS.
PREPARE THE PROCESS CONTROL SYSTEM FOR PHASE 2
AREAS.
2. PROVIDE POWER TO CHROME SCRUBBER WATER
RECIRCULATION PUMP P582B IN TEMPORARY LOCATION (SEE
SHEET ED0400).
3. REMOVE POWER, LIGHTING AND CONTROLS IN PHASE 1 DEMO
AREAS AS INDICATED ON ELECTRICAL DEMOLITION DRAWINGS.
PHASE 2:
1. PROVIDE POWER TO RO WATER SYSTEM AS INDICATED ON
ELECTRICAL DRAWINGS. PROVIDE POWER TO RO WATER
SYSTEM DISTRIBUTION PUMPS P-101 AND P-102 IN
TEMPORARY LOCATION OUTSIDE WEST OF AREA A (SEE
SHEET ED0400).
2. REMOVE POWER, LIGHTING AND CONTROLS IN PHASE 2 DEMO
AREAS AS INDICATED ON ELECTRICAL DEMOLITION
DRAWINGS.
3. PROVIDE NEW POWER, LIGHTING AND CONTROLS IN PHASE 2
NEW WORK AREAS AS INDICATED ON ELECTRICAL DRAWINGS.
PROVIDE POWER TO RO WATER SYSTEM DISTRIBUTION
PUMPS P-101 AND P-102 IN FINAL LOCATION. REMOVE PUMP
FEEDERS IN TEMPORARY LOCATION (SEE SHEET ED0400).
PHASE 3:
1. PROVIDE POWER TO MASKING TABLE IN AREA A TEMPORARY
LOCATION (SEE SHEET ED0400).
2. PROVIDE NEW POWER, LIGHTING AND CONTROLS IN PHASE 3
NEW WORK AREAS AS INDICATED ON ELECTRICAL DRAWINGS.
3. REMOVE POWER, LIGHTING AND CONTROLS IN PHASE 3 DEMO
AREAS AS INDICATED ON ELECTRICAL DEMOLITION
DRAWINGS.
PHASE 4:
1. PROVIDE NEW POWER, LIGHTING AND CONTROLS IN PHASE 4
NEW WORK AREAS AS INDICATED ON ELECTRICAL DRAWINGS.
2. REMOVE POWER, LIGHTING AND CONTROLS IN PHASE 4 DEMO
AREAS AS INDICATED ON ELECTRICAL DEMOLITION
DRAWINGS.
PHASE 5:
1. PROVIDE NEW POWER, LIGHTING AND CONTROLS IN PHASE 5
NEW WORK AREAS AS INDICATED ON ELECTRICAL DRAWINGS.
2. REMOVE POWER, LIGHTING AND CONTROLS IN PHASE 5 DEMO
AREAS AS INDICATED ON ELECTRICAL DEMOLITION
DRAWINGS.
3. REMOVE EXHAUST FAN MOTOR CONTROL PANELS ALONG
WALL EAST OF AREA B.
4. REMOVE PROCESS CONTROL CENTRAL ANNUNCIATOR PANEL
ON WALL EAST OF AREA B.
5. REROUTE POWER TO EXISTING OVEN IN TEMPORARY
LOCATION AT EAST END OF AREA B (SEE SHEET ED0400).
REPLACE EXISTING FEEDER.
6. REMOVE POWER FROM CHROME SCRUBBER WATER
RECIRCULATION PUMP P582B IN TEMPORARY LOCATION (SEE
SHEET ED0400). PUMP SHALL BE REMOVED FROM SERVICE.
PHASE 6:
1. PROVIDE NEW POWER, LIGHTING AND CONTROLS IN PHASE 6
NEW WORK AREAS AS INDICATED ON ELECTRICAL DRAWINGS.
2. RELOCATE OVEN TO FINAL AREA B LOCATION AND PROVIDE
NEW FEEDER. REMOVE TEMPORARY FEEDER (SEE SHEET
ED0400).
GENERAL ELECTRICAL NOTES:
GENERAL PHASING ELECTRICAL GUIDELINES
1. WORK IS LIMITED TO PHASE AREAS INDICATED ON GENERAL PHASING
PLANS UON OR WHEN PERFORMING WORK OUTSIDE A PHASE AREA IS
ABSOLUTELY NECESSARY. COORDINATE WORK WITH CONTRACTING
OFFICER TO ENSURE MINIMAL INTERRUPTIONS TO NORMAL SHOP
OPERATIONS IN AREAS OUTSIDE THE CURRENT CONSTRUCTION
PHASE.
2. WORK MAY BE PERFORMED IN THE MAIN NORTH/SOUTH AISLES OF
THE SHOP OPERATING FLOOR (WEST AND EAST SIDES) DURING ANY
PHASE AS LONG AS INTERRUPTIONS TO NORMAL SHOP OPERATIONS
ARE MINIMIZED AND COORDINATED WITH THE CONTRACTING OFFICER
BEFORE STARTING WORK.
3. COORDINATE WITH REPLACEMENT OF OPERATING FLOORS FOR
ACCESS TO EXISTING EQUIPMENT UNDER MEZZANINES.
4. PANELBOARD AND BUSWAY SCHEDULES ON EP0600 SERIES SHEETS
REPRESENT FINAL STATE OF PANELBOARDS AND BUSWAYS AFTER
ALL PHASES ARE COMPLETE. MAINTAIN POWER TO EXISTING LOADS
UNTIL THE PHASE IN WHICH THEY ARE REMOVED.
5. ELECTRICAL WORK MAY BE PERFORMED ON MEZZANINES ADJACENT
TO PHASE AREAS DURING THE SAME PHASE (EVEN IF MEZZANINE IS
NOT SHOWN WITHIN THE PHASE BOUNDARY ON THE PHASING PLAN).
CARE SHALL BE TAKEN TO ENSURE NO MATERIALS, TOOLS, ETC. ARE
DROPPED INTO ACTIVE TANK AREAS. DUST CURTAINS SHALL BE
INSTALLED BETWEEN ACTIVE AREAS AND CURRENT PHASE WORK
AREAS TO PREVENT CONTAMINATION OF ACTIVE TANK AREAS.
ACTIVE TANKS SHALL BE COVERED WITH PLYWOOD AND VISQUEEN
WHEN WORKING IN THE SAME VICINITY.
6. ALL CONDUITS SHALL BE REMOVED BACK TO THE SOURCE OR
CURRENT PHASE BOUNDARY AND FURTHER REMOVED IN
SUBSEQUENT PHASES UNTIL COMPLETELY REMOVED BACK TO THE
SOURCE.
7. EXISTING PROCESS CONTROL SYSTEM COMPONENTS WHICH ARE
CURRENTLY ACTIVE SHALL REMAIN UNTIL NO LONGER REQUIRED TO
SUPPORT EXISTING PROCESSES. CONTROLS SHALL NOT BE
REMOVED UNTIL THE ASSOCIATED PROCESS EQUIPMENT IS
REMOVED.
8. THE EMERGENCY STANDBY GENERATOR SHALL BE TESTED AND
COMMISSIONED AT THE COMPLETION OF EACH PHASE.
9. TESTING AND TRAINING ON POWER, LIGHTING AND CONTROLS
SYSTEMS SHALL OCCUR AFTER EACH PHASE OF WORK. ONLY AFTER
ALL PHASES ARE COMPLETE WILL FINAL TESTING AND ACCEPTANCE
FOR EACH SYSTEM OCCUR.
PHASING NEW WORK KEY PLAN:PHASING DEMOLITION KEY PLAN:
AREA
A
AREA
B
AREA
C
AREA
D
AREA
E
AREA
F
AREA
G
AREA
H
PH
A
SE
PH
A
SE
PH
A
SE
PH
A
SE
PH
A
SE
PH
A
SE
PH
A
SE
PH
A
SE
PHASE 1
PH
A
SE
PH
A
SE
PH
A
SE
PH
A
SE
PH
A
SE
PH
A
SE
PH
A
SE
PH
A
SE
PHASE 2
FIRE PROTECTION GENERAL NOTES
FIRE SPRINKLER:
1. DEMOLITION ACTIVITIES SHALL FOLLOW THE GENERAL
PHASING PLAN.
2. DEMOLITION IN EACH PHASE SHALL BE PLANNED AND
COORDINATED TO MINIMIZE THE IMPAIRMENT TIME TO THE
SYSTEM.
3. ONLY THE BRANCH LINES ARE TO BE REMOVED ON THE
SPRINKLER SYSTEM IN THE BASEMENT. CROSS AND FEED
MAINS ARE TO REMAIN.
4. PIPING THAT REMAINS IN SERVICE AFTER A DEMOLITION PHASE
SHALL BE PROPERLY SUPPORTED AND PROTECTED TO
PREVENT DAMAGE.
5. PRESSURE TEST EACH NEW BRANCH LINE PRIOR TO IMPAIRING
THE SYSTEM TO MAKE THE FINAL CONNECTION.
FIRE ALARM:
1. THE EXISTING FIRE ALARM \ MASS NOTIFICATION SYSTEM
SHALL BE MODIFIED ACCORDING TO THE GENERAL PHASING
PLAN.
2. DEMOLITION IN EACH PHASE SHALL BE PLANNED AND
COORDINATED TO MINIMIZE THE IMPAIRMENT TIME TO THE
SYSTEM.
3. IF WIRING FOR A PHASE IN DEMOLITION REQUIRES REMOVING
CONDUIT AND WIRE FEEDING DEVICES IN OTHER PHASES THAT
MUST REMAIN OPERATIONAL, TEMPORARY WIRING SHALL BE
INSTALLED TO MAINTAIN THOSE DEVICES IN SERVICE.
4. FIRE ALARM/MASS NOTIFICATION SYSTEM MODIFICATIONS
SHALL BE TESTED IN EACH PHASE.
AREA
A
AREA
B
AREA
C
AREA
D
AREA
E
AREA
F
AREA
G
AREA
H
MECHANICAL GENERAL NOTES
PHASE 1:
1. REFER TO SHEET G-0006 FOR LEGEND AND ABBREVIATIONS.
2. "RENOVATE" INCLUDES, AS APPLICABLE, REMOVAL OF EXISTING
TANKS, PUMPS, PIPING, SCRUBBERS, FANS, CONDENSING UNITS, AND
EQUIPMENT WITH LINES AS INDICATED ON GENERAL PHASING
SHEETS. SEE STRUCTURAL, ELECTRICAL AND ARCHITECTURAL
DRAWINGS FOR SCOPE OF RENOVATION FOR THOSE DISCIPLINES IN
THIS PHASE. SEE GENERAL PHASING SHEETS G-1100, G-1110, G-1140
FOR MECHANICAL WORK TO BE PERFORMED DURING PHASE 1
RENOVATION.
3. "DEMOLISH" INCLUDES, AS APPLICABLE, REMOVAL OF TANKS, PUMPS,
PIPING, EQUIPMENT, EQUIPMENT PADS, SUPPORTS, HANGERS,
VALVES, FITTINGS, DUCTWORK, SCRUBBERS, AND FANS FROM THE
SITE AND DISPOSAL AS DIRECTED BY THE CLIENT.
4. "INSTALL" INCLUDES, AS APPLICABLE, NEW TANKS, PIPING,
EQUIPMENT, EQUIPMENT PADS, OPERATING FLOOR, SCRUBBERS,
FANS, AND SUPPORT STEEL AS REQUIRED. SEE GENERAL PHASING
SHEETS G-1100, G-1110, G-1140 FOR WORK TO BE PERFORMED
DURING PHASE 1 RENOVATION.
5. SEE KEYED NOTE 1 ON SHEET G-1100 AND SHEET G-1110 FOR PHASE 1
WORK TO OCCUR BEFORE RENOVATION OF AREA F.
6. SEE PHASE 1 DEMOLITION DRAWINGS FOR DEMOLITION MECHANICAL
WORK TO BE PERFORMED DURING PHASE 1.
7. SEE PHASE 1 NEW WORK DRAWINGS FOR NEW MECHANICAL WORK
TO BE PERFORMED DURING PHASE 1.
8. SEE DRAWINGS G-1100 FOR PHASE 1 MECH PHASING PLAN
BASEMENT, G-1110 FOR PHASE 1 MECH PHASING PLAN OPERATING
FLOOR AND G-1140 FOR PHASE 1 MECH PHASING PLAN ROOF.
9. CONTRACTOR SHALL BE KNOWLEDGEABLE OF ALL PHASES AND
SHALL NAVIGATE BETWEEN PHASES TO REFERENCE AREAS NOT
AFFECTED BY WORK IN THIS PHASE.
10. REFER TO STRUCTURAL , ELECTRICAL, AND ARCHITECTURAL
DRAWINGS FOR SPECIFIC DISCIPLINE PHASING INFORMATION.
11. ALL DETAILS, SECTIONS, SCHEDULES, P&IDS, FLOW DIAGRAMS,
ISOMETRICS COMMON TO MULTIPLE PHASES SHALL BE LOCATION IN
PHASE 0.
12. ALL PIPING ELEVATIONS LISTED ON ALL BASEMENT MP SHEETS ARE
TAKEN IN REFERENCE TO THE OPERATING FLOOR.
13. FOR ALL ROOF PENETRATIONS NOT BEING RE-USED/BEING PATCHED,
REFER TO ARCHITECTURAL DETAILS ON SHEET A-0500 FOR
ADDITIONAL INFORMATION.
PHASE 2:
1. REFER TO SHEET G-0006 FOR LEGEND AND ABBREVIATIONS.
2. "RENOVATE" INCLUDES, AS APPLICABLE, REMOVAL OF EXISTING TANKS,
PUMPS, PIPING, SCRUBBERS, FANS, CONDENSING UNITS, AND
EQUIPMENT WITH LINES AS INDICATED ON GENERAL PHASING SHEETS.
SEE STRUCTURAL, ELECTRICAL AND ARCHITECTURAL DRAWINGS FOR
SCOPE OF RENOVATION FOR THOSE DISCIPLINES IN THIS PHASE. SEE
GENERAL PHASING SHEETS G-2100, G-2110, G-2120, G-2140 FOR
MECHANICAL WORK TO BE PERFORMED DURING PHASE 2 RENOVATION.
3. "DEMOLISH" INCLUDES, AS APPLICABLE, REMOVAL OF TANKS, PUMPS,
PIPING, EQUIPMENT, EQUIPMENT PADS, SUPPORTS, HANGERS, VALVES,
FITTINGS, DUCTWORK, SCRUBBERS, AND FANS FROM THE SITE AND
DISPOSAL AS DIRECTED BY THE CLIENT.
4. "INSTALL" INCLUDES, AS APPLICABLE, NEW TANKS, PIPING, EQUIPMENT,
EQUIPMENT PADS, OPERATING FLOOR, SCRUBBERS, FANS, AND
SUPPORT STEEL AS REQUIRED. SEE GENERAL PHASING SHEETS G-2100,
G-2110, G-2140 FOR WORK TO BE PERFORMED DURING PHASE 2
RENOVATION.
5. SEE KEYED NOTE 1 AND 2 ON SHEET G-1100 AND KEYED NOTE 1 ON
SHEET G-1110 FOR PHASE 2 NEW WORK TO OCCUR BEFORE
RENOVATION OF AREA C AND D.
6. SEE PHASE 2 DEMOLITION DRAWINGS FOR DEMOLITION MECHANICAL
WORK TO BE PERFORMED DURING PHASE 2.
7. SEE PHASE 2 NEW WORK DRAWINGS FOR NEW MECHANICAL WORK TO
BE PERFORMED DURING PHASE 2.
8. SEE DRAWINGS G-2100 FOR PHASE 2 MECH PHASING PLAN BASEMENT,
G-2110 FOR PHASE 2 MECH PHASING PLAN OPERATING FLOOR AND
G-2140 FOR PHASE 2 MECH PHASING PLAN ROOF.
9. CONTRACTOR SHALL BE KNOWLEDGEABLE OF ALL PHASES AND SHALL
NAVIGATE BETWEEN PHASES TO REFERENCE AREAS NOT AFFECTED BY
WORK IN THIS PHASE.
10. REFER TO STRUCTURAL , ELECTRICAL, AND ARCHITECTURAL DRAWINGS
FOR SPECIFIC DISCIPLINE PHASING INFORMATION.
11. ALL DETAILS, SECTIONS, SCHEDULES, P&IDS, FLOW DIAGRAMS,
ISOMETRICS COMMON TO MULTIPLE PHASES SHALL BE LOCATION IN
PHASE 0.
12. ALL PIPING ELEVATIONS LISTED ON ALL BASEMENT MP SHEETS ARE
TAKEN IN REFERENCE TO THE OPERATING FLOOR.
13. FOR ALL ROOF PENETRATIONS NOT BEING RE-USED/BEING PATCHED,
REFER TO ARCHITECTURAL DETAILS ON SHEET A-0500 FOR ADDITIONAL
INFORMATION.
PHASE 3:
1. REFER TO SHEET G-0006 FOR LEGEND AND ABBREVIATIONS.
2. "RENOVATE" INCLUDES, AS APPLICABLE, REMOVAL OF
EXISTING TANKS, PUMPS, PIPING, SCRUBBERS, FANS,
CONDENSING UNITS, AND EQUIPMENT WITH LINES AS
INDICATED ON GENERAL PHASING SHEETS. SEE STRUCTURAL,
ELECTRICAL AND ARCHITECTURAL DRAWINGS FOR SCOPE OF
RENOVATION FOR THOSE DISCIPLINES IN THIS PHASE. SEE
GENERAL PHASING SHEETS G-3100, G-3110, G-3120, G-3140
FOR MECHANICAL WORK TO BE PERFORMED DURING PHASE 3
RENOVATION.
3. "DEMOLISH" INCLUDES, AS APPLICABLE, REMOVAL OF TANKS,
PUMPS, PIPING, EQUIPMENT, EQUIPMENT PADS, SUPPORTS,
HANGERS, VALVES, FITTINGS, DUCTWORK, SCRUBBERS, AND
FANS FROM THE SITE AND DISPOSAL AS DIRECTED BY THE
CLIENT.
4. "INSTALL" INCLUDES, AS APPLICABLE, NEW TANKS, PIPING,
EQUIPMENT, EQUIPMENT PADS, OPERATING FLOOR,
SCRUBBERS, FANS, AND SUPPORT STEEL AS REQUIRED. SEE
GENERAL PHASING SHEETS G-3100, G-3110, G-3140 FOR WORK
TO BE PERFORMED DURING PHASE 3 RENOVATION.
5. SEE PHASE 3 DEMOLITION DRAWINGS FOR DEMOLITION
MECHANICAL WORK TO BE PERFORMED DURING PHASE 3.
6. SEE PHASE 3 NEW WORK DRAWINGS FOR NEW MECHANICAL
WORK TO BE PERFORMED DURING PHASE 3.
7. SEE DRAWINGS G-3100 FOR PHASE 3 MECH PHASING PLAN
BASEMENT, G-3110 FOR PHASE 3 MECH PHASING PLAN
OPERATING FLOOR AND G-3140 FOR PHASE 3 MECH PHASING
PLAN ROOF.
8. CONTRACTOR SHALL BE KNOWLEDGEABLE OF ALL PHASES
AND SHALL NAVIGATE BETWEEN PHASES TO REFERENCE
AREAS NOT AFFECTED BY WORK IN THIS PHASE.
9. REFER TO STRUCTURAL , ELECTRICAL, AND ARCHITECTURAL
DRAWINGS FOR SPECIFIC DISCIPLINE PHASING INFORMATION.
10. ALL DETAILS, SECTIONS, SCHEDULES, P&IDS, FLOW
DIAGRAMS, ISOMETRICS COMMON TO MULTIPLE PHASES
SHALL BE LOCATION IN PHASE 0.
11. ALL PIPING ELEVATIONS LISTED ON ALL BASEMENT MP
SHEETS ARE TAKEN IN REFERENCE TO THE OPERATING
FLOOR.
12. FOR ALL ROOF PENETRATIONS NOT BEING RE-USED/BEING
PATCHED, REFER TO ARCHITECTURAL DETAILS ON SHEET
A-0500 FOR ADDITIONAL INFORMATION.
PHASE 4:
1. REFER TO SHEET G-0006 FOR LEGEND AND ABBREVIATIONS.
2. "RENOVATE" INCLUDES, AS APPLICABLE, REMOVAL OF
EXISTING TANKS, PUMPS, PIPING, SCRUBBERS, FANS,
CONDENSING UNITS, AND EQUIPMENT WITH LINES AS
INDICATED ON GENERAL PHASING SHEETS. SEE STRUCTURAL,
ELECTRICAL AND ARCHITECTURAL DRAWINGS FOR SCOPE OF
RENOVATION FOR THOSE DISCIPLINES IN THIS PHASE. SEE
GENERAL PHASING SHEETS G-4100, G-4110, G-4120, G-4140
FOR MECHANICAL WORK TO BE PERFORMED DURING PHASE 4
RENOVATION.
3. "DEMOLISH" INCLUDES, AS APPLICABLE, REMOVAL OF TANKS,
PUMPS, PIPING, EQUIPMENT, EQUIPMENT PADS, SUPPORTS,
HANGERS, VALVES, FITTINGS, DUCTWORK, SCRUBBERS, AND
FANS FROM THE SITE AND DISPOSAL AS DIRECTED BY THE
CLIENT.
4. "INSTALL" INCLUDES, AS APPLICABLE, NEW TANKS, PIPING,
EQUIPMENT, EQUIPMENT PADS, OPERATING FLOOR,
SCRUBBERS, FANS, AND SUPPORT STEEL AS REQUIRED. SEE
GENERAL PHASING SHEETS G-4100, G-4110, G-4140 FOR WORK
TO BE PERFORMED DURING PHASE 4 RENOVATION.
5. SEE PHASE 4 DEMOLITION DRAWINGS FOR DEMOLITION
MECHANICAL WORK TO BE PERFORMED DURING PHASE 4.
6. SEE PHASE 4 NEW WORK DRAWINGS FOR NEW MECHANICAL
WORK TO BE PERFORMED DURING PHASE 4.
7. SEE DRAWINGS G-4100 FOR PHASE 4 MECH PHASING PLAN
BASEMENT, G-4110 FOR PHASE 4 MECH PHASING PLAN
OPERATING FLOOR AND G-4140 FOR PHASE 4 MECH PHASING
PLAN ROOF.
8. CONTRACTOR SHALL BE KNOWLEDGEABLE OF ALL PHASES
AND SHALL NAVIGATE BETWEEN PHASES TO REFERENCE
AREAS NOT AFFECTED BY WORK IN THIS PHASE.
9. REFER TO STRUCTURAL , ELECTRICAL, AND ARCHITECTURAL
DRAWINGS FOR SPECIFIC DISCIPLINE PHASING INFORMATION.
10. ALL DETAILS, SECTIONS, SCHEDULES, P&IDS, FLOW
DIAGRAMS, ISOMETRICS COMMON TO MULTIPLE PHASES
SHALL BE LOCATION IN PHASE 0.
11. ALL PIPING ELEVATIONS LISTED ON ALL BASEMENT MP
SHEETS ARE TAKEN IN REFERENCE TO THE OPERATING
FLOOR.
12. FOR ALL ROOF PENETRATIONS NOT BEING RE-USED/BEING
PATCHED, REFER TO ARCHITECTURAL DETAILS ON SHEET
A-0500 FOR ADDITIONAL INFORMATION.
PHASE 5:
1. REFER TO SHEET G-0006 FOR LEGEND AND ABBREVIATIONS.
2. "RENOVATE" INCLUDES, AS APPLICABLE, REMOVAL OF
EXISTING TANKS, PUMPS, PIPING, SCRUBBERS, FANS,
CONDENSING UNITS, AND EQUIPMENT WITH LINES AS
INDICATED ON GENERAL PHASING SHEETS. SEE STRUCTURAL,
ELECTRICAL AND ARCHITECTURAL DRAWINGS FOR SCOPE OF
RENOVATION FOR THOSE DISCIPLINES IN THIS PHASE. SEE
GENERAL PHASING SHEETS G-5100, G-5110, G-5120, G-5140
FOR MECHANICAL WORK TO BE PERFORMED DURING PHASE 5
RENOVATION.
3. "DEMOLISH" INCLUDES, AS APPLICABLE, REMOVAL OF TANKS,
PUMPS, PIPING, EQUIPMENT, EQUIPMENT PADS, SUPPORTS,
HANGERS, VALVES, FITTINGS, DUCTWORK, SCRUBBERS, AND
FANS FROM THE SITE AND DISPOSAL AS DIRECTED BY THE
CLIENT.
4. "INSTALL" INCLUDES, AS APPLICABLE, NEW TANKS, PIPING,
EQUIPMENT, EQUIPMENT PADS, OPERATING FLOOR,
SCRUBBERS, FANS, AND SUPPORT STEEL AS REQUIRED. SEE
GENERAL PHASING SHEETS G-5100, G-5110, G-5140 FOR WORK
TO BE PERFORMED DURING PHASE 5 RENOVATION.
5. SEE PHASE 5 DEMOLITION DRAWINGS FOR DEMOLITION
MECHANICAL WORK TO BE PERFORMED DURING PHASE 5.
6. SEE PHASE 5 NEW WORK DRAWINGS FOR NEW MECHANICAL
WORK TO BE PERFORMED DURING PHASE 5.
7. SEE DRAWINGS G-5100 FOR PHASE 5 MECH PHASING PLAN
BASEMENT, G-5110 FOR PHASE 5 MECH PHASING PLAN
OPERATING FLOOR AND G-5140 FOR PHASE 5 MECH PHASING
PLAN ROOF.
8. CONTRACTOR SHALL BE KNOWLEDGEABLE OF ALL PHASES
AND SHALL NAVIGATE BETWEEN PHASES TO REFERENCE
AREAS NOT AFFECTED BY WORK IN THIS PHASE.
9. REFER TO STRUCTURAL , ELECTRICAL, AND ARCHITECTURAL
DRAWINGS FOR SPECIFIC DISCIPLINE PHASING INFORMATION.
10. ALL DETAILS, SECTIONS, SCHEDULES, P&IDS, FLOW
DIAGRAMS, ISOMETRICS COMMON TO MULTIPLE PHASES
SHALL BE LOCATION IN PHASE 0.
11. ALL PIPING ELEVATIONS LISTED ON ALL BASEMENT MP
SHEETS ARE TAKEN IN REFERENCE TO THE OPERATING
FLOOR.
12. FOR ALL ROOF PENETRATIONS NOT BEING RE-USED/BEING
PATCHED, REFER TO ARCHITECTURAL DETAILS ON SHEET
A-0500 FOR ADDITIONAL INFORMATION.
