W912BU24R0032 Amendment 0003.pdf
PDF 1 MB Posted
- Attached to
- PA056 LANCASTER USARC HVAC Federal contract opportunity
- Solicitation number
- W912BU-24-R-0032
About this file
This document is an amendment to Solicitation W912BU-24-R-0032 for HVAC system design and construction at the Lancaster USARC Training Building in Lancaster, PA. The amendment answers several contractor questions, including clarifying the required contract duration, design flexibility, and site visit information. It also provides attachments including the NAVFAC/USACE Past Performance Questionnaire form and instructions, as well as a template for a "Narrative for Relevant Projects". The solicitation is for a design-build contract to design and construct a new HVAC system, power distribution, and suspended ceiling systems, and remove the existing systems. Key requirements include split direct expansion variable air volume air handling units, condensing units, DDC controls, and other HVAC equipment. The government provided as-built drawings for reference. The period of performance is 18 months, with liquidated damages of $219.59 per day for late completion. Offerors are required to submit a price proposal and relevant past performance information.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AsbestosSurvey-PA056-20061001.pdf | ||
| Amendment 0004.pdf | ||
| Site Visit Attendees Lancaster HVAC 2024-05-31 10.07.58 AM.pdf | ||
| W912BU24R0032 Amendment 0002.pdf | ||
| PA056 Lancaster - As Built Archive 1.pdf | ||
| Attachment_1_Past_Performance_Questionnaire.pdf | ||
| Attachment 2 Narrative for Relevant Projects.docx | DOCX document | |
| PA056 Lancaster - As Built Archive 2.pdf | ||
| 24R0032 Amendment 001.pdf | ||
| PA056_Compiled_Final_20230811.pdf | ||
| SOLICITATION - final.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912BU24R0032
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The reason for this amendment is to answ er request for information (RFI's) from the contractors. Also, the As-built draw ings/PPQ and Relevant Projects attachments w ere added to the solicitation. The LD's listed in the SOW is updated from $180.00 to $219.59. Volume III – Price Proposal (Factor 3) 1. VOLUME III - FACTOR 3: PRICE. The Offeror shall submit a completed price schedule as part of this factor. The Offeror shall not include or provide pricing in any other part of the proposal. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 12
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Jun-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912BU24R0032
X 9B. DATED (SEE ITEM 11)
24-May-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Jun-2024
CODE
U.S. ARMY CORPS AND ENGINEERS - PHILA
1650 ARCH STREET
PHILADELPHIA PA 19103
W912BU 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AS-BUILT DRAWINGS/PPQ
NAVFAC / USACE Past Performance Questionnaire (PPQ) Form PPQ -0 (9/30/11)
INSTRUCTIONS FOR IMPLEMENTATION OF
NAVFAC/USACE PAST PERFORMANCE QUESIONNAIRE (PPQ)
FORM
1. Background: In many source selections and MATOC task order evaluations, the RFP encourages the
Offeror to have their clients provide a completed PPQ directly to the contract specialist. In addition, throughout USACE, various formats of PPQs are being utilized. Industry expressed concern regarding the process by which PPQs are submitted, that completing multiple PPQs for the same type projects over time places a significant burden on their clients, and seeking a standard process and format to be implemented across USACE and NAVFAC.
2. Discussion: Based on input from industry, NAVFAC and USACE will still allow Offerors to submit PPQs with their proposal but will not require them to be sent directly from the client to the contracting office. In addition, NAVFAC and USACE will utilize a standard PPQ format for all requirements, when required as part of an evaluation. The standard PPQ form and process will allow Offerors to obtain clients’ completed PPQ at the completion of a contract or task order, and the Offeror may retain PPQs in its files for submission on future procurements. In cases where the validity of the completed PPQ is questioned, the contract specialist/contracting officer may contact the reference for verification or additional information.
The standard PPQ for NAVFAC and USACE is Form PPQ-0 (9/30/11). NAVFAC/USACE does not intend to create and maintain a database of PPQs submitted by Offerors. Therefore, it will be the Offerors responsibility to insure the submission of the relevant PPQs in its files for each solicitation. Alternatively, the Offeror may obtain an updated/new PPQ from its client(s) for submission. This new process does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation as a source of information. Also, as the completion of Contractor Performance Assessment Reports (CPARS) is required, Contracting Officers should search CPARS to determine if a relevant and recent evaluation is on file when one is not provided by the offeror. Recognizing CPARS evaluations are just one tool for assessing past performance, these evaluations are expected to be considered by the Contracting Officer. Discrepancies between CPARS evaluations and information provided in PPQs will be resolved by the Contracting Officer during the source selection evaluation process.
In completing the PPQ form, representatives that have direct knowledge of the Offerors past performance are encouraged to complete the PPQ (i.e., Administrative Contracting Officers, Contracting Officer Representatives, Project Engineers, etc., who had direct oversight/involvement with the project).
ACTIONS: Effective immediately, for all procurements that are using PPQs in the evaluation process:
1. Form PPQ-0 shall be utilized for all evaluations that require a PPQ. Offerors shall submit the PPQ with their proposal submission to the Contracting Office designated proposal submission location. The contract specialist or Contracting Officer shall not require the PPQ to be sent directly from the client. Solicitations that have previously been issued do not need to be amended to include this requirement.
2. RFPs utilizing PPQs shall incorporate language from the “Sample Solicitation Submittal Requirement” (below) stating, at a minimum, the following: “Completed Past Performance Questionnaires should be submitted with your proposal as required by RFP Section XXXXX. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. This does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror. ”
3. When Past Performance Questionnaires are being permitted/sought, the following sample language will be tailored to the specific acquisition and included in the solicitation:
Sample Solicitation Submittal Requirement:
“The Past Performance Questionnaire (PPQ) included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor _1 (insert the applicable factor number, usually as “Factor 4” and insert the factor title, usually “Past Performance for the Prime Contractor”). Ensure correct phone numbers and email addresses are provided for the client point of contact.
Completed Past Performance Questionnaires should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Attachment 1 ), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, _Henry D Barron via email at henry.d.barron@usace.army.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
Also include performance recognition documents received within the last (insert the number of years) such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition.
In addition to the above, the Government may review any other sources of information for evaluating past performance.
Other sources may include, but are not limited to, past performance information retrieved through the Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.”
NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information CAGE Code:
Firm Name: DUNs Number:
Address:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name: Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: NAVFAC/USACE requests that the client completes this questionnaire and submits directly back to the offeror.
The offeror will submit the completed questionnaire to USACE with their proposal, and may duplicate this questionnaire for future submission on USACE solicitations. Clients are highly encouraged to submit questionnaires directly to the offeror. However, questionnaires may be submitted directly to USACE. Please contact the offeror for USACE POC information. The Government reserves the right to verify any and all information on this form.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT YOUR EVALUATION OF THE CONTRACTOR’S
PERFORMANCE
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit.
The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable No information or did not apply to your contract Rating will be neither positive nor negative.
TO BE COMPLETED BY CLIENT
PLEASE SELECT THE ADJECTIVE RATING WHICH BEST REFLECTS
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY
a) Quality of technical data/report preparation efforts VG S M U N
b) Ability to meet quality standards specified for technical performance E
VG S
M
U
N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance
E
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
VG
S
2. SCHEDULE/TIMELINESS OF PERFORMANCE
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract
3. CUSTOMER SATISFACTION
a) To what extent were the end users satisfied with the project? E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;
responsiveness to administrative reports, businesslike and communication)
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
d) Overall customer satisfaction E VG S M U N
4. MANAGEMENT/ PERSONNEL/LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?
E VG
b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N
c) Government Property Control E VG S M U N
d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N
e) Utilization of Small Business concerns E VG S M U N
f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N
g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
5. COST/FINANCIAL MANAGEMENT
a) Ability to meet the terms and conditions within the contractually agreed price(s)?
Form PPQ -0 (9/30/11)
b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
Yes
No
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.
6. SAFETY/SECURITY
a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?
(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)
b) Contractor complied with all security requirements for the project and personnel security requirements.
E VG S M U N
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).
b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N
c) Would you hire or work with this firm again? (If no, please explain below) Yes No
d) In summary, provide an overall rating for the work performed by this contractor.
E VG S M U N
Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):
RELEVANT PROJECTS
ATTACHMENT 2: NARRATIVE FOR RELEVANT PROJECTS
Contractor’s Name (Who performed the work? *include DOR if applicable):
<<Picture>>
Project Name & Contract No:
Project Location:
City, State
Contract Type: Stand Alone Construction Contract (C-Type) or Task Order on MATOC or SATOC
Project Delivery Method: Design-Build, Design-Bid-Build, CM@Risk, Early Contractor Involvement, Integrated Design, Design Only, etc.
HVAC:
Agency/Government Contracting Activity: Point of contact information (address, PCO name, email address and phone number) If Government Contract, additionally provide the contract number and contracting office)
Agency/Government Technical Rep. /COR: Point of contact information (email address and phone number). If Government Contract, additionally provide the contract number)
Detailed Project Description: General scope and relevance. Provide a description of the project. Be sure to include features of this project that make it comparable in type or nature to the proposed project described in this request for proposal.
Description of the actual work performed by the contractor submitting this project: Describe your company’s role (prime, joint venture, subcontractor, etc.) and level of effort on this project. Be sure to indicate type of work and percentage of work performed by the Offeror or Offeror’s team member.
Detailed Explanation of Relevancy: Explain how the project experience is relevant to HVAC systems repairs that is similar in size and scope described in this request for proposal. Be sure to include specific features of work that make it comparable to the proposed project described in this request for proposal, Problems encountered during performance and solutions to stated problems:
Schedule:
Start Date:
MM-DD-YYYY
Original Completion:
Final Contract Completion:
Beneficial Occupancy Date:
Cost
Original Project Cost:
Final Project Cost:
Cost Difference
*Original Subcontractor Cost:
*Final Subcontractor Cost:
*Cost Difference
Cost and Time Growth Discussion: Reason(s) for differences between original and final schedule and/or costs. This section can be excluded if not applicable to the project. Response should contain more detail than “Owner requested/initiated changes”. Provide examples to support growth.
OFFERORS MAY INCREASE SPACING IN FORM AS NECESSARY
REQUEST FOR INFORMATION
1. Please provide “Attachment 2” identified on page 16 under Evaluation: Factor 1 – Past Performance Response: Both attachments 1 and 2 have been provided as part of the amendment
2. Based on design time frame, current lead times, and consideration for consolidating the construction period to limit unoccupancy duration and or cost of temporary, it appears that an overall 18 Month Contract duration would be needed, will this be acceptable? We will provide a schedule with our proposal to substantiate. This is 6 Months additional to the 12 months identified in Block 11 on the SF 1442.
Response: Note: Engineering believes an 18 month construction duration seems reasonable.
3. In the event design calculation post award indicate differing sizing other than what is listed in section 01 10 00 par 6.3.2, will an equitable adjustment be made? Or is it the design build contractor’s responsibility to validate this pre-award and account?
Response: The design build contractor is responsible.
4. Liquidated damaged in section 01 10 00 par 6.9.2 do not match what is included in the solicitation.
Response: The solicitation is hereby updated to reflect the correct amount from $180.00 to $219.59.
5. Can a second site visit be scheduled?-
Response: A second site visit will not be scheduled. A site visit is not mandatory in order to submit a proposal.
6. Please confirm that in addition to MATOC and SATOC task order work, single award projects are acceptable to be used as past performance.
Response: Yes single award past performance projects are acceptable.
7. Can the government clarify the instructions for Volume I – Past Performance? Page 9 of 97 of the solicitation states Past Performance Evaluations shall be provided, however, page 16 of 97 of the solicitation states to use Attachment 2 (Narrative for Relevant Projects) in addition to a PPQ/CPARS. however, Response: Clarified page 16 of 97 of the use Attachment 2 (Narrative for Relevant Projects) in addition to a PPQ/CPARS. Both attachments 1 and 2 have been provided as part of the amendment.
8. On page 16 of 97 of the solicitation, the instructions state to use Attachment 2 (Narrative for
Relevant Projects). Can the government please provide this attachment?
Response: Attachment 2 Relevant Projects attachment 2 is provided.
9. On page 18 of 97 of the solicitation, the instructions state to use NAVFAC/USACE Past Performance Questionnaire (Attachment 1). Can the government please provide this attach Response: Attachment 1 PPQ attachment 1 is provided.
10. Under 6.3.2 Air Handling Units, statement of work states the kitchen is served by an existing
MAU which should be integrated into the new controls system installed under new work. Under
6.3.6 Package Make Up Air Unit, statement of work indicates to provide and install a new make up air unit. Please clarify whether contractor is to provide and install new MAU or integrate existing unit into new system. Response: No MAU required.
11. Should new DDC controls be provided for kitchen MAU should it be replaced with a new one? Or should existing controls stay and be integrated? Response: No MAU required.
12. If kitchen controls are replaced or existing integrated, should drill hall controls be integrated into new system as well? Response: No MAU Required.
13. Is there an IH report? Response: An environmental survey was completed in 2020.
14. What hazardous materials should we account for and what quantities? Response: Review Survey results and bid per SOW
15. Can a second site visit be scheduled? Response: No, Site Visit is not required for award
16. Are as-built drawings available? Response: Yes
17. Is the pop negotiable? Response: The pop is not negotiable at this time.
18. Will the buildings be occupied during construction? Response: Assume building is occupied during construction
19. Will the project need to be phased? Response: Offerors shall present solution in narrative
20. Is the DB team able to find alternative ways to accomplish the scope and include in our proposal? Response: Bid as shown.
21. Will there be furniture that needs to be relocated as part of this project? Response: Bid per SOW
(End of Summary of Changes)