This file is provided for ease of use and viewing. This file is the conformed solicitation document and all sections, as amended, through amendment 0003.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Abstract_W912BU18B0013_SF_1409.pdf | ||
| Amendment_0005.pdf | ||
| Amendment_0004.pdf | ||
| 793-D780-01_ALARM_MONITORING_CONTROL_SYSTEM_OVERVIEW.pdf | ||
| 3101_Section_H_Updated_17_Aug_2018.DOCX | DOCX document | |
| Amendment_0003.pdf | ||
| 3101_Section_C_Updated_17_Aug_2018.docx | DOCX document | |
| 3101_Section_C_Updated_8-10-2018.docx | DOCX document | |
| 397-D730-02_LIGHTING_PLAN.pdf | ||
| Amendment_0002.pdf | ||
| 397-D730-01_LIGHTING_PLAN_-OUTBOARD_PROF.pdf | ||
| 826-B445-01_RD_Fire_&_Safety_Plan.pdf | ||
| 793-D725-01_CABLE_SCHEDULE_VOLTAGE_DROP_AC.pdf | ||
| W912BU18B0013_Amendment_0001.pdf | ||
| Contract_Drawings.7z | 7Z file | |
| Reference_Drawings.7z | 7Z file | |
| W912BU18B0013.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912BU18B0013
CODE
(Hour)
PAGE(S)
until 02:00 PM local time 30 Aug 2018
X
A
X B
X C X D
EX
X
G
F 165 - 168
169 - 170
X H 171
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA
FAR (48 CFR) 53.214(c)
1 171
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W912BU 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 10
11 - 12
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
13 - 121
122 - 123
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
124 - 125
126 - 127 X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 128 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 129 - 146 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
147 - 160
PART II - CO NTRACT CLAUSES
US ARMY ENGINEER DISTRICT, PHILADELPHIA
CONTRACTING DIVISION
WANAMAKER BUILDING
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
161 - 164
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
25 Jul 2018
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
Section SF 30 - BLOCK 14 CONTINUATION PAGE
QUESTIONS AND ANSWERS 17 AUG
Questions and Answers W912BU18B0013 (As of 17 Aug 18)
Q1. Could Government please verify if the bid is due August 24th NLT 2:00 p.m. IAW block 9 of the SF 33 Form
(and as posted on FBO) or if the due date is August 23rd IAW Section L?
A1. As of 7 August 2018, bids are due August 24th, 2:00 P.M. EST. Any updates to this time and date will be provided as an official amendment to the solicitation.
Q2. In Section C455 Deck Crane: What is the Billy Pugh product rescue basket? There are a few products that could be used for this, and the basket is needed to calculate the man-rated capacity for the crane. Also, is this to be used for harbor conditions?
A2. Billy Pugh Rescue Basket shall be OMB-1 or equal, rated for harbor conditions.
Q3. In Section C615: The original specs and current piping diagram show a single cylinder driving two rudders but the current specs (Section D) refers to 2 cylinders. Please confirm.
A3. The current piping diagram is correct, with a single cylinder driving two rudders.
Q4. In Section C615: The original specs and the current system diagram shows no steering from the engine room control stand but spec section F requires it.
A4. There should be steering controls from the Engine Room Control Stand as required in the specification.
Q5. In Section C615: Section F also requires two rudder angle indicators at each station but since the rudders are now mechanically synchronized by a tie bar, only one indicator per station is required. This section also requires pump running lights but these are normally included with the motor starter and not required in the engine control room for vessels under 50M in length. Please clarify.
A5. A single rudder angle indicator per station is acceptable. Pump running lights can be omitted in the engine room.
Q6. Could the Government please advise if there is a preferred method or specification reference for the Heated
Walkway as referenced on the General Arrangement Drawing 826-B215-01 in Zone 3D? Contractor does not see any reference to this in the solicitation and only sees reference to it on the drawing.
A6. Please disregard. No heated walkway is required on this vessel.
Q7. It has been confirmed by ABS that Load Line requirements only apply to vessels over 79’ in length and that operate outside the boundary line. Further, it is USCG’s policy to not permit the assignment of a Load Line to vessel under 79 feet in length, even if the owner requests it on a voluntary basis. Can the USACE please advise or kindly remove the Load Line requirement?
A7. Per correspondence with ABS, the contractor shall obtain a Statement of Voluntary Compliance (SoVC) in the
ABS plan review.
Q8. Contract Specification C420 Deck Fittings Part C states “Two (2) anchors similar to Fortress FX-125” shall be used however, Contract Drawing 826-B599-01 calls out a Baldt 240 kg Anchor. Can the USACE please confirm the type and quantity of anchors required?
A8. C420: Updated section C provides updated language, reflective of the following:
The anchors provided shall be one (1) Baldt 240kg stockless anchor or equal, with one (1) Fortress FX-125 HHP or equal, backup anchor provided in a stowed location.
Q9. Contract Specification C420 Deck Fitting Part C states “20’ of ½” galvanized chain and “300’ of ½” wire rope” is required for the Anchor; however, Contract Drawing 826-B599-01 calls for 340’ of 5/8” Wire Rope w/ 20’ of 5/8”
Gr 1 chain. Can the USACE please confirm the type and length of rope and chain required?
A9. C420: Updated section C provides updated language, reflective of the following: The anchor line shall be 340' of 5/8" wire rope, with 20' of 5/8" grade 1 chain.
Q10. What is the operating temperature for the crane?
A10. The crane operating temperatures shall be in accordance with ASHRAE standards for New York, New York.
Q11. Is drawing 397-D730-01 available?
A11. The drawing has been added as part of this amendment.
Q12. Can the Government please advise industry IAW Contract Clause C800 SPARE PARTS if Contractor is to provide a drawing only for this requirement or is the Contractor to actually provide the list of spare parts? If the latter, please confirm if the Government has a NTE cost/CLIN for spare parts? Or, please confirm if Contractor is to provide a cost for these spare parts, what CLIN is Contractor supposed to include the cost of spare parts on in our response to the Government? C800 references packaging references to spare parts, but since spare parts can be dependent on Contractors choice of manufacturers, please advise the best way to establish price reasonableness on spare parts from the industry so evaluation of bids can be reviewed fairly.
A12. USACE is only requiring a drawing which will contain a complete inventory and list of spares as indicated in section C800. Section D01 and D02 apply to any spare parts the contractor tenders as required by the contract.
Q13. Sewage Tank; Page 26, C315, B states “all of the tanks shall be constructed of mild plate steel and mild structural steel.” Page 73, C667, D states “sewage tank shall be 200 gallon polyethylene tank.” Please clarify.
A13. The sewage tank shall be polyethylene in accordance with section C667.
Q14. Main Engine: Page 53, C605 C. The main engine is specified as having a brake horsepower of 670 (shaft horsepower approx. 645), but the propellers (C606) are specified for a shaft horsepower of 671 which will require a brake horsepower of about 700. Which is correct? Please clarify.
A14. Section C606 has been updated to reflect 645 HP.
Q15. Insulation: Page 39-40, C436. The specification calls for fiberglass. To get a fire rating above A-0 we believe design will need to use Rockwool insulation. Please clarify.
A15. Section C436 allows the use of mineral wood to meet this requirement.
Q16. Reduction Gear: Page 54, C605, F. The main engine Reduction Gear calls for an internal shaft brake. This feature is not available on the ZF 2350 gear. This feature will require using a ZF W3310 reverse gear. Please clarify.
A16. Section C605 has been updated to clarify this issue.
Q17. Section C406: Acrolon 218 is not immersion grade and should not be used below the water line. With where the vessel will be used I would recommend the Red Ablative antifouling. Is this acceptable?
A17. Comply with the item as specified.
Q18. Section C437: Is the Bantam flip seat instead of the M1381 jump seat acceptable?
A18. Comply with the item as specified.
Q19. Section C605: The specification indicates a low starting pressure alarm - this is not required as the specification indicates a DC starting system. Is this acceptable?
A19. This is acceptable.
Q20. Section C620: In the past, ABS approval was not needed on thrusters under 100hp not being essential to the propulsion of the vessel. However, the tunnel and weldment of the tunnel has always had to meet ABS, both of these are normally handled by the yard. For section C620, are the housings and propellers are made out of stainless steel and not bronze. Is stainless steel acceptable? Also, is ABS approval needed on these bow thrusters due to them being
100hp? Is it acceptable that the bow thrusters are not ABS?
A20. Bow thruster ABS approval need only be sufficient for Class of the vessel, with the bow thruster considered not essential to the propulsion of the vessel. Stainless steel is acceptable for housings and propellers so long as 316 grade stainless is used for the housing.
Q21. Section C733: The generator required per the specification is a 60 hertz 80eKW@1500RPM. This rating is a
50 hertz rating. The generator we want to use is 60 hertz 99eKW@1800RPM. Is this acceptable?
A21. 60Hz is acceptable.
Q22. The generator set we want to use has a local control panel, a Caterpillar remote monitoring panel and the
Powerview 780 panel with all necessary hardware and software. Clarification is needed if the speciation requires three (3) panels or two (2) and of the two which are preferred?
A22. The specification requires three panels; a local panel on the genset, the Powerview panel, and a panel in the
Pilothouse.
Q23. In C675, are the threads for the fire stations NST, NPSH, or NYFD? Also, if the polycarb nozzle is not USCG approved, would a brass USCG approved nozzle be acceptable?
A23. Threads for fire stations shall be NST. The specification for polycarbonate nozzle stands as written.
Q24. In C770, the FLIR M500 camera retail around $190k. A M400 costs around $60k. Is the M400 and acceptable alternative?
A24. The FLIR M400 is acceptable and has been specified in the solicitation instead of the FLIR M500.
Q25. C665, para C – Potable Water System (and others): the specification states “The potable water system shall utilize Type K copper piping with soldered fittings.” Is it acceptable to use ABS approved alternatives to soldering fittings? Please clarify.
A25. - The contract requirement for soldered fittings shall be maintained. The requirement is intended to facilitate vessel maintenance without requiring specialized tools.
Q26. C715, para D – Arc Flash Hazard Analysis: the specification states “detailed incident energy analysis shall be conducted using EasyPower and the IEEE 1584 method of calculation.” Is it acceptable to use SKM Arc Flash software vice EasyPower? Please clarify.
A26. The specification stands as written.
Q27. C430, para C – Interior Decks: the specification states “the engine room, crew compartments, forward and aft machinery floor plates shall be steel diamond plate or equal, removable with gaskets…..” Is it acceptable to use aluminum for the deck floor plates? Please clarify.
A27. The requirement for steel deck plates shall be maintained. The requirement is intended to provide better fire protection.
Q28. C455, para B – Deck Crane: the specifications requires a model 85M-2S, which has 2 hydraulic extensions.
The lifting requirements listed are for 5.3m (17.5ft), would it be acceptable to propose model 85M-1S which has a slightly shorter total outreach of 5.23m (17.06ft) with a standard configuration? By making this model change from a -2S to a -1S it will save weight and cost to the vessel, and may even better meet the load calculations. Is this alternative acceptable? Please clarify.
A28. The requirement for the 85M-2S crane shall be maintained. The requirement is intended to maximize the crane’s reach and lift height for equipment transfer on and off the vessel. It is recognized that the required lift capacity has been established at lesser reach than the maximum crane reach of the 2S crane, but the maximized reach is still required.
Q29. C455, para B – Deck Crane: The operating temperatures that are assumed from the ASHREA specifications are below the deck crane suppliers design rating. The low temp is assumed to be -7.4F and the deck crane supplier’s design can only go down to -4F. Is this rating acceptable? Please clarify.
A29. -4 degrees F is an acceptable rating in lieu of the ASHREA standard.
Q30. C455, para B – Deck Crane (Billy Pugh OMB-1 Rescue basket): Amendment 0002 provided a make and model number (OMD-1) for the Billy Pugh Rescue Basket that attaches to the Deck Crane. The ABS man-rated load calculations for a typical search and rescue basket are significantly less than an OMB-1 basket. The OMB-1 model has a SWL load of approximately 1,000lbs. This change in basket designation will require the Deck Crane manufacturer to perform an engineering load capacity analysis using personnel from their European factory, which is on summer holiday to determine impact to the specified Deck Crane model number. Please advise.
A30. The basket has been modified to reflect the Billy Pugh X-544, with a rated load of 2 personnel (500 lbs.)
Q31. The specification document (W912BU18B0013) on page 75 of 151 states the CO2 system shall be design in accordance with the USCG 46CFR, Subchapter H, subpart 76.15. but on the page 6 of 151 states the Vessel has been designed per USCG subchapter T. Please clarify.
A31. The requirements in 46CFR 76.15 exceed those of Subchapter T, and are therefore incorporated into the specification for further definition of the desired system.
Q32. In the specification document (W912BU18B0013) the CO2 system requirements on page 75 of 151 stated The contractor shall provide and install a fixed carbon dioxide (CO2) fire extinguishing system for the Engine Room but the 826-B445-01 Fire and safety plan drawing shows CO2 protection on not only the Engine room but also FWD
Storage space. Please clarify.
A32. The specification has been revised to include CO2 fire extinguishing system capabilities for the FWD storage space.
Q33. The general arrangement drawing 826-B215-01 Rev1 shows a CO2 storage room on Hold deck frame 12-14, but 826-B445-01 rev D Fire and safety plan drawing show the CO2 storage room on main deck frame 30-31. Please clarify the CO2 storage location.
A33. The location of the CO2 bottles shall be as shown on 826-B215-01 Rev I. See specification section C677.D.
Q34. The paint locker room shall be protected Per USCG in 46CFR, Subchapter H subpart 76.05-20. But nothing has been mentioned in the specification document about the paint locker room CO2 protection. Please clarify.
A34. The specification has been revised to reflect protection for the FWD storage space in accordance with 46CFR
76.05-20.
Q35. Please provide an estimate for the hull and superstructure steel weight, or any information available.
A35. The contractor shall develop a weight estimate as part of the final design of the vessel.
Q36. Safety plan does not show (2) sensors on generators or the manual fire pull boxes called out in spec. Please advise.
A36. The contractor shall be responsible for final design of the vessel, including locating these items.
Q37. Section C455 please confirm number of personnel the crane and rescue basket are to be rated for.
A37. The crane and rescue basket shall be rated to lift two personnel (500 lbs.)
Q38. Per spec sheet, "the crane shall be provided with a boom tip hook, and a hydraulic winch hoist with hook".
How many hooks are required? and the usage?
A38. Two hooks will be required per the specification. One hook shall serve as the boom tip hook for use with the crane and the other shall service the winch hoist when full operation of the crane is not required.
Q39. Section C305 Hull Structure – listed Lifting Padeye and Lifting Padeye Calc as drawing #’s 826-C306-01 &
826-C306-02, respectively; however, on page 130 the same 2 drawings and report read as 826-C305-01 & -02.
Please clarify which one is correct.
A39. The drawings shall be identified as 826-306-01 & 826-306-02. The specification has been revised accordingly.
Q40. Section C675 Firemain System – There is no mention of a drawing being developed or engineering calculations for the firemain? Is this correct?
A40. The specification has been revised to include submittal of a schematic of the firemain system, as well as piping calculations (as part of the bilge pump sizing calculations).
Q41. Section C780, para A – Please clarify what information is to be depicted on drawing 826-C780-01 ALARM, MONITORING, & CONTROLS OVERVIEW.
A41. This drawing serves as a master list of all alarms, monitors, and control systems, inclusive of the system serviced, locations of alarm/control/monitor, and WBS number. Please see the reference drawing 793-D780-01.
Q42. Section C715, para C – Regarding the coordination study they reference (USCG, 46 CFR, subchapter J, subpart 111.51). That subpart is not referenced by Subchapter T and subchapter T does not reference any subpart requiring a coordination study. There is no requirement for this study under sub T. Does the Government still want the Contractor to provide a Protective Device Coordination Study? Please clarify.
A42. The requirement stands as written.
Q43. Section L – Instructions, Conditions and Notices to Bidders – There is no specific proposal format or structure identified; such as, Technical, Management, Past Performance, Cost, etc. Is this by design or an omission?
A43. This solicitation is issued using FAR Part 14 – Sealed Bidding procedures. Please see contract clauses for more information.
Q44. Contract Drawing 826-B720-01 - Is there a particular reason for use of 400A Frames for shore power? It’s a
100A shore power with 100A circuit breaker disconnects. The lowest available trip on most 400AF breakers is 120A if you dial them all the way down so it’s not really possible to drop the trip value down to 100A. Contractor recommends a 250A Frame. Additionally, since the shore power ports each already have 100A circuit breaker disconnect switches, the interlocked breakers in the main switchboard could be a simple, double throw disconnect switch. Please clarify.
A44. The 250AF circuit breaker is acceptable to ensure a trip value of 100A. The double throw disconnect switch is not acceptable, as this would need to be located outside the switchboard. The mechanical interlock requirement stands.
Q45. Contract Drawing 826-B720-01 - For the MCCs, when it says “No Overload Protection” doe this apply to both the breaker (motor circuit protector) and the controller unit itself? Just an MCP and a contactor only starter? What about the ones that do have overload protection? Are the “breakers” supposed to be standard breakers or motor circuit protectors with the overload protection in the controller unit? Or both? Contractor interpretation of the drawing would typically be that if a trip value is shown (ie 250AF/80AT) then it should be a breaker. But the steering gear for instance can’t be a breaker (even though it shows a trip value) because it would violate USCG rules. Contractor assumption is that is must be an MCP. Please clarify.
A45. The "No Overload Protection" applies to the circuit breaker only, which in turn gives the controller unit no overload protection as well. By putting a "No Overload Protection" in the controller unit, the application from the circuit breaker is repeated. The steering gear protection can be a circuit breaker, albeit with no overload protection.
Therefore, it will still have instantaneous inrush current protection (per USCG).
Q46. Please clarify the requirements for the vessel’s boxcoolers. You will notice that the main engines are sized for a hull speed of 3 knots. The specification uses these same part numbers for the boxcoolers, but also outlines a hull speed of 0 knots for the main engines. If we size the boxcooelrs for a hull speed of 0 knots, the size of the coolers will almost double. It will also have different part numbers. Please clarify.
A46. The specification has been updated to reflect 3kt cooling.
QUESTIONS AND ANSWERS 10 AUG
Questions and Answers W912BU18B0013 (As of 10 Aug 18)
Q1. Could Government please verify if the bid is due August 24th NLT 2:00 p.m. IAW block 9 of the SF 33 Form (and as posted on FBO) or if the due date is August 23rd IAW Section L?
A1. As of 7 August 2018, bids are due August 24th, 2:00 P.M. EST. Any updates to this time and date will be provided as an official amendment to the solicitation.
Q2. In Section C455 Deck Crane: What is the Billy Pugh product rescue basket? There are a few products that could be used for this, and the basket is needed to calculate the man-rated capacity for the crane. Also, is this to be used for harbor conditions?
A2. Billy Pugh Rescue Basket shall be OMB-1 or equal, rated for harbor conditions.
Q3. In Section C615: The original specs and current piping diagram show a single cylinder driving two rudders but the current specs (Section D) refers to 2 cylinders. Please confirm.
A3. The current piping diagram is correct, with a single cylinder driving two rudders.
Q4. In Section C615: The original specs and the current system diagram shows no steering from the engine room control stand but spec section F requires it.
A4. There should be steering controls from the Engine Room Control Stand as required in the specification.
Q5. In Section C615: Section F also requires two rudder angle indicators at each station but since the rudders are now mechanically synchronized by a tie bar, only one indicator per station is required. This section also requires pump running lights but these are normally included with the motor starter and not required in the engine control room for vessels under 50M in length. Please clarify.
A5. A single rudder angle indicator per station is acceptable. Pump running lights can be omitted in the engine room.
Q6. Could the Government please advise if there is a preferred method or specification reference for the Heated Walkway as referenced on the General Arrangement Drawing 826-B215-01 in
Zone 3D? Contractor does not see any reference to this in the solicitation and only sees reference to it on the drawing.
A6. Please disregard. No heated walkway is required on this vessel.
Q7. It has been confirmed by ABS that Load Line requirements only apply to vessels over 79’ in length and that operate outside the boundary line. Further, it is USCG’s policy to not permit the assignment of a Load Line to vessel under 79 feet in length, even if the owner requests it on a voluntary basis. Can the USACE please advise or kindly remove the Load Line requirement?
A7. Per correspondence with ABS, the contractor shall obtain a Statement of Voluntary
Compliance (SoVC) in the ABS plan review.
Q8. Contract Specification C420 Deck Fittings Part C states “Two (2) anchors similar to Fortress
FX-125” shall be used however, Contract Drawing 826-B599-01 calls out a Baldt 240 kg
Anchor. Can the USACE please confirm the type and quantity of anchors required?
A8. C420: Updated section C provides updated language, reflective of the following:
The anchors provided shall be one (1) Baldt 240kg stockless anchor or equal, with one (1)
Fortress FX-125 HHP or equal, backup anchor provided in a stowed location.
Q9. Contract Specification C420 Deck Fitting Part C states “20’ of ½” galvanized chain and
“300’ of ½” wire rope” is required for the Anchor; however, Contract Drawing 826-B599-01 calls for 340’ of 5/8” Wire Rope w/ 20’ of 5/8” Gr 1 chain. Can the USACE please confirm the type and length of rope and chain required?
A9. C420: Updated section C provides updated language, reflective of the following: The anchor line shall be 340' of 5/8" wire rope, with 20' of 5/8" grade 1 chain.
Q10. What is the operating temperature for the crane?
A10. The crane operating temperatures shall be in accordance with ASHRAE standards for New
York, New York.
Q11. Is drawing 397-D730-01 available?
A11. The drawing has been added as part of this amendment.
Q12. Can the Government please advise industry IAW Contract Clause C800 SPARE PARTS if
Contractor is to provide a drawing only for this requirement or is the Contractor to actually provide the list of spare parts? If the latter, please confirm if the Government has a NTE cost/CLIN for spare parts? Or, please confirm if Contractor is to provide a cost for these spare parts, what CLIN is Contractor supposed to include the cost of spare parts on in our response to the Government? C800 references packaging references to spare parts, but since spare parts can be dependent on Contractors choice of manufacturers, please advise the best way to establish price reasonableness on spare parts from the industry so evaluation of bids can be reviewed fairly.
A12. USACE is only requiring a drawing which will contain a complete inventory and list of spares as indicated in section C800. Section D01 and D02 apply to any spare parts the contractor tenders as required by the contract.
Q13. Sewage Tank; Page 26, C315, B states “all of the tanks shall be constructed of mild plate steel and mild structural steel.” Page 73, C667, D states “sewage tank shall be 200 gallon polyethylene tank.” Please clarify.
A13. The sewage tank shall be polyethylene in accordance with section C667.
Q14. Main Engine: Page 53, C605 C. The main engine is specified as having a brake horsepower of 670 (shaft horsepower approx. 645), but the propellers (C606) are specified for a shaft horsepower of 671 which will require a brake horsepower of about 700. Which is correct?
Please clarify.
A14. Section C606 has been updated to reflect 645 HP.
Q15. Insulation: Page 39-40, C436. The specification calls for fiberglass. To get a fire rating above A-0 we believe design will need to use Rockwool insulation. Please clarify.
A15. Section C436 allows the use of mineral wood to meet this requirement.
Q16. Reduction Gear: Page 54, C605, F. The main engine Reduction Gear calls for an internal shaft brake. This feature is not available on the ZF 2350 gear. This feature will require using a
ZF W3310 reverse gear. Please clarify.
A16. Section C605 has been updated to clarify this issue.
AMENDMENT 0002 ATTACHMENTS
1. Drawing 397-D730-01 LIGHTING PLAN -OUTBOARD PROFILE
2. Drawing 397-D730-02 LIGHTING PLAN
3. Section C Revised 10 Aug 18
Section B - Supplies or Services and Prices
SUPPLIES OR SERVICES & PRICES
INSERT LOCATION OF THE SHIPYARD WHERE THE WORK WILL BE PERFORMED:
The Government may reject an offer as non-responsive if it is materially and mathematically unbalanced as to price for any offered item or combination of offered items. An offer is unbalanced when it is based on prices significantly less than cost for some work and/or prices, which are significantly overstated for other work.
The Government will evaluate offers for award purposes by adding the total price for CLIN 0001AA and CLIN
0001AB. CLIN 0001 should equal the sum of CLIN 0001AA and CLIN 0001AB.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Liberty and Ellis Island Utility Vessel
FFP
NET AMT
0001AA 1 Job Planning, Scheduling, and Engineering
FFP
Contractor shall complete all work IAW the specifications herein.
FOB: Destination
0001AB 1 Job Construct, Test, and Deliver
FFP
Contractor shall complete all work IAW the specifications herein.
FOB: Destination
Section C - Descriptions and Specifications
DESCRIPTIONS & SPECIFICATIONS
SECTION C - DESCRIPTION/SPECIFICATION/WORK STATEMENT
C000 GENERAL
C001 PROJECT OVERVIEW
The National Park Service (NPS) is charged with preserving and managing the National Park System throughout the
United States.
NPS intends to construct a new vessel to meet this requirement. NPS has tasked the US Army Corps of Engineers, Marine Design Center (MDC) to provide project management, engineering, and contract management support for the new vessel. All contracting placement and actions will be through the US Army Corps of Engineers, Philadelphia
District (NAP).
The new utility vessel, named the USNPS ANNIE MOORE, will transport passengers, supplies and equipment to the
Statue of Liberty and Ellis Island (STLI) national parks from Battery Park, New York, NY.
The vessel shall be all steel, and shall be suitable for year-round operation, day and night, in New York harbor waters.
C002 CONTRACT OVERVIEW
For this contract, the contractor shall include, as a minimum, all costs to provide and deliver the following:
Using the contract and reference drawings provided in the procurement package, complete the design for production and fabrication of the vessel.
Engage ABS for engineering review and surveyor services to obtain ABS class.
Obtain a USCG COI in compliance with Subchapter T.
Fabricate one vessel in accordance with the specifications of this contract.
Test all vessel related equipment, systems, piping, and electrical systems.
Deliver the completed vessel to National Park Service boat facility at Ellis Island in New York Harbor.
Final Acceptance Demonstrations at the Corps’ designated point of Final Acceptance of the completed vessel.
C003 STANDARDS
The vessel shall be designed and constructed in accordance with the latest edition and interpretations of the rules, regulations, and requirements and standards of the Legislation, Regulatory Agencies, and technical organizations listed as follows or as stipulated in the respective specification clause:
American Bureau of Shipping (ABS) “Rules for Building and Classing Steel Vessels for Service on
Rivers and Intracoastal Waterways”.
o This may be referred to in this specification and Contract Drawings as the ABS River
Rules.
American Bureau of Shipping (ABS) “Rules for Building and Classing Steel Vessels”:
o Part 2 – Rules for Materials and Welding.
American Bureau of Shipping (ABS) “Guide for Shipbuilding and Repair Quality Standard for Hull
Structures During Construction”.
American Welding Society (AWS) “Guide for Steel Hull Welding”, AWS D3.5.
33 CFR Subchapter O, Part 155 – Oil or Hazardous Material Pollution Prevention Regulations for
Vessels
40 CFR, Subchapter C, Part 89 – Protection of Environment: Control of Emissions from New and
In-Use Nonroad Compression Ignition Engines
40 CFR, Subchapter C, Part 94 – Protection of Environment: Control of Emissions from Marine
Compression Ignition Engines
46 CFR, Subchapter F – Marine Engineering
46 CFR, Subchapter G, Part 69 – Measurement of Vessels
46 CFR, Subchapter S, Part 170, Subpart E
46 CFR, Subchapter S, Part 171, Subparts A and B
46 CFR, Subchapter J - Electrical Engineering
46 CFR, Subchapter T – Small Passenger Vessels
U.S. Coast Guard Navigation Rules and Regulations Handbook
U.S. Army Corps of Engineers, Publication No. EM 385-1-1, “Safety and Health Requirements
Manual.”
The National Shipbuilding Research Program (NSRP 0490), January 1998, “Industrial Standards for Hull Structural Penetration Design Criteria and Details.”
Institute of Electrical and Electronic Engineers Standards, Publication No. IEEE Standard 45, “Recommended Practice for Electrical Installation on Shipboard.”
Illuminating Engineering Society, “Recommended Practice for Marine Lighting”.
National Electric Code (NEC).
Environmental Criteria (Temperature): the vessel shall be designed in accordance with ASHRAE temperature standards.
C004 CLASSIFICATION & CERTIFICATION
A. ABS CLASSIFICATION
The contractor shall be responsible for obtaining necessary regulatory body reviews and approvals, obtaining necessary inspections and surveys during construction, and for the certification and classing of the vessel as follows:
ABS classification for “Maltese Cross ✠A-1 Passenger Vessel with Maltese Cross ✠ AMS” per ABS River
Rules.
Certificate of Measurement issued by the measuring organization, per 46 CFR, Part 69.
The Contractor shall be responsible for all costs associated with applications, plan submittals, and inspections required to obtain such certification\documentation.
The ABS point of contact is Mr. Rich Delpizzo, available by phone, email or mail, at: (703) 519-9233, RDelpizzo@eagle.org, or 1321 Prince Street, Suite 200, Alexandria, VA 22314.
When steel construction commences, the contractor shall coordinate with ABS to ensure the frequency of onsite inspections are not less than once every two weeks.
If the contractor intends to launch, test, operate or tow the vessel “out of class”, the contractor must specifically advise
ABS of such intent and incorporate any and all modifications required by that agency for such operation at no additional cost to the Government and at no additional contract time. Any such modification which, in the opinion of the COR, affects the arrangements, operability, or suitability of the vessel shall be removed from the vessel by the contractor at no additional cost or time and the vessel returned to new condition prior to Final Acceptance.
B. VESSEL DESIGN AND CLASSIFICATION REVIEW STATUS
The Government has developed the vessel’s design and drawings in accordance with ABS River Rules, USCG
Subchapter T, and these specifications. The Government has not initiated an initial ABS Class review process. For the purpose of bidding, all contract drawings in this solicitation shall be assumed to be approved by ABS as issued.
The contractor shall be responsible for all additional costs associated with applications, plan submittals, and inspections required to obtain such certification\documentation. In addition, the contractor shall be responsible for all mailto:RDelpizzo@eagle.org
ABS Surveyor comments and technical comments related to final equipment, material selection, and standard shipyard construction/installation practices. All technical comments related to the principal design and function of the vessel shall be the responsibility of the Government. The COR shall be notified immediately of these comments to address and resolve. If necessary, the Government will coordinate a contract modification with the Contractor.
C. TONNAGE MEASUREMENT
The contract design has maintained the vessel gross tonnage under 100 Tons. The contractor shall maintain the vessel gross tonnage under 100 tons. A certificate of measurement shall be issued by a measuring organization per 46 CFR
Part 69.
D. US COAST GUARD SUBCHAPTER T CERTIFICATION
The vessel design and drawings have been developed to meet the requirements for USCG Subchapter T passenger vessel certification in addition to those for ABS Class. The USCG can authorize ABS review and inspections on their behalf through NVIC 10-82; the Contractor shall submit an Application for Inspection and a letter requesting ABS review to USCG OCMI NY District. This will allow ABS to review and inspect the vessel for Subchapter T compliance.
The contractor shall provide a USCG Subchapter T passenger vessel COI as well as a load line Statement of Voluntary
Complaince (SOVC) from ABS upon completion of the vessel. The Certificate shall identify maximum passenger capacity as not less than 49 passengers, excluding crew.
E. VESSEL OWNER & ADDRESS
For the ABS certificate of classification, the owner shall be listed as “US Department of Interior, National Park
Service”. The owner’s address of record shall be listed as:
US DEPARTMENT OF INTERIOR
NATIONAL PARK SERVICE
Washington, DC 20240
F. ABS ENGINEERING MANAGER ACCESS & DISCLOSURE
The Marine Design Center (CEMDC) will be the “Owner’s Representative” on this project and all correspondence with ABS shall be made available to the COR. In order to facilitate the communication process and reduce the paperwork burden on all parties, the contractor, and all sub-contractors, shall utilize the ABS Eagle Construct
Engineering Manager Portal (02E) for all drawing submittals and correspondence. The contractor and all sub-contractors shall make the necessary arrangements with ABS to ensure that the Marine Design Center is granted the following Oversight Permissions for this contract:
View project and drawing status
View comments
View transmittals
Download approved drawings and review letters
E-mail notification of approval
E-mail notification of transmittal
Status
Disclaimer
The Marine Design Center’s ID/WCN number is 615255 and the point of contact with respect to the ABS
Coordination/Engineering Manager Portal (02E) is Mr. Tim Keyser, Timothy.J.Keyser@usace.army.mil, phone: (215)
656-6171.
mailto:Timothy.J.Keyser@usace.army.mil
The contractor shall ensure that, as a part of its contract with ABS, the contractor authorizes ABS to disclose to and discuss with the Army Corps of Engineers any Rule or certification criteria issues, design assumptions and their impact on classification and certification, and any other technical considerations on which classification is to be based or which may affect future classification or certification of the vessel.
The contractor shall authorize ABS to provide the Army Corps of Engineers at its request with a copy of all correspondence related to classification, statutory certification or other compliance verification for which ABS is responsible as it is promulgated and initially distributed. This is to include drawings and other engineering work requiring ABS approval as well as correspondence generated which relates to such approvals, including all such correspondence dealing with vendors.
In addition, the contractor shall copy the Army Corps of Engineers with correspondence regarding classification, statutory certification and other compliance verification for which ABS is responsible. The contractor shall also authorize ABS to establish and maintain contact with other certification, verification and compliance agents involved on the vessel being built.
Upon request by the COR, the contractor shall request ABS to furnish the Government with the project comment list.
The list shall include open and closed technical and surveyor comments. The surveyor comments shall not only include comments generated during the drawing review process, but also comments generated by the ABS Surveyor during construction inspections. The comment list shall be sent directly from ABS to the COR via email as a .pdf file.
At the completion of the ABS review process, the contractor shall download all ABS “Eagle Stamped” drawings and provide them on a CD or DVD to the Government in .pdf format.
C006 VESSEL IDENTIFICATION & PRINCIPAL CHARACTERISTICS
A. VESSEL IDENTIFICATION
The vessel to be acquired through this solicitation has been assigned the following name and Marine Design Center hull and project numbers:
MDC Hull Number 826
MDC Project Number 3101
Vessel Name ANNIE MOORE
ABS Engineers Project Number 3981329
B. PRINCIPAL CHARACTERISTICS
These specifications are intended to describe the contract design for one small passenger vessel. The principal dimensions of the vessel are:
Molded Length 74’-0”
Molded Beam 24’-0”
Molded Depth (@ bow) 11’-6”
Molded Depth (@ transom) 10’-7”
Design Draft 6-6”
Air Draft (from 6’-6” draft) 22’-4”
C010 DEFINITIONS
The following definitions are applicable to phrases and acronyms used throughout this contract:
ABS – American Bureau of Shipping
COR - Contracting Officer’s Representative - a member of the contract management and quality assurance team authorized by the Contracting Officer to perform certain administrative and managerial duties. A copy of the COR’s authority letter is furnished to the contractor.
GFE – Government Furnished Equipment – Equipment, materials or components furnished by the
Government to the contractor for installation on the vessel.
K.O. - Contracting Officer - A person with the authority to enter into, administer and/or terminate contracts and make related determinations and findings.
MDC – Acronym for the Marine Design Center.
NPS – National Park Service
OCMI – Officer in Charge, Marine Inspection
QC - Quality Control - Quality Control is a function of the contractor. Refer to clause E03. Quality
Assurance (QA) is a function of the Government.
SNAME – Society of Naval Architects and Marine Engineers.
USACE – Acronym for United States Army Corps of Engineers.
USCG - Acronym for United States Coast Guard.
C025 CONTRACTOR QUALITY STANDARDS
A. GENERAL
The contractor shall be responsible for the construction of a complete and functioning vessel.
Inspection by the Marine Design Center is for the purpose of verifying the proper function of the contractor’s quality control measures and is not to be used as a substitute for control of quality by the contractor.
Every effort shall be made during production planning to construct the vessel in an efficient sequence minimizing re-work and repair. Care shall be taken to assure the latest revisions of the Final Design plans are being used.
B. STRUCTURAL MATERIALS
Unless otherwise specified or noted on the contract drawings, all structural hull material shall be in accordance with the following specifications:
American Bureau of Shipping (ABS), “Rules for Building and Classing Steel Vessels” and “Rules for
Building and Classing Steel Vessels for Service on Rivers and Intracoastal Waterways”.
Welding Materials - ABS “Approved Welding Electrodes, Wire-Flux and Wire Gas Combination”.
Bolts, nuts and screws – ASTM A307-82, Specification for Carbon Steel Externally and Internally Threaded
Standard Fasteners.
C. STANDARD PARTS AND MATERIALS
All articles, fittings, equipment, machinery, supplies, and materials used in the construction and outfitting of the vessel shall be new, of the highest grade, free from defects and imperfections, and be the standard product of reputable manufacturers, to the maximum extent practicable. Any material not specified shall be the best of their kind for the purpose intended. All items shall be suitable for workboat application and meet the latest requirements of standard specifications published by National Agencies. No salvaged materials shall be used in the works. Spare parts and service shall be readily obtainable.
D. WORKMANSHIP
All labor shall be especially skilled for each kind of work and under competent direction.
Where work of one trade joins, passes through, or is on other work, there shall be no discrepancy or misfit when completed. In engaging one kind of work with another, marring or damage of previously acceptable construction shall be cause for rejection. All parts of the vessel intended to join or bear upon other parts shall have complete and solid contact and shall fit together without excessive cold work during erection. All faying surfaces shall be painted and be clean and smooth before bolting up. Shims or liners shall not be used for the purpose of overcoming a bad fit.
All frames and longitudinal members, where applicable, shall be provided with limber holes and/or snipes of adequate size to allow water in bilges to flow to the lowest point of each compartment. Limber holes shall also be provided to allow for the passage of air in tanks. Limber holes shall be located at the plate edge.
Ends of outstanding flanges shall be cropped. Lighting holes may be punched or flame-cut and all edges shall have burrs removed.
All holes for machinery mounting bolts shall be drilled or punched; burning is not acceptable. Holes in members having sharp curvature shall be avoided.
All hull casting shall be machined or ground to bear solidly against the connecting structure.
E. WELDERS
All welding under this contract shall be done only by welders who have successfully passed qualification tests accepted by the American Bureau of Shipping or other regulatory agency acceptable to ABS. The contractor shall bear the expense of conducting these tests and shall certify, by name to the Contracting Officer, welders who have successfully passed the prescribed tests and hold current, valid certifications.
The contractor shall require any welder to repeat these tests when in the opinion of the Contracting Officer’s
Representative, the work of the welder indicates a reasonable doubt of his proficiency. In such cases the welder shall be re-certified as above if he successfully passed the retest; otherwise, he shall be disqualified until he has successfully passed the retest.
The contractor shall maintain records of the individual welder’s certification during the course of the contract. The records are to be available for examination upon request of the Contracting Officer or his representative.
F. WELDING
All welding shall be in accordance with the current rules of the American Bureau of Shipping, except where stated otherwise. All welding equipment used on the work shall be of a modern type subject to close control. The electrodes used throughout the work shall be suitable for use with the parent metal at each weld, and be approved by ABS.
Welding procedures, as to direction, length, numbers and sequence of beads, shall be carefully planned to minimize lock-up stresses. Care shall be exercised to produce smooth even beads, especially on all exposed plating and fittings.
Beads shall be ground where directed by the Contracting Officer or his authorized representative.
The contractor shall employ appropriate welding procedures and grounding connections to preclude the possibility of anodic erosion of the hull after launching.
A detailed description of all welding procedures being employed in the construction shall be available to the
Contracting Officer or his authorized representative.
G. INSTALLATION
Materials and equipment shall be installed in accordance with the approved recommendations of the manufacturer, and in compliance of this specification and the contract documents. The installation shall be accomplished by workmen especially skilled for each kind of work and under competent direction.
H. PLATE FAIRNESS
Steel plating shall be installed using proper welding procedures and sequences to insure fair, undistorted plating panels. The use of filler materials to surface unfair areas is not acceptable.
Maximum allowable plating distortion is depicted in the “Guide For Shipbuilding And Repair Quality Standard For
Hull Structure During Construction” from ABS. Distortion shall not exceed the amounts in this guide.
I. CONSTRUCTION STANDARDS
All material, machinery and equipment shall be new, of current manufacture and suitable for the marine service intended. Spare parts and service shall be readily obtainable.
All material, unless otherwise specified in these specifications or in the drawings, shall be of commercial quality to
ASTM, ANSI, or SAE specifications.
During construction and before delivery, the contractor shall be responsible for protection of all material, equipment, etc., intended for the vessel.
The overweight tolerance of members shall be within the limits defined by the specifications of the American Society for Testing and Materials.
All materials shall be free of imperfections due to manufacturing processes and from defects which adversely affect appearance or serviceability.
All plating shall be neatly cut, fitted and welded. All sharp edges or projections which constitute a personnel hazard shall be removed or ground smooth. All notches shall have a radius to prevent stress concentrations.
Where aluminum must be attached to dissimilar metals or between dissimilar alloys of aluminum, fasteners shall be of stainless steel of an approved design with insulation as required to eliminate metal to metal contact.
All galvanizing shall be done after fabrication by the hot dip process, and the zinc shall be not less than 98% pure. In instances where some types of metals cannot be hot dip galvanized, zinc silicate coating may then be substituted.
C040 SCOPE OF WORK
A. CONTRACTOR’S RESPONSIBILITY
The contract consists of two phases:
Phase I Planning, Scheduling, and Engineering
Phase II Construct, Test, and Deliver
In accordance with the two phases, the contractor assumes complete responsibility for completing the final design, obtaining ABS classification and certification, obtaining a COI and tonnage measurement, and constructing, testing, and delivering the vessel to meet the requirements of the contract.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.