W912BV-15-D-0093-0001.pdf

PDF 734 KB Posted

Attached to
Plating Shop Renovation, Building 3001, Tinker Air Force Base, Oklahoma.
Solicitation number
W912BV-15-R-0093
Issued by

About this file

Amendment 0001

View the file

Other files

File Type Posted
W912BV-15-R-0093-0006.pdf PDF
W912BV-15-R-0093-0005.pdf PDF
W912BV-15-R-0093-0004.pdf PDF
W912BV-15-R-0093-0003a.pdf PDF
W912BV-15-D-0093-0002.pdf PDF
Site_Visit_Attendee_Sheet.pdf PDF
W912BV-15-R-0093_DWGS_8.pdf PDF
W912BV-15-R-0093_DWGS_2.pdf PDF
W912BV-15-R-0093_DWGS_6.pdf PDF
W912BV-15-R-0093_DWGS_4.pdf PDF
W912BV-15-R-0093_DWGS_3.pdf PDF
W912BV-15-R-0093_DWGS_5.pdf PDF
W912BV-15-R-0093_DWGS_7.pdf PDF
W912BV-15-R-0093_DWGS_1.pdf PDF
W912BV-15-R-0093_SPECSa.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Plating Shop Renovation, Building 3001, Tinker AFB, OK.

1. Summary of amendment 0001 changes can be found on the second page of this amendment.

2. The due date is extended to 2:00 PM CST, 6 Jan 2015.

3. All potential offerors must acknow ledge this amendment by completing blocks 15A, 15B and 15C of this page. Return the completed first page of this amendment w ith your proposal.

4. POC for this amendment is Pun Chittchang, punnie.chittchang@usace.army.mil, phone:918-669-7544, fax:918-669-7495.

5. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED BY THIS AMENDMENT.

1. CONTRACT ID CODE PAGE OF PAGES

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BV-15-R-0093

X 9B. DATED (SEE ITEM 11)

28-Oct-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Nov-2015

CODE

CONTRACTING DIV

USACE, TULSA 1645 S 101 E AVE

TULSA OK 74128-4609

W912BV 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

X 1

AMENDMENT 0001

W912BV-15-R-0093

PMXG PLATING SHOP RENOVATION, B3001

TINKER AIR FORCE BASE, OKLAHOMA

1. The revised/appendices/pages listed below are hereby added to or revised and made a part of the solicitation.

Revised or added/deleted information can be located in the specifications by searching for an asterisk and amendment number (i.e., *AM1).

00 11 00 PRICING SCHEDULE

00 21 00 INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

00 22 11 PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA AND BASIS OF AWARD 00 72 00 CONTRACT CLAUSES (Clause 52.236-27 SITE VISIT only; remainder of section is unchanged)

01 04 00 COORDINATION, FIELD ENGINEERING, AND MEETINGS

01 45 01.00 10 USACE QUALITY CONTROL

01 60 00.00 50 MATERIAL AND EQUIPMENT

01 91 00.00 40 COMMISSIONING

00 11 00 1 W912BV-15-R-0093

B3001 Plating Shop Renovation AMENDMENT 0001 REPLACE IN ITS ENTIRELY Tinker AFB, OK

PRICING SCHEDULE

CLIN Estimated Unit No. Description Quantity Unit Price Amount

BASE PROPOSAL

0001 Phase 1 and Phase 2 Plating Shop 1 Job XXX $_____________

0002 Phase 3 to Phase 6 Plating Shop 1 Job XXX $_____________

0003 Real Property 1 Job XXX $_____________

0004 As-Built Drawings 1 Job XXX $_____________

0005 O&M Manuals 1 Job XXX $_____________

TOTAL BASE PROPOSAL

(CLIN 0001 – 0005 INCLUSIVE) $___________________

OPTIONS

0006 Option 1 – Access Door from Area A to Area B

(See note 5a) 1 Job XXX $_____________

0007 Option 2 – Roof Replacement (See note 5b) 1 Job XXX $_____________

0008 Option 3 – Wax/DeWax Renovation (See note 5c) 1 Job XXX $_____________

0009 Option 4 – Contaminated Soil Removal and Disposal (See note 5d) 20 CY $_____ $_____________

Sub-Total Options 1 – 4 (CLINS 0006 – 0009 Inclusive) $______________

TOTAL BASE PROPOSAL & OPTIONS

(CLINS 0001 – 0009 INCLUSIVE) $______________

Contract Duration _____________ (in calendar days; see Note 9)

00 11 00 2 W912BV-15-R-0093

Tinker AFB, OK

PRICING SCHEDULE NOTES

1. The Offeror shall submit pricing data on the latest Pricing Schedule as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.

2. Offerors must insert a price on all numbered CLINS of the Pricing Schedule.

3. All the extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.

4. BASE PROPOSAL ITEM DESCRIPTIONS

a. The following item costs shall be excluded from CLINS 0001 and 0002. Include the following item costs in CLIN 0003:

(1) Fire Alarm & Mass Notification Systems

(2) Lighting within the Basement (Below bottom of tank level)

(3) Sprinkler System

5. DESCRIPTION OF OPTIONS

a. Option 1: Access Door from Area A to Area B – this option shall provide double door access between Area A and Area B. This option will include adjustment/relocation of associated structural steel, mezzanine, equipment, and piping as required for installation of the doors. See drawings and specifications for further definition.

b. Option 2: Roof Replacement – this option shall provide a new roof system over the entire plating shop. This option shall include the removal of the existing roof, deck replacement as required, new expansion joints and all new flashing around all roof penetrations. This option includes all associated work required to replace the roofing system. See drawings and specifications for further definition.

c. Option 3: Wax/DeWax Renovation – this option shall include removal and installation of new equipment, replacement of hoists, and other items as shown within the drawings and specifications.

d. Option 4: Contaminated Soil Removal and Disposal: The work shall include removal and disposal of contaminated soil associated with construction on this project. Costs for this item shall include excavation, laboratory analytical testing, characterization, manifesting, confirmation sampling, containerization, transportation, and off-site disposal. For estimating purposes any waste encountered would be classified as industrial waste and not Hazardous waste.

6. SITE WORK

a. All site work shall be included within CLIN Line Items 0001 and 0002.

00 11 00 3 W912BV-15-R-0093

Tinker AFB, OK

7. COST BREAKDOWN INFORMATION

The Contractor shall provide cost or pricing data with this proposal as required by FAR Part 15. This information shall be provided in the format specified by Table 15-2 of FAR 15.408 or in the Contractor’s own format provided that format includes the appropriate information.

8. AWARD OF OPTIONAL PROPOSAL ITEMS

CLINS 0006 and 0008 (Options 1 and 3) may, at the option of the Government, be awarded at the time of contract award or may be exercised at any time from the date of contract award until 90 days after award.

CLINS 0007 (Options 2) may, at the option of the Government, be awarded at the time of contract award or may be exercised at any time from the date of contract award until 270 days after award.

CLINS 0009 (Option 4) may, at the discretion of the Government, be exercised at any time from the date of Contract Award to the completion of the contract.

Any and all optional line items may be exercised solely at the discretion of the Government.

9. CONTRACT DURATION

The Offeror shall propose total integrated contract duration in number of calendar days after the Notice to Proceed (NTP) is received by the Contractor, whether via electronic means or hard copy, whichever is the earliest method of delivery. The total number of proposed calendar days for design and construction through completion, ready for turnover shall not exceed the days shown at, SCR: 52.211-10 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK. The proposed duration shall become the required contract duration. The Government may issue the NTP via e-mail or Facsimile (FAX) or by other means. Day number 1 is the day after the date of receipt of the NTP.

PMXG Plating Shop Renovation, Bldg 3001 Tinker AFB, OK

00 21 00 - 1

Section 00 21 00 - Instructions, Conditions & Notices to Offerors

00 21 00

INSTRUCTIONS TO OFFERORS

SECTION 00 21 00

INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

1.0 GENERAL INFORMATION

1.1 GENERAL DESCRIPTION OF WORK

1.2 GOVERNMENT SECURITY REQUIREMENTS

1.3 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

1.4 OFFEROR'S QUESTIONS AND COMMENTS

1.5 SMALL BUSINESS SIZE STANDARD/NAICS CODE

1.6 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

1.7 PRE-PROPOSAL CONFERENCE

1.8 ACCURACY IN PROPOSALS

1.9 PROPOSAL SUBMITTALS

1.10 JOINT VENTURE PROPOSAL REQUIREMENTS

1.0 GENERAL INFORMATION

1.1. GENERAL DESCRIPTION OF WORK

This project involves renovating the existing 40,000 square foot plating shop located within Building 3001, including: new chemical process tanks (approximately 180 tanks); replacing the operating floor; replacing roof-mounted scrubbers/exhaust fans; and recoating the entire shop.

As part of this effort, power, lighting, Reverse Osmosis (RO) water system, process controls and other utility systems supporting the process lines will require modifications and replacement.

*AM1 *AM1

1.2. GOVERNMENT SECURITY REQUIREMENTS

The Offeror(s) must ensure that ALL mail sent to the Tulsa District, U.S. Army Corps of Engineers, either pre-contract or post-contract award, has a return mailing address on the outside of the envelope, package, box, etc. ANY MAIL addressed to the U.S. Army Corps of Engineers, including but not limited to bids, modifications to bids, proposals, revised proposals, bonds, correspondence, etc., will be REJECTED by the US Army Corps of Engineers mail room facility located at 1645 S. 101 E. Ave, Tulsa, OK 74128, if it does not contain a return mailing address. There will be no exceptions.

USACE Tulsa District Point of Contact is Punnie Chittchang:

Phone: 918-669-7544 Email: punnie.chittchang@usace.army.mil

1.3. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation documents will be posted through the Army’s Single Face to Industry (AFSI) to the Federal Business Opportunities (FBO) website at:

http://www.fbo.gov

Solicitation number: W912BV-15-R-0093

It shall be the contractor’s responsibility to check the websites for any amendments. The offeror shall submit in the proposal all requested information specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation.

1.4. OFFEROR'S QUESTIONS AND COMMENTS

Questions and/or comments relative to the document should be submitted via Bidders Inquiry at:

https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=HomePagePublic.

Instructions for registering in the ProjNet Bidder Inquiry system are available on the above web site.

