PA056 Lancaster - As Built Archive 2.pdf

PDF 14 MB Posted

Attached to
PA056 LANCASTER USARC HVAC Federal contract opportunity
Solicitation number
W912BU-24-R-0032
Issued by
Department of the Army Corps of Engineers Engineering District Philadeplhia

About this file

This document is a Request for Proposal (RFP) for the PA056 Lancaster USARC HVAC project. The project involves the design and construction of a new HVAC system, associated power distribution circuits, and suspended ceiling systems at the Lancaster USARC Training Building. Key requirements include: removing portions of the existing HVAC system, power distribution circuits, and suspended ceiling; providing temporary heating and cooling during construction; completing an energy model; and providing as-built drawings. The solicitation number is W912BU-24-R-0032, and the contracting agency is the Department of the Army Corps of Engineers Engineering District Philadelphia. The RFP provides technical requirements in Parts 4, 5, and 6, as well as drawings and photographs in the appendices for reference. Proposals that offer betterments impacting energy efficiency must include a life-cycle cost analysis.

View the file

Other files for this federal contract opportunity

Other files attached to PA056 LANCASTER USARC HVAC, newest first.
File Type Posted
AsbestosSurvey-PA056-20061001.pdf PDF
Amendment 0004.pdf PDF
Site Visit Attendees Lancaster HVAC 2024-05-31 10.07.58 AM.pdf PDF
PA056 Lancaster - As Built Archive 1.pdf PDF
W912BU24R0032 Amendment 0003.pdf PDF
Attachment_1_Past_Performance_Questionnaire.pdf PDF
Attachment 2 Narrative for Relevant Projects.docx DOCX document
W912BU24R0032 Amendment 0002.pdf PDF
24R0032 Amendment 001.pdf PDF
PA056_Compiled_Final_20230811.pdf PDF
SOLICITATION - final.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PA056 Boiler piping layoutD

PA056 Lancaster - As Built Archive 2
PAINT
PARKING
PLUMB1
PLUMB2
PLUMB3
RANGE
ROOF
ROOF2
ROOF3
ROOF4
ROOF5
ROOF6
SCHEDUL
SECTION
SHED2
SHED3
SHED4
SHED5
SHED6
SITE1
SITE2
SITE5
SITE6
SITE7
SITE9
SITE10
STRUCT
TOILET
UTILITY
WALL1
WALL2
WASH
WASH2
WIN1
WIN2
WIN3
WIN4
WIN5

File details come from the government source that posted it. Updated .