W912BU-10-R-0033 0013 LINE ITEMS SPECS SECT H EXTEND RESPONSE DATE.pdf

PDF 509 KB Posted

Attached to
AWARD OF DRY DOCKING & REPAIR FOR THE DREDGE MCFARLAND
Solicitation number
W912BU-10-R-0033
Issued by

About this file

Amendment 0013 is issued to extend response date and make changes to bid sheet and specifications.

View the file

Other files

File Type Posted
ETMS 215-276.xls XLS spreadsheet
ETMS 277-282.xls XLS spreadsheet
ETMS 084-133.xls XLS spreadsheet
ETMS 035-083.xls XLS spreadsheet
W912BU-10-R-0033 PRICING WORKBOOK 24NOV10.xls XLS spreadsheet
ETMS 134-199.xls XLS spreadsheet
ETMS COVER-LETTER.xls XLS spreadsheet
ETMS 001-034.xls XLS spreadsheet
ETMS ASBESTOS REPORTS.xls XLS spreadsheet
MF-H5-057-3 22NOV.TIF TIF image
FIBER OPTICS TEST PROCEDURE 22NOV.pdf PDF
MF-H5-051 22NOV.TIF TIF image
MF-H5-57 22NOV.tif TIF image
Mf-h5-51 22NOV.tif TIF image
MF-H5-116 22NOV.TIF TIF image
MF-H5-049-R3 22NOV .TIF TIF image
MF-H2-032 22NOV.TIF TIF image
MASTER CABLE LIST REV_B 22NOV.pdf PDF
MF-H5-115 22NOV.TIF TIF image
MF-H5-057 22NOV.TIF TIF image
MF-H5-080 22NOV.TIF TIF image
MF-H5-050 22NOV.TIF TIF image
MF-H3-024 Pilot House 22NOV.pdf PDF
MF-H5-057-1 22NOV.TIF TIF image
MF-H4-25 22NOV.tif TIF image
MF-H5-058 22NOV.TIF TIF image
333-F518-01 -- JETTING SYSTEM MODIFICATIONS REV_A.pdf PDF
MF-M1-8-1 22NOV —
MF-M1-8-2 22NOV —
MF-H2-114 22NOV.TIF TIF image
MF-H5-053 22NOV.TIF TIF image
MF-H5-049-R2 22NOV.TIF TIF image
MF-H5-059 22NOV.TIF TIF image
MF-M1-8-3 22NOV —
LIGHTING PANEL LOCATIONS.pdf PDF
MF-H5-057-2 22NOV.TIF TIF image
9-7-281 -- JETTING WATER AND HOPPER WASHDOWN SYSTEM PLANS SECTIONS AND ELEVATIONS REV_A 22NOV.pdf PDF
MF-H4-012-2 22NOV —
MF-H5-049-R1 22NOV.TIF TIF image
WB912BU-10-R-0033 AMENDMENT 0012.pdf PDF
10-R-0033-0011.pdf PDF
W912BU-10-R-0033 0010 CHANGE POP EXTEND RESPONSE DATE.pdf PDF
W912BU-10-R-0033 0009 EXTEND RESPONSE DATE.pdf PDF
W912BU-10-R-0033 0008 ADDTNL VESSEL VISIT.pdf PDF
W912BU-10-R-0033 0007 MCH301D EXTND DATE.pdf PDF
MF-M3-60 -- ARRANGEMENT OF CENTRAL CONTROL STATION.TIF TIF image
080310-3 ENGINE MONITORING SYSTEM CABLING REQUIREMENTS.pdf PDF
MF-M3-61 -- CABLING AND CONNECTION DIAGRAM CENTRAL ENG CONTROL STAION PANELS AND CONSOLES.TIF TIF image
080310-2 REVD ENGINE MONITORING SYSTEM.PDF PDF
9-7-2514 -- Engine Starting Monitoring Console.pdf PDF
Show 40 more

Latest 50 of 183 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912BU-10-R-0033

W25PHS01110555A

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Extend the response date from 30 NOV 2010 to 8 DEC 2010.

Revise - Section B line items

Replace Work Item H-206

1. CONTRACT ID CODE PAGE OF PAGES

J 1 31

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Nov-2010

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU-10-R-0033

X 9B. DATED (SEE ITEM 11)

07-Jul-2010

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 3 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES T HE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. T HIS CHANGE ORDER IS ISSUED PURSUANT T O: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Nov-2010

CODE

US ARMY ENGINEER DISTRICT, PHILADELPHIA

CONTRACTING DIVISION

WANAMAKER BUILDING

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

E5CTSEAB

Typewritten Text

E5CTSEAB

Typewritten Text

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 30-Nov-2010 03:30 PM to 08-Dec-2010 03:30 PM.

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been added by full text:

24 NOV 2010 CHANGES TO SECT B

SECTION B SUMMARY OF LINE ITEM CHANGES 22 NOV 2010

The following changes are made to the lines items.

1. DEL THE FOLLOWING CLIN(S):

a. CLIN 0001CF “H-402 HOPPER DOORS AND OPERATING MECHANISMS

(IF DIRECTED) 3.F. TURNBUCKLE”

2. ADD THE FOLLOWING CLIN(S):

a. CLIN 0001FV H-511 REPLACE DREDGE PIPE AND CASTINGS

b. CLIN 0001FZ H-205 MISCELLANEOUS STEEL C. (4) 3/4" ROLLED SS

PLATE

c. CLIN 0001GA H-205 MISCELLANEOUS STEEL C. (6) 5/8" ROLLED SS

d. CLIN 0001GB H-214 CLEAN AND GAS-FREE SPACES (IF DIRECTED) 4.E.

SWELL COMPENSATOR COMPARTMENTS

e. CLIN 0001GC H-402 HOPPER DOORS AND OPERATING MECHANISMS

(IF DIRECTED) 3.Q. ROTATE STUFFING BOX

f. CLIN 0001GD M-201 REPAIR PORT & STBD DREDGE SHIP'S SERVICE

GENERATORS (GFE)

g. CLIN 0001GE M-181 DREDGE ENGINE EXHAUST & AUXILIARY

GENERATOR ENGINE EXHAUST STACKS

h. CLIN 0001GF M-110 REPLACE Auxiliary Generator engine silencers (IF

DIRECTED

i. CLIN 0001GG M-204 REBABBITT BEARINGS Ships’ Service Generator Bearings (IF DIRECTED)

j. CLIN 0001GH M-305 LOAD BANK RENTAL

k. CLIN 0001GJ H-301 ASBESTOS REMOVAL - BLOCK 1

l. CLIN 0001GK H-301 ASBESTOS REMOVAL - BLOCK 14

3. MAKE THE FOLLOWING CHANGES TO DESCRIPTIONS:

a. CLIN 0001AC Change the Quantity from 75 TO 90

b. CLIN 0001AF Change the Quantity from 1,500 TO 3,000

c. CLIN 0001AU Change the Description from "H-205 MISCELLANEOUS

STEEL C. (1) 1/2" ROLLED SS PLATE" TO "H-205 MISCELLANEOUS STEEL C.

(1) 1/4" ROLLED SS PLATE"

d. CLIN 0001AV Change the Description and Quantity from "H-205

MISCELLANEOUS STEEL C. (2) 3/4" ROLLED SS PLATE QTY" 100 TO "H-205

MISCELLANEOUS STEEL C. (2) 1/2" ROLLED SS PLATE" QTY 250

e. CLIN 0001AW Change the Quantity from 100 TO 250

f. CLIN 0001AX Change the Description "H-205 MISCELLANEOUS STEEL C.

(4) 3/4" ROLLED AR PLATE" TO "H-205 MISCELLANEOUS STEEL C. (5) 3/4"

ROLLED AR PLATE"

g. CLIN 0001AY Change the Quantity from 100 TO 250

h. CLIN 0001BQ Change the Description and the Quantity from "H-212

CLEAN AND GAS-FREE TANKS (IF DIRECTED) (11) FUEL TRANSFER,

STORAGE AND RETURN" QTY 100,000 TO " H-212 CLEAN AND GAS-FREE

TANKS (IF DIRECTED) (15) FUEL TRANSFER, STORAGE AND RETURN" QTY

150,000

i. CLIN 0001CG Change the Description from "H-402 HOPPER DOORS AND

OPERATING MECHANISMS (IF DIRECTED) 3.G. REPLACE HOPPER DOOR

CYLINDERS" TO "H-402 HOPPER DOORS AND OPERATING MECHANISMS (IF

DIRECTED) 3.F. REPLACE HOPPER DOOR CYLINDERS

j. CLIN 0001CH Change the Description from "H-402 HOPPER DOORS AND

OPERATING MECHANISMS (IF DIRECTED) 3.H. DOOR BRACKET CENTER

LINK AND CAP" TO "H-402 HOPPER DOORS AND OPERATING MECHANISMS

(IF DIRECTED) 3.G. DOOR BRACKET CENTER LINK AND CAP"

k. CLIN 0001CJ Change the Description from "H-402 HOPPER DOORS AND

OPERATING MECHANISMS (IF DIRECTED) 3.I. GASKET RETAINING BAR

SCREW HOLE REPAIR” TO "H-402 HOPPER DOORS AND OPERATING

MECHANISMS (IF DIRECTED) 3.H. GASKET RETAINING BAR SCREW HOLE

REPAIR"

l. 0 CLIN 001CK Change the Description from "H-402 HOPPER DOORS AND

OPERATING MECHANISMS (IF DIRECTED)3.J. STUFFING BOX PACKING

GLAND STUDS" TO "H-402 HOPPER DOORS AND OPERATING MECHANISMS

(IF DIRECTED)3.I. STUFFING BOX PACKING GLAND STUDS"

m. CLIN 0001CL Change the Description from “H-402 HOPPER DOORS AND

OPERATING MECHANISMS (IF DIRECTED) 3.K. CRANKSHAFT LINK AND

CAPS" TO "H-402 HOPPER DOORS AND OPERATING MECHANISMS (IF

DIRECTED) 3.J. CRANKSHAFT LINK AND CAPS"

n. CLIN 0001CM Change the Description from “H-402 HOPPER DOORS AND

OPERATING MECHANISMS (IF DIRECTED) 3.L. DOOR RAM CYLINDER

SUPPORT BRACKET" TO "H-402 HOPPER DOORS AND OPERATING

MECHANISMS (IF DIRECTED) 3.K. DOOR RAM CYLINDER SUPPORT

BRACKET"

o. CLIN 0001CN Change the Description from H-402 HOPPER DOORS AND

OPERATING MECHANISMS (IF DIRECTED) 3.M. HOPPER DOOR GASKETS

TO H-402 HOPPER DOORS AND OPERATING MECHANISMS (IF DIRECTED)

3.L. HOPPER DOOR GASKETS 6

p. CLIN 0001CP Change the Description from “H-402 HOPPER DOORS AND

OPERATING MECHANISMS (IF DIRECTED) 3.N. DOOR LINK AND CAP" TO "H-

402 HOPPER DOORS AND OPERATING MECHANISMS (IF DIRECTED) 3.M.

DOOR LINK AND CAP"

q. CLIN 0001CQ Change the Description from “H-402 HOPPER DOORS AND

OPERATING MECHANISMS (IF DIRECTED) 3.O. STUFFING BOX CARRIER

FLANGE" TO "H-402 HOPPER DOORS AND OPERATING MECHANISMS (IF

DIRECTED) 3.N. STUFFING BOX CARRIER FLANGE"

r. CLIN 0001CR Change the Description from “H-402 HOPPER DOORS AND

OPERATING MECHANISMS (IF DIRECTED) 3.P. STUFFING BOX" TO "H-402

HOPPER DOORS AND OPERATING MECHANISMS (IF DIRECTED) 3.O.

STUFFING BOX"

s. CLIN 0001CS Change the Description and the Quantity from “H-402

HOPPER DOORS AND OPERATING MECHANISMS (IF DIRECTED) 3.Q. PIVOT

BEARING" QTY 6 TO "H-402 HOPPER DOORS AND OPERATING

MECHANISMS (IF DIRECTED) 3.P. PIVOT BEARING QTY 4"

t. CLIN 0001DB Change the Quantity from 12 TO 16

u. CLIN 0001DC Change the Quantity from 12 TO 16

v. CLIN 0001FL Change the Description from "H-910 INSPECT PORT AND

STARBOARD RUDDER BEARINGS" TO "H-910 PORT AND STARBOARD

RUDDER REPAIR"

w. CLIN 0001FN Change the Description from "H-206 REPLACE SHELL AND

BULKHEAD PLATING (GFE)" TO "H-206 REPLACE SHELL AND BULKHEAD

PLATING"

24 NOV 2010 LINE ITEM

PROVIDE UNIT AND EXTENDED PRICING FOR THE FOLLOWING ITEMS

CLIN SUPPLIES/SERVICES QTY UNIT UNIT

PRICE

AMOUNT

0001 FFP – CONTRACTOR TO PROVIDE ALL THE FACILITIES, SERVICES, LABOR, MATERIALS, EQUIPMENT

AND SUB-CONTRACTORS TO OVERHAUL THE DREDGE MCFARLAND IN ACCORDANCE WITH THE

FOLLOWING LINE ITEMS, PLANS, DRAWINGS, SPECIFICATIONS AND REGULATIONS AS STATED

HEREIN. Provide all necessary plant, labor, material, equipment and services to perform the specified work in accordance with these specifications, reference drawings and the terms and conditions of the solicitation.

The total performance period for this procurement will be ninety (90) calendar days. Work to begin on or about 03 JANUARY 2011, but no later than 01 FEBRUARY 2011, and must be completed within the allotted period of perfromance. However, if circumstances change between the receipt of a successful proposal and 03 JANUARY 2011, the actual work on the vessel may be started sooner, with the period of performance to remain 90 calendar days, if mutually agreed upon by both parties. It is the intention of the Government to award the contract as soon as possible after receipt, evaluation, and determination of a successful proposal to allow for efficient planning of the work.

NOTE: Estimated quantities of “IF-DIRECTED” work are included for preparation of proposals. The contractor shall be required to perform work less than such quantities at the unit prices stated in his/her bid. The period of performance will not be adjusted for issuance of “IF-DIRECTED” work within the estimated quantities indicated.

0001AA H-101 DRYDOCKING OF McFARLAND

JB

0001AB H-102 LAY DAYS (IF DIRECTED)

DY

0001AC H-103 UTILITIES AND SERVICES

DY

PRICE

AMOUNT

0001AD H-201 BLASTING AND PAINTING

JB

0001AE H-202 REPLACE HULL ANODES

JB

0001AF H-205 MISCELLANEOUS STEEL A. SHAPES

3,000

LB

0001AG H-205 MISCELLANEOUS STEEL B. (1) 1/4" PLATE

SF

0001AH H-205 MISCELLANEOUS STEEL B. (2) 5/16” PLATE

SF

0001AJ H-205 MISCELLANEOUS STEEL B. (3) 3/8” PLATE

SF

0001AK H-205 MISCELLANEOUS STEEL B. (4) 7/16” PLATE

SF

0001AL H-205 MISCELLANEOUS STEEL B. (5) 1/2" PLATE

SF

0001AM H-205 MISCELLANEOUS STEEL B. (6) 9/16” PLATE

SF

0001AN H-205 MISCELLANEOUS STEEL B. (7) 1/2" AR PLATE

SF

0001AP H-205 MISCELLANEOUS STEEL B. (8) 3/4" AR PLATE

SF

0001AQ H-205 MISCELLANEOUS STEEL B. (9) 1/2" SS PLATE

SF

0001AR H-205 MISCELLANEOUS STEEL B. (10) 5/8” PLATE

SF

0001AS H-205 MISCELLANEOUS STEEL B. (11) 5/8” SHELL PLATE

SF

0001AT H-205 MISCELLANEOUS STEEL B. (12) 1” SHELL PLATE

SF

0001AU H-205 MISCELLANEOUS STEEL C. (1) 1/4" ROLLED SS

SF

0001AV H-205 MISCELLANEOUS STEEL C. (2) 1/2" ROLLED SS

0001A W

H-205 MISCELLANEOUS STEEL C. (3) 1/2" ROLLED AR

0001AX H-205 MISCELLANEOUS STEEL C. (5) 3/4" ROLLED AR

0001AY H-205 MISCELLANEOUS STEEL D. LINEAR WELDING

LF

0001AZ H-210 CLEAN AND PAINT POTABLE WATER TANKS

JB

0001BA H�212 CLEAN AND GAS-FREE TANKS (IF DIRECTED) (1)

#1 P DOUBLE BOTTOM

JB

0001BB H�212 CLEAN AND GAS-FREE TANKS (IF DIRECTED) (2)

#1 S DOUBLE BOTTOM

0001BC H�212 CLEAN AND GAS-FREE TANKS (IF DIRECTED) (3)

#2 P DOUBLE BOTTOM

0001BD H�212 CLEAN AND GAS-FREE TANKS (IF DIRECTED) (4)

#2 S DOUBLE BOTTOM

0001BE H�212 CLEAN AND GAS-FREE TANKS (IF DIRECTED) (5)

#1 P DEEP TANK

PRICE

AMOUNT

0001BF H�212 CLEAN AND GAS-FREE TANKS (IF DIRECTED) (6)

#1 S DEEP TANK

0001BG H-212 CLEAN AND GAS-FREE TANKS (IF DIRECTED) (7)

#3 P DOUBLE BOTTOM

0001BH H-212 CLEAN AND GAS-FREE TANKS (IF DIRECTED) (8)

#3 S DOUBLE BOTTOM

0001BJ H-212 CLEAN AND GAS-FREE TANKS (IF DIRECTED) (9)

#4 P DOUBLE BOTTOM

0001BK H-212 CLEAN AND GAS-FREE TANKS (IF DIRECTED) (10)

#4 S DOUBLE BOTTOM

0001BL H-212 CLEAN AND GAS-FREE TANKS (IF DIRECTED) (11)

#5 P DOUBLE BOTTOM

0001BM H-212 CLEAN AND GAS-FREE TANKS (IF DIRECTED) (12)

#5 S DOUBLE BOTTOM

0001BN H-212 CLEAN AND GAS-FREE TANKS (IF DIRECTED) (13)

#2 P DEEP TANK

0001BP H-212 CLEAN AND GAS-FREE TANKS (IF DIRECTED) (14)

#2 S DEEP TANK

0001BQ H-212 CLEAN AND GAS-FREE TANKS (IF DIRECTED) (15)

FUEL TRANSFER, STORAGE AND RETURN

150,000

GL

0001BR H-213 PUMP OUT AFTER PEAK TANKS (IF DIRECTED) A.

CLEAN AND GAS-FREE TANK

0001BS H-213 PUMP OUT AFTER PEAK TANK (IF DIRECTED) B.

REMOVAL AND DISPOSAL

20,000

GL

0001BT H-214 CLEAN AND GAS-FREE SPACES (IF DIRECTED) 4.A.

DRAGHEAD PENETRATION SPACES

0001BU H-214 CLEAN AND GAS-FREE SPACES (IF DIRECTED) 4.B.

FORWARD COFFERDAMS

0001BV H-214 CLEAN AND GAS-FREE SPACES (IF DIRECTED)

4.C. AFT COFFERDAMS

0001B W

H-214 CLEAN AND GAS-FREE SPACES (IF DIRECTED)

4.D. FORE PEAK TANK

0001BX H-221 ANCHOR, CHAIN AND LOCKER INSPECTION AND

PAINTING

0001BY H-231 INSPECT SEA VALVES

JB

0001BZ H-401 HOPPER DOORS AND OPERATING MECHANISMS

JB

0001CA H-402 HOPPER DOORS AND OPERATING MECHANISMS

(IF DIRECTED) 3.A. DOOR HINGE PINS

EA

0001CB H-402 HOPPER DOORS AND OPERATING MECHANISMS

(IF DIRECTED) 3.B. DOOR BRACKET PINS

0001CC H-402 HOPPER DOORS AND OPERATING MECHANISMS

(IF DIRECTED) 3.C. CRANKSHAFT LINK PINS

0001CD H-402 HOPPER DOORS AND OPERATING MECHANISMS

(IF DIRECTED) 3.D. FRAME HINGE PAD BUSHING

0001CE H-402 HOPPER DOORS AND OPERATING MECHANISMS

(IF DIRECTED) 3.E. LATCHEND BRACKET

0001CF H-402 HOPPER DOORS AND OPERATING MECHANISMS

(IF DIRECTED) 3.F. TURNBUCKLE

EA LINE ITEM DELETED

PRICE

AMOUNT

0001CG H-402 HOPPER DOORS AND OPERATING MECHANISMS

(IF DIRECTED) 3.F. REPLACE HOPPER DOOR CYLINDERS

0001CH H-402 HOPPER DOORS AND OPERATING MECHANISMS

(IF DIRECTED) 3.G. DOOR BRACKET CENTER LINK AND

CAP

0001CJ H-402 HOPPER DOORS AND OPERATING MECHANISMS

(IF DIRECTED) 3.H. GASKET RETAINING BAR SCREW

HOLE REPAIR

0001CK H-402 HOPPER DOORS AND OPERATING MECHANISMS

(IF DIRECTED)3.I. STUFFING BOX PACKING GLAND STUDS

0001CL H-402 HOPPER DOORS AND OPERATING MECHANISMS

(IF DIRECTED) 3.J. CRANKSHAFT LINK AND CAPS

0001CM H-402 HOPPER DOORS AND OPERATING MECHANISMS

(IF DIRECTED) 3.K. DOOR RAM CYLINDER SUPPORT

BRACKET

0001CN H-402 HOPPER DOORS AND OPERATING MECHANISMS

(IF DIRECTED) 3.L. HOPPER DOOR GASKETS

0001CP H-402 HOPPER DOORS AND OPERATING MECHANISMS

(IF DIRECTED) 3.M. DOOR LINK AND CAP

0001CQ H-402 HOPPER DOORS AND OPERATING MECHANISMS

(IF DIRECTED) 3.N. STUFFING BOX CARRIER FLANGE

0001CR H-402 HOPPER DOORS AND OPERATING MECHANISMS

(IF DIRECTED) 3.O. STUFFING BOX

0001CS H-402 HOPPER DOORS AND OPERATING MECHANISMS

(IF DIRECTED) 3.P. PIVOT BEARING

0001CT H-403 REPLACE HOPPER DOOR FRAMES (IF DIRECTED)

EA

0001CU H-404 REPLACE DISTRIBUTION TROUGHS

EA

0001CV H-503 COLLECTION VALVE, HOFER VALVE, & JETTING

VALVE REPAIRS

0001C W

H�522 REPAIR 26” AND 34” DREDGING VALVES

JB

0001CX H-541 REPLACE OVERFLOW TROUGHS

JB

0001CY M-101A OVERHAUL TWO ALCO MAIN PROPULSION

ENGINES

0001CZ M-101B OVERHAUL ALCO GENERATOR ENGINE

JB

0001DA M-141 MISC ALCO ENGINE REPAIRS

JB

0001DB M-145 INSTALL UPPER LINER INSERTS

EA

0001DC M-146 INSTALL LOWER LINER INSERTS

EA

0001DD M-301 SUPPORT ELEC UPGRADES - MDC PROJ 2802

JB

0001DE M-302 ASBESTOS REMOVAL - (MDC PROJ 2802)

JB

0001DF M-303 RELOCATION OF STARBOARD JETTING PUMP (IF

DIRECTED) - MDC PROJ 2802

0001DG M-601 OVERHAUL P & S DREDGE PUMPS JB

PRICE

AMOUNT

0001DH M-701 REPAIR AND INSPECT CONTROLLABLE PITCH

PROPULSION SYSTEM

0001DJ M-702 REPLACE CUTLASS BEARINGS AND CHOCKFAST

(IF DIRECTED) A. REPLACE PORT FORWARD BEARING.

0001DK M-702 REPLACE CUTLASS BEARINGS AND CHOCKFAST

(IF DIRECTED) B. REPLACE STBD FORWARD BEARING.

0001DL M-702 REPLACE CUTLASS BEARINGS AND CHOCKFAST

(IF DIRECTED) C. REPLACE PORT AFT BEARING

0001DM M-702 REPLACE CUTLASS BEARINGS AND CHOCKFAST

(IF DIRECTED) D. REPLACE STBD AFT BEARING

0001DN M-702 REPLACE CUTLASS BEARINGS AND CHOCKFAST

(IF DIRECTED) E. REPLACE CHOCKFAST

0001DP M-703 REPLACE TAILSHAFT AND FLUSH HYDRAULIC

SYSTEM (IF DIRECTED) A. REPLACE PORT TAILSHAFT

0001DQ M-703 REPLACE TAILSHAFT AND FLUSH HYDRAULIC

SYSTEM (IF DIRECTED) B. REPLACE STBD TAILSHAFT

0001DR M-703 REPLACE TAILSHAFT AND FLUSH HYDRAULIC

SYSTEM (IF DIRECTED) C. FLUSH PORT CPP SYSTEM

0001DS M-703 REPLACE TAILSHAFT AND FLUSH HYDRAULIC

SYSTEM (IF DIRECTED) D. FLUSH STBD CPP SYSTEM

0001DT M-704 REPLACE BOW THRUSTER SEALS

JB

0001DU M-901 MISCELLANEOUS MAINT. A. LABOR

3,000

HRS

0001DV M-901 MISCELLANEOUS MAINT. B. MATERIALS 1 JB

0001D W

M-901 MISCELLANEOUS MAINT. (INSERT PERCENTAGE RATE) C. BURDEN CHARGES

0001DX M-902 MISC. PIPING (IF DIRECTED) 1. ½ INCH PIPE (A) IN

KIND

LF

0001DY M-902 MISC. PIPING (IF DIRECTED) 1. ½ INCH PIPE (B)

COPPER�NICKEL

0001DZ M-902 MISC. PIPING (IF DIRECTED) 2. ¾ INCH PIPE (A) IN

0001EA M-902 MISC. PIPING (IF DIRECTED) 2. ¾ INCH PIPE (B)

0001EB M-902 MISC. PIPING (IF DIRECTED) 3. 1 INCH PIPE (A) IN

0001EC M-902 MISC. PIPING (IF DIRECTED) 3. 1 INCH PIPE (B)

0001ED M-902 MISC. PIPING (IF DIRECTED) 4. 1�1/2�INCH PIPE

(A) IN KIND

0001EE M-902 MISC. PIPING (IF DIRECTED) 4. 1�1/2�INCH PIPE

(B) COPPER�NICKEL

0001EF M-902 MISC. PIPING (IF DIRECTED) 5. 2�INCH PIPE (A) IN

0001EG M-902 MISC. PIPING (IF DIRECTED) 5. 2�INCH PIPE (B)

0001EH M-902 MISC. PIPING (IF DIRECTED) 6. 2�1/2�INCH PIPE

(A) IN KIND

PRICE

AMOUNT

0001EJ M-902 MISC. PIPING (IF DIRECTED) 6. 2�1/2�INCH PIPE

(B) COPPER�NICKEL

0001EK M-902 MISC. PIPING (IF DIRECTED) 7. 3�INCH PIPE (A) IN

0001EL M-902 MISC. PIPING (IF DIRECTED) 7. 3�INCH PIPE (B)

0001EM M-902 MISC. PIPING (IF DIRECTED) 8. 4�INCH PIPE (A) IN

0001EN M-902 MISC. PIPING (IF DIRECTED) 8. 4�INCH PIPE (B)

0001EP M-902 MISC. PIPING (IF DIRECTED) 9. 5�INCH PIPE (A) IN

0001EQ M-902 MISC. PIPING (IF DIRECTED) 9. 5�INCH PIPE (B)

0001ER M-902 MISC. PIPING (IF DIRECTED) 10. 6�INCH PIPE (A)

IN KIND

0001ES M-902 MISC. PIPING (IF DIRECTED) 10. 6�INCH PIPE (B)

0001ET M-902 MISC. PIPING (IF DIRECTED) 11. 1 INCH FLANGE

SETS (A) IN KIND

0001EU M-902 MISC. PIPING (IF DIRECTED) 11. 1 INCH FLANGE

SETS (B) COPPER�NICKEL

0001EV M-902 MISC. PIPING (IF DIRECTED) 12. 1�1/2 INCH

FLANGE SETS (A) IN KIND

0001E W

M-902 MISC. PIPING (IF DIRECTED) 12. 1�1/2 INCH

FLANGE SETS (B) COPPER�NICKEL

0001EX M-902 MISC. PIPING (IF DIRECTED) 13. 2 INCH FLANGE

0001EY M-902 MISC. PIPING (IF DIRECTED) 13. 2 INCH FLANGE

0001EZ M-902 MISC. PIPING (IF DIRECTED) 14. 2�1/2 INCH

FLANGE SETS (A) IN KIND

0001FA M-902 MISC. PIPING (IF DIRECTED) 14. 2�1/2 INCH

FLANGE SETS (B) COPPER�NICKEL

0001FB M-902 MISC. PIPING (IF DIRECTED) 15. 3 INCH FLANGE

0001FC M-902 MISC. PIPING (IF DIRECTED) 15. 3 INCH FLANGE

0001FD M-902 MISC. PIPING (IF DIRECTED) 16. 4 INCH FLANGE

0001FE M-902 MISC. PIPING (IF DIRECTED) 16. 4 INCH FLANGE

SETS (B) COPPER-NICKEL

0001FF M-902 MISC. PIPING (IF DIRECTED) 17. 5 INCH FLANGE

0001FG M-902 MISC. PIPING (IF DIRECTED) 17. 5 INCH FLANGE

0001FH M-902 MISC. PIPING (IF DIRECTED) 18. 6 INCH FLANGE

0001FJ M-902 MISC. PIPING (IF DIRECTED) 18. 6 INCH FLANGE

SETS (B) COPPER NICKEL

PRICE

AMOUNT

0001FK M-933 REBUILD BILGE MANIFOLDS

JB

0001FL H-910 PORT AND STARBOARD RUDDER REPAIR

JB

0001FM M-181 Main Engine exhaust stacks, along with the Stbd Auxiliary Engine stacks crossover

0001FN H-206 REPLACE SHELL AND BULKHEAD PLATING

JB

0001FP H-501 TRUNNION EXAMINATION & REPAIR

JB

0001FQ M-110 REPLACE Dredge Engine silencers (IF DIRECTED)

EA

0001FR M-201 REPAIR PORT & STBD DREDGE PUMP MOTORS

(GFE)

0001FS H-203 AUDIOGAGING (IF DIRECTED)

1,500

EA

0001FT H-531 DRAGARM REPAIRS

JB

0001FU M-304 PROVIDE & INSTALL CABLING (IF DIRECTED)

1,000

FT

0001FV H-511 REPLACE DREDGE PIPE AND CASTINGS

JB

0001FX M-204 REBABBITT BEARINGS Dredge Pump Motor Bearings

(IF DIRECTED)

0001FY M-602 REPLACE DREDGE PUMP CASINGS (Port and Stbd)

(IF DIRECTED)

0001FZ H-205 MISCELLANEOUS STEEL C. (4) 3/4" ROLLED SS

0001GA H-205 MISCELLANEOUS STEEL C. (6) 5/8" ROLLED SS

0001GB H-214 CLEAN AND GAS-FREE SPACES (IF DIRECTED) 4.E.

SWELL COMPENSATOR COMPARTMENTS

0001GC H-402 HOPPER DOORS AND OPERATING MECHANISMS

(IF DIRECTED) 3.Q. ROTATE STUFFING BOX

0001GD M-201 REPAIR PORT & STBD DREDGE SHIP'S SERVICE

GENERATORS (GFE)

0001GE M-181 Dredge Engine exhaust & Auxiliary Generator Engine exhaust stacks

0001GF M-110 REPLACE Auxiliary Generator engine silencers (IF

DIRECTED)

0001GG M-204 REBABBITT BEARINGS Ships’ Service Generator Bearings (IF DIRECTED)

0001GH M-305 LOAD BANK RENTAL

JB

0001GJ H-301 ASBESTOS REMOVAL - BLOCK 1

JB

0001GK H-301 ASBESTOS REMOVAL - BLOCK 14

CLIN0001AA - 0001GK TOTAL

INSERT THE LOCATION OF THE SHIPYARD WHERE THE WORK WILL BE PERFORMED:

FAR 52.215-1(f)(8) The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government

The following have been deleted:

LINE ITEM 15 NOV 2010

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

24NOV SPECIFICATION CHANGES

INSERT THIS SPECIFICATION BETWEEN WORK ITEM H-231 AND WORK ITEM

H-401

This is a new work item specification issued 24 NOV 2010

H-301 ASBESTOS ABATEMENT AND REFURBISHMENT (IF-DIRECTED)

1. Intent

The intent is to perform asbestos ab atement and refurbishment for the U.S. Ar my Corps of Engineers Dredge McFarland in the Pilot House, Officer’s Mess, Galley Storage and adjacent hallway, Cr ew Mess, a nd Galley Dry Storage. All m aterial and labor, unless denoted as Government Furnished Material (GFM), shall be provided by the Contractor.

This work shall be coordinated so that it is performed at the sam e time as Line Ite m M- 301 and Line Item H-210. The intent is to m inimize the am ount of tim e the Galley and Mess Halls will be shut down.

2. Reference Documents

Dwg. MF-H3-022 (for Block 14) Dwg. MF-H3-024 (for Block 1) JJMA-Abatement Schedule Blocks (for Blocks 1 & 14)

Corps of Engineers, Safety and Health Requirements Manual EM-385 1-1

The contractor shall ab ate asbestos onboard the McFarland in accordance with all Federal, State, Local, OSHA, and EPA rules and regulations.

Any reference to specific room names or numbers will be referring to th ose found on the JJMA-Abatement Schedule Blocks document. As reference, on drawing MF-H3-022, the Galley Storage is identified as the Petty Officers Mes s and the Galley Dry Storage is identified as Dr y Stores.

As reference, R&M Ship Technologies USA In c. has performed all recent refurbishm ent work in stateroom s, passageways, and lounges. The point of contact is Chris Elbers, 352-345- 3231.

3. Safety

The Contractor shall abate asbestos onboard the McFarland in accordance with all Federal, State, Local, OSHA, and EPA rules and regulations.

The Contractor shall limit the amount of welding on the vessel. Care shall be taken when welding to the decks or bulkheads.

No hot work shall be perform ed unless first coordinated with the C aptain, or in his absence, the Chief Engi neer onboard. A fire watch shall be provided during all hot work.

Necessary precaution must be taken to ensure no surrounding areas of the vessel are d amaged or affected by welding.

4. Evaluation/Inspection Factors

Abatement:

The abatement must comply with containment procedures in accordance with all Federal, State, Local, OSHA, and EPA r ules and regul ations, a s well as with the s pecification requirements within this document. The entire a batement area must be cleared of asbestos with all tests and samples below the re-occupancy standard.

Installation:

All m aterial ins talled must com ply with the specif ication require ments within this document. The installa tion must be com plete in every way, including all finish work, m olding pieces, caulking, and o ther incidental material required for a com plete installation p resenting a satisfactory standard of appearance. Other spaces on the vessel have recently been refurbished.

The Contractor sh all inspect a sa mpling of those areas prior to the start of installation work to determine what is expected under this item . Installation shall be consistent in appearance with the previously completed spaces. The COR will administer a final walkthrough of each area to identify any issues and, if satisfactory, provide final acceptance.

5. Description of Work

The contractor shall provide all n ecessary labor, m aterials, serv ices, equipm ent and subcontractors to perform and complete the work listed herein.

A. BLOCK LIST

Areas for C ontractor work onboard the Dredge McFarland have been designated as the following Blocks, as listed in the JJMA-Abatement Schedule Blocks:

Block 1 – Pilot House

Block 14 – Officers Mess, Galley Storage and adjacent hallway, Crew Mess, and Galley Dry Storage.

B. OBJECTIVES

The Contractor shall remove all asbestos in Block 1 – P ilot House, Block 14 – Officers Mess, Galley Storage and adjacent hallway, Crew Mess, and Galley Dry Storage. Reference #3, JJMA Abatement Schedule Blocks, m ay be used as a guideline to rem oving asbestos containing wall panels, ceiling panels, floor tile, underlaym ent, and both asbestos containing and fiberglass insulation. The Contrac tor shall remove all As bestos Containing Mate rial that exists within the abatement area. The Contractor sh all perform abatement in accord ance with the s pecification requirements.

The Contractor shall dispose of all materials consistent with regulations for handling of asbestos. A copy of all m anifests a nd other docum ents associated with the abatem ent shall be provided to the COR.

Installation of New Materials:

The Contractor shall perfor m refurbishment in all areas where abatem ent was performed as listed in the above Abatement section.

The Contractor shall install new material to replace removed Asbestos Containing

Material as defined herein a nd in the specification requ irements. The attached drawing s, References #1 & #2, shall also be used to es timate m aterial quan tities. The o bject is to modernize the living spaces using new and existing materials. The Contractor shall perform the installation in accord ance with th e specification requirem ents found here in. It is the inten t that the ins tallation will be com plete in every wa y, includ ing all f inish work, m olding pie ces, caulking, and other incidental mat erial required for a co mplete ins tallation pr esenting a satisfactory standard of appearance equivalent to and in harmony with recently refurbished areas.

Any da mage incurred to m aterial being retained as a cons equence of the asbestos abatem ent procedure shall be repaired or replaced by the Contractor.

C. PLACE OF PERFORMANCE AND SCHEDULE

Work shall be performed onboard the McFarland at the shipyard’s facility.

The abatem ent and installa tion of new m aterials in Bl ock 14 – Officers Mess, Galley Storage and adjacent hallway, Crew Mess, and Ga lley Dry Storage shall be com pleted in a total of no more than 6 weeks. This work is to be c oordinated so that it occ urs at the sa me time as Line Item M-301 and Line Item H-210. The intent is to minimize the amount of time the Galley and Mess Halls will be shut down.

The Contractor must provide a schedule identifying when each space will be started and completed.

D. MATERIALS

Any material denoted as Government Furnished Material (GFM) will be delivered to the Contractor’s facility. T he Cont ractor sha ll provide a material inventory to the CO R to ensu re that all GFM was delivered and free of damage.

Prior to the start of installation, the Contractor shall meet with the Government to discuss a plan for efficient m aterial usage to m inimize wastage. A t th is meeting, the Con tractor shall notify the Governm ent if the Contractor finds th e material quantities provided as GFM are not sufficient to complete the job.

Unless specified as GFM, all material listed herein shall be contractor-furnished.

E. SPECIFICATION REQUIREMENTS

The Contractor shall use Reference #3 as guidance in the removal of known asbestos.

The abatement shall be perform ed under c ontainment procedures in acco rdance with all Federal, State, Local, O SHA, and EPA rules an d regulations. The Contra ctor shall provide air monitoring services and supervision for the asb estos abatement, and shall b e responsible for all permits and proper disposal of all asbestos materials.

The Contractor shall coordinate lock-out tag- out of circuits with th e crew as appropriate and follow documented procedures for lock-out tag-out.

The Contractor shall provide one days notice of intention to start work so t hat crew can clear the areas of loose items.

The Contractor shall rem ove all Asbest os Containing Materi al found within the abatement area.

The Contractor shall rem ove all fiberg lass in sulation that will be found above the overhead or on the shell plate areas after transite panels are removed.

The Contractor shall remove all overhead ceiling panel grid work including the perimeter tracks along the bulkh eads around each space. Th e Contractor m ay elect to leave som e grid work or perimeter tracks if they are to be used for reinstallation of new ceiling or wall panels.

The Contractor shall remove all flooring and residual floor underlayment.

The Contractor shall remove all furniture.

The Contractor shall remove all air conditioning units. Th e Contractor shall d ispose of removed units.

In Block 1 – Pilot House, the Contractor shall construct plywood box barriers around all sensitive equipment (16 pieces). The Contractor shall carefully rem ove the brass foot rail and wooden arm rail around the perimeter of the pilot house without damage and place in storage for reinstallation. The foot rail and arm rail run a distance of approxim ately 50 linear feet. The Contractor shall rem ove all other furniture and foundations consistin g of 1 floor m ounted bookshelf, 1 floor m ounted bench, 1 floor m ounted cabinet, 1 floor m ounted chart table, 1 floor mounted table, and 6 AC units.

In Block 14 – Officers Mess, the Contractor shall rem ove the table top and place i n storage for reinstallation on the existing foundation. The refriger ator shall be rem oved without damage and placed in storage for reinstallatio n on the existing foundation. The existing table and refrigerator foundations should not be removed during abatem ent. The Contractor shall remove all other furniture and foundations cons isting of 1 wall mounted cabinet, 2 wall mounted shelves, and 2 floor cabinets.

In Block 14 – Crew Mess – the Contractor sh all remove 3 table tops and place them in storage for reinstallation on the existing foundations. The refriger ator shall be rem oved without damage and placed in storage for reins tallation on the existing foun dation. Th e table and refrigerator foundations should not be removed during abatement. The Contractor shall rem ove all other furniture and foundations consisting of 1 floor m ounted cabinet, 2 wall m ounted shelving cabinets, and 1 drinking water fountain.

In Block 14 – Galley Storage – the refrigerator shall be removed without dam age and placed in storage for reinstallation on the existing foundation. The refrigerator foundation should not be rem oved during abatem ent. The Contract or shall remove all fu rniture and foundations consisting of 1 floor mounted desk, and 1 wall mounted shelf.

The Contractor shall prepare a comprehensiv e asbestos report con taining all applicable documentation for this project.

Installation of New Materials:

All paint an d m aterial c olors m ust m atch those insta lled o n areas of the ship re cently refurbished this year. Any alternative colors must first be approved by the COR.

Prior to the start of installation, the Contractor shall walk recently refurbished sp aces to develop an understanding of the level of workm anship and finish work required f or a com plete installation presenting a satisfactory standard of appearance.

Foundations:

The Governm ent will provide furniture foundations as GFM for a ll floor m ounted furniture pieces listed below. The Contractor sh all weld the furniture f oundations to the deck in locations designated by the COR. The Contractor shall provide and pour concre te inside the foundations to strengthen them.

Furnishings:

The Government will pr ovide all new air h andlers and furniture as GFM, which will be delivered to the Contra ctor’s f acility. Furnish ings shall be car ried on to the sh ip a nd into the compartments by the Contractor. T he Contractor shall assemble and mount all furniture to the foundations and bulkheads. The COR will direct the Contractor as to th e exact locations of all air handlers, furniture, fixtures, etc. within th e living spaces and passageways. Care m ust be taken in m oving and installing furniture as the C ontractor shall be responsible for any resulting damages to the furniture or surrounding areas.

In Block 1 – Pilot House, the Contracto r sh all install four pieces of furnitu re and one chart table, in accordance with the above proced ures. Additionally, the Contractor shall reinstall the brass foot rail and wooden arm rail that were removed during abatement.

In Block 14 – Crew Mess, the Contractor shal l install two p ieces of furniture – one floor piece and o ne wall piece. Additionally, th e Cont ractor shall reins tall the three tables and refrigerator that were removed prior to abatement.

In Block 14 – Officer’s Mess, the C ontractor shall install four pieces of furniture – one floor piece and thre e wall p ieces. Additiona lly, the Contracto r sha ll reins tall th e table and refrigerator that were removed prior to abatement.

In Block 14 – Galley Storage, the Contractor sh all install two pieces of furniture – one floor piece and one wall piece. Addition ally, the Contractor shall re install the refrigera tor that was removed prior to abatement.

The furniture pieces pro vided as GFM will be sim ilar in size and typ e to the existing furniture only modernized.

Insulation:

The Governm ent will p rovide foil faced fibe rglass the rmal insula tion as GFM. The Contractor shall install insulation to replace all bulkhead, shell, and overhead insulation removed during abatement. The pins to ins tall the insulation are existing, however locking tabs will need to be provided and installed by the Contractor. Insulation quantities are listed below:

Block 1 – Pilot House – 2300 sq. ft.

Block 14 – Crew Mess – 630 sq. ft.

Block 14 – Officers Mess – 330 sq. ft.

Block 14 – Galley Storage – 255 sq. ft.

Block 14 – Galley Storage Adjacent Hallway – N/A Block 14 – Galley Dry Storage – 345 sq. ft.

The Contractor shall provide and install pi pe insulation o n pipes tha t had insulation removed during abatement. The Contractor shall al so install pipe insulation for chill water lines to and from Air handlers. Pipe insulation shall be fiberglass, 1" thick for all pipe sizes, Armaflex or equivalent. Pipe insulation shall be installed on the piping only; f ittings, valves, etc. shall be left un-insulated. The pipe insulation shall be provided with a vapor barrier jacket. Pipe insulation quantities can be found in Reference #3.

Hot potable water piping insulation shal l be suitable for a temperature of 150 oF. Chilled water HVAC piping insulation shall be suitable for a temperature range of 40 to 150 oF.

The Contrac tor sha ll no t insta ll p ipe insula tion on hot wate r lin es leading into the Air handlers in the living spaces. The hot water boiler is not functional.

Paint:

The Contractor shall m echanically scale painted bulkheads, doors, all trim , handrails, ladders, and anything that has been painted except for the steel decks. The Contractor shall then apply new paint that matches the previous color except bulkheads which shall match the color of the wall panels.

Flooring:

The Contractor shall be responsible for repair ing any damage to the steel decking caused by the Contracto r during abatement or rem oval. Any other unusual conditions fou nd shall be indentified to the COR.

The Contractor shall ins tall Coast Guard certified Flexco Flextones Radial (RLT) rubb er tile flooring or equal in all areas that had flooring removed. The Contractor shall install a poured underlayment to level the floor before flooring is installed. Flooring quantities are listed below:

Block 1 – Pilot House – 1550 sq. ft.

Block 14 – Crew Mess – 415 sq. ft.

Block 14 – Officers Mess – 215 sq. ft.

Block 14 – Galley Storage – 162 sq. ft.

Block 14 – Galley Dry Storage – N/A

In all areas where flooring is installed the C ontractor shall provide and install a san itary cove base. The cove base shall b e of si milar material and color to th e adjacent floor covering, and shall be a m inimum of 4 inches high. The cove base shall be worked around all bulkheads, cabinets and equipm ent. The coving shall be s ealed at the top and bottom edge with a long lasting silicone seal. Where coving will not fit below doorways, the coving shall be trimmed to suit o r sealed by other m eans on an instance- by-instance basis as determ ined on site by the Contractor and approved by the COR. Cove Base quantities are listed below:

Block 1 – Pilot House – 195 linear ft.

Block 14 – Crew Mess – 90 linear ft.

Block 14 – Officers Mess – 62 linear ft.

Block 14 – Galley Storage – 55 linear ft.

Care shall be taken to account for any deck drains when installing floor coverings. In any areas with d eck drains the floor coverings shall be sloped down to the drains. Deck drains are listed below:

Block 1 – Pilot House – 1 deck drain Block 14 – Crew Mess – 2 deck drains Block 14 – Officers Mess – 2 deck drains Block 14 – Galley Storage – 2 deck drains

Door Thresholds:

The Contractor shall provide and in stall stainless steel capping at the door thresholds to provide a f ull complete threshold the width of the fram ing. The Contractor shal l continue the stainless steel up the side framing approximately 12 inches. Doors are listed below:

Block 1 – Pilot House – 1 door (1 door does not need threshold) Block 14 – Crew Mess – 3 doors Block 14 – Officers Mess – 4 doors Block 14 – Galley Storage – 2 doors

Block 14 – Galley Dry Storage – 1 door

Ceilings:

The Government will provide ceilin gs as GFM. Ceiling will be R&M ceiling syste m – Type SD50 paneling with matted finish.

The Contractor sha ll in stall ceiling panels in all com partments where the ceiling was removed. Ceiling quantities are listed below:

Block 1 – Pilot House – 1550 sq. ft.

Block 14 – Crew Mess – 415 sq. ft.

Block 14 – Officers Mess – 215 sq. ft.

Block 14 – Galley Storage – 162 sq. ft.

Block 14 – Galley Storage Adjacent Hallway – 47 sq. ft.

Sheathing:

The Government will provide wall p anels as GFM. Wall panels will be R&M sand wich wall 25 – Type 25SW or equivalent.

The Contractor shall install wall panels where wall panels were removed. Wall paneling quantities are listed below:

Block 1 – Pilot House – 750 sq. ft.

Block 14 – Crew Mess – 700 sq. ft.

Block 14 – Officers Mess – 490 sq. ft.

Block 14 – Galley Storage – 305 sq. ft.

Block 14 – Galley Dry Storage – 280 sq. ft.

There shall be no wood behind joinery. If used, furring strips shall be metal.

All item s mounted against the bulkhead pane ls shall be fastened through the panels directly to vessel structure.

If necessary, the Contractor shall provide temporary protective covers to enclose the new sheathing and prevent potential da mages during installation of furniture. Any dam age caused during transport and installation of furniture will be the Contractor’s responsibility.

Access Panels:

The Government will provide access panels as GFM. Access panels will be R&M Hatch for ceiling panel SD50, or equivalent.

In Block 1 – Pilot House, the Contractor sh all insta ll s ix a ccess pane ls, approximately 2.3’ x 2.3’. The specific location for each access panel will be identified by the COR.

In Block 14 – Crew Me ss, the Con tractor shall install two a ccess panels approximately 1.5’ x 1.5’. The specific location for each access panel will be identified by the COR.

In Block 14 – Officer’s Mess, the Contractor sh all install one access panel approximately

In Block 14 – Galley Storage, the Contractor shall install one access panel approximately

Air Handlers:

The Governm ent will provide all air handl ers as GFM. The Contractor sh all be responsible for m ounting all air handlers. Ai r handlers mounted in the overhead m ust be mounted using four All Thread Ro ds to allow for angle adjustm ent. Overhead air handlers shall not be located above any furniture , unless approved by the COR, and shall be located as close to a drainage area as possible to provide the shorte st run of drain piping. Air handlers m ust be mounted at a proper an gle so that condensation runoff will be directed towards the drain pip e.

The Contractor shall d etermine a proper location and orientation for each air h andler to b e approved by the COR.

There shall be two ch eck points during th e installation of each air handler. The Contractor shall f irst v erify with the COR th e exact location of each air hand ler p rior to mounting. After m ounting, the Contractor shall verify with the COR the orientation and proper mounting prior to installing any overhead paneling or tracking.

The Contractor shall p erform all HVAC installa tion work inc luding installing and connecting all plumbing, electrical, heating elements, and t hermostats for each. The Contracto r shall be responsible for providing copper pipe exte nsions for chill water supply and return from the location of the old air handler to the new location.

In Block 1 – Pilot House, the Contractor shall install six air ha ndlers mounted on the wall.

In Block 14 – Crew Mess, the Contractor shall install two air handlers mounted on the wall.

In Block 14 – Officer’s Mess, the Contractor shall install one air handler mounted on the wall.

If it is determ ined after abatem ent that any ai r handlers sh all be ins talled in the o verhead, a contract modification will be issued for the change.

Vents:

The Government will provide all vents as GFM.

The Contractor shall install new vents in each living space for air supply and return. The Contractor shall be responsible for providing a good connection from the air supply and return ducting to the vent. If the Contra ctor e lects to alte r the location of the vent, it will be the Contractor’s responsibility to provide any duct extensions or modifications necessary.

Block 1 – Pilot House – 0 Block 14 – Crew Mess – 3 supply, 1 exhaust

Block 14 – Officers Mess – 1 supply, 1 exhaust Block 14 – Galley Storage – 1 supply, 1 exhaust Block 14 – Galley Dry Storage – 0

Electrical:

The Government will provide recessed ceiling lights as GFM.

The Contractor shall mount recessed ceiling lighting.

All electrical work shall be performed by the Contractor. All electrical work shall b e per electrical code.

The Contractor shall provide an d insta ll a ll wiring w ithin the r oom between all receptacles, switches, and light fixtures.

In Block 14 – Crew Mess the Contractor shall install 150’ of wiring from the two air handlers to the circuit breaker panel.

In Block 14 – Officers Mess th e C ontractor sh all ins tall 1 00’ of wiring from the air handler to the circuit breaker panel.

The Contractor shall provide new wiring, junction boxes, switches, and receptacles.

The Contractor shall coordinate lock-out tag-out of circuits with th e crew as appropriate and follow docum ented procedures for lock-out tag-out. Lock-out shall only be removed upon Contractor’s request.

In Block 1 – Pilot House, the Contractor sh all insta ll 24 lights, 20 receptacles, and 4 switches.

In Block 14 – Crew Mess, the Contractor sh all install 12 lights, 13 receptacles (including 4 that were not existing to be provided on the same circuit), and 2 switches.

In Block 14 – Officer’s Mess, th e Contracto r shall ins tall six lights , 11 receptacles (including 4 that were not existing to be provided on the same circuit), and 3 switches.

In Block 14 – Galley Storage, the C ontractor shall ins tall 6 lights, 4 receptacles, and 1 switch.

In Block 14 – Galley Storage Adjacent Hallway, the Contractor shall install two lights.

General:

The Contractor and all Subcont ractors shall provide an Eng lish speaking forem an to be on site at all times during the installation.

With regards to this specification where “or equivalent” has been stated, if the Contractor wishes to substitute an e quivalent material, a sample must be provid ed to and approved by th e

COR.

F. PRE-BID INSPECTION

Prior to submission of bid, the Contractor m ay visit the vessel in order to perform a ship check to w alk each sp ace and determ ine m aterial quantities as neces sary. Additionally, the Contractor m ay walk recently refurbished spaces to develop an understanding of the level of workmanship and finish work required for a co mplete installation pr esenting a satisfactory standard of appearance.

6. Bid Quantities

A. Estimate on performing all work listed herein on Block 1. Price per job.

B. Estimate on performing all work listed herein on Block 14. Price per job.

INSERT THIS SPECIFICATION BETWEEN WORK ITEM M-304 AND WORK ITEM

M-601

This is a new work item specification issued 24 NOV 2010

M-305 LOAD BANK RENTAL

1. Intent

The intent of this Work Item is to provide a load bank for use in commissioning and testing of the electrical upgrade work being performed herein under Work Items No. M-301.

2. Scope of Work

The Contractor shall provi de a load bank for use in testing for u p to and i ncluding 14 days for commissioning and final testing of GFE. The load bank shall be 3 phase, 450 Volt, rated for 700 kW real power adjustable in 5kW increments, 525 kVar reactiv e power adjustable in 5 kVar increm ents with individual phase disconnect. The load bank shall have built in overload and short circuit protection.

The Contractor shall provi de a load bank operato r for 10 hours a day for t he duration of the 14 day period. The Contractor may assume that the 14 days will be consecutive. The COR will notif y the Contractor at least 2 weeks prior t o the first day that the load bank will be needed on site. For planning purposes the Contractor may assume that the load ba nk will not be needed any sooner than 60 da ys after vessel arrival.

The operator shall maintain the load bank and adjust the power factor and load dem and as directed by the COR. The Contractor shall provide and install cabling, includ ing lugs and all hardware, between the load bank and the ne w switchboard. The new switch gear will have a location were the lugs can be attached without drilling additional holes or modifying the bus work. The cable shall be hung out of the way of walkways and protected from damage. Cabling shall be sized for t he full rating of the load bank.

Several of the tests being performed wi ll trip the ship’s power offline for several minutes at a time. The Contractor shall be prepared for these intermittent blackouts by providing temporary lighting and power as needed to continue work elsewhere in the vessel. The Cont ractor shall also provi de temporary lighting in the generator room and at the switchboard.

The Contract or shall bear all costs associated with delivery , setup, maintenance, operation, breakdown, r emoval, and return of t he load bank and any auxiliary transformers, cables, or other equipment that may be needed to load the main switchboard to the specified levels.

The Contractor shall locate the load bank on an open area of the deck and protect from the weather as needed in accordance with the manufacturer’s recommendations. The exa ct location shall be coordinated with the COR.

Estimate on providing load bank in accordance with the aforementioned specifications.

Price per job.

REMOVE ANY SPEFICATIONS FOR WORK ITEM H-206 AND REPLACE THEM

WITH THE SPECIFICATIONS BELOW.

This work item specification supersedes all specifications for this work item that were issued prior to 24 NOV 2010

H-206 REPLACE SHELL AND BULKHEAD PLATING

1. Intent

The intent of this work item is repla ce shell plating in the P ump Room between Fra mes 32 and 48 on the Port Side, and bulkhead plat ing on Fram e 125 I WO the stern tube stuffing boxes in the Auxiliary Machinery Room . All cost s associated with this W ork Item shall be include herein.

2. Reference Drawings

MF-H2-32, “Bulkhead Transverse, Frame 125” MF-H2-114, “Shell Expansion, Forward Frame 48”

3. Gas-Free Requirements

The Pump Room is already being cleaned an d made safe for hot work under W ork Item

No. M-601, the Auxiliary Machinery Room (AMR) is already being and made safe for hot work under Work Item No. M-701, and the cofferdam s under the tanktop can be cleaned and m ade safe for hot work under Work Item No. H-214.

The work s pecified h erein will als o require cleaning and gas-freeing of the fairw aters located forward and aft o f the trunnion along the shell, and the space surrounding the aft potable water tanks.

For the f airwaters, the contractor shall drain, clean, gas-free and m ake them safe for hot work. This Hot W ork Certificate shall remain valid f or the duration of the repa ir period. The fairwaters are flow-coated and shall be gas-free d and certif ied safe for hot work according ly.

Dispose of all con tents of the fairwaters in accordance with the Tech nical Prov isions and all applicable Federal, State and Local requirements, and include cost herein.

For the aft potable water tank space, it is em pty and should require nothing m ore than ventilation to maintain gas free atmosphere. Pr ovide the services of a licensed Marine Che mist to verify that this space is safe for hot work. This certification shall remain valid for the duration of the repair period.

4. Asbestos and Lead Paint Removal

The shell plate replacement in the Pump Room will require the removal of asbestos. The perforated steel sheathing on the shell IW O of the shell plating is a ttached to the f raming members by means of a sbestos-containing vibration tape. The contractor shall remove the stee l sheathing and asbestos-containing vibration tape to 3’ above the deck to allow for replacement of the shell plate.

This is the start of the file's text. The full file is on GovTribe.