The Bidder Inquiry Key for this project is:

Any information given to an offeror which impacts the solicitation and/or offer will be given in the form of a written amendment to the solicitation.

Note: All questions and/or comments should be entered in Bidder’s Inquiry no later than 14 calendar days (23 Dec 2015) prior to the proposal deadline, so they may be given consideration or action taken prior to receipt of offers.

*AM1 * AM1

00 21 00 - 2 *AM1 *AM1

IAD5A8-G2FAUM

1.5. SMALL BUSINESS SIZE STANDARD/NAICS CODE

The small business size standard for NAICS Code 236220 is $36.5 Million.

1.6. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

This Request for Proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.

1.7. PRE-PROPOSAL CONFERENCE

The Government intends to hold the pre-proposal conference. The date, location, and time will be announced by Amendment. The offeror must submit, via e-mail, the firm’s name, address, point of contact, telephone number, and number of personnel planning to attend to the following no later than two (2) working days prior to the conference:

U.S. Army Corps of Engineers, Tulsa District ATTN: Punnie Chittchang 1645 S. 101 E. Ave.

Tulsa, OK 74128 Phone: 918-669-7657 Fax: 918-669-7495 Email: punnie.chittchang@usace.army.mil

During this conference, the requirements set forth in the solicitation will be reviewed and discussed, with part of the conference to include a question and answer period.

1.8. ACCURACY IN PROPOSALS

Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments). The penalty for making false statements is prescribed in 18 U.S.C.

1001.

1.9. PROPOSAL SUBMITTALS

The submittal method for proposals is electronic via AMRDEC SAFE web site or email:

https://safe.amrdec.army.mil/safe/.

The following email addresses must be entered for notification of proposal receipt and download availability:

punnie.chittchang@usace.army.mil nathan.r.kloeckler@usace.army.mil

00 21 00 - 3 *AM1 *AM1

Proposals will be received until the time and date shown on Standard Form SF 1442 or as amended on SF30. Mail proposals to:

U.S. Army Corps of Engineers, Tulsa District ATTN: Punnie Chittchang, CESWT-CT 1645 S. 101 E. Ave.

Tulsa, OK 74128

The Packaging Proposals shall be marked:

”Proposal for Solicitation Number: W912BV-15-R-0093”

1.10. JOINT VENTURE PROPOSAL REQUIREMENTS

When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 and the bid bond unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration.

If this is an 8(a) or HubZone joint venture, the offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124 and 13 CFR Part 126, respectively

00 21 00 - 4 *AM1 *AM1

*AM1 00 22 11 - 1*

*AM1 SSP ATTACHMENT #1 *

SECTION 00 22 11

PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA, AND BASIS OF AWARD

1. 0 OVERVIEW

This is a competitive best-value solicitationutilizing the trade-off method for a construction contract for the PMXG Plating Shop Renovation, Bldg 3001, located at Tinker Air Force Base, Oklahoma. The Government will evaluate proposals in accordance with the criteria described herein and award a firm fixed-price contract to the responsible firm whose proposal conforms to all the terms and conditions of the solicitation and whose proposal is determined to represent the overall best value to the Government.

If awarded the contract, the Offeror shall construct the project in accordance with the plans and specifications.

1.1 WHO CAN SUBMIT

1.1.1 Firms formally organized as construction contractors that have associated specifically for this project, consortia of firms or any other interested parties may submit proposals. Associations may be as joint ventures or as key team subcontractors.

1.1.2 Organization Conflicts of Interest (OCI) Disclosure: The Offeror shall provide a disclosure statement with its proposal which concisely describes all the relevant facts concerning the past or present organizational conflicts of interest relating to work on this project. In the same statement, and if applicable, the Offeror shall provide information to assure the Government that the conflicts of interest have been mitigated and/or neutralized to the maximum extent possible. If a conflict of interest is discovered after award of this contract, the Contracting Office will make a decision whether to terminate the contract.

2.0 BASIS OF AWARD

The Contracting Officer intends to award a firm fixed-price contract to the responsible Offeror whose proposal the Source Selection Authority determines conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government, considering all non-price factors described herein, and price. All evaluation factors, other than price, when combined, are considered more important than the price. The intent of this solicitation is to obtain the best proposal for the work within the solicitation. The Government reserves the right to accept other than the lowest priced offer or to reject all offers. The Government will not award a contract to a Firm whose proposal contains a deficiency, as defined in FAR 15.001. The Government reserves the right to reject any offer if the offer is not in the best interest of the Government.

3. 0 PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS

All offerors shall be required to submit a proposal with the minimum content as specified herein. Proposals without the minimum content may be rejected. Proposals will be received until the date and time indicated on Standard Form 1442 at the following address:

U.S. Army Engineer District, Tulsa

CESWT-CT-E

ATTN: Punnie Chittchang 1645 E 101ST East Ave, Tulsa, OK 74128

*AM1 00 22 11 - 2*

3.1 REQUIREMENT FOR SEPARATE PRICE AND TECHNICAL PROPOSALS

3.1.1 Each Offeror must submit both a Price Proposal and a Technical Proposal. The Price Proposal and the Technical Proposal must be submitted as separate volumes. Ensure that the outside of each separate volume is clearly marked to indicate its contents; and the identity of the Offeror. Additionally, clearly identify the “original” price proposal and the “original” technical proposal on the outside cover.

3.1.2 Both the Price Proposal and the Technical Proposal must be received by the closing date and time set for receipt of proposals.

3.1.3 No dollar amounts from the Price Proposal are to be included in the Technical Proposal.

3.1.4 All information intended to be evaluated as part of the Technical Proposal must be submitted as part of the Technical Proposal (Volume 1). Do not merely cross-reference similar material in the Price Proposal, or vice versa. Also, do not include links to websites in lieu of incorporating information into your proposal.

3.2 DISCUSSIONS

The Government does not intend to enter into discussions with offerors prior to making an award. Offerors are encouraged to present their best technical proposal and prices in their initial proposal submission. However, in accordance with FAR Part 15.306, should discussions become necessary, the Government reserves the right to hold them. If this occurs, a competitive range will be determined and offerors notified. The competitive range may be limited for purposes of efficiency in accordance with (IAW) FAR Part 15.306(c)(2).

3.3 GENERAL INSTRUCTIONS

3.3.1 Submit only the hard-copy paper documents and the electronic files specifically authorized and/or required elsewhere in this section. Do not submit excess information, to include audio-visual materials, electronic media, etc. Number all pages unless told otherwise.

3.3.2 Text font size shall not be less than 10 point. Do not use condensed font. Each page shall be identified with the appropriate page number centered at the bottom of the page, except for the cover sheet, which shall not be numbered. Page number format for the Table of Contents shall be “i, ii, iii….” Proposal page size shall be 8-1/2 inches x 11 inches; however, if drawings, charts, or other graphics are submitted, sheets no larger than 11 x 17 inches and folded to 8-1/2 inches x 11 inches (folio) shall be used. Eleven-by-seventeen (11 x 17) inch sheets will be counted as two (2) 8-1/2 inch x 11 inch sheets. Each side of a double-sided page (sheet) counts as one page.

Proposals shall not exceed the maximum page limits indicated, excluding the cover sheet and Table of Contents.

The Government will not review any information submitted in an appendix or attachment to the proposal. The Offeror shall not submit verbatim sections of this solicitation as part of their proposal. Offers that do not meet these requirements may be subject to rejection. All page margins must be at least 1 inch wide, but may include headers and footers.

3.3.3 Use three-ring binders to assemble your proposal. Do not use spring clamps or exceed the recommended capacity of the fastener or binder.

3.3.4 “Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can be provided to the Government as part of the Offeror’s technical proposal.

Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must be clearly marked in accordance with the instructions at FAR 52.215-1, “Instructions to Offerors—Competitive Acquisition”, paragraph (e), “Restriction on disclosure and use of data”.

*AM1 00 22 11 - 3 *

3.3.5 Proposal revisions shall be submitted as page replacements with revised text readily identifiable, e.g., bold face print or underlining. The source of the revision, e.g., Error, Omission, or Clarification, or amendment shall be included and be annotated for each revision. Proposal replacement pages shall be numbered, shall be clearly marked “REVISED”, shall show the date of revision, shall be submitted in appropriate number of copies (e.g., if two

(2) copies of the original page was required, then two (2) copies of the revised page will also be required, and shall be a different color than the original pages they are to replace).

3.3.6 Cover Sheets and Table of Contents

a. Proposals shall contain a cover sheet containing the information shown below in accordance with FAR 52.215-1 “Instructions to Offerors – Competitive Acquisitions”.

PROPOSAL COVER SHEET FORMAT:

Solicitation Number: W912BV-15-R-0093

Title: PMXG PLATING SHOP RENOVATION, BUILDING 3001, TINKER AFB, OK

Name, address, email address(es),telephone and facsimile number(s) of Offeror.

Company CAGE code, DUNS number and Federal ID number.

Names, titles, telephone, email addresses and facsimile numbers of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this solicitation.

Name, title, and signature of person authorized to sign the proposal.

NOTE: Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.

b. Table of Contents. The second sheet shall be a detailed Table of Contents. If more than one binder is used, the complete Table of Contents shall be included in each.

3.4 SPECIFIC INSTRUCTIONS FOR THE TECHNICAL PROPOSAL

3.4.1 Number of Sets of the Technical Proposal. The Offeror shall submit one ORIGINAL copy of the written Technical Proposal in hard copy format and provide the complete proposal on 6 (six) CDs. The six (6) CDs shall contain the entire technical proposal in .pdf format using Adobe Acrobat software to print to a .pdf file (or “save as .pdf”); do NOT scan the document(s) into a .pdf file. The text portion of the complete proposal shall be contained as a single .pdf file. Sections of the proposal shall be bookmarked (linked to the index) in logical order.

3.4.2 Format and Contents of the Technical Proposal and List of Tabs. The original and all copies of the Technical Proposal will be appropriately labeled as such and shall be organized using the tabs specified in the chart below.

3.4.3 Page Limitations. The following page limitations are established for each Factor/Subfactor/Element:

Factor 1 – Performance Capability:

Subfactor 1, Specialized Experience – Limited to 20 pages (1 page per project; maximum 5 forms; see paragraph 5.1.1) per contactor/subcontractor Subfactor 2, Key Subcontractors – Limited to 1 letter per subcontractor Subfactor 3, Key Personnel – Limited to 1 page for each resume provided

Factor 2 – Contract Duration, Schedule, Organization & Technical Approach Subfactor 1, Proposed Contract Duration and Summary Schedule - No page limit Subfactor 2, Organization/Technical Approach – Limited to 10 pages

*AM1 00 22 11 - 4 *

Factor 3- Past Performance – No page limitation Factor 4 - Small and Small Disadvantaged Business Utilization – No page limitation

3.5 SPECIFIC INSTRUCTIONS FOR THE PRICE PROPOSAL (VOLUME 2)

3.5.1 Number of Sets of the Price Proposal. Submit an ORIGINAL set of the Price Proposal plus a CD containing the Price Proposal. The Price Proposal CD will be due 24 hours following the proposal due date. Mail or hand deliver the CD in accordance with the instructions in Section 00 21 00.

3.5.2 Size Restrictions and Page Limits. The following are established for each Factor/Subfactor:

Factor 5 – SF 1442, Pricing (CLIN) Schedule (no page limit) Subfactor 1 – Subcontracting Plan (no page limit)

Use only 8 ½” x 11” pages. There are no page limits set for the Price Proposal. However, limit your response to information required by this solicitation. Excess information will not be considered in the Government’s evaluation.

3.5.3 Format and Contents of the Price Proposal and List of Tabs. The Price Proposal shall be appropriately labeled as such and shall be organized as indicated in the following chart. Note: If the Offeror is not required to submit any information under a listed Tab in accordance with the instructions below, that tab can be omitted.

However, do not renumber the subsequent tabs.

4.0 PROPOSAL CONTENTS AND RELATED EVALUATION FACTORS

VOLUME 1 – TECHNICAL PROPOSAL

Factor/ Subfactor/ Element

LOCATION DESCRIPTION RELATIVE IMPORTANCE

N/A Vol 1 Tab A Assumptions Not rated.

FACTOR 1 PERFORMANCE

CAPABILITY

1st Most Important Factor

Subfactor 1 Vol 1 Tab B Specialized Experience Most Important Subfactor

Subfactor 2 Vol 1 Tab C Key Subcontractors 2nd Most Important Subfactor

Subfactor 3 Vol 1 Tab D Key Personnel 3rd Most Important Subfactor

FACTOR 2 CONTRACT DURATION,

SCHEDULE, ORGANIZATION &

TECHNICAL APPROACH

2nd Most Important Factor

Subfactor 1 Vol 1 Tab E Proposed Contract Duration & Summary Schedule

Most Important Subfactor

*AM1 00 22 11 - 5 *

Subfactor 2 Vol 1 Tab F Organization & Technical Approach

2nd Most Important Subfactor

FACTOR 3 Vol 1 Tab G PAST PERFORMANCE 3rd Most Important Factor

FACTOR 4 Vol 1 Tab H SMALL AND SMALL

DISADVANTAGED BUSINESS

UTILIZATION

4th Most Important Factor

*AM1 00 22 11 - 6 *

VOLUME 2 – PRICE PROPOSAL

Factor/ Subfactor/ Element

LOCATION

DESCRIPTION

RELATIVE IMPORTANCE

FACTOR 5 Vol 2 Tab A SF 1442, PRICING (CLIN)

SCHEDULE

Not Rated

N/A Vol 2 Tab B Bid Guarantee (Bid Bond) Not Rated N/A Vol 2 Tab C Self-Performed Work Not Rated N/A Vol 2 Tab D Required Pre-Award Information Not Rated

Subfactor 1 Vol 2 Tab 7 Subcontracting Plan Go/No Go

5.0 VOLUME 1 – TECHNICAL PROPOSAL

5.1 VOLUME 1, TAB A: ASSUMPTIONS

Deviations and exceptions to the requirements contained in the RFP are not allowed. Any questions related to specific terms and conditions of the solicitation must be resolved prior to submission of the proposal. However, if assumptions are made, the Offeror shall list and describe in detail the assumption(s). If award is made without discussions, an exception or deviation to any portion of the RFP requirements may make the proposal ineligible for award. Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the proposal may be deemed “unacceptable” and thus ineligible for award. See Section 00 22 11, paragraphs 7.3, “Definitions”.

5.1.1 Submission Requirements

The list of assumptions shall be located under Tab A of Volume 1 – Technical Proposal Information. All assumptions shall be fully supported with the Offeror’s rationale and shall fully explain the impact, if any, on the performance and specific requirement of the RFP. The Offeror shall clearly describe on the Proposal Cover Sheet submitted with the Price Proposal any assumptions made concerning contractual and/or technical terms and include the monetary impact on the solicitation with the price proposal.

5.1.2 Evaluation Criteria

The list of assumptions will not be rated separately but will be used to determine if the Offeror understands the Statement of Work and the intent and may affect the rating of the other factors. It will also be used to compare the impact on the performance of the project.

5.2 VOLUME 1 – FACTOR 1: PERFORMANCE CAPABILITY

5.2.1 Volume 1, Tab B: Subfactor 1 – Specialized Experience

5.2.1.1 Submission Requirements

Demonstrate the specialized experience of the Offeror and/or proposed team, including sub-contractors, on projects same/similar in size and complexity to that described in the solicitation for same/similar construction services. Emphasis shall be placed on large renovation projects involving fully operational processing facilities, to include tank lines and associated equipment for chemical cleaning and/or plating processes or fully operational heavy industrial facilities, to include fuel processing facilities, paint/paint stripping facilities, food processing facilities or other specialized industrial processing facilities, during construction. If using subcontractors as part of the proposed team to demonstrate experience, describe the role they will play in this project and the percentage

*AM1 00 22 11 - 7 *

of work they will perform. Demonstrate successful management of multiple subcontractors and multiple project phases within an occupied and operational facility for all projects submitted. Experience from a sub-contractor or team member with heavy industrial experience will be acceptable as long as the Prime has experience with large renovation projects.

The Contractor shall complete a minimum of three (3), but no more than five (5), “Experience Information” forms, attached at the end of this section (Attachment 1), in response to this factor. All blocks must be filled in and all data should be accurate, current, and complete. All projects submitted must be at least 50% complete and completed within the last 7 years. At least two (2) of the projects provided must be valued at over $15,000,000.

5.2.1.2 Evaluation Criteria

a. The Government will evaluate the extent of recent, related experience of the Offeror in regard to their role on this project. The Government may place greater importance on projects performed as a prime contractor than as a subcontractor, depending upon overall role and relevancy considerations. Federal Government project experience will not be rated inherently more important than non-Federal Government project experience.

Offerors demonstrating experience with projects of similar size and complexity and on processing facilities with tank lines and associated equipment for chemical cleaning and/or plating processes or fully operational heavy industrial facilities, to include fuel processing facilities, paint/paint stripping, food processing facilities or other specialized industrial processing facilities that remained fully operational during construction will be viewed more favorably by the Government. All projects must demonstrate successful management of multiple subcontractors and multiple project phases within an occupied and operational facility.

(1) The Offeror must submit the requested information to demonstrate a record of recent, related experience in construction, for the project (which may include similar state or local government or private counterparts) included in this solicitation. Recent experience includes projects well underway (see above criteria) or those completed and turned over within 7 years of the proposal issue date for this RFP for construction experience. Joint Venture partners should each demonstrate experience commensurate with their role on this project or how their experience qualifies them for their role on this project. If any of the information required is not included in the form (Attachment 1), then the Contractor will be considered non-responsive and evaluated as unacceptable.

(2) The Government reserves the right to verify the experience record of cited projects or other recent projects by reviewing the Corps of Engineers Construction Contractor (or Architect-Engineer) Appraisal Support System (CCASS/ACASS), other DOD or Government appraisal systems or to interview owners or references. The Government may check any or all cited references to verify supplied information.

(3) To receive credit for extent (amount) of experience, the Offeror shall demonstrate a history of recent, relevant experience. A firm will not receive credit under this factor for the relevant experience of key personnel proposed for this project.

(4) The Government will consider extent of recent experience, degree of relationship of such experience to this project, demonstrated familiarity with applicable codes and local conditions. Some examples of relevancy to this project may include, but not be limited to:

(a) Number, size, type work, complexity, location

(b) Dates (well under way or completed no more than 7 years preceding date of Solicitation)

(c) Firm's role and extent of work self-performed (brokering out all work and simply “placing the sidewalks” or similar minor work on a cited project are examples of less relevant experience).

5.2.2 Volume 1 – Tab C: Subfactor 2 - Key Subcontractors

*AM1 00 22 11 - 8 *

5.2.2.1 Submission Requirements

Identify the potential Key Subcontractors chosen for mechanical, electrical and process controls installation, describing the extent of their involvement in the project. Submit at least three (3) but no more than five (5) Specialized Experience forms (Attachment 1) for each Key Subcontractor, using the same requirements as described in the Phase 1 Specialized Experience submission requirements. Subcontractors shall be selected from the list of potential subcontractors. Any substitutions shall be approved by the Contracting Officer. All subcontractor personnel working on this project must be U.S. citizens or documented U.S. workers and must be able to provide proof of U.S. citizenship or other authorized documentation (See Contract Clause 52.0000-4515 Security Contract Language for All Corps of Engineers’ Unclassified Contracts).

Provide letters of commitment for each of the Key Subcontractors (Attachment 4).

5.2.2.2 Evaluation Criteria

This Factor is composed of two equal elements: Specialized Experience and Past Performance. The Government will evaluate the specialized experience and past performance of the Key Subcontractors for mechanical, electrical, and process controls installation using the same criteria as in the Phase 1 evaluation. After award, the Section 00 73 00 SCR entitled “Key Personnel, Subcontractors and Outside Consultants” will apply to the selection, which establishes the minimum quality standard. No substitution will be allowed without adequate reason and possible consideration to the Government.

