12R0002-SPECS-AM7.PDF

PDF 45 KB Posted

Attached to
C-5-M Formal Training Unit Facility, Dover Air Force Base, Dover, Delaware
Solicitation number
W912BU12R0002
Issued by

About this file

Amendment Number 0007 - Specs

View the file

Other files

File Type Posted
12R0002-DWGS-AM8.PDF PDF
12R0002-SPECS-AM8.PDF PDF
12R0002-DWGS-AM7.PDF PDF
Amendment6.pdf PDF
12R0002-SPECS-AM5.PDF PDF
12R0002-SPECS-AM4.PDF PDF
12R0002-DWGS-AM4.PDF PDF
12R0002-SPECS-AM3.PDF PDF
12R0002-DWGS-AM3.PDF PDF
Site Visit Attendees.pdf PDF
11R0002-SPECS-AM2.PDF PDF
Amendment 0001.pdf PDF
12R0002_C-5M_Dwgs.pdf PDF
12R0002_C-5M_Specs_Volume 1.pdf PDF
RFI Example.xls XLS spreadsheet
12R0002_C-5M_Specs_Volume 2.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

Design and Construct a C-5M Formal Training Unit Facility, Dover Air Force Base, Dover, Delaware

THIS AMENDMENT DOES NOT EXTEND THE PROPOSAL DUE DATE OF 9 FEBRUARY 2012 AT 4:00 PM.

The cut off date for Requests for Information (RFI) has past. If additional RFI's are received, they may not be addressed.

CONTINUED ON NEXT PAGE

US Army Engineer District, Philadelphia Wanamaker Building, 100 Penn Square East Philadelphia, Pennsylvania 19107-3390

US Army Engineer District, Philadelphia Attn: Michelle Bertoline Wanamaker Building, 100 Penn Square East Philadelphia, Pennsylvania 19107-3390

W912BU-12-R-0002

01/31/2012

11/14/2011

This page was intentionally left blank for duplex printing.

Amendment No. 0007

RFP W912BU-12-R-0002

14. DESCRIPTION OF AMENDMENT (continued)

a. SPECIFICATIONS:

(1) Section 01 45 04 – CONTRACTOR QUALITY CONTROL: Please delete page 01 45 04-4 in its entirety and substitute revised page 01 45 04-4, annotated Amendment No. 0007, attached hereto.

b. CONTRACT DRAWINGS:

(1) Please delete drawings T1, CL101, CL102, and A101 in their entirety and substitute revised drawings of the same numbers, with the latest revision date of 31 Jan 2012, attached hereto.

(2) Insert new drawing CL103 dated of 31 Jan 2012, attached hereto.

c. Please indicate receipt of this amendment on Standard Form 1442 (SOLICITATION, OFFER, AND AWARD) as Amendment No. 0007. Failure to acknowledge all amendments may be cause for rejection of the offer.

Amendment No. 0007

RFP W912BU-12-R-0002

Section 01 45 04 Page 4 of 17 site project superintendent shall maintain a physical presence at the site at all times, except as otherwise acceptable to the Contracting Officer, and shall be responsible for all construction and construction related activities at the site.

3.2. QUALITY CONTROL PLAN

The Offeror shall furnish for review by the Government, not later than 30 days after receipt of notice to proceed, the Contractor Quality Control (CQC) Plan proposed to implement the requirements of the Contract Clause titled "Inspection of Construction." The plan shall identify personnel, procedures, control, instructions, tests, records, and forms to be used. The Government will consider an interim plan for the first 30 days of operation. Design and construction will be permitted to begin only after acceptance of the CQC Plan or acceptance of an interim plan applicable to the particular feature of work to be started. Work outside of the features of work included in an accepted interim plan will not be permitted to begin until acceptance of a CQC Plan or another interim plan containing the additional features of work to be started. Where the applicable Code issued by the International Code Council calls for an inspection by the Building Official, the Offeror shall include the inspections in the Quality Control Plan and shall perform the inspections. The Designer of Record shall develop a program for any special inspections required by the applicable International Codes and the Offeror shall perform these inspections, using qualified inspectors. Include the special inspection plan in the CQC plan.

3.2.1. Content of the CQC Plan:

The CQC Plan shall include, as a minimum, the following to cover all design and construction operations, both onsite and offsite, including work by subcontractors, fabricators, suppliers, and purchasing agents subcontractors, designers of record, consultants, architect/engineers (AE), fabricators, suppliers, and purchasing agents:

3.2.1.1. A description of the quality control organization, including a chart showing lines of authority and acknowledgment that the CQC staff shall implement the three phase control system for all aspects of the work specified. The staff shall include a CQC System Manager who shall report to a responsible corporate official of the Prime Contractor organization and not be subordinated to the Project Manager or the Project Superintendent.

3.2.1.2. The name, qualifications (in resume format), duties, responsibilities, and authorities of each person assigned a CQC function. Also include those responsibilities for performing and documenting the inspections required by the International Codes and the special inspection program developed by the designer of record.

3.2.1.3. A copy of the letter to the CQC System Manager signed by an authorized official of the firm which describes the responsibilities and delegates sufficient authorities to adequately perform the functions of the CQC System Manager, including authority to stop work which is not in compliance with the contract. The CQC System Manager shall issue letters of direction to all other various quality control representatives outlining duties, authorities, and responsibilities. Copies of these letters shall also be furnished to the Government.

3.2.1.4. Procedures for scheduling, reviewing, certifying, and managing submittals, including those of subcontractors, offsite fabricators, suppliers, and purchasing agents subcontractors, designers of record, consultants, architect engineers (AE), offsite

SF30
AMENDMENT DESCRIPTION
01 45 04

File details come from the government source that posted it. Updated .