15-R-0068_Specs.pdf
PDF 13 MB Posted
- Attached to
- AIR CONTROL GROUP SQUADRON OPERATIONS TINKER AFB, OK Federal contract opportunity
- Solicitation number
- W912BV-15-R-0068
About this file
W912BV-15-R-0068 - Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912BV-15-R-0068_Amendment_7.pdf | ||
| W912BV-15-R-0068-0006_Amendment_6_Complete.pdf | ||
| Amendment_5_to_W912BV-15-R-0068_re_due_date.pdf | ||
| Amendment_4_to_W912BV-15-R-0068_complete.pdf | ||
| Site_Visit_Attendance_Sheets_10-27-15.pdf | ||
| W912BV-15-R-0068_Amendment_0003.pdf | ||
| W912BV-15-R-0068_Amendment_2_complete.pdf | ||
| AMENDMENT_0001.pdf | ||
| 15-R-0068_DRAWINGS.pdf | ||
| W912BV-15-R-0068_AFR_513_Squad_Ops_Bldg.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP NO: W912BV-15-R-0068
US Army Corps of Engineers Tulsa District
AIR CONTROL GROUP SQUADRON
OPERATIONS
TINKER AIR FORCE BASE, OKLAHOMA
WWYK12900
REQUEST FOR PROPOSAL
Prepared by:
SEPTEMBER 2015
AIR CONTROL GROUP SQUADRON OPERATIONS
Tinker Air Force Base
Midwest City, Oklahoma
Solicitation Number: W912BV-15-R-0068 Contract Number:
Project Number: WWYK12900
Specifications
August 2015 Burns & McDonnell 9400 Ward Parkway
Kansas City, MO 64114
CERTIFICATION PAGE
CERTIFIC AT ION (SI
O'
22476
ARCHITECTURAL STRUCTURAL
<8/z
MECHANICAL
06 20 00 06 41 16 06 61 16 09 30 00 09 51 00 09 65 00 09 65 66 09 68 00 09 83 13
10 1000 10 14 02 1021 13 10 26 13 10 28 13 12 21 00 12 24 13 1248 13.13 12 65 00
ARCHITECTURAL/INTERIOR
CERT.DOC SIC-1
(o£{\ 70 t £ i*% lot? ^omv^ ff if
ELECTRICAL
o» , , ,"*# .
W 0/2Xf/Zi) l<
CIVIL
SIC-2
Fire Protection
Air Control Group Squadron Operations Tinker AFB, Oklahoma
81432
PROJECT TABLE OF CONTENTS Page 1
PROJECT TABLE OF CONTENTS
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00 11 00 SF1442 AND PRICING (CLIN) SCHEDULE
00 21 00 INSTRUCTIONS TO OFFERORS
00 22 11 PROPOSAL SUBMISSION REQUIREMENT, EVALUATION CRITERIA
AND BASIS OF AWARD
00 45 00 REPRESENTATIONS AND CERTIFICATONS
00 72 00 CONTRACT CLAUSES
00 73 00 SPECIAL CONTRACT REQUIREMENTS
00 73 46 WAGE DETERMINATIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 04 00 COORDINATION, FIELD ENGINEERING, AND MEETINGS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00.10 10 DIGITAL SUBMITTAL PROCEDURES AND CORRESPONDENCE
01 33 29 SUSTAINABILITY REPORTING
01 35 26.00 10 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)
01 45 01.00 10 USACE QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 50 02.00 10 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS
01 57 20.01 10 ENVIRONMENTAL PROTECTION
01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL
01 58 00.00 10 BULLETIN BOARD, PROJECT SIGN, AND SAFETY SIGN
01 60 00.00 50 MATERIAL AND EQUIPMENT
01 62 35 RECYCLED/RECOVERED/BIOBASED MATERIALS
01 70 00.00 10 CONTRACT CLOSEOUT
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00.00 40 COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL
02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS
DIVISION 03 - CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 30 00.00 10 CAST-IN-PLACE CONCRETE
03 35 00.00 10 CONCRETE FINISHING
03 39 00.00 10 CONCRETE CURING
DIVISION 04 - MASONRY
04 20 00 MASONRY
DIVISION 05 - METALS
05 05 23.16 STRUCTURAL WELDING
05 12 00 STRUCTURAL STEEL
05 21 19 OPEN WEB STEEL JOIST FRAMING
PROJECT TABLE OF CONTENTS Page 2
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 16.00 10 LAMINATE CLAD ARCHITECTURAL CASEWORK
06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 11 13 BITUMINOUS DAMPPROOFING AND WATER PROOFING
07 18 00 TRAFFIC COATINGS
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 21 19 SPRAYED POLYURETHANE FOAM (SPF) INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 42 63 FABRICATED WALL PANEL ASSEMBLIES
07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING
07 55 00 PROTECTED MEMBRANE ROOFING (PMR) AND PAVER SYSTEM
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 33 13 METAL ROLLING COUNTER DOORS
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 44 00 WINDOW, CURTAIN WALL AND GLAZED ASSEMBLIES
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 00 CERAMIC TILE, QUARRY TILE, AND PAVER TILE
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 65 66 RESILIENT ATHLETIC FLOORING
09 68 00 CARPET
09 83 13 ACOUSTICAL WALL TREATMENT
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 10 00 VISUAL COMMUNICATIONS SPECIALTIES