PHASE 6:
1. REFER TO SHEET G-0006 FOR LEGEND AND ABBREVIATIONS.
2. "RENOVATE" INCLUDES, AS APPLICABLE, REMOVAL OF
EXISTING TANKS, PUMPS, PIPING, SCRUBBERS, FANS,
CONDENSING UNITS, AND EQUIPMENT WITH LINES AS
INDICATED ON GENERAL PHASING SHEETS. SEE STRUCTURAL,
ELECTRICAL AND ARCHITECTURAL DRAWINGS FOR SCOPE OF
RENOVATION FOR THOSE DISCIPLINES IN THIS PHASE. SEE
GENERAL PHASING SHEETS G-6100, G-6110, G-6140 FOR
MECHANICAL WORK TO BE PERFORMED DURING PHASE 6
RENOVATION.
3. "DEMOLISH" INCLUDES, AS APPLICABLE, REMOVAL OF TANKS,
PUMPS, PIPING, EQUIPMENT, EQUIPMENT PADS, SUPPORTS,
HANGERS, VALVES, FITTINGS, DUCTWORK, SCRUBBERS, AND
FANS FROM THE SITE AND DISPOSAL AS DIRECTED BY THE
CLIENT.
4. "INSTALL" INCLUDES, AS APPLICABLE, NEW TANKS, PIPING,
EQUIPMENT, EQUIPMENT PADS, OPERATING FLOOR,
SCRUBBERS, FANS, AND SUPPORT STEEL AS REQUIRED. SEE
GENERAL PHASING SHEETS G-6100, G-6110, G-6140 FOR WORK
TO BE PERFORMED DURING PHASE 6.
5. SEE PHASE 6 NEW WORK DRAWINGS FOR NEW MECHANICAL
WORK TO BE PERFORMED DURING PHASE 6.
6. SEE DRAWINGS G-6100 FOR PHASE 6 MECH PHASING PLAN
BASEMENT, G-6110 FOR PHASE 6 MECH PHASING PLAN
OPERATING FLOOR AND G-6140 FOR PHASE 6 MECH PHASING
PLAN ROOF.
7. CONTRACTOR SHALL BE KNOWLEDGEABLE OF ALL PHASES
AND SHALL NAVIGATE BETWEEN PHASES TO REFERENCE
AREAS NOT AFFECTED BY WORK IN THIS PHASE.
8. REFER TO STRUCTURAL , ELECTRICAL, AND ARCHITECTURAL
DRAWINGS FOR SPECIFIC DISCIPLINE PHASING INFORMATION.
9. ALL DETAILS, SECTIONS, SCHEDULES, P&IDS, FLOW
DIAGRAMS, ISOMETRICS COMMON TO MULTIPLE PHASES
SHALL BE LOCATION IN PHASE 0.
10. ALL PIPING ELEVATIONS LISTED ON ALL BASEMENT MP
SHEETS ARE TAKEN IN REFERENCE TO THE OPERATING
FLOOR.
11. FOR ALL ROOF PENETRATIONS NOT BEING RE-USED/BEING
PATCHED, REFER TO ARCHITECTURAL DETAILS ON SHEET
A-0500 FOR ADDITIONAL INFORMATION.
M. SCHLUENDER
C. MCAFEE
M. SCHLUENDER
G. REWALD
J. KLING
1:1
NOTES
GENERAL PHASING
G-0005
SET 1-MG0005.DWG
8/26/14
UP
UP UP UP UP
UP
61.661.160.5
Le
La
Kb
Ka
Ja
Ib
Ia
Hc
Ha
Gb
59.959.358.758.157.556.956.355.755.154.553.953.4 53.9a
Ha.9
Ia.9
Ja.9
Kb.9
BASEMENT
1 1
1:1
BLDG 3001 PLATING SHOP RENOVATIONS
TINKER AIR FORCE BASE
OKLAHOMA CITY, OKLAHOMA
FY:15
DESIGNED BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY:
SUBMITTED BY:
PLOT SCALE:
DATE:
FILE NUMBER:
SHEET
IDENTIFICATION
SOLICITATION NO.:
CONTRACT NO.:
SIZE:
BURNS & MCDONNELL
9400 WARD PARKWAY
KANSAS CITY, MO 64114
US Army Corps of Engineers ofSheet
TULSA, OKLAHOMA
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
SYMBOL REVISIONS DATE APPROVED
5 4 3 2 1
D
C
B
A A
B
C
D
C O
PY
R
IG
H
T
BU
RN
S
AN
D
M
CD
O N
N
EL
L
EN
G
IN
EE
RI
N G
C O
M
PA
N Y, I N
C.
W912BV-15-R0093
J. KLING
42x30
2/6/15 AD0100
OVERALL DEMOLITION PLAN -
BASEMENT
A. WHITENER
D. SCOTT
A. WHITENER
78794AD0100.DWG
D. SCOTT
SCALE: 1/8" = 1'-0"A5 OVERALL DEMOLITION PLAN - BASEMENT
GENERAL NOTES:
1. REFERENCE MECHANICAL PHASING DRAWINGS FOR SCOPE RELATED TO EACH
PHASE OF CONSTRUCTION.
2. IF SAND BLASTING IS REQUIRED TO REMOVE EXISTING COATINGS - PROVIDE
FIRE TREATED PLYWOOD + ANTI STATIC, FIRE RETARDANT FABRIC WALL TO
PROTECT ADJACENT AREAS FROM DUST.
DEMO KEYNOTE LEGEND
1 REMOVE EXISTING METAL STAIR , STRINGERS & HANDRAIL . PATCH HOLE
WHERE ANCHOR BOLTS WERE REMOVED WITH HIGH STRENGTH
NON-SHRINK GROUT.
2 REMOVE METAL PANEL WALL AS SHOWN. PATCH HOLES IN FLOOR AND
CEILING WHERE ANCHORS WERE REMOVED WITH HIGH STRENGTH,
NON-SHRINK GROUT. SAVE METAL PANELS FOR REUSE.
3 REMOVE EXISTING HOLLOW METAL DOOR(S), FRAME & HARDWARE.
4 REMOVE EXISTING MASONRY & METAL PANEL WALL TO FORM NEW
OPENING.
7 DEMOLISH ROOF AND PREPARE FOR NEW PENETRATION AND CURB.
COORDINATE WITH STRUCTURAL AND MECHANICAL.
N
0 4' 8' 16'
UP UP
62.361.661.160.5
Le
La
Kb
Ka
Ja
Ib
Ia
Hc
Ha
Gb
G
59.959.358.758.157.556.956.355.755.154.553.953.452.9 53.9a
Ha.9
Ia.9
Ja.9
Kb.9
ELECTROLESS
NICKEL PLATING
NICKEL PLATING
PLC/FIRE
WATER TREATMENT
31' - 3 1/2"
CORRIDOR
6'
- 4
" W m in x 7
4"
H
2'
- 2
3/ 4"
1 1
1:1
BLDG 3001 PLATING SHOP RENOVATIONS
TINKER AIR FORCE BASE
OKLAHOMA CITY, OKLAHOMA
FY:15
DESIGNED BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY:
SUBMITTED BY:
PLOT SCALE:
DATE:
FILE NUMBER:
SHEET
IDENTIFICATION
SOLICITATION NO.:
CONTRACT NO.:
SIZE:
BURNS & MCDONNELL
9400 WARD PARKWAY
KANSAS CITY, MO 64114
US Army Corps of Engineers ofSheet
TULSA, OKLAHOMA
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
SYMBOL REVISIONS DATE APPROVED
5 4 3 2 1
D
C
B
A A
B
C
D
C O
PY
R
IG
H
T
BU
RN
S
AN
D
M
CD
O N
N
EL
L
EN
G
IN
EE
RI
N G
C O
M
PA
N Y, I N
C.
W912BV-15-R0093
J. KLING
42x30
2/6/15 AD0110
OVERALL DEMOLITION PLAN -
OPERATING FLOOR
A. WHITENER
D. SCOTT
A. WHITENER
78794AD0110.DWG
D. SCOTT
SCALE: 1/8" = 1'-0"A5 DEMO PLAN - OPERATING FLOOR
GENERAL NOTES:
1. REFERENCE MECHANICAL PHASING DRAWINGS FOR SCOPE RELATED TO
EACH PHASE OF CONSTRUCTION.
2. IF SAND BLASTING IS REQUIRED TO REMOVE EXISTING COATINGS - PROVIDE
FIRE TREATED PLYWOOD + ANTI STATIC, FIRE RETARDANT FABRIC WALL TO
PROTECT ADJACENT AREAS FROM DUST.
DEMO KEYNOTE LEGEND
1 REMOVE EXISTING METAL STAIR , STRINGERS & HANDRAIL . PATCH HOLE
WHERE ANCHOR BOLTS WERE REMOVED WITH HIGH STRENGTH
NON-SHRINK GROUT.
2 REMOVE METAL PANEL WALL AS SHOWN. PATCH HOLES IN FLOOR AND
CEILING WHERE ANCHORS WERE REMOVED WITH HIGH STRENGTH,
NON-SHRINK GROUT. SAVE METAL PANELS FOR REUSE.
3 REMOVE EXISTING HOLLOW METAL DOOR(S), FRAME & HARDWARE.
4 REMOVE EXISTING MASONRY & METAL PANEL WALL TO FORM NEW
OPENING.
7 DEMOLISH ROOF AND PREPARE FOR NEW PENETRATION AND CURB.
COORDINATE WITH STRUCTURAL AND MECHANICAL.
N
62.361.661.160.5
Le
La
Kb
Ka
Ja
Ib
Ia
Hc
Ha
Gb
G
59.959.358.758.157.556.956.355.755.154.553.953.4 53.9a
Ha.9
Ia.9
Ja.9
Kb.9
17' - 4"
NEW FIBERGLASS GRATING
OVER PLATFORM
RE: STRUCTURAL FOR SIZE
1:1
BLDG 3001 PLATING SHOP RENOVATIONS
TINKER AIR FORCE BASE
OKLAHOMA CITY, OKLAHOMA
FY:15
DESIGNED BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY:
SUBMITTED BY:
PLOT SCALE:
DATE:
FILE NUMBER:
SHEET
IDENTIFICATION
SOLICITATION NO.:
CONTRACT NO.:
SIZE:
BURNS & MCDONNELL
9400 WARD PARKWAY
KANSAS CITY, MO 64114
US Army Corps of Engineers ofSheet
TULSA, OKLAHOMA
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
SYMBOL REVISIONS DATE APPROVED
5 4 3 2 1
D
C
B
A A
B
C
D
C O
PY
R
IG
H
T
BU
RN
S
AN
D
M
CD
O N
N
EL
L
EN
G
IN
EE
RI
N G
C O
M
PA
N Y, I N
C.
W912BV-15-R0093
J. KLING
42x30
05/06/15 AD0140
OVERALL DEMOLITION PLAN - ROOF
A. WHITENER
D. SCOTT
A. WHITENER
78794AD0140.DWG
D. SCOTT
SCALE: 1/8" = 1'-0"1 DEMO PLAN - ROOF
N
0 4' 8' 16'
GENERAL NOTES:
1. REFERENCE MECHANICAL PHASING DRAWINGS FOR SCOPE RELATED TO
EACH PHASE OF CONSTRUCTION.
2. INFILL ANY UNUSED PENETRATIONS. COORDINATE WITH MECHANICAL.
REFERENCE SHEET A-0500 FOR CORRESPONDING DETAILS.
3. REROOF OF ENTIRE PLATING SHOP AREA AS SHOWN BID OPTION NO. 2.
REFERENCE SHEET A-0500 FOR CORRESPONDING DETAILS.
DEMO KEYNOTE LEGEND
1 REMOVE EXISTING METAL STAIR , STRINGERS & HANDRAIL . PATCH HOLE
WHERE ANCHOR BOLTS WERE REMOVED WITH HIGH STRENGTH
NON-SHRINK GROUT.
2 REMOVE METAL PANEL WALL AS SHOWN. PATCH HOLES IN FLOOR AND
CEILING WHERE ANCHORS WERE REMOVED WITH HIGH STRENGTH,
NON-SHRINK GROUT. SAVE METAL PANELS FOR REUSE.
3 REMOVE EXISTING HOLLOW METAL DOOR(S), FRAME & HARDWARE.
4 REMOVE EXISTING MASONRY & METAL PANEL WALL TO FORM NEW
OPENING.
7 DEMOLISH ROOF AND PREPARE FOR NEW PENETRATION AND CURB.
COORDINATE WITH STRUCTURAL AND MECHANICAL.
CP
62.361.661.160.5
Le
La
Kb
Ka
Ja
Ib
Ia
Hc
Ha
Gb
G
59.959.358.758.157.556.956.355.755.154.553.953.452.9 53.9a
Ha.9
Ia.9
Ja.9
Kb.9
27903.94 SF
BASEMENT
2'
- 6
1/ 2"
NORMALLY UNOCCUPIED
EQUIPMENT ACCESS
INDUSTRIAL 1 PERSON / 100 SQFT
0 PERSONS
NUMBER OF OCCUPANTS
ROOM NAME
AREA
CLEAR WIDTH
EXIT CAPACITY
OCCUPANTS SERVED
COMMON PATH
OF TRAVEL
TRAVEL
DISTANCE
EGRESS
PATH
COMMON PATH
TERMINATION
POINT
EXIT DOOR
REQUIRED WIDTH
36"
22"
44" 44"
NAME
XX
111SF
GENERAL NOTES
1. REFER TO ARCHITECTURAL LEGEND FOR ADDITIONAL
INFORMATION REGARDING SYMBOLS AND
ABBREVIATIONS.
2. REFER TO AG003 FOR LIFE SAFETY NARRATIVE AND
BUILDING CODE ANALYSIS.
3. REFER TO THE ELECTRICAL LIGHTING PLANS FOR
LOCATION OF EXIT SIGNS AND EMERGENCY
LIGHTING.
4. REFER TO THE FIRE SUPPRESSION AND ALARM PLANS
FOR LOCATION OF FIRE PROTECTION DEVICES.
5. FINAL LOCATIONS OF FIRE EXTINGUISHERS AND
HOSE REELS SHALL BE APPROVED BY THE AHJ PRIOR
TO INSTALLATION.
DOOR EGRESS TAG STAIR EGRESS TAG
ROOM OCCUPANCY TAG
EGRESS PATH
100'CP:666'
A:B:C: TYPE DRY CHEMICAL
4A-20B-C
PORTABLE FIRE EXTINGUISHERS AND HOSE REELS
FE:SR
EXTINGUISHER /HOSE
REEL TYPE
EXTINGUISHER/HOSE
REEL MOUNTING
-FE: FIRE EXTINGUISHER
-SR: SEMI-RECESSED CABINET
-BR: BRACKET MOUNTED
-HR: HOSE REEL
-SM: SURFACE MOUNT CABINET
-FR: FULLY RECESSED CABINET
HR:SM
WET-PIPE HOSE REEL
1:1
BLDG 3001 PLATING SHOP RENOVATIONS
TINKER AIR FORCE BASE
OKLAHOMA CITY, OKLAHOMA
FY:15
DESIGNED BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY:
SUBMITTED BY:
PLOT SCALE:
DATE:
FILE NUMBER:
SHEET
IDENTIFICATION
SOLICITATION NO.:
CONTRACT NO.:
SIZE:
BURNS & MCDONNELL
9400 WARD PARKWAY
KANSAS CITY, MO 64114
US Army Corps of Engineers ofSheet
TULSA, OKLAHOMA
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
SYMBOL REVISIONS DATE APPROVED
5 4 3 2 1
D
C
B
A A
B
C
D
C O
PY
R
IG
H
T
BU
RN
S
AN
D
M
CD
O N
N
EL
L
EN
G
IN
EE
RI
N G
C O
M
PA
N Y, I N
C.
W912BV-15-R0093
J. KLING
42x30
03/12/14 LS-011
LIFE SAFETY PLAN - BASEMENT
A. WHITENER
D. SCOTT
A. WHITENER
78794LS-011.DWG
D. SCOTT
SCALE: 1/8" = 1'-0"A5 BASEMENT LIFE SAFETY PLAN
UP
CP
62.361.661.160.5
Le
La
Kb
Ka
Ja
Ib
Ia
Hc
Ha
Gb
G
59.959.358.758.157.556.956.355.755.154.553.953.452.9 53.9a
Ha.9
Ia.9
Ja.9
Kb.9
2998.80 SF
ELECTROLESS
NICKEL
PLATING
32305.32 SF
NICKEL
PLATING
164.97 SF
PLC/FIRE
Redundant
Room
VAPOR
BLAST
ROOM
3716.89 SF
WATER
TREATMENT
146.94 SF
RESPIRATOR
CLEANING
128.10 SF
CORRIDOR
226'
178' 200'
142'CP:25'
145' - 11 1/2"
64'
119.63 SF
ELECTROLESS
NICKEL LAB
4A - 80BC 4A - 80BC
10A - 60BC
10A - 60BC40A - 80BC40A - 80BC
10A - 60BC
10A - 60BC
10A - 60BC
NORMALLY UNOCCUPIED
EQUIPMENT ACCESS
INDUSTRIAL 1 PERSON / 100 SQFT
0 PERSONS
NUMBER OF OCCUPANTS
ROOM NAME
AREA
CLEAR WIDTH
EXIT CAPACITY
OCCUPANTS SERVED
COMMON PATH
OF TRAVEL
TRAVEL
DISTANCE
EGRESS
PATH
COMMON PATH
TERMINATION
POINT
EXIT DOOR
REQUIRED WIDTH
36"
22"
44" 44"
NAME
XX
111SF
GENERAL NOTES
1. REFER TO ARCHITECTURAL LEGEND FOR ADDITIONAL
INFORMATION REGARDING SYMBOLS AND
ABBREVIATIONS.
2. REFER TO AG003 FOR LIFE SAFETY NARRATIVE AND
BUILDING CODE ANALYSIS.
3. REFER TO THE ELECTRICAL LIGHTING PLANS FOR
LOCATION OF EXIT SIGNS AND EMERGENCY
LIGHTING.
4. REFER TO THE FIRE SUPPRESSION AND ALARM PLANS
FOR LOCATION OF FIRE PROTECTION DEVICES.
5. FINAL LOCATIONS OF FIRE EXTINGUISHERS AND
HOSE REELS SHALL BE APPROVED BY THE AHJ PRIOR
TO INSTALLATION.
DOOR EGRESS TAG STAIR EGRESS TAG
ROOM OCCUPANCY TAG
EGRESS PATH
100'CP:666'
A:B:C: TYPE DRY CHEMICAL
4A-20B-C
PORTABLE FIRE EXTINGUISHERS AND HOSE REELS
FE:SR
EXTINGUISHER /HOSE
REEL TYPE
EXTINGUISHER/HOSE
REEL MOUNTING
-FE: FIRE EXTINGUISHER
-SR: SEMI-RECESSED CABINET
-BR: BRACKET MOUNTED
-HR: HOSE REEL
-SM: SURFACE MOUNT CABINET
-FR: FULLY RECESSED CABINET
HR:SM
WET-PIPE HOSE REEL
1:1
BLDG 3001 PLATING SHOP RENOVATIONS
TINKER AIR FORCE BASE
OKLAHOMA CITY, OKLAHOMA
FY:15
DESIGNED BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY:
SUBMITTED BY:
PLOT SCALE:
DATE:
FILE NUMBER:
SHEET
IDENTIFICATION
SOLICITATION NO.:
CONTRACT NO.:
SIZE:
BURNS & MCDONNELL
9400 WARD PARKWAY
KANSAS CITY, MO 64114
US Army Corps of Engineers ofSheet
TULSA, OKLAHOMA
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
SYMBOL REVISIONS DATE APPROVED
5 4 3 2 1
D
C
B
A A
B
C
D
C O
PY
R
IG
H
T
BU
RN
S
AN
D
M
CD
O N
N
EL
L
EN
G
IN
EE
RI
N G
C O
M
PA
N Y, I N
C.
W912BV-15-R0093
J. KLING
42x30
03/04/15 LS-012
LIFE SAFETY PLAN - OPERATING
FLOOR
A. WHITENER
D. SCOTT
A. WHITENER
78794LS-012.DWG
D. SCOTT
SCALE: 1/8" = 1'-0"A5 OPERATING FLOOR LIFE SAFETY PLAN
UP UP
UP
UP
CP
62.361.661.160.5
Le
La
Kb
Ka
Ja
Ib
Ia
Hc
Ha
Gb
G
59.959.358.758.157.556.956.355.755.154.553.953.452.9 53.9a
Ha.9
Ia.9
Ja.9
Kb.9
184' 166'
NORMALLY UNOCCUPIED
EQUIPMENT ACCESS
INDUSTRIAL 1 PERSON / 100 SQFT
0 PERSONS
NUMBER OF OCCUPANTS
ROOM NAME
AREA
CLEAR WIDTH
EXIT CAPACITY
OCCUPANTS SERVED
COMMON PATH
OF TRAVEL
TRAVEL
DISTANCE
EGRESS
PATH
COMMON PATH
TERMINATION
POINT
EXIT DOOR
REQUIRED WIDTH
36"
22"
44" 44"
NAME
XX
111SF
GENERAL NOTES
1. REFER TO ARCHITECTURAL LEGEND FOR ADDITIONAL
INFORMATION REGARDING SYMBOLS AND
ABBREVIATIONS.
2. REFER TO AG003 FOR LIFE SAFETY NARRATIVE AND
BUILDING CODE ANALYSIS.
3. REFER TO THE ELECTRICAL LIGHTING PLANS FOR
LOCATION OF EXIT SIGNS AND EMERGENCY
LIGHTING.
4. REFER TO THE FIRE SUPPRESSION AND ALARM PLANS
FOR LOCATION OF FIRE PROTECTION DEVICES.
5. FINAL LOCATIONS OF FIRE EXTINGUISHERS AND
HOSE REELS SHALL BE APPROVED BY THE AHJ PRIOR
TO INSTALLATION.
DOOR EGRESS TAG STAIR EGRESS TAG
ROOM OCCUPANCY TAG
EGRESS PATH
100'CP:666'
A:B:C: TYPE DRY CHEMICAL
4A-20B-C
PORTABLE FIRE EXTINGUISHERS AND HOSE REELS
FE:SR
EXTINGUISHER /HOSE
REEL TYPE
EXTINGUISHER/HOSE
REEL MOUNTING
-FE: FIRE EXTINGUISHER
-SR: SEMI-RECESSED CABINET
-BR: BRACKET MOUNTED
-HR: HOSE REEL
-SM: SURFACE MOUNT CABINET
-FR: FULLY RECESSED CABINET
HR:SM
WET-PIPE HOSE REEL
1:1
BLDG 3001 PLATING SHOP RENOVATIONS
TINKER AIR FORCE BASE
OKLAHOMA CITY, OKLAHOMA
FY:15
DESIGNED BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY:
SUBMITTED BY:
PLOT SCALE:
DATE:
FILE NUMBER:
SHEET
IDENTIFICATION
SOLICITATION NO.:
CONTRACT NO.:
SIZE:
BURNS & MCDONNELL
9400 WARD PARKWAY
KANSAS CITY, MO 64114
US Army Corps of Engineers ofSheet
TULSA, OKLAHOMA
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
SYMBOL REVISIONS DATE APPROVED
5 4 3 2 1
D
C
B
A A
B
C
D
C O
PY
R
IG
H
T
BU
RN
S
AN
D
M
CD
O N
N
EL
L
EN
G
IN
EE
RI
N G
C O
M
PA
N Y, I N
C.
W912BV-15-R0093
J. KLING
42x30
03/04/15 LS-013
LIFE SAFETY PLAN - MEZZANINE
A. WHITENER
D. SCOTT
A. WHITENER
78794LS-013.DWG
D. SCOTT
SCALE: 1/8" = 1'-0"A5 MEZZANINE LIFE SAFETY PLAN
62.361.661.160.5
Le
La
Kb
Ka
Ja
Ib
Ia
Hc
Ha
Gb
G
59.959.358.758.157.556.956.355.755.154.553.953.4 53.9a
Ha.9
Ia.9
Ja.9
Kb.9
BASEMENT
2'
- 6
1/ 2"
STAIR TYPE A
STAIR TYPE A STAIR TYPE A
STAIR TYPE B
STAIR TYPE B
STAIR TYPE A
C1 A-0400
B1 A-0400
1:1
BLDG 3001 PLATING SHOP RENOVATIONS
TINKER AIR FORCE BASE
OKLAHOMA CITY, OKLAHOMA
FY:15
DESIGNED BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY:
SUBMITTED BY:
PLOT SCALE:
DATE:
FILE NUMBER:
SHEET
IDENTIFICATION
SOLICITATION NO.:
CONTRACT NO.:
SIZE:
BURNS & MCDONNELL
9400 WARD PARKWAY
KANSAS CITY, MO 64114
US Army Corps of Engineers ofSheet
TULSA, OKLAHOMA
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
SYMBOL REVISIONS DATE APPROVED
5 4 3 2 1
D
C
B
A A
B
C
D
C O
PY
R
IG
H
T
BU
RN
S
AN
D
M
CD
O N
N
EL
L
EN
G
IN
EE
RI
N G
C O
M
PA
N Y, I N
C.
W912BV-15-R0093
J. KLING
42x30
2/6/15 A-0100
OVERALL PLAN - BASEMENT
A. WHITENER
D. SCOTT
A. WHITENER
78794A-0100.DWG
D. SCOTT
SCALE: 1/8" = 1'-0"A5 NEW WORK - BASEMENT
BASEMENT COATING SYSTEM:
CONCRETE FLOOR & STRUCTURAL STEEL: PROTECTIVE SYSTEM I-3
BOTTOM OF NEW METAL DECK CEILING: PROTECTIVE COATING SYSTEM M-2
GENERAL NOTES:
1. REFERENCE MECHANICAL PHASING DRAWINGS FOR SCOPE RELATED TO
EACH PHASE OF CONSTRUCTION.
N
T-701 T-703
T-705 T-707
T-709 T-711
T-713 T-717
T-719 T-721
T-723 T-725
T-727 T-729
T-569 T-571
T-573
T-501 T-503
T-505 T-507
T-509 T-511
T-513 T-515
T-517 T-519
T-521 T-523
T-525 T-527
T-529 T-531
T-533 T-535
T-537 T-539
T-541
W
ET
B
LA
ST
T-471 T-473
T-429 T-431
T-305 T-309
T-307 T-301
T-303
R O
-2
T-251 T-253
T-255 T-257
T-259 T-261
T-263 T-265
T-267 T-269
T-271 T-273
T-275
R O
-1
C C
F-1 M
M F- 1
C
IP
-1
T-277 T-279
T-281 T-283
T-285
W S-1
T-205 T-207
T-209 T-211
T-213 T-215
T-217 T-219
T-221 T-223
T-225 T-227
T-231 T-229
T-233 T-235
T-203 T-201
T-237 T-239
T-101 T-103
62.361.661.160.5
Le
La
Kb
Ka
Ja
Ib
Ia
Hc
Ha
Gb
G
59.959.358.758.157.556.956.355.755.154.553.953.452.9 53.9a
Ha.9
Ia.9
Ja.9
Kb.9
ELECTROLESS
NICKEL PLATING
NICKEL PLATING
PLC/FIRE
WATER TREATMENT
RESPIRATOR
CLEANING
BID OPTION NO. 1
UP UP UP
UP
UP
NEW STAIR FROM
BASEMENT NEW STAIR FROM
BASEMENT
NEW STAIR FROM
BASEMENT
NEW STAIR FROM
BASEMENT
NEW STAIR FROM
BASEMENT
B5
Sim A-0114
A5
Sim A-0112
A5
Sim A-0112
CORRIDOR
NEW STAIR FROM
BASEMENT
NEW STAINLESS
STEEL GUARDRAIL
NEW STAINLESS
STEEL GUARDRAIL
SEE DETAIL A2 - TYP.
NEW STAINLESS
STEEL GUARDRAIL
NEW STAINLESS
STEEL GUARDRAILNEW STAINLESS
STEEL GUARDRAIL
BENT PLATE, DECK
AND CONCRETE
TOPPING RE: STRUC
1/8" STEEL PIPE.
PAINT EXTERIOR AND
LINE INTERIOR WITH
ASPHALT BASED PRIMER
8"
1'
- 9
1'
- 9
TYPE 304
STAINLESS
STEEL GUARDRAIL
1 - 1/4" DIAMETER.
PER ASTM A276
1" GALVANIZED
FASTENER
1:1
BLDG 3001 PLATING SHOP RENOVATIONS
TINKER AIR FORCE BASE
OKLAHOMA CITY, OKLAHOMA
FY:15
DESIGNED BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY:
SUBMITTED BY:
PLOT SCALE:
DATE:
FILE NUMBER:
SHEET
IDENTIFICATION
SOLICITATION NO.:
CONTRACT NO.:
SIZE:
BURNS & MCDONNELL
9400 WARD PARKWAY
KANSAS CITY, MO 64114
US Army Corps of Engineers ofSheet
TULSA, OKLAHOMA
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
SYMBOL REVISIONS DATE APPROVED
5 4 3 2 1
D
C
B
A A
B
C
D
C O
PY
R
IG
H
T
BU
RN
S
AN
D
M
CD
O N
N
EL
L
EN
G
IN
EE
RI
N G
C O
M
PA
N Y, I N
C.
W912BV-15-R0093
J. KLING
42x30
2/6/15 A-0110
OVERALL PLAN - OPERATING FLOOR
A. WHITENER
D. SCOTT
A. WHITENER
78794A-0110.DWG
D. SCOTT
SCALE: 1/8" = 1'-0"A5 NEW WORK - OPERATING FLOOR
OPERATING FLOOR COATING SYSTEM:
CONCRETE FLOOR & STRUCTURAL STEEL TO 4' - 0" AFF: PROTECTIVE SYSTEM F-8
STEEL ABOVE 4' - 0": PROTECTIVE COATING SYSTEM M-2
HOLLOW METAL DOORS & FRAMES: PROTECTIVE COATING M-2
GENERAL NOTES:
1. REFERENCE MECHANICAL PHASING DRAWINGS FOR SCOPE RELATED TO
EACH PHASE OF CONSTRUCTION.
2. GUARDRAIL VERTICAL POSTS TO BE EQUALLY SPACED NO CLOSER THAN 8"
AND NO FURTHER THAN 4' - 0" APART. DO NOT PLACE VERTICAL POSTS IN
AREAS MARKED WITH BLACK BOX. COORDINATE WITH MECHANICAL FOR TANK
LOCATIONS AND ELECTRICAL FOR RECTIFIER CONTROL PANEL LOCATIONS.
N
0 4' 8' 16'
SCALE: 1 1/2" = 1'-0"A2 STAINLESS STEEL GUARDRAIL
LeLaKbKaJaIbIaHcHaGbG
56.3
55.7
55.1
54.5
53.9
53.9a
Ha.9 Ia.9 Ja.9 Kb.9
ELECTROLESS
NICKEL PLATING
NICKEL PLATING
PLC/FIRE
CORRIDOR
RESPIRATOR
CLEANING
104 102
1'
- 8
8'
- 6
20' - 0"
1'
- 6
BID OPTION NO. 1
INFILL DOOR OPENINGS
WITH METAL PANELS
REMOVED DURING
DEMOLITION.
EXISTING METAL PANELS
REMOVED DURING DEMOLITION
ON NEW 20 GA METAL STUDS
@ 24" O.C.
METAL WALL
PANEL ON 20GA
4" METAL STUDS
@ 16" O.C.
METAL WALL
PANEL ON 20GA
4" METAL STUDS
@ 16" O.C.
Sim A-0114
A-0112
ALIGN TO
SLAB EDGE
OVEN
MASKING
TABLE
MASKING
TABLE
CAX ORGANISOL
DRY MIX BUCKET
WASH
SALT SPRAYSINK
DESK LOCKERS
SINK
1' - 6"
56.3
EXISTING METAL
PANEL WALL
18 GA. BENT METAL PLATE -
FASTEN TO STUDS @ 24" O.C.
PAINT TO MATCH EXISTING WALL
4"
INFILL END OF
WALL CAVITY
WITH (2) STUDS
1:1
BLDG 3001 PLATING SHOP RENOVATIONS
TINKER AIR FORCE BASE
OKLAHOMA CITY, OKLAHOMA
FY:15
DESIGNED BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY:
SUBMITTED BY:
PLOT SCALE:
DATE:
FILE NUMBER:
SHEET
IDENTIFICATION
SOLICITATION NO.:
CONTRACT NO.:
SIZE:
BURNS & MCDONNELL
9400 WARD PARKWAY
KANSAS CITY, MO 64114
US Army Corps of Engineers ofSheet
TULSA, OKLAHOMA
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
SYMBOL REVISIONS DATE APPROVED
5 4 3 2 1
D
C
B
A A
B
C
D
C O
PY
R
IG
H
T
BU
RN
S
AN
D
M
CD
O N
N
EL
L
EN
G
IN
EE
RI
N G
C O
M
PA
N Y, I N
C.
W912BV-15-R0093
J. KLING
42x30
2/6/15 A-0112
AREA PLAN - OPERATING FLOOR -
AREA B
A. WHITENER
D. SCOTT
A. WHITENER
78794A-0112.DWG
D. SCOTT
SCALE: 1/4" = 1'-0"A5 OPERATING FLOOR - AREA A
GENERAL NOTES:
1. REFERENCE MECHANICAL PHASING DRAWINGS FOR SCOPE RELATED TO EACH PHASE
OF CONSTRUCTION.
OPERATING FLOOR COATING SYSTEM:
CONCRETE FLOOR & STRUCTURAL STEEL TO 4' - 0" AFF: PROTECTIVE SYSTEM F-8
STEEL ABOVE 4' - 0": PROTECTIVE COATING SYSTEM M-2
HOLLOW METAL DOORS & FRAMES: PROTECTIVE COATING M-2
N
0 4' 8' 16'
SCALE: 1 1/2" = 1'-0"1 END OF WALL DETAIL - TYPICAL
LeLaKb
59.3
58.7
Kb.9
METAL WALL PANEL ON
20GA 4" METAL STUDS
@ 16" O.C.
ELECTROLESS
NICKEL LAB
A-0114
WET
BLASTER
HOODSINK
3"
9' - 3" 2' - 5 1/2"
11' - 8 1/2"
FLAT METAL PANEL
8" METAL JOIST (20 GA)
@ 16" O.C.FLAT METAL PANEL
4" METAL STUDS
(20 GA) @ 16" O.C.
FLASHING
FLASHING FLASHING BY METAL
PANEL MANUFACTURER
8"
8"
C3
Sim A-0600
9"
9"
SCALE: 1/4" = 1'-0"B5 OPERATING FLOOR-AREA D
BASIS OF DESIGN FOR METAL WALL PANELS
PROFILE SERIES, BY CENTRIA
1W - 30A - 20GA. SUBSTRATE G-90
HOT DIP GALVANIZED STEEL CONFORMING TO ASTM A924 + A653
STRUCTURAL QUALITY. FINISH COATING: VERSACOR ELITE PF
COATING SYSTEM
GENERAL NOTES:
1. REFERENCE MECHANICAL PHASING DRAWINGS FOR SCOPE
RELATED TO EACH PHASE OF CONSTRUCTION. OPERATING FLOOR COATING SYSTEM:
CONCRETE FLOOR & STRUCTURAL STEEL TO 4' - 0" AFF: PROTECTIVE SYSTEM F-8
STEEL ABOVE 4' - 0": PROTECTIVE COATING SYSTEM M-2
HOLLOW METAL DOORS & FRAMES: PROTECTIVE COATING M-2
1:1
BLDG 3001 PLATING SHOP RENOVATIONS
TINKER AIR FORCE BASE
OKLAHOMA CITY, OKLAHOMA
FY:15
DESIGNED BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY:
SUBMITTED BY:
PLOT SCALE:
DATE:
FILE NUMBER:
SHEET
IDENTIFICATION
SOLICITATION NO.:
CONTRACT NO.:
SIZE:
BURNS & MCDONNELL
9400 WARD PARKWAY
KANSAS CITY, MO 64114
US Army Corps of Engineers ofSheet
TULSA, OKLAHOMA
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
SYMBOL REVISIONS DATE APPROVED
5 4 3 2 1
D
C
B
A A
B
C
D
C O
PY
R
IG
H
T
BU
RN
S
AN
D
M
CD
O N
N
EL
L
EN
G
IN
EE
RI
N G
C O
M
PA
N Y, I N
C.
W912BV-15-R0093
J. KLING
42x30
2/6/15 A-0114
AREA PLAN - OPERATING FLOOR -
AREA F
A. WHITENER
D. SCOTT
A. WHITENER
78794A-0114.DWG
D. SCOTT
N
0 4' 8' 16'
SCALE: 1/4" = 1'-0"1 TYPICAL ENCLOSURE SECTION
UP UP
UP
UP
62.361.661.160.5
Le
La
Kb
Ka
Ja
Ib
Ia
Hc
Ha
Gb
G
59.959.358.758.157.556.956.355.755.154.553.953.452.9 53.9a
Ha.9
Ia.9
Ja.9
Kb.9
FLAT METAL PANELS
ON 8" (20 GA) METAL
JOISTS @ 16" O.C.
FLAT METAL PANELS ON
8" (20 GA) METAL JOISTS
@ 16" O.C.
1:1
BLDG 3001 PLATING SHOP RENOVATIONS
TINKER AIR FORCE BASE
OKLAHOMA CITY, OKLAHOMA
FY:15
DESIGNED BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY:
SUBMITTED BY:
PLOT SCALE:
DATE:
FILE NUMBER:
SHEET
IDENTIFICATION
SOLICITATION NO.:
CONTRACT NO.:
SIZE:
BURNS & MCDONNELL
9400 WARD PARKWAY
KANSAS CITY, MO 64114
US Army Corps of Engineers ofSheet
TULSA, OKLAHOMA
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
SYMBOL REVISIONS DATE APPROVED
5 4 3 2 1
D
C
B
A A
B
C
D
C O
PY
R
IG
H
T
BU
RN
S
AN
D
M
CD
O N
N
EL
L
EN
G
IN
EE
RI
N G
C O
M
PA
N Y, I N
C.
W912BV-15-R0093
J. KLING
42x30
2/6/15 A-0120
OVERALL PLAN - MEZZANINE
A. WHITENER
D. SCOTT
A. WHITENER
78794A-0120.DWG
D. SCOTT
SCALE: 1/8" = 1'-0"A5 NEW WORK - MEZZANINE
MEZZANINE COATING SYSTEM:
STRUCTURAL STEEL, GRATING, AND HANDRAILS: PROTECTIVE COATING SYSTEM M-2
GENERAL NOTES:
1. REFERENCE MECHANICAL PHASING DRAWINGS FOR SCOPE RELATED TO
EACH PHASE OF CONSTRUCTION.
N
62.361.661.160.5
Le
La
Kb
Ka
Ja
Ib
Ia
Hc
Ha
Gb
G
59.959.358.758.157.556.956.355.755.154.553.953.4 53.9a
Ha.9
Ia.9
Ja.9
Kb.9
NEW FIBERGLASS GRATING
OVER PLATFORM W/
GALVANIZED GUARDRAIL -
SEE DETAIL A3/A-0140
RE: STRUCTURAL FOR SIZE
PULTRUDED STAIR TREAD
PANEL - FIBERGLASS SPF,
YELLOW 1 - 1/2" BEARING
BARS, 1 - 1/2" O.C. REGULAR
CROSS BARS, 6" O.C.
YELLOW GRIT SURFACE,
INTERNAL NOSING; 11"
PANEL WIDTH.
RE: STRUC FOR DETAIL.
COVER AND PATCH EXISTING OPENING WHERE MECHANICAL
EQUIPMENT WILL NOT BE REPLACED. COORDINATE WITH
MECHANICAL AND STRUCTURAL. RE: DETAILS ON A-0500
3" 3"
7/8" MIN
HSS2x2x3/16 POST (GALV)
PAINT TO MATCH EXISTING
1'
- 9
1'
- 9
1:1
BLDG 3001 PLATING SHOP RENOVATIONS
TINKER AIR FORCE BASE
OKLAHOMA CITY, OKLAHOMA
FY:15
DESIGNED BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY:
SUBMITTED BY:
PLOT SCALE:
DATE:
FILE NUMBER:
SHEET
IDENTIFICATION
SOLICITATION NO.:
CONTRACT NO.:
SIZE:
BURNS & MCDONNELL
9400 WARD PARKWAY
KANSAS CITY, MO 64114
US Army Corps of Engineers ofSheet
TULSA, OKLAHOMA
U.S. ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
SYMBOL REVISIONS DATE APPROVED
5 4 3 2 1
D
C
B
A A
B
C
D
C O
PY
R
IG
H
T
BU
RN
S
AN
D
M
CD
O N
N
EL
L
EN
G
IN
EE
RI
N G
C O
M
PA
N Y, I N
C.
W912BV-15-R0093
J. KLING
42x30
2/6/15 A-0140
OVERALL PLAN - ROOF
A. WHITENER
D. SCOTT
A. WHITENER
78794A-0140.DWG
D. SCOTT
SCALE: 1/8" = 1'-0"A5 NEW WORK - ROOF
GENERAL NOTES:
1. REFERENCE MECHANICAL PHASING DRAWINGS FOR SCOPE RELATED TO EACH
PHASE OF CONSTRUCTION.
2. REFERENCE MECHANICAL DRAWINGS FOR REQUIRED NEW PENETRATIONS
AND INFILL.
3. REFERENCE STRUCTURAL DRAWINGS FOR PLATFORM DEMOLITION.
4. REFERENCE SHEET A0500 FOR ROOFING AND PENETRATION DETAILS.
5. ALL OPENINGS SHALL BE ENCLOSED AT THE END OF EACH WORKING DAY.
6. WELDING IS BY PERMIT ONLY. ALL FIRE SAFETY PROVISIONS WILL BE
FOLLOWED. A FIRE EXTINGUISHER OF THE CORRECT TYPE WILL BE ADJACENT
TO WORK ON THE ROOF AT ALL TIME.
7. AFTER EXISTING ROOFING, SHEATHING & INSULATION HAS BEEN REMOVED,
CONTACT THE CONTRACTING OFFICER TO INSPECT THE EXISTING ROOF DECK.
SCOPE NOTES:
1. PATCHING AND REPAIRING DECK AND ROOF TO BE COMPLETED WITH
REMOVAL OF ALL EQUIPMENT AND PLATFORMS AS PART OF BASE BID.
2. MODIFY OR REPLACE EXISTING FRAMING AND GRATING AS REQUIRED TO
ACCOMMODATE NEW EQUIPMENT, DUCTWORK OR ROOFING ACCESS . GENERAL
CONTRACTOR TO COORDINATE.
3. REROOF OF ENTIRE PLATING SHOP AREA TO BE COMPLETED AS PART OF BID
OPTION NO. 2.
N
0 4' 8' 16'
SCALE: 1 1/2" = 1'-0"A3 GALV GUARDRAIL
Ha
T
RE
AD
S
3' - 10"
C3 A-0400
C3 A-0400
13 TREADS @ 11"
R
IS
ER
S
7"
CHANNEL
BOLTED ON TREADS
B4 A-0400
D4 A-0400
11' - 0"
4'-0" O.C. MAX TYP.
Gb
B3 A-0400
B3 A-0400
3' - 10"
T
RE
AD
S
13 TREADS @ 11"
R
IS
ER
S
7"
C4 A-0400
11' - 0"
1" GRATING TREADS
W/ ABRASIVE NOSING
BOLTED TO
STRINGER.
8" STEEL BEAM
- SEE
STRUCTURAL
1/4
2-1/2" CONC.
SLAB ON 1-1/2"
COMPOSITE
DECK.
TREAD
RISER
1" GRATING TREADS
W/ ABRASIVE NOSING
BOLTED TO STRINGER.
1/4" CHECKERED
PLATE NOSING
3/16
3 SIDES
L4x4x1/4x0'-6" EA
STRINGER W/ (2) 3/4"
DIA EPOXY ANCHOR
TREAD
RISER
3/16
TOC
3 SIDES
1" GRATING TREADS
W/ ABRASIVE NOSING
L4x4x1/4x0'-6" EA STRINGER
W/ (1) 3/4" DIA EPOXY ANCHOR
1-1/2" NOM. SCHED.
40 PIPE (PAINT)
3/16TYP.
C12X20.7 STAIR STRINGER (GALV.)
TREAD
RISER
1:1
BLDG 3001 PLATING SHOP RENOVATIONS
TINKER AIR FORCE BASE
OKLAHOMA CITY, OKLAHOMA
FY:15
DESIGNED BY:
DRAWN BY:
CHECKED BY:
REVIEWED BY:
SUBMITTED BY:
PLOT SCALE:
DATE:
FILE NUMBER:
SHEET
IDENTIFICATION
SOLICITATION NO.:
CONTRACT NO.:
SIZE:
BURNS & MCDONNELL
9400 WARD PARKWAY
KANSAS CITY, MO 64114
US Army Corps of Engineers ofSheet
TULSA,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .