This document is a Standard Form 30 Amendment to Solicitation W912BU25BA001 for the Lewes and Rehoboth Canal Maintenance Dredging Project. The amendment extends the bid opening date from 28 April 2025 to 5 May 2025 at 2:00 PM EDT and provides additional project details. The base contract involves dredging approximately 90,000 cubic yards of sediment between Lewes and North Shores, Delaware, with two optional additional dredging segments between North Shores and Rehoboth Bay. Dredging will use hydraulic cutterhead or mechanical methods to a depth of -6 feet MLLW plus 1 foot, with dredged material placed in upland facilities in Lewes. The base contract period is 365 calendar days, with potential additional 300 days if options are exercised, and dredging is only permitted between 1 October and 1 March due to environmental restrictions.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section 00 00 00 - Procurement and Contracting Requirements
The following changes have been made:
INFORMATION FROM TO
Response Due Date 28 Apr 2025 05 May 2025
Miscellaneous text in this section has been modified to:
The scope of this project will consist of maintenance dredging of approximately 90,000 cubic yards of sediment within the Lewes to Rehoboth Canal. Base contract work includes dredging between Lewes, DE and North Shores, DE with placement of the dredged material into one or both of the upland dredged material placement facilities in Lewes, DE between the canal and Cedar Street. There will be two (2) Options to dredge between North Shores and Rehoboth Bay with placement of the dredged material into one or both of the upland dredged material placement facilities in Lewes, DE between the canal and Cedar Street. Solicitation will allow hydraulic cutterhead or mechanical dredging to -6 feet MLLW (Datum) plus 1' allowable over depth. The base contract will also require minor earthwork for embankment improvements at one or both disposal areas. The base contract period of performance is 365 calendar days with an additional 300 days added if one or both Options are awarded. Due to environmental restrictions, dredging is only permitted between 1 October and 1 March.
Section 00 20 00 - Instructions for Procurements
The following clauses were deleted:
FAR Clauses Incorporated by Full Text 52.236-27 Site Visit (Construction). (Alternate I) (Feb 1995)Alternate I(Feb 1995)
Alternate I . If an organized site visit will be conducted, substitute a paragraph substantially (Feb 1995) the same as the following for paragraph (b) of the basic provision:
(b) An organized site visit has been scheduled for-
10:00 AM EDT on 08 April 2025
(c) Participants will meet at-
400 Anglers Rd, Lewes, DE 19958________
W912BU25BA0010001
Section 00 45 00 - Representations and Certifications
The following clauses were modified:
252.204-7007Alternate A, Annual Representations and Certifications.Oct 2024Alternate AOct 2024 hereby reads as follows:
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)
Substitute the following paragraphs (b), (d), and (e) for paragraphs (b) and (d) of the provision at FAR 52.204-8:
(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (e) of this provision applies.
(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (e) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:
(i) Paragraph (e) applies.
(ii) Paragraph (e) does not apply and the Offeror has completed the individual representations and certifications in the solicitation.
(d)(1) The following representations or certifications in the SAM database are applicable to this solicitation as indicated:
(i) 252.204-7016, Covered Defense Telecommunications Equipment or Services- Representation. Applies to all solicitations.
(ii) 252.216-7008, Economic Price Adjustment-Wage Rates or Material Prices Controlled by a Foreign Government. Applies to solicitations for fixed-price supply and service contracts when the contract is to be performed wholly or in part in a foreign country, and a foreign government controls wage rates or material prices and may during contract performance impose a mandatory change in wages or prices of materials.
(iii) 252.225-7042, Authorization to Perform. Applies to all solicitations when performance will be wholly or in part in a foreign country.
(iv) 252.225-7049, Prohibition on Acquisition of Certain Foreign Commercial Satellite Services-Representations. Applies to solicitations for the acquisition of commercial satellite services.
(v) 252.225-7050, Disclosure of Ownership or Control by the Government of a Country that is a State Sponsor of Terrorism. Applies to all solicitations expected to result in contracts of $150,000 or more.
(vi) 252.229-7012, Tax Exemptions (Italy)-Representation. Applies to solicitations and contracts when contract performance will be in Italy.
(vii) 252.229-7013, Tax Exemptions (Spain)-Representation. Applies to solicitations and contracts when contract performance will be in Spain.
(2) The following representations or certifications in SAM are applicable to this solicitation as indicated by the Contracting Officer:
(i) 252.209-7002, Disclosure of Ownership or Control by a Foreign Government. XX
(ii) 252.225-7000, Buy American-Balance of Payments Program Certificate.
(iii) 252.225-7020, Trade Agreements Certificate.
Use with Alternate I.
(XX iv)(iv) 252.225-7031, Secondary Arab Boycott of Israel.
(v) 252.225-7035, Buy American-Free Trade Agreements-Balance of Payments Program Certificate.
Use with Alternate I.
Use with Alternate II.
Use with Alternate III.
Use with Alternate IV.
Use with Alternate V.
(vi) 252.226-7002, Representation for Demonstration Project for Contractors Employing Persons with Disabilities.
(vii) 252.232-7015, Performance-Based Payments-Representation.
(e) The Offeror has completed the annual representations and certifications electronically via the SAM website at . After reviewing the SAM database information, the Offeror https://www.sam.gov verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in FAR 52.204-8(c) and paragraph (d) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer, and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.
FAR/DFARS Provision # Title Date Chang e
Any changes provided by the Offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications located in the SAM database.
(End of provision)
Section 00 70 00 - Conditions of the Contract
Additional Information/Notes
The following clauses were added:
FAR Clauses Incorporated by Reference
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
52.236-17 Layout of Work. Apr 1984
FAR Clauses Incorporated by Full Text
52.232-16 Progress Payments. (Nov 2021)
Progress Payments (Nov 2021)
The Government will make progress payments to the Contractor when requested as work progresses, but not more frequently than monthly, in amounts of $2,500 or more approved by the Contracting Officer, under the following conditions:
Computation of amounts.(a)
Unless the Contractor requests a smaller amount, the Government will compute each progress (1) payment as 80 percent of the Contractor's total costs incurred under this contract whether or not actually paid, plus financing payments to subcontractors (see paragraph (j) of this clause), less the sum of all previous progress payments made by the Government under this contract. The Contracting Officer will consider cost of money that would be allowable under Federal Acquisition Regulation (FAR)31.205-10 as an incurred cost for progress payment purposes.
The amount of financing and other payments for supplies and services purchased directly for the (2) contract are limited to the amounts that have been paid by cash, check, or other forms of payment, or that are determined due and will be paid to subcontractors-
In accordance with the terms and conditions of a subcontract or invoice; and(i)
Ordinarily within 30 days of the submission of the Contractor's payment request to the Government.(ii)
The Government will exclude accrued costs of Contractor contributions under employee pension (3) plans until actually paid unless-
The Contractor's practice is to make contributions to the retirement fund quarterly or more frequently; (i) and
The contribution does not remain unpaid 30 days after the end of the applicable quarter or shorter (ii) payment period (any contribution remaining unpaid shall be excluded from the Contractor's total costs for progress payments until paid).
The Contractor shall not include the following in total costs for progress payment purposes in (4) paragraph (a)(1) of this clause:
Costs that are not reasonable, allocable to this contract, and consistent with sound and generally (i) accepted accounting principles and practices.
Costs incurred by subcontractors or suppliers.(ii)
Costs ordinarily capitalized and subject to depreciation or amortization except for the properly (iii) depreciated or amortized portion of such costs.
Payments made or amounts payable to subcontractors or suppliers, except for-(iv)
Completed work, including partial deliveries, to which the Contractor has acquired title; and(A)
Work under cost-reimbursement or time-and-material subcontracts to which the Contractor has (B) acquired title.
The amount of unliquidated progress payments may exceed neither (i) the progress payments made (5) against incomplete work (including allowable unliquidated progress payments to subcontractors) nor (ii) the value, for progress payment purposes, of the incomplete work. Incomplete work shall be considered to be the supplies and services required by this contract, for which delivery and invoicing by the Contractor and acceptance by the Government are incomplete.
The total amount of progress payments shall not exceed 80 percent of the total contract price.(6)
If a progress payment or the unliquidated progress payments exceed the amounts permitted by (7) paragraphs (a)(4) or (a)(5) of this clause, the Contractor shall repay the amount of such excess to the Government on demand.
Notwithstanding any other terms of the contract, the Contractor agrees not to request progress (8) payments in dollar amounts of less than $2,500. The Contracting Officer may make exceptions.
The costs applicable to items delivered, invoiced, and accepted shall not include costs in excess of the (9) contract price of the items.
. Except as provided in the Termination for Convenience of the Government clause, all (b) Liquidation progress payments shall be liquidated by deducting from any payment under this contract, other than advance or progress payments, the unliquidated progress payments, or 80 percent of the amount invoiced, whichever is less. The Contractor shall repay to the Government any amounts required by a retroactive price reduction, after computing liquidations and payments on past invoices at the reduced prices and adjusting the unliquidated progress payments accordingly. The Government reserves the right to unilaterally change from the ordinary liquidation rate to an alternate rate when deemed appropriate for proper contract financing.
. The Contracting Officer may reduce or suspend progress payments, increase (c) Reduction or suspension the rate of liquidation, or take a combination of these actions, after finding on substantial evidence any of the following conditions:
The Contractor failed to comply with any material requirement of this contract (which includes (1) paragraphs (f) and (g) of this clause).
Performance of this contract is endangered by the Contractor's-(2)
Failure to make progress; or(i)
Unsatisfactory financial condition.(ii)
Inventory allocated to this contract substantially exceeds reasonable requirements.(3)
The Contractor is delinquent in payment of the costs of performing this contract in the ordinary (4) course of business.
The fair value of the undelivered work is less than the amount of unliquidated progress payments for (5) that work.
The Contractor is realizing less profit than that reflected in the establishment of any alternate (6) liquidation rate in paragraph (b) of this clause, and that rate is less than the progress payment rate stated in paragraph (a)(1) of this clause.
Title.(d)
Title to the property described in this paragraph (d) shall vest in the Government. Vestiture shall be (1) immediately upon the date of this contract, for property acquired or produced before that date. Otherwise, vestiture shall occur when the property is or should have been allocable or properly chargeable to this contract.
"Property," as used in this clause, includes all of the below-described items acquired or produced by (2) the Contractor that are or should be allocable or properly chargeable to this contract under sound and generally accepted accounting principles and practices.
Parts, materials, inventories, and work in process;(i)
Special tooling and special test equipment to which the Government is to acquire title;(ii)
Nondurable ( noncapital) tools, jigs, dies, fixtures, molds, patterns, taps, gauges, test equipment, (iii) i.e., and other similar manufacturing aids, title to which would not be obtained as special tooling under paragraph (d)(2)(ii) of this clause; and
Drawings and technical data, to the extent the Contractor or subcontractors are required to deliver (iv) them to the Government by other clauses of this contract.
Although title to property is in the Government under this clause, other applicable clauses of this (3) contract; the termination clauses, shall determine the handling and disposition of the property.e.g., The Contractor may sell any scrap resulting from production under this contract without requesting (4) the Contracting Officer's approval, but the proceeds shall be credited against the costs of performance.
To acquire for its own use or dispose of property to which title is vested in the Government under this (5) clause, the Contractor must obtain the Contracting Officer's advance approval of the action and the terms.
The Contractor shall (i) exclude the allocable costs of the property from the costs of contract performance, and (ii) repay to the Government any amount of unliquidated progress payments allocable to the property. Repayment may be by cash or credit memorandum.
When the Contractor completes all of the obligations under this contract, including liquidation of all (6) progress payments, title shall vest in the Contractor for all property (or the proceeds thereof) not-
Delivered to, and accepted by, the Government under this contract; or(i)
Incorporated in supplies delivered to, and accepted by, the Government under this contract and to (ii) which title is vested in the Government under this clause.
The terms of this contract concerning liability for Government-furnished property shall not apply to (7) property to which the Government acquired title solely under this clause.
. Before delivery to and acceptance by the Government, the Contractor shall bear the risk (e) Risk of loss of loss for property, the title to which vests in the Government under this clause, except to the extent the Government expressly assumes the risk. The Contractor shall repay the Government an amount equal to the unliquidated progress payments that are based on costs allocable to property that is lost (see 45.101).
. The Contractor shall maintain an accounting system and controls (f) Control of costs and property adequate for the proper administration of this clause.
Reports, forms, and access to records.(g)
The Contractor shall promptly furnish reports, certificates, financial statements, and other pertinent (1) information (including estimates to complete) reasonably requested by the Contracting Officer for the administration of this clause. Also, the Contractor shall give the Government reasonable opportunity to examine and verify the Contractor's books, records, and accounts.
The Contractor shall furnish estimates to complete that have been developed or updated within six (2) months of the date of the progress payment request. The estimates to complete shall represent the Contractor's best estimate of total costs to complete all remaining contract work required under the contract. The estimates shall include sufficient detail to permit Government verification.
Each Contractor request for progress payment shall:(3)
Be submitted on Standard Form 1443, Contractor's Request for Progress Payment, or the electronic (i) equivalent as required by agency regulations, in accordance with the form instructions and the contract terms; and
Include any additional supporting documentation requested by the Contracting Officer.(ii)
. If this contract is terminated under the Default clause, (i) the (h) Special terms regarding default Contractor shall, on demand, repay to the Government the amount of unliquidated progress payments and
(ii) title shall vest in the Contractor, on full liquidation of progress payments, for all property for which the Government elects not to require delivery under the Default clause. The Government shall be liable for no payment except as provided by the Default clause.
Reservations of rights.(i)
No payment or vesting of title under this clause shall-(1)
Excuse the Contractor from performance of obligations under this contract; or(i)
Constitute a waiver of any of the rights or remedies of the parties under the contract.(ii)
The Government's rights and remedies under this clause-(2)
Shall not be exclusive but rather shall be in addition to any other rights and remedies provided by law (i) or this contract; and
Shall not be affected by delayed, partial, or omitted exercise of any right, remedy, power, or (ii) privilege, nor shall such exercise or any single exercise preclude or impair any further exercise under this clause or the exercise of any other right, power, or privilege of the Government.
The financing payments to subcontractors mentioned in (j) Financing payments to subcontractors.
paragraphs (a)(1) and (a)(2) of this clause shall be all financing payments to subcontractors or divisions, if the following conditions are met:
The amounts included are limited to-(1)
The unliquidated remainder of financing payments made; plus(i)
Any unpaid subcontractor requests for financing payments.(ii)
The subcontract or interdivisional order is expected to involve a minimum of approximately 6 months (2) between the beginning of work and the first delivery; or, if the subcontractor is a small business concern, 4 months.
If the financing payments are in the form of progress payments, the terms of the subcontract or (3) interdivisional order concerning progress payments-
Are substantially similar to the terms of this clause for any subcontractor that is a large business (i) concern, or this clause with its Alternate I for any subcontractor that is a small business concern;
Are at least as favorable to the Government as the terms of this clause;(ii)
Are not more favorable to the subcontractor or division than the terms of this clause are to the (iii) Contractor;
Are in conformance with the requirements of FAR 32.504(e); and(iv)
Subordinate all subcontractor rights concerning property to which the Government has title under the (v) subcontract to the Government's right to require delivery of the property to the Government if-
The Contractor defaults; or(A)
The subcontractor becomes bankrupt or insolvent.(B)
If the financing payments are in the form of performance-based payments, the terms of the (4) subcontract or interdivisional order concerning payments-
Are substantially similar to the Performance-Based Payments clause at FAR 52.232-32 and meet the (i) criteria for, and definition of, performance-based payments in FAR part 32;
Are in conformance with the requirements of FAR 32.504(f); and(ii)
Subordinate all subcontractor rights concerning property to which the Government has title under the (iii) subcon-tract to the Government's right to require delivery of the property to the Government if-
The Contractor defaults; or(A)
The subcontractor becomes bankrupt or insolvent.(B)
If the financing payments are in the form of commercial product or commercial service financing (5) payments, the terms of the subcontract or interdivisional order concerning payments-
Are constructed in accordance with FAR 32.206(c) and included in a subcontract for a commercial (i) product or commercial service purchase that meets the definition and standards for acquisition of commercial products and commercial services in FAR parts 2 and 12;
Are in conformance with the requirements of FAR 32.504(g); and(ii)
Subordinate all subcontractor rights concerning property to which the Government has title under the (iii) subcontract to the Government's right to require delivery of the property to the Government if-
The Contractor defaults; or(A)
The subcontractor becomes bankrupt or insolvent.(B)
If financing is in the form of progress payments, the progress payment rate in the subcontract is the (6) customary rate used by the contracting agency, depending on whether the subcontractor is or is not a small business concern.
Concerning any proceeds received by the Government for property to which title has vested in the (7) Government under the subcontract terms, the parties agree that the proceeds shall be applied to reducing any unliquidated financing payments by the Government to the Contractor under this contract.
If no unliquidated financing payments to the Contractor remain, but there are unliquidated financing (8) payments that the Contractor has made to any subcontractor, the Contractor shall be subrogated to all the rights the Government obtained through the terms required by this clause to be in any subcontract, as if all such rights had been assigned and transferred to the Contractor.
To facilitate small business participation in subcontracting under this contract, the Contractor shall (9) provide financing payments to small business concerns, in conformity with the standards for customary contract financing payments stated in FAR 32.113. The Contractor shall not consider the need for such financing payments as a handicap or adverse factor in the award of subcontracts.
. Notwithstanding any other progress payment provisions (k) Limitations on undefinitized contract actions in this contract, progress payments may not exceed 80 percent of costs incurred on work accomplished under undefinitized contract actions. A "contract action" is any action resulting in a contract, as defined in subpart 2.1, including contract modifications for additional supplies or services, but not including contract modifications that are within the scope and under the terms of the contract, such as contract modifications issued pursuant to the Changes clause, or funding and other administrative changes. This limitation shall apply to the costs incurred, as computed in accordance with paragraph (a) of this clause, and shall remain in effect until the contract action is definitized. Costs incurred which are subject to this limitation shall be segregated on Contractor progress payment requests and invoices from those costs eligible for higher progress payment rates. For purposes of progress payment liquidation, as described in paragraph (b) of this clause, progress payments for undefinitized contract actions shall be liquidated at 80 percent of the amount invoiced for work performed under the undefinitized contract action as long as the contract action remains undefinitized. The amount of unliquidated progress payments for undefinitized contract actions shall not exceed 80 percent of the maximum liability of the Government under the undefinitized contract action or such lower limit specified elsewhere in the contract. Separate limits may be specified for separate actions.
. The designated payment office will make progress payments on the [Contracting (l) Due date ____ Officer insert date as prescribed by agency head; if not prescribed, insert "30th"] day after the designated billing office receives a proper progress payment request. In the event that the Government requires an audit or other review of a specific progress payment request to ensure compliance with the terms and conditions of the contract, the designated payment office is not compelled to make payment by the specified due date. Progress payments are considered contract financing and are not subject to the interest penalty provisions of the Prompt Payment Act.
. The Contractor shall account for and submit (m) Progress payments under indefinite-delivery contracts progress payment requests under individual orders as if the order constituted a separate contract, unless otherwise specified in this contract.
(End of clause)
The following clauses were modified:
52.211-10Commencement, Prosecution, and Completion of Work.Apr 1984 hereby reads as follows:
As prescribed in , insert the following clause in solicitations and contracts when a fixed-price 11.404(b) construction contract is contemplated. The clause may be changed to accommodate the issuance of orders under indefinite-delivery contracts for construction.
Commencement, Prosecution, and Completion of Work (Apr 1984)
The Contractor shall be required to (a) commence work under this contract within calendar days after 10 the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than .* The time 365 Calendar Days after Notice to Proceed (NTP) stated for completion shall include final cleanup of the premises.
"The Contracting Officer has the right to exercise any or all of the options in this contract by written notice to the Contractor within 30 calendar days of Notice to Proceed."
Period Period of Performance (PoP) Base Contract 365 Calendar Days from NTP Option 1 **Additional 300 Calendar Days Option 2 **Additional 300 Calendar Days
**- The total PoP shall not exceed 665 calendar days in any configuration with the exercising of contract options.
(End of clause)
52.252-4Alterations in Contract.Apr 1984 hereby reads as follows:
As prescribed in , insert the following clause in solicitations and contracts in order to revise or 52.107(d) supplement, as necessary, other parts of the contract, or parts of the solicitation that apply after contract award, except for any clause authorized for use with a deviation. Include clear identification of what is being altered.
Alterations in Contract (Apr 1984)
Portions of this contract are altered as follows:
NONE
(End of clause)
52.252-6Authorized Deviations in Clauses.Nov 2020 hereby reads as follows:
As prescribed in , insert the following clause in solicitations and contracts that include any FAR 52.107(f) or supplemental clause with an authorized deviation. Whenever any FAR or supplemental clause is used with an authorized deviation, the contracting officer shall identify it by the same number, title, and date assigned to the clause when it is used without deviation, include regulation name for any supplemental clause, except that the contracting officer shall insert "(DEVIATION)" after the date of the clause.
Authorized Deviations in Clauses (Nov 2020)
The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) (a) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.
The use in this solicitation or contract of any (b) Defense Federal Aquisition Regulation Supplement (48 ) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after CFR Chapter 2 the name of the regulation.
(End of clause)
252.236-7001Contract Drawings and Specifications.Aug 2000 hereby reads as follows:
As prescribed in 236.570(a), use the following clause:
CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall-
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Amendment 0001, 22 April 2024
TITLE
L&R Channel_Coordinates.pdf LR_Channel Coordinates.txt
Documents provided on 28 March 2024:
TITLE
W912BU25BA001- Dwgs.pdf
W912BU25BA001 - Specs.pdf
(End of clause)
The following clauses were deleted:
FAR Clauses Incorporated by Reference
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
52.219-33Nonmanufacturer Rule. Sep 2021 52.227-4 Patent Indemnity-Construction Contracts. Dec 2007
52.244-6 Subcontracts for Commercial Products and Commercial Services. (DEVIATION 2025- O0003)
Jan 2025 Deviation 2025-O0003Mar 2025
FAR Clauses Incorporated by Full Text
52.219-28 Post-Award Small Business Program Rerepresentation.
(Alternate I)
(Feb 2024)Alternate I(Mar 2020)
Alternate I . As prescribed in (c)(2), substitute the following paragraph (h)(1) for (Mar 2020) 19.309 paragraph (h)(1) of the basic clause:
(h)(1) The Contractor represents its small business size status for each one of the NAICS codes assigned to this contract.
NAICS Code Small business concern (yes/no)
[ ]Contracting Officer to insert NAICS codes.
| IDCode: J |
| Page: 1 |
| Pages: 14 |
| AmendNo: 0001 |
| EffDate: 22 APR 2025 |
| ReqNo: |
| ProjNo: 462113 |
| IssCode: W912BU |
| AdmCode: |
| IssuedBy: W2SD ENDIST PHILADELPHIA |
1650 ARCH STREET, 7TH FLOOR
PHILADELPHIA, PA 19103-0000
UNITED STATES
MOLLY GALLAGHER, EMAIL: MOLLY.GALLAGHER@USACE.ARMY.MIL TELEPHONE: (215) 656-6929
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W912BU25BA001 |
| SolDate: 28 MAR 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: THE PURPOSE OF AMENDMENT 0001 TO SOLICITATION W912BU25BA001 IS TO INCORPORATE THE FOLLOWING CHANGES: |
A.) THE BID OPENING DATE IS BEING EXTENDED FROM 28 APRIL 2025 TO 5 MAY 2025 AT 2:00 PM EDT.
B.) PROVIDE ANSWERS TO THE RFIS SUBMITTED AND TO PROVIDE THE SIGN-IN SHEET FROM THE PRE-BID SITE VISIT.
C.) REVISE FAR 52.211-10, COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK.
D.) UPDATE DFARS CLAUSE 252.236-7001, CONTRACT DRAWINGS AND SPECIFICATIONS, AND FAR PROVISION 52.252-3, ALTERATIONS IN SOLICITATION.
| ContNameTitle: |
| CoNameTitle: CONNOR STRUCKMEYER |
| ContDate: |
| CODate: 22 APR 2025 |