10 14 01 EXTERIOR SIGNAGE
10 14 02 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
PROJECT TABLE OF CONTENTS Page 3
10 26 13 WALL AND CORNER GUARDS
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
DIVISION 12 - FURNISHINGS
12 21 00 WINDOW BLINDS
12 24 13 ROLLER WINDOW SHADES
12 48 13.13 ENTRANCE FLOOR MATS
12 65 00 FIXED SEATING
DIVISION 14 - CONVEYING EQUIPMENT
14 21 23 ELECTRIC TRACTION PASSENGER ELEVATORS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 07 19.00 40 PLUMBING PIPING INSULATION
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS
23 09 23 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER
BUILDING CONTROL SYSTEMS
23 11 25 FACILITY GAS PIPING
23 23 00 REFRIGERANT PIPING
23 31 13.00 40 METAL DUCTS
23 34 23.00 40 HVAC POWER VENTILATORS
23 37 13.00 40 DIFFUSERS, REGISTERS, AND GRILLES
23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT
23 83 00.00 20 ELECTRIC SPACE HEATING EQUIPMENT
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 09 23.00 40 LIGHTING CONTROL DEVICES
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 27 13.10 30 ELECTRIC METERS
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 32 33 UNINTERRUPTIBLE POWER SUPPLY (UPS) SYSTEM
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
PROJECT TABLE OF CONTENTS Page 4
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 31 16 SOIL TREATMENT FOR SUBTERRANEAN TERMITE CONTROL
31 63 26 DRILLED CAISSONS
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 16.17 COLD MILLING OF BITUMINOUS PAVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID
PAVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 23 GRADED-CRUSHED AGGREGATE BASE COURSE
32 11 29 LIME-MODIFIED SUBGRADE
32 12 10 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 17 23.00 20 PAVEMENT MARKINGS
32 31 13 CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
32 92 23 SODDING
32 93 00 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 05 23.13 UTILITY HORIZONTAL DIRECTIONAL DRILLING
33 11 00 WATER DISTRIBUTION
33 24 13 GROUNDWATER MONITORING WELLS
33 30 00 SANITARY SEWERS
33 40 00 STORM DRAINAGE UTILITIES
33 51 15 NATURAL-GAS DISTRIBUTION
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
00 11 00 3 W912BV-15-R-0068
Tinker AFB, OK
PRICING SCHEDULE
CLIN Estimated Unit No. Description Quantity Unit Price Amount
BASE PROPOSAL
0001 All work unless listed Separately 1 Job XXX $_____________
0002 Site Work
(Note 9a) 1 Job XXX $_____________
0003 As-Built Drawings 1 Job XXX $___55,000___ _
0004 O&M Manuals 1 Job XXX $___90,000___
0005 Drilled Caissons 2’-0” Diameter
26 VLF _______ $__________________
0006 Drilled Caissons 2’-6” Diameter
406 VLF _______ $__________________
0007 Drilled Caissons 3’-0” Diameter
210 VLF _______ $__________________
TOTAL BASE PROPOSAL
(CLIN 0001 – 0007 INCLUSIVE) $___________________
00 11 00 4 W912BV-15-R-0068
Tinker AFB, OK
OPTIONS
0008 Option 1 – Furnishings (See note 8a) 1 Job XXX $_____________
0009 Option 2 – Break Area & Patio (See note 8b) 1 Job XXX $_____________
0010 Option 3 – Enhanced Landscaping (See note 8c) 1 Job XXX $_____________
0011 Option 4 – Landscape Feature (See note 8d) 1 Job XXX $_____________
0012 Option 5 – Bus Drop Off (See note 8e)
001201 Bus Drop Off - all work unless listed separately 1 Job xxx $__________
001202 Drilled Caissons 2’-0” Diameter
17 VLF _______ $__________________
Subtotal Option 5 (CLIN 0012) $____________
Sub-Total Options 1 – 5 (CLINS 0010 – 0012 Inclusive) $______________
TOTAL BASE PROPOSAL & OPTIONS
(CLINS 0001 – 0012 INCLUSIVE) $______________
Contract Duration (See Note 6): ______________
00 11 00 5 W912BV-15-R-0068
PRICING SCHEDULE NOTES
1. The Offeror shall submit pricing data on the latest Pricing Schedule as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.
2. Offerors must insert a price on all numbered items of the Pricing Schedule. Failure to do so will disqualify the Offer.
3. All quantities are estimated except where the unit is given as Lump Sum (LS).
4. If a modification to a proposal is submitted and provides for a lump-sum adjustment to the total estimated cost, the application of the lump-sum adjustment to each unit price and/or lump-sum price, in the Pricing Schedule must be stated or, if it is not stated, the Offeror agrees that the lump-sum adjustment shall be applied on the prorated basis to every litem in the Bidding Schedule.
