am4.pdf

PDF 8 MB Posted

Attached to
--FUEL MAINTENANCE HANGAR, VANCE AFB, OK Federal contract opportunity
Solicitation number
W912BV-08-R-2014
Issued by
Department of the Army Corps of Engineers Engineering District Tulsa

View the file

Other files for this federal contract opportunity

Other files attached to --FUEL MAINTENANCE HANGAR, VANCE AFB, OK, newest first.
File Type Posted
am5.pdf PDF
CADD.zip ZIP file
am3.pdf PDF
am2.pdf PDF
am1.pdf PDF
08r2014.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT NO. 0004 FUEL SYSTEM MAINTENANCE HANGAR

W912BV-08-R-2014 VANCE AFB, OK

AMENDMENT OF SOLICITATION

1. CONTRACTOR ID CODE

NOT APPLICABLE (NA) PAGE 1 OF

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If Applicable)

0004 30 Jul 08 NA NA

6. ISSUED BY

CODE

7. ADMINISTERED BY (If other than Item 6)

CODE

DISTRICT ENGINEER

TULSA DISTRICT, CORPS OF ENGINEERS

1645 SOUTH 101ST EAST AVENUE

TULSA, OK 74128-4609

NA

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (%) 9A. AMENDMENT OF SOLICITATION NO.

W912BV-08-R-2014

% 9B. DATED (SEE ITEM 11)

26 Jun 08

10A. MODIFICATION OF CONTRACT/ORDER NO.

NA

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE NA

11. THIS ITEM APPLIES ONLY TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, X is not extended.

THE PROPOSAL DUE DATE IS 11 AUG 08 AS PREVIOUSLY ANNOUNCED.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

NA

NA 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14

(%) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b)

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not; is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

SEE ATTACHED CONTINUATION SHEET

NOTE: IN THIS AMENDMENT “SOLICITATION NO.”, “OFFER”, AND “OFFEROR” MEAN “INVITATION NO.”, “BID”, AND “BIDDER”, RESPECTIVELY Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as hertofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

NA

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

NA NA

(Signature of person authorized to sign) (Signature of person authorized to sign)

NSN 7540-01-162-8070 30-105-02 STANDARD FORM 30 (REV. 10-8)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

AMENDMENT 0004

FUEL SYSTEM MAINTENANCE HANGAR

VANCE AIR FORCE BASE, OKLAHOMA

W912 BV-08-R-2014

The Request for Proposal documents are revised as follows:

Table of Contents. Add the following after APPENDIX G:

“APPENDIX H – VANCE COMPATIBILITY GUIDE”

Section 00800, paragraph 2, SCR 52.0000-4002 WAGE RATES: Delete the existing paragraph and associated Wage Rates. Replace with the attached revised paragraph and associated Wage Rates.

Section 01 01 00.

a. Paragraph 1.1.2: Add the following after the last sentence in the second subparagraph: “The target energy budget for the CESA is a 30% reduction from the published ASHRAE 90.1 – 2004 standard building.

Actual Utility Rate Information:

Natural Gas: $9 per thousand cubic feet (MCF or KCF);

Electric: $.06 per KWH;

Water: $1.18 per KGAL;

Sewer: $3.26 per KGAL.”

Section 01 01 40.

a. Add the following after the last sentence in paragraph 4.2(f)(12)(a): “Lighted signs are not required.”

b. Add the following after the last sentence in paragraph 6.2(a):

“Under Proposal Option 1, The following equipment will be disconnected, transported to B 188 (new Wash Facility), and reconnected:

(1) 2 Hotsy Water Heaters with Control Module (Model #1525). Each Hotsy is serviced from a 60A disconnect mounted on the wall adjacent to the equipment. The disconnects are labeled 277/480 3p.

(2) Environmental Products USA Reverse Osmosis Purification System, which includes 2 large plastic water storage tanks, a TEEL expansion tank (Model #3P716A), and a ¾ hp Dayton pump (Model #4TA98). The Reverse Osmosis system (EP) electrical information indicates 1 HP 120v, 15 Max Amps Pump running, 55 Max Amps starting. Unit utilizes a plug and a cord. The detergent pump is controlled with low voltage wiring from the Hotsy.

(3) Culligan Water Softening System which includes 2 softening tanks and a brine tank. The water softener utilizes a 120v standard receptacle.

(4) 2 Hose Reel Stands; each with a Hotsy detergent pump, 2 hose reels and equipment, and a 50-gallon plastic detergent storage tank.

(5) 1 Hose Reel on the ground.”

c. Add the following after the last sentence in paragraph 6.3(d): “All mechanical systems are to be commissioned. Design Build Proposal shall state the specific systems to be included.”

d. Add the following after the third sentence in paragraph 6.4(e)(2): “Wastewater piping beyond 5 feet from the building shall be PVC.”

e. Add the following after the last sentence in paragraph 7.2(a)(3):

“Existing electrical devices shall be removed from Building 188 as follows: the switch for the breathing machines, along with conduit, wire and junction boxes, back to the source - on the northwest wall it is located in the middle of a rack of 5 switches. On the southwest wall it is a stand alone switch. The 440 switch and plug including wire, conduit and junction boxes back to the source. Note that all receptacles and switches in the Hangar area are gasket type devices. Provide a new outdoor weather cover on the 110v general receptacles. Building 188 cannot add any additional load. There is a 30 KVA transformer feeding a 225A panel. It appears the transformer is overloaded based on the size of the main breaker it serves. The transformer will need to be relocated – it currently sits in front of the panel it serves.”

f. Add the following after the last sentence in paragraph 7.2(b)(1): “All devices within thirty vertical feet of the hangar floor shall be explosion proof.”

g. Add the following after the last sentence in paragraph 7.2(h)(2): “Remove electrical conductors and communication conductors back to the nearest manholes. Do not abandon cables in place.”

h. Delete paragraph 7.2(I)(10) in its entirety and replace with the following:

“(10) Requirements listed below are to provide additional information in the design to be provided along with common standard practice, codes and standards.

Spaces (Hangar):

Bay 1:

400HZ power for aircraft including transformer, conduit, and wire. Coordinate locations and type of drops with Base personnel.

2 explosion proof reel type drop lights.

Bonding rings in floor. Connect to building steel and counterpoise.

2 Grounding Reels Reel part # S/N-4930-01-165-0829 Plug part # S/N-5935-00-572-5174 Ground wire part # S/N-4010-00-286-2681 Static Discharge Pad 28 VDC Aircraft Power

Bay 2:

400HZ power for aircraft including transformer, conduit, and wire. Coordinate locations and type of drops with Base personnel.

2 explosion proof reel type drop lights.

Bonding rings in floor. Connect to building steel and counterpoise.

2 Grounding Reels Reel part # S/N-4930-01-165-0829 Plug part # S/N-5935-00-572-5174 Ground wire part # S/N-4010-00-286-2681 Static Discharge Pad 28 VDC Aircraft Power

Bay 3:

400HZ power for aircraft including transformer, conduit, and wire. Coordinate locations and type of drops with Base personnel.

2 explosion proof reel type drop lights.

Bonding rings in floor. Connect to building steel and counterpoise.

2 Grounding Reels Reel part # S/N-4930-01-165-0829 Plug part # S/N-5935-00-572-5174 Ground wire part # S/N-4010-00-286-2681 Static Discharge Pad 28 VDC Aircraft Power

Bay 4:

400HZ power for aircraft including transformer, conduit, and wire. Coordinate locations and type of drops with Base personnel.

2 explosion proof reel type drop lights.

Bonding rings in floor. Connect to building steel and counterpoise.

2 Grounding Reels Reel part # S/N-4930-01-165-0829 Plug part # S/N-5935-00-572-5174 Ground wire part # S/N-4010-00-286-2681 Static Discharge Pad 28 VDC Aircraft Power”

i. Add the following to the last sentence in paragraph 7.2(r)(5): “Contractor shall install all equipment. Result shall be a complete and operational system.”

Appendix H: Add the attached new appendix after Appendix G.

00800-1 W912BV-08-R-2014

SECTION 00800

SPECIAL CONTRACT REQUIREMENTS

CLAUSES INCORPORATED BY FULL TEXT

1. 52.0000-4001 CONTRACTING OFFICER

The Contracting Officer signing this contract is the primary Contracting

Officer on this contract. However, any Contracting Officer assigned to the

Tulsa District and acting within his authority may take formal action on this contract when a contract action needs to be taken and the primary

Contracting Officer is away from the office. The e-mail address for all

Contracting Officers in the Tulsa District is:

Cheryl.Wickson@usace.army.mil.

2. 52.0000-4002 WAGE RATES

The following Wage Determination No.(s) are attached and made a part hereof:

General Decision Nos: OK080014, with 8 modifications, dated 07/11/2008, and OK080001, with 1 modification, dated 07/25/2008

(End of clause)

3. 52.0000-4020 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER (OCT 1989)

(ER 415-1-15)

1. This provision specifies the procedure for determination of time extensions for unusually severe weather in accordance with the contract clause entitled "Default: (Fixed Price Construction)". In order for the

Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:

a. The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.

b. The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the contractor.

2. The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.

MONTHLY ANTICIPATED ADVERSE WEATHER DELAY

WORK DAYS BASED ON (5) DAY WORK WEEK

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

4 1 3 4 4 4 4 3 4 3 2 3

Revised by Am 0004

Revised by Amend 4 00800-5

SOLICITATION NO. W912BV-08-R-2014

DESIGN AND CONSTRUCT FUEL MAINTENANCE HANGAR

VANCE AIR FORCE BASE, GARFIELD COUNTY, OKLAHOMA

APPLICABILITY OF WAGE RATES

Wage Decision No. OK080014, Building Construction, with eight modifications, dated 07/11/2008, is applicable to construction, demolition, renovation, alteration, or repair of buildings, installations within buildings, appurtenances to buildings, foundations for buildings, excavation and fill for buildings, landscaping incidental to building construction, and utilities within 5 feet of building.

Wage Decision No. OK080001, Heavy Sewer and Water Line and Highway Construction, with one modification, dated 07/25/2008, is applicable to construction work beyond 5 feet of the building.

PLEASE NOTE: The applicable wage decision must be referenced on each payroll.

Revised by Amend 4 00800-6

Revised by Amend 4 00800-7

General Decision Number: OK080014 07/11/2008 OK14

Superseded General Decision Number: OK20070014

State: Oklahoma

Construction Type: Building

Counties: Alfalfa, Beckham, Blaine, Caddo, Carter, Comanche, Cotton, Custer, Dewey, Ellis, Garfield, Garvin, Grady, Grant, Greer, Harmon, Harper, Jackson, Jefferson, Johnston, Kay, Kingfisher, Kiowa, Love, Major, Marshall, Murray, Noble, Pontotoc, Roger Mills, Stephens, Tillman, Washita, Woods and

Woodward Counties in Oklahoma.

BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)

Modification Number Publication Date

0 02/08/2008

1 02/15/2008

2 04/18/2008

3 05/09/2008

4 05/30/2008

5 06/06/2008

6 06/27/2008

7 07/04/2008

8 07/11/2008

W912BV-08-R-2014, DESIGN AND CONSTRUCT FUEL MAINTENANCE HANGAR, VANCE AIR

FORCE BASE, GARFIELD COUNTY , OKLAHOMA

OK080014 – 1 07/11/2008

Revised by Amend 4 00800-8

ASBE0064-002 07/16/2002

KAY COUNTY

Rates Fringes

Asbestos Workers/Insulator.......$ 18.15 5.89

SCOPE OF WORK:

Includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems.

ASBE0066-002 03/01/2008

BECKHAM, ELLIS, GREER, HARMON, HARPER AND ROGER MILLS COUNTIES

Rates Fringes

Asbestos Workers/Insulator.......$ 17.84 8.13

Scope of Work:

Includes application of all insulation materials, protective coverings, coatings and finishings to all types of mechanical systems.

ASBE0094-003 07/16/2006

REMAINING COUNTIES

Rates Fringes

Asbestos Workers/Insulator.......$ 23.49 10.26

SCOPE OF WORK:

Includes application of all insulation materials, protective coverings and finishings to all types of mechanical systems.

BOIL0592-001 08/08/2006

Rates Fringes

BOILERMAKER......................$ 23.47 13.91

BROK0005-012 06/01/2007

BECKHAM, CADDO, CARTER, COMANCHE, COTTON, CUSTER, DEWEY,

GARVIN, GRADY, GREER, HARMON, JACKSON, JEFFERSON, JOHNSTON,

KIOWA, LOVE, MARSHALL, PONTOTOC, ROGER MILLS, STEPHENS, TILLMAN

AND WASHITA COUNTIES

Rates Fringes

Bricklayer, Stonemason...........$ 22.61 8.30

BROK0005-013 06/01/2007

ALFALFA, BLAINE, ELLIS, GARFIELD, GRANT, HARPER, KINGFISHER,

MAJOR, WOODS AND WOODWARD COUNTIES

Rates Fringes

Bricklayer, Stonemason...........$ 22.61 8.30

BROK0005-014 06/01/2007

KAY AND NOBLE COUNTIES

Rates Fringes

Bricklayer, Stonemason...........$ 22.61 8.30

CARP0329-002 06/01/1997

BECKHAM, BLAINE, CADDO, COMANCHE, COTTON, DEWEY, GARVIN

(Remainder of County), GRADY, GREER, HARMON, JACKSON, JEFFERSON, KINGFISHER (South of the Cimmarron River), KIOWA, STEPHENS, TILLMAN AND WASHITA COUNTIES

OK080014 – 2 07/11/2008

Revised by Amend 4 00800-9

Rates Fringes

Carpenters:

CARPENTERS & POWER SAW

OPERATORS...................$ 15.50 2.80

MILLWRIGHTS & PILEDRIVERMEN.$ 16.90 2.80

CARP1362-002 01/01/1995

CARTER, GARVIN ( Northern half of Garvin including the Towns of

Pauls Valley and Wynnwood), JOHNSTON, LOVE, MARSHALL, MURRAY

AND PONTOTOC COUNTIES

Rates Fringes

Carpenters:......................$ 13.40 2.85

MILLWRIGHT.......................$ 15.50 2.85

PILEDRIVERMAN....................$ 13.65 2.85

CARP1686-004 06/11/1994

NOBLE COUNTY (East of Interstate #35 and South of Black Bear

Creek)

Rates Fringes

Carpenters:

CARPENTERS..................$ 14.40 .80

MILLWRIGHTS.................$ 15.05 .80

PILEDRIVERMEN...............$ 14.40 .80

POWER SAW OPERATOR..........$ 14.40 .80

CARP1894-001 06/01/1993

ELLIS, HARPER, ROGER MILLS, WOODS AND WOODWARD COUNTIES

Rates Fringes

Carpenters:

CARPENTERS..................$ 11.55 1.40

MILLWRIGHTS.................$ 12.425 1.40

PILEDRIVERMEN...............$ 12.425 1.40

POWER SAW OPERATOR..........$ 11.85 1.40

CARP2008-001 06/01/1994

ALFALFA, GARFIELD, GRANT, KAY, MAJOR, NOBLE (West of Interstate

# 35 and North of Black Bear Creek) COUNTIES

Rates Fringes

Carpenter; Millwright;

Piledrivermen....................$ 12.30 .30

CARP2008-002 06/01/1994

ALFALFA, GARFIELD, GRANT AND MAJOR COUNTIES

Rates Fringes

LATHER...........................$ 12.30 .30

ELEC0020-002 06/01/2003

MARSHALL COUNTY

Rates Fringes

ELECTRICIAN......................$ 21.40 4.25%+4.19

ELEC0444-002 08/29/2007

KAY AND NOBLE COUNTIES

Rates Fringes

ELECTRICIAN......................$ 23.75 7.55+3.5%

OK080014 – 3 07/11/2008

Revised by Amend 4 00800-10

ELEC1002-002 09/01/2007

Rates Fringes

Line Construction

Cable Splicer...............$ 27.00 4.75+25.5%

Groundman...................$ 16.75 4.75+25.5%

Hole Digger, Heavy

Equipment Op., (Pole Cat

Equivalent).................$ 22.25 4.75+25.5%

Jackhammer Op...............$ 17.50 4.75+25.5%

Line Truck Driver (Winch op.)........................$ 19.50 4.75+25.5%

Lineman.....................$ 25.00 4.75+25.5%

Powderman...................$ 21.50 4.75+25.5%

Truck Driver (Flat Bed, Ton & 1/2) and Under).....$ 16.75 4.75+25.5%

ELEC1141-004 05/28/2008

ALFALFA, BECKHAM, BLAINE, CADDO, CARTER, CUSTER, DEWEY, ELLIS,

GARFIELD, GARVIN, GRADY, GRANT, HARPER, JOHNSON, KINGFISHER,

LOVE, MAJOR, MURRY, PONTOTOC, ROGER MILLS, WASHITA, WOODS AND

WOODWARD COUNTIES

Rates Fringes

ELECTRICIAN......................$ 24.40 17.25%+4.50

* ELEC1141-005 05/28/2008

ALFALFA, BECKHAM, BLAINE, CADDO, CARTER, COMANCHE, CUSTER,

DEWEY, ELLIS, GARFIELD, GARVIN, GRADY, GRANT, HARPER, JOHNSON,

KINGFISHER, LOVE, MAJOR, MURRAY, PONTOTOC, ROGER MILLS,

WASHITA, WOODS AND WOODWARD COUNTIES

Rates Fringes

Electricians:

Cable Puller (Inside Work)..$ 9.83 15.5%+4.50

Sound & Communication

Technicians.................$ 21.70 17.25%+4.50

Tele-Data Technician

(Inside Work)...............$ 19.95 15.5%+4.50

ELEC1141-008 05/28/2008

COMANCHE, COTTON, GREER, HARMON, JACKSON, JEFFERSON, KIOWA,

STEPHENS AND TILLMAN

Rates Fringes

Electricians:....................$ 24.40 17.25%4.50

ELEV0063-003 01/01/2005

Rates Fringes

Elevator Constructor

Mechanic....................$ 26.885 12.115+a

FOOTNOTE:

a. Paid Holidays: New Year's Day; Memorial Day; July 4th;

Labor Day; Thanksgiving Day; Friday after Thanksgiving

Day; Christmas Day., Vacation Pay Credit: Employer contributes 8% of the basic hourly rate for employees with

5 years or more of service or 6% of the basic hourly rate for employees with 6 months to 5 years of service.

OK080014 – 4 07/11/2008

Revised by Amend 4 00800-11

ENGI0627-005 06/01/2007

Rates Fringes

Power Equipment Operator

GROUP 1:...................$ 22.70 9.00

GROUP 2:...................$ 21.95 9.00

GROUP 3:...................$ 21.45 9.00

GROUP 4:...................$ 20.95 9.00

GROUP 5:...................$ 20.45 9.00

GROUP 6:...................$ 20.20 9.00

GROUP 7:...................$ 19.80 9.00

GROUP 8:...................$ 18.20 9.00

GROUP 9:...................$ 17.70 9.00

GROUP 10:...................$ 17.20 9.00

GROUP 1: All crane type equipment with at least 300 feet of boom and over (including jib)

GROUP 2: All crane type equipment with at least 200 feet and less than 300 feet of boom (including jib)

GROUP 3: All crane type equipment with at least 100 feet and less than 200 feet of boom (including jib); all tower cranes; crane equipment (as rated by mfg.) 3 cu. yd. and over; guy derrick; whirley; power driven hole digger (with

30 feet and longer mast)

GROUP 4: Cranes with less than 100 feet of boom with jib and cranes (as rated by mfg.) less than 3 cu. yd.; heavy duty mechanic; overhead monorail type crane; panel board batch plant op.; piledriver engineer; dragline; clamshell;

backhoe (3/4 yd. and over); sideboom or similar type equipment; gradall; cherry picker; hoist (while operating two or more drums); all hoist (while doing stack and chimmey work); power driven hole digger with less than 30

ft. mast; motor patrol (boom type)

GROUP 5: Dozer (engine r.p. 65 or over); roller and compactors with dozer blade; backhoe under 3/4 yd., all scraper type equipment; water wagons under the jurisdiction of this craft; loader of hi-lift (engine h.p. 65 or over);

asphalt laying machine; conveyor-multiple, panel board central; trenching machine; concrete pump (boom type)

GROUP 6: Rollers, all types; oil distributor; pulvimixer;

screed operator; concrete pump (trailer type); rotary drilling machine when operated from console; greaser; tilt top trailer operator.

GROUP 7: Greaser; tilt top trailer operator

GROUP 8: Locomotive engineer; boring machine; tug boat; mixer

- 18 cu. ft. and over; sand barge; dredging machine;

tugger; hoist (operating one drum); air compressor - 3 to 6

- size 500 cu. ft. and under; air compressor - over 500 cu.

ft. (1); pump, battery - 3 to 6; all fork-lift, bobcat and similar equipment; generator plant engineer, diesel elect;

winch truck with A frame; concrete buster buster or tamper;

heater under jurisdiction of operating engineers; fireman;

OK080014 – 5 07/11/2008

Revised by Amend 4 00800-12 boiler operator; crushing plants; farm tractor with or without attachments; batch plant opperator - (portable);

conveyor operator - continuous belt bulking handling; form grader; screening plant; well point pump operator; signal man on whirley when and if required; outside, side elevator or construction type hoist personel.

GROUP 9: Concrete mixers, less than 18 cu. ft.; air compressor, 500 cu. ft. and under (1 or 2); fuelman;

asphalt lay machine backend man.

GROUP 10: Truck crane oiler and driver; crane oiler;

permanent building type elevator operator.

IRON0048-002 06/01/2008

BLAINE, CADDO, CARTER, COMANCHE, CUSTER, DEWEY, GARFIELD,

GARVIN, GRADY, JOHNSTON, KINGFISHER, KIOWA, MAJOR, MURRAY,

NOBLE, PONTOTOC, ROGER MILLS, STEPHENS, WASHITA AND WOODWARD

COUNTIES

Rates Fringes

Ironworkers:.....................$ 22.10 10.01

IRON0263-005 06/01/2007

MARSHALL COUNTY

Rates Fringes

Ironworkers:.....................$ 20.10 4.60

IRON0263-006 06/01/2007

BECKHAM, COTTON, ELLIS, GREER, HARMON, HARPER, JACKSON

JEFFERSON, LOVE AND TILLMAN COUNTIES

Rates Fringes

Ironworkers:.....................$ 20.10 4.90

IRON0584-006 06/01/2008

KAY COUNTY (The southern portion to a line running east and west at the South City limits of Ponca City), Rates Fringes

Ironworkers:.....................$ 22.10 10.01

IRON0606-003 06/01/2008

ALFALFA, GRANT, KAY (Remainder of County), AND WOODS COUNTIES

Rates Fringes

Ironworkers:.....................$ 20.15 8.70

LABO0462-002 06/01/1993

Rates Fringes

Laborers:

ALFALFA, BECKHAM, BLAINE,

CADDO, CARTER, COMANCHE,

COTTON, CUSTER, DEWEY,

ELLIS, GARFIELD, GARVIN,

GRADY, GRANT, GREER,

HARMON, HARPER, JACKSON,

JEFFERSON, KINGFISHER,

KIOWA, LOVE, MAJOR,

MARSHALL, MURRAY, ROGER

MILLS, STEPHENS, TILLMAN,

WASHITA, WOODS AND

WOODWARD COUNTIES

OK080014 – 6 07/11/2008

Revised by Amend 4 00800-13

GROUP 1....................$ 7.50 1.31

GROUP 2....................$ 8.00 1.31

JOHNSTON, KAY, NOBILE AND

PONTOTOC COUNTIES

GROUP 1....................$ 8.00 1.31

GROUP 2....................$ 8.50 1.31

LABORER CLASSIFICATION

GROUP 1 - All digging and dirt work; Firing of salamanders and portable space heaters; All loading and unloading ofthe materials and equipment to and from hoist or cages for stock piling only; Wheeling and placing of concrete;

Handling of lumber, steel, cement and distribution of materials; All cleaning including windows; All wrecking and razing of buildings and all structures; Cleaning and clearing of derbis; Loading and unloading of materials, hoist or cages, except when the man is directly tending lathers, masons or plasterers; Water boys when used;

Carpenters tenders.

GROUP 2 - All machine tool operators that come under the jurisdiction of the laborers; All sewer and draintile layers and handling at the ditch, excluding distribution;

Operators of water pumps up to four inches and slip form jackets; All men erecting scaffolds and directly tending lathers, masons, cement masons and plasterers, Mortar mixers, hod carriers and dry mixers; High work over 30 feet from ground or floors; Cement finisher tender; Work on swinging scaffold; All kettle and pot men; Tank cleaning;

All pipe doping, treating and wrapping including all men working with dope; Mortar and plaster mixing machine pumpcrete machine and gunite mixing machines; including placing of concrete; Handling creosoted or treated materials liquid acid or like materials when injurious to health, eyes, skin or clothes; All newly developed mechanical equipment which replaces wheel-barrows or buggies previously used by loaders; All scale men on batch plants and tool crib men; All laborers screening sand, running sand drier and feeding operating sand blaster, except nozzle; Flaggers; Concrete graders and cutting torch operators in connection with laborers' work.

PAIN0807-001 06/15/2004

Rates Fringes

Painters:

Brush & Roller..............$ 18.00 2.35

Paper Hanging...............$ 19.00 2.35

Spray, Sandblasting &

Water blasting over 30 ft.$ 19.00 2.35

Spray, Sandblasting &

Water blasting under 30 ft..........................$ 18.00 2.35

Tapers using machine tools..$ 18.00 2.35

PLAS0690-001 06/01/1985

JOHNSTON AND MARSHALL COUNTIES

Rates Fringes

Cement Masons:...................$ 13.70 .76

OK080014 – 7 07/11/2008

Revised by Amend 4 00800-14

PLAS0786-001 06/01/1993

KAY COUNTY

Rates Fringes

Cement Masons:...................$ 10.80

Power Tool Operator..............$ 11.05

PLAS0807-001 06/01/1990

ALFALFA, BECKHAM, BLAINE, CADDO, CARTER, COMANCHE, COTTON,

CUSTER, DEWEY, ELLIS, GARFIELD, GARVIN, GRADY, GRANT, GREER,

HARMON, HARPER, JACKSON, JEFFERSON, JOHNSTON, KINGFISHER,

KIOWA, LOVE, MAJOR, MARSHALL, MURRAY, NOBLE, ROGER MILLS,

STEPHENS, TILLMAN, WASHITA, WOODS AND WOODWARD COUNTIES

Rates Fringes

PLASTERER........................$ 15.60 .95

PLUM0344-003 07/01/2008

REMAINING COUNTIES

Rates Fringes

PLUMBER/PIPEFITTER...............$ 25.88 10.92

PLUM0430-005 07/01/2008

KAY COUNTY

Rates Fringes

PLUMBER/PIPEFITTER...............$ 25.71 0.00

ROOF0143-001 06/01/2008

Rates Fringes

ROOFER, Including Built Up, Composition and Single Ply

Roofs............................$ 19.32 5.03

SHEE0124-001 07/01/2001

Rates Fringes

Sheet metal worker (Including

Duct Work).......................$ 21.62 6.04

TEAM0516-001 06/01/1993

MARSHALL COUNTY:

Rates Fringes

Truck drivers:

GROUP 1:....................$ 10.43

GROUP 2:....................$ 10.53

GROUP 3:....................$ 10.63

GROUP 4:....................$ 10.58

GROUP 5:....................$ 10.73

TRUCK DRIVER CLASSIFICATIONS

GROUP 1 - Pick-up, 1-1/2 tons or 2-1/2 yards and up to but not including 3 tons or 4 yards, such as dump trucks, flat beds, stake bodies and buses.

GROUP 2 - 3 tons or 4 yards and up to but not including 4 tons or 6 yards.

GROUP 3 - 5 tons or 6 yards and over including heavy equipment such as pole trucks, winch trucks, euclids, mississippi wagons, semi-dumps, turner pulls or other heavy

OK080014 – 8 07/11/2008

Revised by Amend 4 00800-15 material moving equipment, tractor trailor drivers and similar equipment such as tractors, ten wheelers.

GROUP 4 - Ready mix concrete trucks up to but not including 3 yards and over.

GROUP 5 - Ready mix concrete truck 3 yards and over.

TEAM0523-001 06/01/1993

KAY AND NOBLE COUNTIES

Rates Fringes

Truck drivers:

GROUP 1:....................$ 12.80

GROUP 2:....................$ 12.85

GROUP 3:....................$ 12.95

TRUCK DRIVER CLASSIFICATION

GROUP 1 - Truck Drivers, Including pick-up, 1- 1/2 tons to

2-1/2 yards up to but not including 3 tons or 4 yards, such as dump trucks, flat beds, stake body or bus driver.

GROUP 2 - 3 tons or 4 yards up to but not including 4 tons or

6 yards.

GROUP 3 - Ready mix concrete truck, tractor trailer and similar equipment.

TEAM0886-001 06/01/1980

ALFALFA, BECKHAM, BLAINE, CADDO, CARTER, COMANCHE, COTTON,

CUSTER, DEWEY, ELLIS, GARFIELD, GARVIN, GRADY, GRANT, GREER,

HARMON, HARPER, JACKSON, JEFFERSON, JOHNSTON, KINGFISHER,

KIOWA, LOGAN, LOVE, MAJOR, MURRAY, PONTOTOC, ROGER MILLS,

STEPHENS, TILLMAN, WASHITA, WOOD AND WOODWARD COUNTIES.

Rates Fringes

Truck drivers:

GROUP 1:....................$ 9.70

GROUP 2:....................$ 9.40

TRUCK DRIVER CLASSIFICATION

GROUP 1 - Truck Drivers for heavy equipment such as lowboys, heavy winch and floats, heavy earth moving equipment such as dump trucks and euclids.

GROUP 2 - Truck Drivers and swampers, such as dump trucks, flat beds, stakebodies and 3/4 and 1/2 ton pick-up trucks.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations

OK080014 – 9 07/11/2008

Revised by Amend 4 00800-16 indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

OK080014 – 10 07/11/2008

Revised by Amend 4 00800-17

General Decision Number: OK080001 07/25/2008 OK1

Superseded General Decision Number: OK20070001

State: Oklahoma

Construction Types: Heavy Sewer and Water Line and Highway

Counties: Comanche, Garfield and Sequoyah Counties in Oklahoma.

Construction, alteration, and/or repair of streets, highways, runways, erosion control structures, and water and sewer utilities, (but does not include building structures on highway rest areas).

Modification Number Publication Date

0 02/08/2008

1 07/25/2008

W912BV-08-R-2014, DESIGN AND CONSTRUCT FUEL MAINTENANCE HANGAR, VANCE AIR

FORCE BASE, GARFIELD COUNTY, OKLAHOMA

OK080001 - 1 07/25/2008

Revised by Amend 4 00800-18

* SUOK1991-002 12/12/1991

Rates Fringes

Air Tool Operator................$ 6.55

BLASTER..........................$ 8.75

CARPENTER........................$ 8.50

Concrete Finisher-Paving.........$ 8.60

Concrete Finisher-Structures.....$ 8.00

Concrete Rubber..................$ 6.55

Flag Person......................$ 6.55

Form Builder (Structures)........$ 7.50

Form Setter - Paving & Curb......$ 7.50

Form Setter-Structures...........$ 7.50

Labor Common.....................$ 6.55

Manhole Inlet Builder............$ 7.25

MECHANIC.........................$ 9.00

Painter-Structures...............$ 7.00

Pile Driver......................$ 7.50

Pipelayer........................$ 7.50

Power equipment operators:

ASPHALT DISTRIBUTOR.........$ 7.55

ASPHALT HOT MIX PLANT.......$ 8.50

ASPHALT PAVING MACHINE

SCREED......................$ 8.55

ASPHALT PAVING MACHINE......$ 8.55

BACKHOE LOADER..............$ 8.30

BOX BLADE LOADER............$ 7.55

BROOM/SWEEPER...............$ 7.00

BULLDOZER (150 H.P. & LESS).$ 8.40

BULLDOZER (OVER 150 H.P.)...$ 8.75

CONCRETE MIXING PLANT.......$ 8.50

CONCRETE PAVING

CURING/TEXTURE/FLOAT........$ 8.50

CONCRETE PAVING FINISHING

MACHINE.....................$ 8.55

CONCRETE PAVING FORM GRADER.$ 8.20

CONCRETE PAVING GRINDER.....$ 7.60

CONCRETE PAVING JOINT

SEALER......................$ 7.75

CONCRETE PAVING SPREADER....$ 8.50

CONCRETE SAW OPERATOR.......$ 7.40

CONCRETE SCREED MACHINE.....$ 7.75

CRANE, CLAMSHELL, DERRICK,

DRAGLINE, SHOVEL (1 1/2

C.Y.& LESS).................$ 7.95

CRANE, CLAMSHELL, DERRICK,

DRAGLINE, SHOVEL (OVER 1

1/2 C.Y.)...................$ 8.50

CRUSHER & SCREENING PLANT...$ 8.25

CURB MACHINE (SLIPFORM).....$ 8.30

FOUNDATION DRILL, TRUCK

MOUNTED.....................$ 11.85

FRONT END LOADER (2 1/2

C.Y. & LESS)................$ 7.75

FRONT END LOADER (OVER 2

1/2 C.Y.)...................$ 8.45

HYDRAULIC EXCAVATOR.........$ 8.65

MOTOR GRADER (FINE GRADE)...$ 9.05

MOTOR GRADER (ROUGH)........$ 8.00

OK080001 - 2 07/25/2008

Revised by Amend 4 00800-19

PAVEMENT MARKING MACHINE....$ 8.00

PLANER, MILLING MACHINE.....$ 8.25

PUGMILL MIXING PLANT........$ 7.15

PUMPCRETE...................$ 7.15

REINFORCING STEEL MACHINE...$ 7.40

ROLLER PNEUMATIC (SELF-

PROPELLED)..................$ 7.45

ROLLER STEEL WHEEL (OTHER)..$ 7.45

ROLLER STEEL WHEEL (PLANT-

MIX)........................$ 7.85

SCRAPER (17 C.Y & LESS).....$ 8.30

SCRAPER (OVER 17 C.Y.)......$ 8.55

SELF-PROPELLED HAMMER.......$ 7.20

SIDE-BOOM...................$ 7.65

TRACTOR; (OVER 80 H.P.).....$ 7.65

TRACTOR; CRAWLER (150 H.P.

& LESS).....................$ 7.15

TRACTOR; CRAWLER (OVER 150

H.P.).......................$ 7.50

TRACTOR; PNEUMATIC (80

H.P. OR LESS)...............$ 7.45

TRAVELING MIXER.............$ 7.25

TRENCHING MACHINE...........$ 8.25

WAGON DRILL, BORING

MACHINE OR POST HOLE........$ 6.60

Reinforcing Steel Setter

Paving...........................$ 7.50

Reinforcing Steel Setter

Structures.......................$ 7.50

Servicer.........................$ 7.75

SIGN ERECTOR.....................$ 8.00

Spreader Box Person..............$ 7.00

Steel Worker Structures..........$ 7.50

Traffic Control Device Monitor...$ 7.00

TRAFFIC SIGNALIZATION:

Traffic Signal Installation......$ 11.50

Truck drivers:

LOWBOY, FLOAT...............$ 8.60

SINGLE AXLE, 2 TONS AND

UNDER.......................$ 6.85

SINGLE AXLE, OVER 2 TONS....$ 7.05

TANDEM AXLE AND SEMI

TRAILER.....................$ 7.30

Vibrator Operator - Hand Type....$ 6.55

Welders - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

OK080001 - 3 07/25/2008

Revised by Amend 4 00800-20

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

OK080001 - 4 07/25/2008

APPENDIX H

VANCE COMPATIBILITY GUIDE

m5ecdckd Typewritten Text m5ecdckd Typewritten Text Added by Amendment 0004

EXECUTIVE SUMMARY

To understand architectural compatibility and how it affects the Air Force, an understanding of the term is necessary. Compatible is generally defined as “the ability to exist and perform in harmonious combination.” Architectural compatibility results from designing and building facilities in harmony with their natural and man-made surroundings and environment. Therefore, architectural compatibility is concerned not only with the physical appearance of buildings, but with site planning, landscape development, security, and sustainability.

Military installations should provide efficient and pleasant physical environments conducive to attracting and retaining skilled and motivated personnel. The design, location, and maintenance of individual elements such as buildings, roads, parking lots, signs, and landscaping create the quality of the environment. Each of the elements should be functional, attractive, and harmonious with each other. This helps to create an environment that enhances the capability of the installations to support their mission and fosters pride in, and a commitment to military service.

Adoption of these guidelines by base leadership will ensure compliance and result in a homogenous community fabric improving overall installation appearance and mission effectiveness.

Specific study objectives include:

• To promote the sense of a unified community by strengthening the prevailing character of the base

• To define goals and objectives leading to more consistency for leadership decision-making

• To achieve better utilization of space through design standardization

• To provide a view of the base in terms of Visual Districts

• To discuss recommended architectural themes for each Visual

District

• To define Visual District edges that require screening

• To identify all “Destination Buildings” on the base

EXECUTIVE SUMMARY

1 INTRODUCTION

1.1 Purpose

1.2 Use & Implementation

2 BASE INFORMATION

2.1 Installation Profile

2.1.1 Location

2.1.2 Mission Summary

2.1.3 History of Base

2.2 Local Characteristics

2.2.1 Climate & Weather

2.2.2 Prevailing Architectural Character

2.2.3 Topography

3 ARCHITECTURAL DESIGN GUIDELINES

3.1 Landscape/Site Design

3.1.1 Introduction

3.1.2 Installation Boundaries

3.1.3 Circulation

3.1.4 Open Spaces

3.1.5 Planting

3.1.6 Walls

3.1.7 Xeriscaping

3.1.8 Exterior Signs

3.1.9 Site Furniture

3.1.10 Site Lighting

3.1.11 Visual Clutter

3.2 Force Protection

3.3 Sustainable Design

3.4 Building Design Standards

3.4.1 Introduction

3.4.2 Context

3.4.3 Building Siting

3.4.4 Building Form & Mass

3.4.5 Scale

3.4.6 Facades

3.4.7 Roofs & Related Elements

3.4.8 Materials

3.4.9 Texture

3.4.10 Color

3.5 Visual Districts

3.5.1 Introduction

3.5.2 Administrative/Community District – District 1

3.5.3 Training District – District 2

3.5.4 Housing District – District 3

3.5.5 Flightline/Industrial District – District 4

3.5.6 Recreation District – District 5

4 PLANNING AND DESIGN RESOURCES

Architectural Compatibility Guide Page 3 of 68 Vance Air Force Base

1. Introduction

1.1 PURPOSE

The purpose of the Architectural Compatibility Guide (ACG) is to establish and document installation-specific standards and provide a tool to assure these standards are consistently applied. The Architectural Compatibility Plan strives to recognize the cultural, environmental, climatic and existing facility conditions particular to Vance AFB and define the appropriate styles, finishes, and materials to be used to achieve the best facility life-cycle costs and still retain the appropriate environment for people to achieve their highest productivity and efficiency.

• Provide a record of established goals, objectives, and decisions leading to more consistent decisions when a change in installation leadership occurs.

• Improve the environment through the installation’s construction projects.

• Provide a mechanism for environmental design continuity.

• Develop a baseline for review and, if necessary, for changes that may occur as a result of redirection in goals and objectives.

• Establish consistency in installation development which takes into account all elements of the environment.

• Control design expression. These controls should not be so specific that design freedom is restricted. A designer should have sufficient latitude for creativity.

• Provide clear and consistent communication between the Air Force and designers; whether they are in-house or contracted professionals.

• Improve programming and budgeting by limiting the range of options and promoting consistency.

• Impart a sense of pride, organization, vitality, and good management. The installation should convey the feeling that it is a good place to work and live. It should reflect a leadership that cares about its people.

Architectural Compatibility Guide Page 4 of 68

YES

Determine which Visual District the proposed site falls in

Read and understand the requirements of the ACG

Determine the architectural parameters appropriate for that

Visual District

Develop conceptual design which addresses the stated objectives for the Visual

District

Submit design to the design review board

Does the design comply with the specific design parameters laid out in the ACG?

Continue to review project for compliance throughout the construction process

NO

1.2 USE & IMPLEMENTATION

The Architectural Compatibility Guide is a tool to chart a course towards installation excellence and provides a means to assess the installation’s progress in achieving that end. The Architectural Compatibility Guide is intended to be used at all stages of the facility delivery process from programming through construction, and even operations and maintenance. It is essential that the Architectural Compatibility Guide be provided to the design agent and AE consultants early in the design process to assure that the entire design team understands the applicable design standards and objectives for the project.

Implementing a strict design review process is important to ensure the Architectural Compatibility Plan is followed as projects are conceived, designed, and constructed. The flowchart to the left outlines the typical process for ensuring compliance with this guide.

Architectural Compatibility Guide Page 5 of 68

2. Base Information

2.1. INSTALLATION PROFILE

2.1.1 LOCATION

Vance Air Force Base (VAFB) is located on the south side of Enid, Oklahoma, approximately 94 miles northwest of Oklahoma City and 1,307 ft above sea level. The installation is situated about five miles south of downtown Enid on land which once produced bumper wheat crops. Vance AFB occupies 2,122 acres with a total of 368 buildings (138 buildings and 230 MFH units). There are approximately 2,449 employees at VAFB (1109 military, 140 civil service, and 1,200 contractors).

2.1.2 MISSION SUMMARY

Vance is one of the premier undergraduate air education and training locations in the United States Air Force (USAF) since the inception of the base in 1941. The 71st Flying Training Wing, the host unit, conducts joint specialized undergraduate pilot training (JSUPT) for qualified United States military officers and also international officers. Flying training is also provided for members of the Air National Guard, Air Force Reserve and the air forces of several allied countries. Major associate units include the 8th Flying Training Squadron, the 25th Flying Training Squadron, the 33d Flying Training Squadron, the 32d Flying Training Squadron, the 5th Flying Training Squadron, the 71st Operations Group, the 71st Mission Support Group, and the 71st Medical Group. Since 1960, VAFB has contracted much of the base’s operation, including maintenance and support services, aircraft and base maintenance, ground transportation, fire protection, procurement, supply, civil engineering, flight simulation, and personnel and management services.

2.1.3 HISTORY OF BASE

The base opened for military use in 1941 and the first building was occupied in November of that year. The installation was generally referred to as Air Corps Basic Flying School of Enid, Oklahoma. It was not until Feb. 11, 1942 that the base was officially named Enid Army Flying School. The mission of the school was to train aviation cadets to become aircraft pilots and commissioned officers in the Army Air Corps. The first aircraft used was the BT-13A, later supplemented by the BT-15. These were the only aircraft used for basic pilot training during World War II. However, in 1944 advanced students were graduated in the TB-25 and TB-26.

As the demand for pilots decreased after World War II, the installation was slated for temporary inactive status between 1947 and

Architectural Compatibility Guide Page 6 of 68

1948. However, with the creation of the U.S. Air Force as a separate service in September 1947, it became evident that once again the Enid training facilities would be required. Upon reactivation, the name was changed to Enid Air Force Base in 1948 as one of the pilot training bases within the Air Training Command. Its mission was to provide training for advanced students in multi-engine aircraft. The four-month program, later expanded to six months, included training in the AT-6 and TB-25.

In keeping with the Air Force tradition of naming bases for deceased Air Force flyers, the base was renamed after a local World War II hero and Medal of Honor winner, Lt Col Leon Robert Vance, Jr. in 1949. The twin-engine T-37 jet, designed as a primary trainer, became operational at the base in 1961. The T-38 replaced the T-33 in 1963-1964, an advanced supersonic jet trainer. In 1960, Vance was the first base selected by the Air Force as part of an extended experiment in contract services. Under such plan, a civilian contractor furnishes the support facilities normally provided by base agencies including aircraft and base maintenance, ground transportation, fire protection, procurement, supply, and other services. The support contract began in 1960 with Serv-Air.

All military training continues, however, under military supervision.

Vance took over the fixed wing qualification training program in 1987. The program, which is basically an accelerated version of UPT (Undergraduate Pilot Training), teaches helicopter pilots to fly fixed wing aircraft. In 1990, Air Force officials announced that Vance would add a new aircraft to its inventory, the Beechcraft T-1 Jayhawk. The installation moved to specialized undergraduate pilot training in September 1995. Under this program, all students start out flying the T-6, then branch off to specialized training. Those heading for tanker/transport assignments subsequently train in the T-1, while fighter, bomber, and reconnaissance pilots train in the T-38. Joint training with the Navy became a reality in 1996, and Navy and Marine Corps student pilots subsequently arrived on base.

Architectural Compatibility Guide Page 7 of 68

Building 500 Wing Headquarters

Brick detail at Auto Facility

2.2. LOCAL CHARACTERISTICS

2.2.1 CLIMATE & WEATHER

The climate of the region varies from hot, humid summers to short, gusty winters. Early evening thunderstorms and tornadoes are common in summer and spring, while winters are shorter and less rigorous than other northern Plains states. Oklahoma is in America’s Tornado Alley. Tornadoes are a particular hazard in this area, in that the frequency of occurrence per unit area is among the highest in the world. Average temperatures range from 25 degrees in the winter to 93 degrees in the summer. Average annual precipitation ranges from 12-17 inches, with May the wettest month and December the driest.

Fairly steady winds blow through the region, with occasionally extremely gusty days.

In the summer, winds are predominantly from the south, and in the winter, they are predominantly from the northwest. The severe weather conditions at Vance AFB affect the overall architectural elements and the use of outdoor spaces.

2.2.2 PREVAILING ARCHITECTURAL CHARACTER

The character of Vance AFB is represented by numerous architectural styles including World War II, industrial, institutional modern and contemporary. The base’s history, its functional use requirements, and its considerable construction has produced a mixed character.

Despite the variety of materials and styles present on base, efforts to provide architectural compatibility are evident in the color palette.

Red standing seam metal roofs, dark brown trim, red-orange brick, EIFS, and beige metal siding are all examples of the present materials used in the installation. Continued efforts to provide an architecturally cohesive installation should be encouraged to provide a good basis for an attractive environment.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .