Attachment 2 Narrative for Relevant Projects.docx

DOCX document 17 KB Posted

Attached to
PA056 LANCASTER USARC HVAC Federal contract opportunity
Solicitation number
W912BU-24-R-0032
Issued by
Department of the Army Corps of Engineers Engineering District Philadeplhia

About this file

This document is an Attachment 2: Narrative for Relevant Projects. It provides details on a previous relevant project performed by the contractor. The project involved design and construction of an HVAC system, associated power distribution circuits, and suspended ceiling systems for the Lancaster USARC Training Building located in Lancaster, PA. The contractor served as the prime contractor and provided a detailed scope of the work performed. Specific details are provided on the project's relevance, problems encountered, schedule, and costs. The document indicates this information is being provided in response to the federal contract opportunity with Solicitation Number W912BU-24-R-0032 for the PA056 Lancaster USARC HVAC project, which requires similar HVAC system design and construction work.

View the file

Other files for this federal contract opportunity

Other files attached to PA056 LANCASTER USARC HVAC, newest first.
File Type Posted
AsbestosSurvey-PA056-20061001.pdf PDF
Amendment 0004.pdf PDF
Site Visit Attendees Lancaster HVAC 2024-05-31 10.07.58 AM.pdf PDF
W912BU24R0032 Amendment 0002.pdf PDF
PA056 Lancaster - As Built Archive 1.pdf PDF
W912BU24R0032 Amendment 0003.pdf PDF
Attachment_1_Past_Performance_Questionnaire.pdf PDF
PA056 Lancaster - As Built Archive 2.pdf PDF
24R0032 Amendment 001.pdf PDF
PA056_Compiled_Final_20230811.pdf PDF
SOLICITATION - final.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2: NARRATIVE FOR RELEVANT PROJECTS

<<Picture>> Contractor’s Name (Who performed the work? *include DOR if applicable):

Project Name & Contract No:
Project Location:

City, State

Contract Type: Stand Alone Construction Contract (C-Type) or Task Order on MATOC or SATOC

Project Delivery Method: Design-Build, Design-Bid-Build, CM@Risk, Early Contractor Involvement, Integrated Design, Design Only, etc.

HVAC:

Agency/Government Contracting Activity: Point of contact information (address, PCO name, email address and phone number) If Government Contract, additionally provide the contract number and contracting office)

Agency/Government Technical Rep. /COR: Point of contact information (email address and phone number). If Government Contract, additionally provide the contract number)

Detailed Project Description: General scope and relevance. Provide a description of the project. Be sure to include features of this project that make it comparable in type or nature to the proposed project described in this request for proposal.

Description of the actual work performed by the contractor submitting this project: Describe your company’s role (prime, joint venture, subcontractor, etc.) and level of effort on this project. Be sure to indicate type of work and percentage of work performed by the Offeror or Offeror’s team member.

Detailed Explanation of Relevancy: Explain how the project experience is relevant to HVAC systems repairs that is similar in size and scope described in this request for proposal. Be sure to include specific features of work that make it comparable to the proposed project described in this request for proposal, Problems encountered during performance and solutions to stated problems:

Schedule:

Start Date:

MM-DD-YYYY

Original Completion:

MM-DD-YYYY

Final Contract Completion:

MM-DD-YYYY

Beneficial Occupancy Date:

MM-DD-YYYY

Cost

Original Project Cost:

Final Project Cost:

Cost Difference

*Original Subcontractor Cost:

*Final Subcontractor Cost:

*Cost Difference

Cost and Time Growth Discussion: Reason(s) for differences between original and final schedule and/or costs. This section can be excluded if not applicable to the project. Response should contain more detail than “Owner requested/initiated changes”. Provide examples to support growth.