5. All the extensions of the unit prices shown (if applicable) will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.
6. The Offeror shall propose total contract duration in number of calendar days after the notice to Proceed (NTP) is received by the Contractor, whether via electronic means or hard copy, whichever is the earliest method of delivery. The total number of proposed calendar days for construction through completion, ready for turnover shall not exceed the days shown at, SCR: 5.211-10 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK. The proposed duration shall become the required contract duration. The Government may issue the NTP via e-mail or Facsimile (FAX) or by other means. Day number 1 is the day after the date of the receipt of the NTP.
7. AWARD
Only one contract will be awarded under this solicitation.
00 11 00 6 W912BV-15-R-0068
8. OPTIONAL BID ITEM DESCRIPTIONS
a. Option 1: Furnishings: This option shall provide furnishing for the facility. See drawings and specifications for further definition.
b. Option 2: Break Area & Patio: This Option shall provide as indicated on the drawings. Option shall also include all associated landscape walls, utilities, lighting, and pavement as indicated on drawings.
c. Option 3: Enhanced Landscaping: This Option shall provide as indicated on the drawings. Option shall also include all associated landscaping, plantings, landscape bedding, and pavement as indicated on drawings.
d. Option 4: Landscape Feature: This Option shall provide as indicated on the drawings. Option shall also include all associated utilities, landscaping, and finishes as indicated on drawings.
e. Option 5: Bus Drop Off: This Option shall provide as indicated on the drawings. Option shall also include all associated lighting, grading and pavement as indicated on drawings.
9. BASE PROPOSAL ITEM DESCRIPTION
a. CLIN 0002: Shall include all site work and any utilities complete to within 5-foot line of the building(s).
11. COST BREAKDOWN INFORMATION
The Contractor shall provide cost or pricing data with this proposal as required by FAR Part 15. This information shall be provided in the format specified by Table 15-2 of FAR 15.408 or in the Contractor’s own format provided that format includes the appropriate information.
12. AWARD OF OPTIONAL PROPOSAL ITEMS
CLINS 0008 (Option 1) may, at the option of the Government, be awarded at the time of contract award or may be exercised at any time from the date of contract award until 270 days after award.
CLINS 0009 – 0012 (Options 2 and 5) may, at the option of the Government, be awarded at the time of contract award or may be exercised at any time from the date of contract award until 90 days after award.
Any and all optional line items may be exercised solely at the discretion of the Government.
AFR 513th Air Squadron Operations Facility Tinker AFB, OK
00 21 00 - 1
Section 00 21 00 - Instructions, Conditions & Notices to Offerors
INSTRUCTIONS TO OFFERORS
00 21 00
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
1.0 GENERAL INFORMATION FOR OFFERORS
1.1 GENERAL DESCRIPTION OF WORK
This is a single-phase, design-bid-build (fully designed), construction contract solicitation with 100% small business set-aside competition. This project involves vertical new construction of an air squadron facility at Tinker AFB, Oklahoma.
1.2 GOVERNMENT SECURITY REQUIREMENTS
The Offeror(s) must ensure that ALL mail sent to the Tulsa District, U.S. Army Corps of Engineers, either pre-contract or post-contract award, has a return mailing address on the outside of the item or it w ill be REJECTED by the US Army Corps of Engineers mail room facility.
1.3 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
Copies of the solicitation and amendments are available on the INTERNET ONLY. All solicitation documents will be posted to the Federal Business Opportunities (FBO) website at:
http://www.fbo.gov
Solicitation number: W912BV-15-R-0068
It shall be the contractor’s responsibility to check the websites for any amendments. The offeror shall submit in the proposal all requested information specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation.
1.4 OFFEROR'S QUESTIONS AND COMMENTS
All contractual matters, questions and or comments relative to these documents should be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet no later than 10 days prior to the proposal due date so they may be given consideration or actions taken prior to receipt of offers.
The Bidder Inquiry Key to submit questions is ZBNZFU-A2PWVT.
1.5 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
This Request for Proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.
1.6 PRE-PROPOSAL CONFERENCE
The Government intends to hold a pre-proposal conference for this Solicitation. The date, location, and time will be announced by Amendment to the Solicitation. Once announced each offeror must submit in writing, via email, the firm’s name, address, point of contact, telephone number, email address and number of personnel planning to attend no later than five (5) working days prior to the conference to:
http://www.fbo.gov/ http://www.projnet.org/projnet
00 21 00 - 2
Brian Abel Email: Brian.J.Abel@usace.army.mil
All interested Offerors are urged to attend. During this conference, the requirements set forth in the Solicitation will be reviewed and discussed, with part of the conference to include a question and answer period.
1.7 ACCURACY IN PROPOSALS
Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments).
The penalty for making false statements is prescribed in 18 U.S.C. 1001.
1.8 PROPOSAL SUBMITTALS
Proposals shall be sent via the AMRDEC Safe website: https://safe.amrdec.army.mil/safe/ before the time and date specified in the solicitation (Standard Form 1442). Enter the following email addresses for recipients of the AMRDEC download:
brian.j.abel@usace.army.mil nathan.r.kloeckler@usace.army.mil punnie.chittchang@usace.army.mil
Proposals must be received by the time and date shown on Standard Form SF 1442 or as amended on SF30.
1.9 PROPOSAL FORMAT
See Sections 00 22 11 PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA.
1.10 ADDITIONAL INFORMATION
1.10.1 This is a competitive acquisition. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
1.10 .2 Oral explanations or instructions are not binding. Any information given to an offeror which impacts the solicitation and/or offer will be given in the form of a written amendment to the solicitation.
1.10.3 Debriefings. The Contracting Officer will promptly notify Offerors of any decision to exclude them from the competitive range, whereupon they may request and receive a debriefing in accordance with FAR 15.505. The Contracting Officer will notify unsuccessful Offerors in the competitive range of the source selection decision in accordance with FAR 15.506. Upon such notification, unsuccessful Offerors may request and receive a debriefing.
Offerors desiring debriefing must make their request in accordance with the requirements of FAR 15.505 or 15.506, as applicable. All debriefings will be provided officially in writing.
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
mailto:Brian.J.Abel@usace.army.mil https://safe.amrdec.army.mil/safe/ mailto:brian.j.abel@usace.army.mil mailto:nathan.r.kloeckler@usace.army.mil mailto:punnie.chittchang@usace.army.mil
00 21 00 - 3
CLAUSES INCORPORATED BY REFERENCE
52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2004 52.216-1 Type Of Contract APR 1984 52.217-5 Evaluation Of Options JUL 1990 52.222-13 Compliance With Construction Wage Rate Requirements and
Related Regulations
MAY 2014
52.225-10 Notice of Buy American Requirement--Construction Materials MAY 2014 52.225-12 Notice of Buy American Requirement - Construction
Materials Under Trade Agreements
MAY 2014
52.232-14 Notice Of Availability Of Progress Payments Exclusively For Small Business Concerns
APR 1984
52.233-2 Service Of Protest SEP 2006 52.236-28 Preparation of Proposals--Construction OCT 1997 252.215-7007 Notice of Intent to Resolicit JUN 2012 252.215-7008 Only One Offer OCT 2013
CLAUSES INCORPORATED BY FULL TEXT
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a firm fixed price contract resulting from this solicitation.
(End of provision)
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
10.2% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the
00 21 00 - 4 goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Oklahoma County, Oklahoma..
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
Mr. Nathan Kloeckler, Contracting Officer USACE-Tulsa Contracting Division 1645 S. 101st E. Avenue Tulsa, OK 74128
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the
GAO.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
00 21 00 - 5
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting:
TBD
Name:
Address:
Telephone:
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/vffar1.htm
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/vffar1.htm https://acquisition.gov/far/index.html
(End of provision) http://farsite.hill.af.mil/vffar1.htm http://farsite.hill.af.mil/vffar1.htm https://acquisition.gov/far/index.html
00 22 11 - 1
Section 00 22 11 - Proposal Submission Requirements, Evaluation Criteria, Basis of Award One-Step-Best Value, Design-Build (Single Award)
PROPOSAL INSTRUCTIONS
SECTION 00 22 11
PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA
1. 0 OVERVIEW
This is a competitive best-value solicitation for a construction contract for the AFR 513th Air Squadron Operations Facility located at Tinker Air Force Base, OK. The Government will evaluate proposals in accordance with the criteria described herein and award a firm fixed-price contract to the responsible firm whose proposal conforms to all the terms and conditions of the solicitation and whose proposal is determined to represent the overall best value to the Government.
If awarded the contract, the Offeror shall construct the project in accordance with the plans and specifications.
1.1 WHO CAN SUBMIT
1.1.1 Firms formally organized as construction contractors that have associated specifically for this project, consortia of firms or any other interested parties may submit proposals. Associations may be as joint ventures or as key team subcontractors.
1.1.2 Organization Conflicts of Interest (OCI) Disclosure: The Offeror shall provide a disclosure statement with its proposal which concisely describes all the relevant facts concerning the past or present organizational conflicts of interest relating to work on this project. In the same statement, and if applicable, the Offeror shall provide information to assure the Government that the conflicts of interest have been mitigated and/or neutralized to the maximum extent possible. If a conflict of interest is discovered after award of this contract, the Contracting Office will make a decision whether to terminate the contract.
1.2 PROPOSAL SUBMISSIONS AND THE TRADE-OFF PROCESS
The trade-off process permits trade-offs among cost or price and non-cost factors and allows the Government to accept other than the lowest priced proposal. Offerors submit their performance and capability information for review and consideration by the Government. Relative weights among technical factors are provided in the paragraph entitled “Proposal Contents And Related Evaluation Factors”. The Source Selection Evaluation Board (SSEB) reviews, evaluates, and rates the proposals against the source selection criteria in the RFP. A competitive range consisting of the most highly qualified technical Offerors will be established prior to discussions (if held).
The SSEB will review, evaluate and rate the project technical proposals against the source selection criteria in the RFP. Concurrently, the Government analyzes price proposals utilizing the techniques listed in FAR Part 15 and the government’s project cost estimate. Price will not be rated, but will be considered in making trade-offs to reach the final best value determination for award. The Source Selection Authority (SSA) compares proposals to one another and determines the best value for the government. The perceived benefits of the higher priced proposal must merit the additional cost, and the rationale for tradeoffs must be documented.
2.0 BASIS OF AWARD
Proposals must meet the criteria stated in the RFP to be eligible for award, to include responsiveness, technical acceptability and responsibility.
2.1 To determine which proposal represents the best overall value, the Government may compare proposals to one another. The Government intends to award a contract to the responsible Offeror whose proposal conforms
00 22 11 - 2 to the solicitation, is fair and reasonable, and offers the best overall value to the Government, considering the non-price factors described herein, and price. All evaluation factors, other than price, when combined, are considered slightly more important than price. Best value will be determined by a comparative assessment of proposals against all source selection criteria in this RFP and the prices offered. The intent of this solicitation is to obtain the best proposal within the funds available. The Government will not award a contract to an Offeror whose proposal contains a deficiency, as defined in FAR 15.001.
2.2 Award will be made to the Offeror whose proposal is determined to represent the best overall value to the Government based on the evaluated ratings. The Government reserves the right to accept other than the lowest priced offer or to reject all offers. If other than the lowest priced offer, the offer must be sufficiently more advantageous than the lowest priced offer to justify the payment of additional amounts.
2.3 The Government intends to award a contract without discussions based on initial proposals received;
therefore, proposals shall contain the Offeror’s best terms from a cost and technical standpoint. The Government reserves the right to conduct discussions in accordance with FAR 52.215-1. If discussions are necessary, the Government will establish a competitive range of the most highly rated offerors. The Government reserves the right to address any pertinent issues in the proposals.
3.0 GENERAL INSTRUCTIONS
3.1 Requirement for Separate Price and Technical Proposals
3.1.1 Each Offeror must submit both a Price Proposal and a Technical Proposal. The Price Proposal and the Technical Proposal must be submitted as separate volumes. Ensure the file containing each separate volume is clearly marked to indicate its contents; and the identity of the offeror.
3.1.2 Both the Price Proposal and the Technical Proposal must be received by the closing date and time set for receipt of proposals.
3.1.3 No dollar amounts from the Price Proposal are to be included in the Technical Proposal.
3.1.4 All information intended to be evaluated as part of the Technical Proposal must be submitted as part of the Technical Proposal. Do not merely cross-reference similar material in the Price Proposal, or vice versa. Also, do not include links to websites in lieu of incorporating information into your proposal.
3.1.5 Do not include exceptions to the terms and conditions of the solicitation in either the technical or price proposal. Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the proposal may be determined "unacceptable" and thus ineligible for award. Any questions related to specific terms and conditions should be resolved prior to submission of the offer.
3.2 Where to Submit. Offerors shall submit their proposal to the Contract Specialist and Contracting Officer in accordance with Section 00 21 00 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS.
3.3 Submission Deadline. Proposals shall be received by the Tulsa District no later than the time and date specified in Block 10 of Standard Form 1442 or on amendment form SF30, as applicable.
3.4 General Submission Requirements
3.4.1 In order to effectively and equitably evaluate all proposals, the Contracting Officer must receive information containing sufficient detail to allow review and evaluation by the Government. Proposal clarity, organization, and cross-referencing are mandatory. Failures to submit and organize proposals as requested may adversely affect a proposal's evaluation. Offerors should provide sufficient detail and clearly define all items required in this section.
00 22 11 - 3
The Contracting Officer may remove any Offeror from further consideration during any phase of the procurement if the proposal fails to meet the submittal requirements of the RFP, or to reduce the competitive range for purposes of efficiency pursuant to FAR 15.306(c)(2).
3.4.2 Tabs. Proposal shall be organized and tabbed as shown in paragraph 5.0, PROPOSAL CONTENTS AND
RELATED EVALUATION FACTORS, SUBFACTORS AND ELEMENTS.
3.4.3 Printed Matter Submission Requirements:
3.4.3.1 Proposals shall be submitted in accordance with the following:
a. Proposals shall be submitted in book-marked original ADOBE PDF file format.
b. Technical and Price Proposals shall be separate PDF files.
c. Proposals shall be tabbed and labeled in a manner to afford easy identification from a Table of
Contents.
d. Font size shall not be less than 10 point. Do not use condensed font.
e. Margins shall be 1-inch wide (minimum) but may include headers and footers.
f. Each page shall be identified with the appropriate page number centered at the bottom of the page, except for the cover sheet, which shall not be numbered. Page number format for the Table of Contents shall be “i, ii, iii….”
g. Sheet size of the proposal contents shall be 8-1/2 inches x 11 inches where sheets are prepared specifically for this proposal; however, if drawings, charts, or other graphics are submitted, sheets no larger than 11 inches x 17 inches and folded to 8-1/2 inches x 11 inches shall be used. Eleven-by-seventeen (11 x 17) inch sheets will be counted as two 8-1/2 inch x 11 inch sheets.
h. Proposals shall not exceed 70 pages, excluding the cover sheet, tabs and Table of Contents. The
Government will not review any information submitted in an appendix or attachment to the proposal. The Government will not evaluate any information beyond the page limitation prescribed.
i. The Offeror shall not submit verbatim sections of this solicitation as part of their proposal.
3.4.3.2 Cover Sheet and Table of Contents.
a. Proposals shall contain a cover sheet containing the information shown below in accordance with FAR 52.215-1 “Instructions to Offerors – Competitive Acquisitions”.
00 22 11 - 4
PROPOSAL COVER SHEET FORMAT:
Solicitation Number: W912BV-15-R-0068
Title: Renovate AFR 513TH Air Squadron Operations Facility, Tinker AFB, OK
Name, address, email address(es), and telephone number(s) of Offeror.
Company CAGE code, DUNS number and Federal Taxpayer ID number (TIN).
Names, titles, telephone, and email addresses of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this solicitation.
Name, title, and signature of person authorized to sign the proposal.
NOTE: Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.
b. Table of Contents. Each file shall include a detailed Table of Contents.
3.4.3.3 Proposals that do not meet the requirements unnecessarily delay the evaluation process and may be rejected by the Government after the initial evaluation, receiving no further consideration.
3.4.4 Electronic Format: Proposals shall be submitted to the Contract Specialist and Contracting Officer as instructed in Section 00 21 00 in original PDF format using Adobe Acrobat software. Do not scan or copy the documents into a PDF file as copies are not searchable. Sections of the proposal shall be linked to the Table of Contents in logical order through use of bookmarks. The Table of Contents shall be displayed automatically when the PDF file is opened.
3.4.5 Number of Copies: Submit one original of of the technical and one original of the price volume in electronic format. If the proposal size exceeds 10MB, the proposal must be sent via AMRDEC Safe Download: see Section 00 21 00.
3.4.6 Proposal revisions shall be submitted as page replacements with revised text readily identifiable, e.g., bold face print or underlining. The source of the revision, e.g., Error, Omission, or Clarification, or amendment shall be included and be annotated for each revision. Proposal replacement pages shall be numbered, shall be clearly marked “REVISED”, and shall show the date of revision.
4.0 SPECIFIC INSTRUCTIONS FOR THE PROPOSAL
4.1 Electronic Proposal Format. The Offeror shall submit the complete proposal in electronic format with the entire proposal in .pdf format using Adobe Acrobat software to print to a .pdf file (or “save as .pdf”); do NOT scan the document(s) into a .pdf file. The text portion of the complete proposal shall be contained as a single .pdf file.
Sections of the proposal shall be bookmarked (linked to the index) in logical order.
4.2 Format and Contents of the Proposal and List of Tabs. The proposal will be appropriately labeled and organized using the tabs specified in the chart below.
4.3 Page Limitations. The following page limitations are established for each Factor/Subfactor/Element:
Factor 1 – PERFORMANCE CAPABILITY Subfactor 1 - Specialized Experience – Limited to 20 pages (1 page per project; maximum 5 forms per contactor/subcontractor)
Subfactor 2 – Key Subcontractors – Limited to 5 forms plus one letter per subcontractor Subfactor 3 –Key Personnel – Limited to 1 page plus one letter per key person
00 22 11 - 5
Subfactor 4 – Organization & Technical Approach – Limited to 10 pages Factor 2 – PROPOSED CONTRACT DURATION & PRELIMINARY SCHEDULE – No page limitation.
Factor 3 - PAST PERFORMANCE – No page limitation.
Factor 4 – QUALITY OF MATERIALS - FURNISHINGS – Limited to 10 pages Factor 5 – PRICE – No page limitation
5.0 PROPOSAL CONTENTS AND RELATED EVALUATION FACTORS
VOLUME 1 – TECHNICAL PROPOSAL FOR (SOLICITATION NO.), (PROJECT TITLE) – 3-RING BINDER TAB A Assumptions Not Rated but may affect other factors VOLUME 1 – FACTOR 1 - PERFORMANCE CAPABILITY 1st Most Important Factor
TAB B SUBFACTOR 1 Specialized Experience 1st –Most important subfactor
TAB C SUBFACTOR 2 Key Subcontractors
2nd – Most important subfactor
TAB D SUBFACTOR 3 Key Personnel 3RD – Most important subfactor
TAB E SUBFACTOR 4 Organization & Technical Approach 4th – Most important subfactor
VOLUME 1 – FACTOR 2 - TAB F – PROPOSED CONTRACT DURATION & PRELIMINARY
SCHEDULE
2nd Most important factor – Equal to Factor 3
VOLUME 1 – FACTOR 3 – TAB G - PAST PERFORMANCE
2ND Most important factor – Equal to Factor 2
VOLUME 1 – FACTOR 4 – TAB H – QUALITY OF MATERIALS - FURNISHINGS 4th Most important factor VOLUME 2 – PRICE AND PRO-FORMA FOR (SOLICITATION NO.), (PROJECT TITLE) – SEALED ENVELOPE
TAB A FACTOR 5 Price (Standard Form 1442 or SF30 & CLIN Schedule) Not Rated
TAB B N/A Bid Bond Not Rated
TAB C N/A Self-Performed Work 15% minimum
TAB D N/A Required Pre-Award Information Not Rated
6.0 VOLUME 1 - TAB A – ASSUMPTIONS:
Deviations and exceptions to the requirements contained in the RFP are not allowed. Any questions related to specific terms and conditions of the solicitation must be resolved prior to submission of the proposal. However, if assumptions are made, the Offeror shall list and describe in detail the assumption(s). If award is made without discussions, an exception or deviation to any portion of the RFP requirements may make the proposal ineligible for award. Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the proposal may be deemed “unacceptable” and thus ineligible for award. See paragraph 15.3, “Definitions”.
6.1 Submission Requirements
The list of assumptions shall be located under Tab A of Volume 1 – Technical Proposal Information. All assumptions shall be fully supported with the Offeror’s rationale and shall fully explain the impact, if any, on the performance and specific requirement of the RFP. The Offeror shall clearly describe on the Proposal Cover Sheet
00 22 11 - 6 submitted with the Price Proposal any assumptions made concerning contractual and/or technical terms and include the monetary impact on the solicitation with the price proposal.
6.2 Evaluation Criteria
The list of assumptions will not be rated separately but will be used to determine if the Offeror understands the Statement of Work and the intent and may affect the rating of the other factors. It will also be used to compare the impact on the performance of the project.
7.0 VOLUME 1 - FACTOR 1 – PERFORMANCE CAPABILITY
7.1 Volume 1 – Tab B – Subfactor 1, Specialized Experience
7.1.1 Submission Requirements
Demonstrate the specialized experience of the Offeror and/or proposed team, including sub-contractors, on projects same/similar in size and complexity to that described in the solicitation for same/similar construction services. Emphasis shall be placed on construction projects of similar scope, complexity and functionality. Building is for an approximately 32,000 sf, two-story Air Control Group Squadron Operations facility. Building design includes an Operations Desk, ORC Ops Office, OSF Aviation Manager Office, Storage, Large 250 person Briefing Room (Auditorium), Building Manager’s Office, Mobility Storage, Mobility Office, Medical Office, Flight Medical Exam Room, 970th AACS Command Suite, Conference Rooms, Special Projects Office; Heritage Room, Mission Planning Flight Deck Room, Pilot’s/Navigator’s Workroom, Flight Engineer Workroom, Physical Training Room, 513th ACG Command Suite, 513th OSF Command Suite, CVZ Room, Public Affair’s Office, Career Adviser’s office, Male and Female Latrine/Shower/Locker Rooms, Laundry Room and Janitor’s Closet, Standards Evaluation Testing, Air Battle Management Work Room and required building support spaces. A secure area will be provided for the 970th Tactics Classified Work Area, 513th OSF/970th Classified Mission Planning & Battle Staff Work Area, 513th Classified Work Area, 970th Tactics Unclassified Work Area, 513th OSF Intel Unclassified Work Area and an Unclassified Storage Room. The classified spaces will be classified as “open storage.” Other sensitive work areas are also included. If using subcontractors as part of the proposed team to demonstrate experience, describe the role they will play in this project and the percentage of work they will perform. Demonstrate successful management of multiple subcontractors and multiple project phases within an occupied and operational facility for all projects submitted.
The Contractor shall complete a minimum of three (3), but no more than five (5), “Experience Information” forms, attached at the end of this section (Attachment 1), in response to this factor. All blocks must be filled in and all data should be accurate, current, and complete. All projects submitted must be at least 50% complete and completed within the last 5 years. At least two (2) of the projects provided must be valued at over $10,000,000.
7.1.2 Evaluation Criteria
7.1.2.1 The Government will evaluate the extent of recent, related experience of the Offeror in regard to their role on this project. The Government may place greater importance on projects performed as a prime contractor than as a subcontractor, depending upon overall role and relevancy considerations. Federal Government project experience on military installations for similar construction will be given more consideration than non-Federal Government project experience. Offerors demonstrating experience with projects of similar size and complexity will be viewed more favorably by the Government. All projects must demonstrate successful management of multiple subcontractors and multiple project phases.
a. The Offeror must submit the requested information to demonstrate a record of recent, related experience in construction, for the project (which may include similar state or local government or private counterparts) included in this solicitation. Recent experience includes projects well underway (see above criteria) or those completed and turned over within 5 years of the proposal issue date for this RFP for construction
00 22 11 - 7 experience. Joint Venture partners should each demonstrate experience commensurate with their role on this project or how their experience qualifies them for their role on this project. If any of the information required is not included in the form (Attachment 1), then the Contractor will be considered non-responsive and evaluated as unacceptable.
b. The Government reserves the right to verify the experience record of cited projects or other recent projects by reviewing the Corps of Engineers Construction Contractor (or Architect-Engineer) Appraisal Support System (CCASS/ACASS), other DOD or Government appraisal systems or to interview owners or references. The Government may check any or all cited references to verify supplied information.
c. To receive credit for extent (amount) of experience, the Offeror shall demonstrate a history of recent, relevant experience. A firm will not receive credit under this factor for the relevant experience of key personnel proposed for this project.
d. The Government will consider extent of recent experience, degree of relationship of such experience to this project, demonstrated familiarity with applicable codes and local conditions. Some examples of relevancy to this project may include, but not be limited to:
1) Number, size, type work, complexity, location
2) Dates (well under way or completed no more than 5 years preceding date of Solicitation)
3) Firm's role and extent of work self-performed (brokering out all work and simply “placing the sidewalks” or similar minor work on a cited project are examples of less relevant experience).
7.2 Volume 1 - Tab C – Subfactor 2 – Key Subcontractors
7.2.1 Submission Requirements
Identify the potential Key Subcontractors chosen for mechanical, electrical and process controls installation, describing the extent of their involvement in the project. Submit no more than five Specialized Experience forms (Attachment 1) for each Key Subcontractor, using the same requirements as described in the Specialized Experience submission requirements in this RFP. Subcontractors shall be selected from the list of potential subcontractors. Any substitutions shall be approved by the Contracting Officer. All subcontractor personnel working on this project must be U.S. citizens or documented U.S. workers and must be able to provide proof of U.S.
citizenship or other authorized documentation (See Contract Clause 52.0000-4515 Security Contract Language for All Corps of Engineers’ Unclassified Contracts).
Provide letters of commitment for each of the Key Subcontractors (Attachment 4).
7.2.2 Evaluation Criteria
This subfactor is composed of two equal elements: Specialized Experience and Past Performance. The Government will evaluate the specialized experience and past performance of the Key Subcontractors for mechanical, electrical, and process controls installation using the same criteria as in the Specialized Experience evaluation for the prime contractor under Factor 1, Subfactor 1, above, in this RFP. After award, the Section 00 73 00 SCR entitled “Key Personnel, Subcontractors and Outside Consultants” will apply to the selection, which establishes the minimum quality standard. No substitution will be allowed without adequate reason and possible consideration to the Government.
7.3 Volume 1 - Tab D – Subfactor 3 - Key Personnel
7.3.1 Submission Requirements
00 22 11 - 8
The Offeror shall provide resume data for the following key personnel: Construction Project Manager, Quality Control Manager (CQC System Manager), Project Scheduler, Site Superintendent, and Site Safety and Health Oficer (SSHO) as applicable to this requirement. Résumé information to be provided shall be limited to no more than one
(1) page per person (Attachment 2), not counting the letter of intent, and shall include the following information as a minimum:
a. Name and title
b. Project assignment
c. Name of firm with which associated
d. Years experience in the role identified.
e. Years experience with this firm and with other firms
f. Education degree(s), year, specialization, if applicable
g. Active professional registration, year first registered, if applicable
h. Other experience and qualifications relevant to same/similar work required under this contract
The minimum experience requirements for the Construction Project Manager and on-site superintendent shall be in accordance with Section 01 45 01.00 10 USACE QUALITY CONTROL. Minimum experience requirements for other personnel shall be as required by Division 01 sections. No substitutions will be allowed without the approval of the Contracting Officer.
Provide letters of commitment for each of the key personnel (Attachment 3).
All contractor and subcontractor working on this project must be U.S. citizens or documented U.S. workers and must be able to provide proof of U.S. citizenship or other authorized documentation.
7.3.2 Evaluation Criteria
The Government will evaluate the required information to determine how well the Offeror identifies and demonstrates that its key personnel meet or exceed minimum qualifications necessary to perform construction.
Project Managers with professional certification to include Project Manager Professional (PMP) or equivalent are preferred. Project Schedulers shall have a minimum of 10 years of experience preparing schedules on projects with similar scope and complexity as this RFP; experience preparing schedules complying with the requirements of Section 01 32 01.00 10 PROJECT SCHEDULE is preferred. Offerors providing resumes for key personnel for this project that have experience in similar key positions on the projects shown under Specialized Experience will be viewed more favorably by the Government. Performance of key personnel proposed for this project may be taken into account when it comes to the attention of the Government. If alternates are proposed for key positions, the evaluation rating will consider the lesser qualified or experienced person, if there is a difference.
7.4 Volume 1 - Tab E -Subfactor 4 - Organization & Technical Approach
7.4.1 Submission Requirements
7.4.1.1 Provide information that describes the offeror’s organization and intended technical approach to executing the construction contract per the detailed requirements herein. Limit the information to 10 pages or less; clearly but concisely describe the organizational and technical approach to project management and execution.
7.4.1.2 Organization: Describe what firms, their resources and how their resources will be utilized, their roles and responsibilities and any contractual arrangements that have been established. Clearly describe any teaming or joint venture arrangements, including a clear description of each firm’s roles and responsibilities on the project. A copy of the teaming or joint venture agreement(s) may be appended to the plan (not included in the page limitation).