5.2.3 Volume 1 - Tab D: Subfactor 3 - Key Personnel

5.2.3.1 Submission Requirements

The Offeror shall provide resume data for the following key personnel: Construction Project Manager, Quality Control Manager (CQC System Manager), Site Superintendent, and Site Safety and Health Oficer (SSHO) as applicable to this requirement. Project Managers with professional certification to include Project Manager Professional (PMP) or equivalent are preferred. Résumé information to be provided shall be limited to no more than one (1) page per person (Attachment 2) and shall include the following information as a minimum:

a. Name and title

b. Project assignment

c. Name of firm with which associated

d. Years experience in the role identified.

e. Years experience with this firm and with other firms

f. Education degree(s), year, specialization, if applicable

g. Active professional registration, year first registered, if applicable

h. Other experience and qualifications relevant to same/similar work required under this contract

The minimum experience requirements for the Construction Project Manager and on-site superintendent shall be in accordance with Section 01 45 01.00 10 USACE QUALITY CONTROL. Minimum experience requirements for other personnel shall be as required by Division 01 sections. No substitutions will be allowed without the approval of the Contracting Officer. Provide letters of commitment for each of the key personnel (Attachment 3).

All contractor and subcontractor personnel working on this project must be U.S. citizens or documented U.S.

workers and must be able to provide proof of U.S. citizenship or other authorized documentation (See Contract Clause 52.0000-4515 Security Contract Language for all Corps of Engineers’ Unclassified Contracts).

5.2.3.2 Evaluation Criteria

*AM1 00 22 11 - 9 *

The Government will evaluate the required information to determine how well the Offeror identifies and demonstrates that its key personnel meet or exceed minimum qualifications necessary to perform construction.

Offerors providing resumes for key personnel for this project that have experience in similar key positions on the projects shown under Specialized Experience will be viewed more favorably by the Government. Performance of key personnel proposed for this project may be taken into account when it comes to the attention of the Government. If alternates are proposed for key positions, the evaluation rating will consider the lesser qualified or experienced person, if there is a difference.

5.3 VOLUME 1 – FACTOR 2: CONTRACT DURATION, SCHEDULE, ORGANIZATION & TECHNICAL APPROACH

5.3.1 Volume 1, Tab E: Subfactor 1 Proposed Contract Duration and Summary Schedule

5.3.1.1 Submission Requirements

a. Proposed Contract Duration. The Offeror shall propose the contract duration in the appropriate location in the CLIN Schedule, not to exceed the maximum contract duration specified in Section 00 73 10 SUPPLEMENTAL CONTRACT REQUIREMENTS, SCR entitled “Commencement, Prosecution, and Completion of Work”.

b. Preliminary Schedule. Submit a preliminary summary level schedule for construction of the work required including any construction phasing. Schedules or diagrams may be provided separately in a size that is easily read, but shall be bound and clearly labeled as Tab D. The preliminary schedule will, after contract award, be replaced with a final schedule as required by Section 01 32 01.00 10 PROJECT SCHEDULE. The schedules shall be task oriented, indicating the number of calendar days, after notice to proceed, by which milestones are to be achieved. Offeror may use a critical path or other method of his choice; however, schedules shall be graphically represented. The proposed project schedule shall reflect the contract duration (additional consideration will be given for a schedule that is shorter than the contract duration period if it is shown to be achievable does not incur additional cost to the Government). Give attention to the following features:

(1) Provide narrative describing long lead item equipment that must be ordered and show the required ordering date in the schedule.

(2) Show construction phases, including contractor down time, commissioning by the Contractor, acceptance testing period by the Government, and the overall construction phase for the project.

(3) Show turnover of the project. Identify any proposed phased turnovers. The time to complete the project and turnover to the Government must consider the requirement for the Contractor’s CQC completion inspection and the subsequent joint Contractor-Government turnover inspection.

(4) Show as-built submissions (See Section 01 70 00.00 10 CONTRACT CLOSEOUT).

(5) Constraints: Offeror must demonstrate the capability and flexibility to plan and schedule the complete project to meet the proposed contract completion period. Clearly identify any constraints on the schedules presented (e.g., labor or material availability, permits, weather, etc.). Indicate the anticipated overall critical path on the schedule.

The intent is to provide enough detail to demonstrate the Offeror’s understands the project; however, it is not the intent for the Offeror to provide the amount of detail that will be required in the pre-work submittals contained in Division 01 of this RFP.

5.3.1.2 Evaluation Criteria

*AM1 00 22 11 - 10 *

a. Proposed Contract Duration: This duration will become the contractually binding completion period.

The Government will evaluate the contract duration, as proposed by the Offeror in the Contract Line Item Schedule, not to exceed the maximum allowed duration of days specified in Section 00 73 10 SUPPLEMENTAL CONTRACT REQUIREMENTS. The Government will rate a proposed contract duration matching the maximum allowed contract duration as “satisfactory”. A proposed contract duration shorter than the maximum allowed duration will receive additional rating consideration, provided it is realistic and deemed to be achievable. An unreasonably condensed contract duration, which places additional cost or schedule risk on the Government will be considered a weakness. Proposed contract duration that shortens the Government’s specified review times for shop drawings will not be considered. During the subsequent trade-off analysis, differences between proposed contract durations of at least three weeks (differences of 21 calendar days between proposals) will be considered an advantage to the government, with greater differences also considered, accordingly. No advantage will be considered between proposals for differences less than 21 calendar days. Offerors are warned that the Military Construction Codification Act prohibits the expenditure of appropriations to expedite the completion date of a military construction contract at additional costs to the Government. Offerors may not expedite the completion date of the construction contract through the use of overtime, double shifts, larger crews and similar efforts unless such measures are required for normal construction efficiencies.

b. Preliminary Schedule. The Government will evaluate the preliminary schedule for construction. The length of the schedule must match the contract duration. If it is shorter, it offers no advantage to the Government because it is non-binding, only representing a preliminary planned schedule. A schedule shorter than the required contract duration may indicate the Offeror is placing additional risk on the Government for any delays between the scheduled completion date and the required contract duration. Both parties shall assume field overhead costs are included in the contract price for the full contract duration. The Government will evaluate the schedule to assess the strength of understanding of the project scope, restrictions which must be considered in the schedule (e.g., permitting, long lead times, contractor down time between phases, etc.). The Government will evaluate the strength of understanding of events associated with coordinating reviews, the Offeror’s capability to schedule the complete project within the proposed contract duration and the realism of the schedule.

5.3.2 Volume 1 – Tab F - Subfactor 2: Organization and Technical Approach

5.3.2.1 Submission Requirements

a. Provide information that describes the Offeror’s organization and intended technical approach to executing the construction contract per the detailed requirements herein. Limit the information to 10 pages or less; clearly but concisely describe the organizational and technical approach to project management and execution.

b. Organization: Describe what firms, their resources and how their resources will be utilized, their roles and responsibilities and any contractual arrangements that have been established. Clearly describe any teaming or joint venture arrangements, including a clear description of each firm’s roles and responsibilities on the project. A copy of the teaming or joint venture agreement(s) may be appended to the plan (not included in the page limitation). Include a simple organizational chart (may be 11”x17” foldout, counted as two pages), illustrating the organization, including the proposed quality control group(s). Present a matrix of responsibilities for each firm in executing the key work breakdown structure activities of the project, including construction activities for each major feature. Identify the firms chosen for the project, if not to be self-performed. Describe the proposed management structure for the team, describing how the construction process will be managed and the authorities and the delegations of authority within the team. Include a key personnel organization chart that clearly depicts the key positions and the names of the personnel, their firm affiliations and their job locations, their job/position title within the organization. The key personnel organization chart shall be consistent with the corporate organization chart, with the matrix of responsibilities assigned to the firms, and with the list of key personnel to be provided under the Tab, “Key Personnel”.

*AM1 00 22 11 - 11 *

c. Planning and Scheduling: Describe the time control capabilities and systems to be used to plan construction and how the schedule will be used to manage construction. Discuss internal procedures for handling delays to minimize time growth or ”schedule creep”.

d. Self-Performed Work: Generally describe the items the offeror will self-perform to comply with the requirements in Section 00 72 00 for self-performed work.

e. Quality Control: Describe the team’s quality control approach, corporate systems and capabilities to maintain quality control of the construction. Describe the proposed quality control organization, including the proposed staffing plan. Provide information on how you will handle internal and external requests for information, shop drawings, progress meetings, site visits, contract completion, closeout, as-built, and completion documentation. There is no need to submit a quality control plan as the successful offeror will provide that after award.

f. Safety Plan: Describe the team’s safety approach, corporate systems and capabilities to maintain safety requirements during construction. Describe the proposed safety organization, including the proposed staffing plan. The intent is to provide enough detail to demonstrate the Offeror’s understanding of the project; however, it is not the intent for the Offeror to provide the amount of detail that will be required in the pre-work submittals contained in Division 01 of this RFP. Not included in 10 page limitation. Limit Safety Plan narrative to two pages.

5.3.2.2 Evaluation Criteria

a. The Government will evaluate the strengths, weaknesses and any deficiencies in the plan. The Government will evaluate the firm’s understanding of the requirements described in the Division 01 requirements and the plans and technical specifications of the Solicitation and the capability to execute the project. Some additional specific evaluation considerations are listed below. This list is not all-inclusive.

b. Organization. The Government will evaluate the clarity and strength of the overall organization and how well it is organized, structured and staffed to execute the entire scope of work. If applicable, joint venture participants’ contribution to the organization should be commensurate with their skills and background.

c. Planning and Scheduling. The Government will evaluate the Offeror’s scheduling capabilities to manage an integrated schedule.

d. Self-Performed Work: The Government will evaluate the Offeror’s proposal to ensure that the self-performed work complies with the requirements of Section 00 73 00 for self-performed work.

e. Quality Control. The Government will evaluate the Offeror’s capabilities and understanding of the contractually required quality control processes for construction. The Government will evaluate the adequacy of the staffing plan to cover all required tasks and responsibilities.

f. Safety Plan: The Government will evaluate the narrative for realism, logic, and understanding of the contractual requirements in regard to the safety plan.

5.4 VOLUME 1 - TAB G: FACTOR 3 - PAST PERFORMANCE

5.4.1 Submission Requirements

a. Past performance refers to the quality of recent project experience from the owner's perspective. The Past Performance Questionnaire (PPQ) included in the solicitation (Attachment 5) is provided for the Offeror or its team members to submit to the client for each project the Offeror includes in its proposal for Factor 1 (Specialized Experience). Ensure correct phone numbers and email addresses are provided for the client’s point of contact.

Completed Past Performance Questionnaires should be submitted with your proposal. If the Offeror is unable to

*AM1 00 22 11 - 12 *

obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .